CN211145582U - Pipeline gallows is synthesized to heavy construction - Google Patents
Pipeline gallows is synthesized to heavy construction Download PDFInfo
- Publication number
- CN211145582U CN211145582U CN201922268199.7U CN201922268199U CN211145582U CN 211145582 U CN211145582 U CN 211145582U CN 201922268199 U CN201922268199 U CN 201922268199U CN 211145582 U CN211145582 U CN 211145582U
- Authority
- CN
- China
- Prior art keywords
- pipe
- pipeline
- baffle
- fire
- clapboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipeline gallows is synthesized to heavy construction, including fixed plate, mount and transverse baffle, transverse baffle's last fixed surface is connected with vertical baffle, one side fixedly connected with baffle of vertical baffle, one side swing joint that transverse baffle surface is close to vertical baffle has the air conditioner tuber pipe, the last surface swing joint of baffle has first through-wire pipe, the lower surface swing joint of baffle has the second through-wire pipe. This pipeline gallows is synthesized to heavy construction, through the mount, the baffle, the setting of fire control hole and limbers, the lower surface at the fixed plate is fixed to the mount, make the fixed subassembly of pipeline and circuit, transverse baffle, vertical baffle and baffle make the mount divide into the three, the fire control pipeline can be installed to the fire control hole, different limbers can be installed to three limbers, make pipeline and circuit integrate together, reduce area occupied, make pipeline gallows neatly make things convenient for the management and just with inspection and maintenance.
Description
Technical Field
The utility model relates to a building auxiliary engineering technical field specifically is a pipeline gallows is synthesized to heavy construction.
Background
In recent years, with the progress of social and economic efficiency, various large buildings are increasing, in which various pipelines including air conditioners, fire fighting, water supply, electric power, communication, heating, etc. are essentially installed, and in building construction, specialized pipeline hangers are used to lay and route various pipelines.
The existing pipeline supporting and hanging frame is single in structural form, so that the pipeline layout is often too complex, lines and pipelines are messy, the maintenance and the inspection are inconvenient, the layout can not be flexibly changed, a lot of building materials are wasted, and the cost is increased.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a pipeline gallows is synthesized to heavy construction has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a large building integrated pipeline gallows, includes the fixed plate, the lower fixed surface of fixed plate is connected with the mount, the inside wall fixedly connected with transverse baffle of mount, transverse baffle's last fixed surface is connected with vertical baffle, one side fixedly connected with baffle of vertical baffle, one side swing joint that transverse baffle surface is close to vertical baffle has the air conditioner tuber pipe, the upper surface swing joint of baffle has first lead-through pipe, the lower surface swing joint of baffle has the second lead-through pipe, fire control hole and limbers have been seted up to the inside wall of mount, the inner wall swing joint of fire control hole has the fire control pipeline, the inner wall swing joint of limbers has the limbers.
Optionally, the fixing plate is made of metal, threaded holes are formed in the surface of the fixing plate, and the number of the threaded holes is four.
Optionally, the air conditioner tuber pipe, the equal fixedly connected with connecting block of one end of first wire pipe and second wire pipe.
Optionally, the connecting groove has all been seted up to the other end of air conditioner tuber pipe, first vent pipe and second vent pipe.
Optionally, one end of the fire-fighting pipeline is provided with fire-fighting pipe external threads, and the inner wall of the fire-fighting pipeline is provided with fire-fighting pipe internal threads.
Optionally, the number of the water service pipes is three, the three water service pipes are provided with external threads at one ends, and the three water service pipes are provided with internal threads at the inner walls.
(III) advantageous effects
The utility model provides a pipeline gallows is synthesized to heavy construction possesses following beneficial effect:
1. this pipeline gallows is synthesized to heavy construction, through the mount, the baffle, the setting of fire control hole and limbers, the lower surface at the fixed plate is fixed to the mount, make the fixed subassembly of pipeline and circuit, transverse baffle, vertical baffle and baffle make the mount divide into the three, the fire control pipeline can be installed to the fire control hole, different limbers can be installed to three limbers, make pipeline and circuit integrate together, reduce area occupied, make pipeline gallows neatly make things convenient for the management and just with inspection and maintenance.
2. This pipeline gallows is synthesized to heavy construction, through the setting of air conditioner tuber pipe, first through-flow pipe, second through-flow pipe, fire control pipeline and water service pipe, the one end of air conditioner tuber pipe, first through-flow pipe and second through-flow pipe is provided with the connecting block, has seted up the spread groove at the other end, can make a plurality of pipelines pass through the connecting block and be connected with the spread groove, and fire control pipeline and three water service pipe can pass through interior external connection, make the installation more convenient, perhaps change the overall arrangement in the maintenance more swift.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the fixing frame of the present invention;
fig. 3 is a side view of the hanger of the present invention.
