CN211118479U - Construction project management informatization management device - Google Patents

Construction project management informatization management device Download PDF

Info

Publication number
CN211118479U
CN211118479U CN201922351976.4U CN201922351976U CN211118479U CN 211118479 U CN211118479 U CN 211118479U CN 201922351976 U CN201922351976 U CN 201922351976U CN 211118479 U CN211118479 U CN 211118479U
Authority
CN
China
Prior art keywords
fixed mounting
fixedly mounted
construction project
management device
project management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922351976.4U
Other languages
Chinese (zh)
Inventor
龚慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University of Industrial Technology
Original Assignee
Zhengzhou University of Industrial Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University of Industrial Technology filed Critical Zhengzhou University of Industrial Technology
Priority to CN201922351976.4U priority Critical patent/CN211118479U/en
Application granted granted Critical
Publication of CN211118479U publication Critical patent/CN211118479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model discloses a belong to construction project management technical field, specifically be a construction project management information-based management device, including base, cavity, pivot and control box, fixed mounting has the battery in the middle of the top of base, the top left side and the right side fixed mounting of base have the telescopic link, the top fixed mounting of telescopic link has the workstation, the top left side fixed mounting of workstation has the support, the top fixed mounting of support has the footstock, the top left side fixed mounting of footstock has wind speed and direction sensor, the top right side fixed mounting of footstock has temperature and humidity sensor, and it is rational in infrastructure, through the cooperation of cavity, slider, reset spring, slide bar and telescopic link, realized at the in-process that uses, effectual reduction vibrations, the life of extension equipment passes through high definition digtal camera, pronunciation collector, and, The cooperation of temperature and humidity sensor and wind speed and direction sensor has realized the detection to construction environment.

