CN211119728U CN201920996748.XU CN201920996748U CN211119728U CN 211119728 U CN211119728 U CN 211119728U CN 201920996748 U CN201920996748 U CN 201920996748U CN 211119728 U CN211119728 U CN 211119728U
Authority
CN
China
Prior art keywords
platform
air conditioner
support
hanging arm
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920996748.XU
Other languages
Chinese (zh)
Inventor
闫显亮
朱彪
杨振
方自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201920996748.XU priority Critical patent/CN211119728U/en
Application granted granted Critical
Publication of CN211119728U publication Critical patent/CN211119728U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model relates to the field of installation of household air conditioners, in particular to an operating platform for assisting in installing an air conditioner outdoor unit; the method is characterized in that: comprises a hanging arm, a supporting rod, a supporting platform and a supporting rod; the hanging arm is made of a section of bent right-angled angle steel, the end part of the horizontal end of the hanging arm is vertically provided with a support rod, so that the hanging arm is U-shaped, a support platform is arranged on the side part of the support rod, and a support rod is arranged between the support platform and the support rod. The utility model adopts the above design, it provides one kind through the form of hanging arm and branch can carry the support on the building outer wall, simultaneously, sets up supporting platform through the outside at the support, so, when the outer machine of installation air conditioner, can bind the outer machine of air conditioner on supporting platform earlier, again with whole operation platform through hanging the arm and carry on the building outer wall, so, to outdoor high altitude construction's air conditioner installer, provides a convenient to use's air conditioner installation temporary platform.

Description

Operation platform for auxiliary installation of air conditioner external unit
Technical Field
The utility model relates to an installation field of domestic air conditioner specifically is an operation platform of outer machine of supplementary installation air conditioner.
Background
Nowadays, more and more high-rise civil buildings are pulled out, and the requirement of human on the indoor living comfort level is higher and higher, so that an air conditioner and an air conditioner outdoor unit are required to be installed. Most of air conditioner external units are installed on the outer wall of a building, the outer wall is not provided with an operation platform during installation, the air conditioner external units are generally installed by means of slings or hemp ropes, and the danger coefficient is very high.
Disclosure of Invention
An object of the utility model is to overcome above-mentioned defect, provide an operation platform for installing the outer machine of air conditioner, it can improve the security of the outer machine installation operation of air conditioner.
In order to achieve the above object, the present invention is realized as follows:
an operation platform for assisting in installing an air conditioner outdoor unit comprises a hanging arm, a support rod, a support platform and a support rod; the hanging arm is made of a section of bent right-angled angle steel, the end part of the horizontal end of the hanging arm is vertically provided with a support rod, so that the hanging arm is U-shaped, the opening width of the hanging arm is larger than the width of a building outer wall by 10-30 cm, a support platform is arranged on the side part of the support rod, and a support rod is arranged between the support platform and the support rod.
The operation platform for assisting in installing the air conditioner outdoor unit is characterized in that the supporting rod is rotatably connected with the supporting platform through a rotating shaft, the supporting platform is rotatably connected with the supporting rod, a row of through holes are vertically formed in the supporting rod, and the supporting rod is inserted into the through holes in different positions to achieve the purpose of adjusting the angle between the supporting rod and the supporting platform.
The operation platform for assisting in installing the air conditioner external unit is characterized in that the hanging arm is connected with the supporting rod through the bolt, and a plurality of through holes are formed in the connecting section of the hanging arm and the supporting rod, so that the operation platform can adapt to walls with different thicknesses.
The utility model adopts the above design, it provides one kind through the form of hanging arm and branch can carry the support on the building outer wall, simultaneously, sets up supporting platform through the outside at the support, so, when the outer machine of installation air conditioner, can bind the outer machine of air conditioner on supporting platform earlier, again with whole operation platform through hanging the arm and carry on the building outer wall, so, to outdoor high altitude construction's air conditioner installer, provides a convenient to use's air conditioner installation temporary platform.
Drawings
Fig. 1 is a schematic structural diagram of the present operation platform.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1, an operation platform for assisting in installing an air conditioner outdoor unit comprises a hanging arm 1, a support rod 2, a support platform 3 and a support rod 4; wherein, hang arm 1 and be one section bending type and be right angled angle steel and make, thereby the tip of its horizontal end is vertical to be set up branch 2 and makes and hang arm 1 and be "U" shape, and the opening width of hanging arm 1 is greater than the width 10~30cm of building outer wall, sets up supporting platform 3 at the lateral part of branch 2, between supporting platform 3 and branch 2, sets up vaulting pole 4.
The operation platform of outer machine of supplementary installation air conditioner, rotate through a pivot between branch 2 and the supporting platform 3 and be connected, for rotating between supporting platform 3 and the vaulting pole 4 and be connected, vertically seted up one row of through-hole on branch 2, vaulting pole 4 realizes the purpose of adjusting the angle of branch 2 and supporting platform 3 through inserting in the through-hole of different positions.
The operation platform for assisting in installing the air conditioner external unit is characterized in that the hanging arm 1 is connected with the supporting rod 2 through a bolt, and a plurality of through holes are formed in the connecting section of the hanging arm 1 and the connecting section of the supporting rod 2, so that the operation platform can adapt to walls with different thicknesses.
The utility model adopts the above design, it provides one kind through the form of hanging arm and branch can carry the support on the building outer wall, simultaneously, sets up supporting platform through the outside at the support, so, when the outer machine of installation air conditioner, can bind the outer machine of air conditioner on supporting platform earlier, again with whole operation platform through hanging the arm and carry on the building outer wall, so, to outdoor high altitude construction's air conditioner installer, provides a convenient to use's air conditioner installation temporary platform.