In the figure: 1. a fixing plate; 2. a fixed mount; 3. a transverse partition; 4. a vertical partition plate; 5. a partition plate; 6. An air-conditioning duct; 7. a first conduit; 8. a second vent tube; 9. a fire hole; 10. a water through hole; 11. A fire conduit; 12. a water pipe; 13. a threaded hole; 14. connecting blocks; 15. connecting grooves; 16. fire fighting pipe external thread; 17. and (4) external threads.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a large building comprehensive pipeline supporting and hanging frame comprises a fixing plate 1, wherein the fixing plate 1 is made of metal, threaded holes 13 are formed in the surface of the fixing plate 1, the number of the threaded holes 13 is four, the fixing plate 1 can be welded together by building reserved steel bars, the four threaded holes 13 are fixed through expansion bolts, the lower surface of the fixing plate 1 is fixedly connected with a fixing frame 2, the inner side wall of the fixing frame 2 is fixedly connected with a transverse partition plate 3, the upper surface of the transverse partition plate 3 is fixedly connected with a vertical partition plate 4, one side of the vertical partition plate 4 is fixedly connected with a partition plate 5, one side, close to the vertical partition plate 4, of the surface of the transverse partition plate 3 is movably connected with an air conditioning air pipe 6, the upper surface of the partition plate 5 is movably connected with a first through pipe 7, the lower surface of the partition plate 5, the air conditioner air pipe 6, the first vent pipe 7 and the second vent pipe 8 are fixedly connected with a connecting block 14 at one end, connecting grooves 15 are formed at the other ends of the air conditioner air pipe 6, the first vent pipe 7 and the second vent pipe 8, and a fire hole 9 and a water hole 10 are formed in the inner side wall of the fixing frame 2;
in order to facilitate the management and maintenance of the pipeline support and hanger, the fixing frame 2 is fixed on the lower surface of the fixing plate 1 through the arrangement of the fixing frame 2, the partition plate 5, the fire hole 9 and the water through hole 10, so that the fixing assembly of the pipeline and the line is realized, the fixing frame 2 is divided into three parts through the transverse partition plate 3, the vertical partition plate 4 and the partition plate 5, the fire hole 9 can be provided with the fire pipeline, the three water through holes 10 can be provided with different water through pipes, the pipeline and the line are integrated, the occupied area is reduced, and the pipeline support and hanger is orderly and convenient to manage and check and maintain;
the inner wall of the fire hole 9 is movably connected with a fire pipeline 11, the inner wall of the water hole 10 is movably connected with water service pipes 12, one of the three water service pipes 12 is a household water service pipe, the other one of the three water service pipes is a heating water return pipe, one end of the fire pipeline 11 is provided with fire pipe external threads 16, the inner wall of the fire pipeline 11 is provided with fire pipe internal threads, the number of the water service pipes 12 is three, one end of each of the three water service pipes 12 is provided with external threads 17, and the inner walls of the three water service pipes 12 are provided with internal threads;
in order to make pipeline gallows can change the overall arrangement, through air conditioner tuber pipe 6, first through-flow pipe 7, second through-flow pipe 8, fire control pipeline 11 and water service pipe 12's setting, air conditioner tuber pipe 6, the one end of first through-flow pipe 7 and second through-flow pipe 8 is provided with connecting block 14, the spread groove has been seted up at the other end, can make a plurality of pipelines pass through connecting block 14 and be connected with the spread groove, fire control pipeline 11 and three water service pipe 12 can be through interior external connection, it is more convenient to make the installation, it is more swift to maintain or change the overall arrangement.
As the utility model discloses a preferred technical scheme: the pipeline supporting and hanging frame is made of metal materials, and is firmer and more durable, and a sealing ring is added at the joint of each section of the fire pipeline 11 and the water service pipe 12, so that the pipeline supporting and hanging frame is sealed more tightly and is not prone to water leakage.
To sum up, this pipeline gallows is synthesized to heavy construction, during the use, use the reinforcing bar welding machine that fixed plate 1 and reservation in the building to be in one, use expansion bolts to fix on the roof through four screw holes 13, being in air conditioner tuber pipe 6, first water service pipe 7, second water service pipe 8, fire control pipeline 11 and three water service pipe 12 insert suitable position, at the second pipeline gallows of installation, air conditioner tuber pipe 6, the one end of first water service pipe 7 and second water service pipe 8 is provided with connecting block 14, the spread groove has been seted up at the other end, can make two or more pipelines pass through connecting block 14 and be connected with the spread groove, fire control pipeline 11 and three water service pipe 12 can pass through interior external screw connection.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a pipeline gallows is synthesized to heavy construction, includes fixed plate (1), its characterized in that: the lower surface of the fixing plate (1) is fixedly connected with a fixing frame (2), the inner side wall of the fixing frame (2) is fixedly connected with a transverse clapboard (3), the upper surface of the transverse clapboard (3) is fixedly connected with a vertical clapboard (4), one side of the vertical clapboard (4) is fixedly connected with a clapboard (5), an air-conditioning air pipe (6) is movably connected with one side of the surface of the transverse clapboard (3) close to the vertical clapboard (4), the upper surface of the clapboard (5) is movably connected with a first through pipe (7), the lower surface of the clapboard (5) is movably connected with a second vent pipe (8), the inner side wall of the fixed frame (2) is provided with a fire hole (9) and a water through hole (10), the inner wall of the fire hole (9) is movably connected with a fire pipeline (11), and the inner wall of the limber hole (10) is movably connected with a limber pipe (12).