Description

Construction project management informatization management device
Technical Field
The utility model relates to a construction project management technical field specifically is a construction project management informationization management device.
Background
The building is a general term of buildings and structures, and is an artificial environment created by people by using the grasped material technical means and applying certain scientific laws, geomantic omen concepts and aesthetic rules to meet the needs of social life. At some construction sites, for the construction section of a construction site, if the problem which cannot be solved by site constructors is met, a project manager is often required to arrive at the site for commanding, so that the labor capacity of the project manager is increased, and the work of the project manager is inconvenient.
Therefore, a construction project management informatization management device is often needed, the existing construction project management informatization management device has some defects in the use process, such as auxiliary construction site environment, large vibration, no damping function of the existing device and easy damage to workpieces in the use process, and therefore a novel construction project management informatization management device needs to be developed to solve the problems.
SUMMERY OF THE UTILITY MODEL
This section is for the purpose of summarizing some aspects of embodiments of the invention and to briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and in the abstract of the specification and the title of the application to avoid obscuring the purpose of this section, the abstract of the specification and the title of the application, and such simplifications or omissions are not intended to limit the scope of the invention.
The utility model discloses in view of the problem that exists among the current construction project management informationization management device, provided the utility model discloses.
Therefore, the utility model aims at providing a construction project management informationization management device can realize at the in-process that uses, conveniently monitors the construction site, and has shock-absorbing function, prolongs the life of equipment.
For solving the technical problem, according to the utility model discloses an aspect, the utility model provides a following technical scheme:
a construction project management informatization management device comprises a base, a cavity, a rotating shaft and a control box, wherein a storage battery is fixedly installed in the middle of the top of the base, telescopic rods are fixedly installed on the left side and the right side of the top of the base, a workbench is fixedly installed on the top of the telescopic rods, a support is fixedly installed on the left side of the top of the workbench, a top seat is fixedly installed on the top of the support, an air speed and air direction sensor is fixedly installed on the left side of the top seat, a temperature and humidity sensor is fixedly installed on the right side of the top seat, a cavity is fixedly installed in the middle of the bottom of the workbench, sliders are fixedly installed on the left side and the right side of an inner cavity of the cavity, a reset spring is arranged between the two sliders, the sliders are connected with the bottom of the telescopic rods through, the utility model discloses a high-speed railway vehicle speed sensor, including carousel, top fixed mounting, the top fixed mounting of carousel has high definition digtal camera, the left side and the right side fixed mounting of mount pad have a voice acquisition ware, fixed mounting has the control box in the middle of the bottom of footstock, the inner chamber of control box fixed mounting has analog-to-digital conversion module, treater and data transmission module respectively, treater electrical property input connection analog-to-digital conversion module, analog-to-digital conversion module electrical property input connection wind speed and direction sensor, temperature and humidity sensor, voice acquisition ware and high definition digtal camera, treater electrical output connects data transmission module, data transmission module electric connection remote terminal.
As a construction project management informatization management device's an preferred scheme, wherein: the solar photovoltaic panel is fixedly mounted at the top of the top seat and electrically connected with the storage battery, and the storage battery is connected with the control box through an electric wire.
As a construction project management informatization management device's an preferred scheme, wherein: the top of carousel is provided with angle set screw, the top surface of workstation is provided with the screw with set screw matched with.
As a construction project management informatization management device's an preferred scheme, wherein: the remote terminal is a computer in an office.
As a construction project management informatization management device's an preferred scheme, wherein: the universal wheels are fixedly mounted at four corners of the bottom of the base, and the limiting devices are fixedly mounted on the universal wheels.
Compared with the prior art, the beneficial effects of the utility model are that: through this setting of construction project management informationization management device, structural design is reasonable, and through the cooperation of cavity, slider, reset spring, slide bar and telescopic link, realized the in-process that uses, effectual reduction vibrations prolong the life of equipment, through high definition digtal camera, voice collector, temperature and humidity sensor and wind speed and direction sensor's cooperation, realized the detection to construction environment.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the present invention will be described in detail with reference to the accompanying drawings and detailed embodiments, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor. Wherein:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is a system block diagram of the present invention.
In the figure; 100 bases, 110 storage batteries, 120 telescopic rods, 130 workbenches, 140 supports, 150 footstands, 160 wind speed and direction sensors, 170 temperature and humidity sensors, 180 solar photovoltaic panels, 200 cavities, 210 sliding blocks, 220 reset springs, 230 sliding rods, 300 rotating shafts, 310 rotating discs, 320 installation bases, 330 voice collectors, 340 high-definition cameras, 400 control boxes, 410 analog-to-digital conversion modules, 420 processors, 430 data transmission modules and 440 remote terminals.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, but the present invention may be implemented in other ways than those specifically described herein, and one skilled in the art may similarly generalize the present invention without departing from the spirit of the present invention, and therefore the present invention is not limited to the specific embodiments disclosed below.
Next, the present invention will be described in detail with reference to the schematic drawings, and in the detailed description of the embodiments of the present invention, for convenience of explanation, the sectional view showing the device structure will not be enlarged partially according to the general scale, and the schematic drawings are only examples, and should not limit the scope of the present invention. In addition, the three-dimensional dimensions of length, width and depth should be included in the actual fabrication.
In order to make the objects, technical solutions and advantages of the present invention clearer, embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
The utility model provides a following technical scheme: a construction project management informatization management device, in the use process, is convenient to monitor a building construction site, has a shock absorption function, prolongs the service life of equipment, please refer to fig. 1 and fig. 3, and comprises a base 100, a cavity 200, a rotating shaft 300 and a control box 400;
referring to fig. 1 again, a storage battery 110 is fixedly installed in the middle of the top of the base 100, telescopic rods 120 are fixedly installed on the left side and the right side of the top of the base 100, a workbench 130 is fixedly installed on the top of the telescopic rods 120, a support 140 is fixedly installed on the left side of the top of the workbench 130, a top seat 150 is fixedly installed on the top of the support 140, an air speed and wind direction sensor 160 is fixedly installed on the left side of the top seat 150, a temperature and humidity sensor 170 is fixedly installed on the right side of the top seat 150, specifically, the storage battery 110 is screwed in the middle of the top of the base 100, the telescopic rods 120 are welded on the left side and the right side of the top of the base 100, the workbench 130 is welded on the top of the telescopic rods 120, the support 140 is welded on the left side of the top of the workbench 130, the base 100 is used for bearing a storage battery 110 and an expansion link 120, the storage battery 110 is used for storing and providing electric energy, the expansion link 120 is used for bearing a workbench 130 and is matched with a sliding rod 230 for damping, the workbench 130 is used for bearing a rotating shaft 300, a support 140 is used for bearing a top seat 150, the top seat 150 is used for bearing a temperature and humidity sensor 170 and an air speed and direction sensor 160, the model of the air speed and direction sensor 160 is NHFS47 and is used for detecting air speed and direction, and the model of the temperature and humidity sensor 170 is SHT3X and is used for detecting temperature and humidity;
referring to fig. 1 again, a cavity 200 is fixedly installed in the middle of the bottom of the workbench 130, sliders 210 are fixedly installed on the left side and the right side of an inner cavity of the cavity 200, a return spring 220 is arranged between the two sliders 210, and the sliders 210 are connected with the bottom of the telescopic rod 120 through a sliding rod 230, specifically, the cavity 200 is screwed in the middle of the bottom of the workbench 130, the sliders 210 are slidably connected with the left side and the right side of the inner cavity of the cavity 200, the return spring 220 is screwed between the two sliders 210, the sliders 210 are connected with the bottom of the telescopic rod 120 through the sliding rod 230, the cavity 200 is used for bearing the sliders 210, the sliders 210 are used for connecting the return spring 220, the return spring 220 is used for;
referring to fig. 1 again, a rotating shaft 300 is fixedly installed in the middle of the top of the workbench 130, a rotating plate 310 is fixedly installed on the top of the rotating shaft 300, an installation base 320 is fixedly installed on the top of the rotating plate 310, a high-definition camera 340 is fixedly installed on the top of the installation base 320, and voice collectors 330 are fixedly installed on the left side and the right side of the installation base 320, specifically, the rotating shaft 300 is rotatably connected to the middle of the top of the workbench 130, the rotating plate 310 is screwed on the top of the rotating shaft 300, the installation base 320 is screwed on the top of the rotating plate 310, the high-definition camera 340 is screwed on the top of the installation base 320, the voice collectors 330 are screwed on the left side and the right side of the installation base 320, the rotating shaft 300 is used for bearing the rotating plate 310 and adjusting angles, the rotating plate 310 is used for bearing the installation base 320, the installation base 320 is used for bearing the voice;
referring to fig. 1 and fig. 3 again, a control box 400 is fixedly installed in the middle of the bottom of the top seat 150, an analog-to-digital conversion module 410, a processor 420 and a data transmission module 430 are respectively and fixedly installed in an inner cavity of the control box 400, the processor 420 is electrically connected with the analog-to-digital conversion module 410 in an input mode, the analog-to-digital conversion module 410 is electrically connected with the wind speed and direction sensor 160, the temperature and humidity sensor 170, the voice collector 330 and the high definition camera 340 in an input mode, the processor 420 is electrically connected with the data transmission module 430 in an output mode, the data transmission module 430 is electrically connected with the remote terminal 440, specifically, the control box 400 is screwed in the middle of the bottom of the top seat 150, the analog-to-digital conversion module 410, the processor 420 and the data transmission module 430 are respectively adhered in an inner cavity of the control box 400, the analog-to, The voice collector 330 and the high-definition camera 340, the processor 420 is electrically connected with a DATA transmission module 430, the DATA transmission module 430 is electrically connected with a remote terminal 440, the control box 400 is used for carrying the processor 420, the analog-to-digital conversion module 410 and the DATA transmission module 430, the analog-to-digital conversion module 410 is A1S68AD and is used for converting analog signals into digital signals, the processor 420 is DATA-7311 and is used for receiving and processing circuit signals, the DATA transmission module 430 is DATA-6131 and is used for transmitting DATA to the remote terminal 440, and the remote terminal 440 is used for remote monitoring.
The working principle is as follows: in the process of using the information management device for construction project management, the cavity 200, the slider 210, the reset spring 220, the slide bar 230 and the telescopic rod 120 are matched, so that vibration is effectively reduced and the service life of equipment is prolonged in the using process, and the detection of a construction environment is realized through the matching of the high-definition camera 340, the voice collector 330, the temperature and humidity sensor 170 and the wind speed and direction sensor 160.
While the invention has been described above with reference to an embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the various features of the disclosed embodiments of the present invention can be used in any combination with each other, and the non-exhaustive description of these combinations in this specification is merely for the sake of brevity and resource conservation. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (5)