Claims (1)

1. An operation platform for assisting in installing an air conditioner outdoor unit comprises a hanging arm, a support rod, a support platform and a support rod; the hanging arm is made of a section of angle steel bent to form a right angle, a support rod is vertically arranged at the end part of the horizontal end of the hanging arm, so that the hanging arm is U-shaped, the opening width of the hanging arm is 10-30 cm larger than the width of an outer wall of a building, a support platform is arranged on the side part of the support rod, and a support rod is arranged between the support platform and the support rod; the hanging arm is connected with the support rod through a bolt, and a plurality of through holes are formed in the connecting section of the hanging arm and the support rod, so that the operating platform can adapt to walls with different thicknesses; the method is characterized in that: the supporting rod is rotatably connected with the supporting platform through a rotating shaft, the supporting platform is rotatably connected with the supporting rod, a row of through holes are vertically formed in the supporting rod, and the supporting rod is inserted into the through holes in different positions to achieve the purpose of adjusting the angle between the supporting rod and the supporting platform.
CN201920996748.XU 2019-06-28 2019-06-28 Operation platform for auxiliary installation of air conditioner external unit Expired - Fee Related CN211119728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920996748.XU CN211119728U (en) 2019-06-28 2019-06-28 Operation platform for auxiliary installation of air conditioner external unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920996748.XU CN211119728U (en) 2019-06-28 2019-06-28 Operation platform for auxiliary installation of air conditioner external unit

Publications (1)

Publication Number Publication Date
CN211119728U true CN211119728U (en) 2020-07-28

Family

ID=71701110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920996748.XU Expired - Fee Related CN211119728U (en) 2019-06-28 2019-06-28 Operation platform for auxiliary installation of air conditioner external unit

Country Status (1)

Country Link
CN (1) CN211119728U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113375237A (en) * 2021-07-08 2021-09-10 江苏协丰建设工程有限公司 Installation device and installation method of air conditioner outdoor unit
CN113696156A (en) * 2021-08-31 2021-11-26 长沙学院 Supplementary installation maintenance device of outer machine of portable air conditioner
WO2023231169A1 (en) * 2022-05-31 2023-12-07 芜湖美智空调设备有限公司 Outdoor unit mounting frame and air conditioner
WO2024065926A1 (en) * 2022-09-28 2024-04-04 广东美的制冷设备有限公司 Mounting bracket and air conditioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113375237A (en) * 2021-07-08 2021-09-10 江苏协丰建设工程有限公司 Installation device and installation method of air conditioner outdoor unit
CN113696156A (en) * 2021-08-31 2021-11-26 长沙学院 Supplementary installation maintenance device of outer machine of portable air conditioner
WO2023231169A1 (en) * 2022-05-31 2023-12-07 芜湖美智空调设备有限公司 Outdoor unit mounting frame and air conditioner
WO2024065926A1 (en) * 2022-09-28 2024-04-04 广东美的制冷设备有限公司 Mounting bracket and air conditioner

Similar Documents

Publication Publication Date Title
CN211119728U (en) Operation platform for auxiliary installation of air conditioner external unit
CN202899342U (en) Ventilating and heat insulating waterproof wall
CN203808233U (en) Windowsill facilitating installation of air conditioning outdoor unit
CN203781732U (en) Air conditioner external unit installation tool
CN203189895U (en) Single-seam rectangular air pipe
CN108413520A (en) A kind of air-conditioner outdoor unit that installation is firm
CN2871676Y (en) Built-in piece for building
CN207196844U (en) A kind of integrated air-line system
CN102192602A (en) Solar water heater and building integrated scheme
CN206014323U (en) Pipeline lift equipment
CN201715678U (en) Plug-in type air conditioner outdoor unit suspension frame
CN214746136U (en) Auxiliary mounting equipment for air conditioner outdoor unit
CN219175639U (en) Direct-connection wallboard structure for assembled building
CN202031308U (en) Inverted-hanging type scaffold
CN215631614U (en) Drainage pipeline hangs mends structure
CN207196845U (en) A kind of integrated airduct module
CN206143963U (en) Integral type wallboard of modularization installation
CN212297944U (en) Anti-seismic support device based on steel structure factory building looped network pipeline
CN210563347U (en) Template supporting structure without window under outer eaves overhanging plate
CN208685793U (en) A kind of outdoor air conditioner plate of the anti-ponding of novel ne-leakage
CN212249390U (en) Integrated assembly type smoke exhaust machine room
CN204534891U (en) A kind of outdoor machine of air-conditioner installing rack
CN215483912U (en) Netted plate curtain wall
CN210286562U (en) Building engineering lifting device
CN218320211U (en) Binding mechanism for building electromechanical installation process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

Termination date: 20210628