2. The integrated pipeline supporting and hanging frame for large buildings according to claim 1, wherein: the fixing plate (1) is made of metal, threaded holes (13) are formed in the surface of the fixing plate (1), and the number of the threaded holes (13) is four.
3. The integrated pipeline supporting and hanging frame for large buildings according to claim 1, wherein: the air conditioner air pipe (6), the first vent pipe (7) and the second vent pipe (8) are fixedly connected with connecting blocks (14).
4. The integrated pipeline supporting and hanging frame for large buildings according to claim 1, wherein: connecting groove (15) have all been seted up to the other end of air conditioner tuber pipe (6), first vent pipe (7) and second vent pipe (8).
5. The integrated pipeline supporting and hanging frame for large buildings according to claim 1, wherein: one end of the fire-fighting pipeline (11) is provided with fire-fighting pipe external threads (16), and the inner wall of the fire-fighting pipeline (11) is provided with fire-fighting pipe internal threads.
6. The integrated pipeline supporting and hanging frame for large buildings according to claim 1, wherein: the number of the water service pipes (12) is three, external threads (17) are arranged at one ends of the three water service pipes (12), and internal threads are arranged on the inner walls of the three water service pipes (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922268199.7U CN211145582U (en) | 2019-12-17 | 2019-12-17 | Pipeline gallows is synthesized to heavy construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922268199.7U CN211145582U (en) | 2019-12-17 | 2019-12-17 | Pipeline gallows is synthesized to heavy construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211145582U true CN211145582U (en) | 2020-07-31 |
Family
ID=71746784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922268199.7U Expired - Fee Related CN211145582U (en) | 2019-12-17 | 2019-12-17 | Pipeline gallows is synthesized to heavy construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211145582U (en) |
-
2019
- 2019-12-17 CN CN201922268199.7U patent/CN211145582U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110440429B (en) | Subway arched roof ventilating pipeline assembling construction method | |
CN205639870U (en) | A pipeline gallows is synthesized in heavy construction | |
CN211145582U (en) | Pipeline gallows is synthesized to heavy construction | |
CN209891244U (en) | Prefabricated assembled concrete assembles utility tunnel from top to bottom | |
CN203230042U (en) | Bolt-cylinder-poured and multi-high-rise-block-structured integrated combination type building | |
CN111720626A (en) | Adjustable support and hanger | |
CN207715928U (en) | A kind of prefabricated direct-buried thermal insulation pipe with mounting bracket | |
CN212338390U (en) | Adjustable support and hanger | |
CN109469338A (en) | A kind of tall and big workshop self-control grid platform and its construction method as electromechanical pipeline | |
CN208204228U (en) | A kind of expansion valve of automobile air conditioner connector | |
CN109028541A (en) | Heat exchanger and air conditioning system with same | |
CN203188369U (en) | Bolt cylinder placing type high-rise block structure assembly combined type unit complex | |
CN209816909U (en) | Composite cable utility tunnel unit and composite cable utility tunnel | |
CN209762722U (en) | Oxygen belt and acetylene belt wiring device for power station boiler installation | |
CN210218910U (en) | Invisible support for socket connection of square air pipes | |
CN208779675U (en) | Heat exchanger and air conditioning system with same | |
CN111895184A (en) | Comprehensive pipeline supporting and hanging frame in limited space | |
CN109322435B (en) | Smallpox system | |
KR20110107927A (en) | Outlet for buried pipes of air-conditioner | |
CN217924335U (en) | Kitchen guarding's furred ceiling prefabricated construction | |
CN216201153U (en) | Water system air conditioner pipeline fixing support | |
CN210107608U (en) | Refrigeration machine room convenient to overhaul | |
CN216159293U (en) | Through beam type fire-fighting smoke-proof and smoke-discharging pipeline structure | |
CN216447535U (en) | Combined device for reinforcing air pipe and fixing spray pipe | |
CN212001903U (en) | Air conditioner plate with floor drain directly installed in place |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200731 Termination date: 20211217 |
|
CF01 | Termination of patent right due to non-payment of annual fee |