1. A construction project management informatization management device is characterized in that: the wind power generation device comprises a base (100), a cavity (200), a rotating shaft (300) and a control box (400), wherein a storage battery (110) is fixedly mounted in the middle of the top of the base (100), a telescopic rod (120) is fixedly mounted on the left side and the right side of the top of the base (100), a workbench (130) is fixedly mounted on the top of the telescopic rod (120), a support (140) is fixedly mounted on the left side of the top of the workbench (130), a top seat (150) is fixedly mounted on the top of the support (140), a wind speed sensor (160) is fixedly mounted on the left side of the top seat (150), a temperature and humidity sensor (170) is fixedly mounted on the right side of the top seat (150), the cavity (200) is fixedly mounted in the middle of the bottom of the workbench (130), a sliding block (210) is fixedly mounted on the left side and the right side of an inner cavity (200, just slider (210) are connected through slide bar (230) and the bottom of telescopic link (120), fixed mounting has pivot (300) in the middle of the top of workstation (130), the top fixed mounting of pivot (300) has carousel (310), the top fixed mounting of carousel (310) has mount pad (320), the top fixed mounting of mount pad (320) has high definition digtal camera (340), the left side and the right side fixed mounting of mount pad (320) have voice collector (330), fixed mounting has control box (400) in the middle of the bottom of footstock (150), the inner chamber of control box (400) fixed mounting respectively has analog-to-digital conversion module (410), treater (420) and data transmission module (430), treater (420) electrical input connection analog-to-digital conversion module (410), analog-to-digital conversion module (410) electrical input connection wind speed and direction sensor (160), Temperature and humidity sensor (170), voice collector (330) and high definition digtal camera (340), processor (420) electrical output connects data transmission module (430), data transmission module (430) electrical connection remote terminal (440).
2. The construction project management informatization management device according to claim 1, characterized in that: the solar photovoltaic panel (180) is fixedly mounted at the top of the top seat (150), the solar photovoltaic panel (180) is electrically connected with the storage battery (110), and the storage battery (110) is connected with the control box (400) through an electric wire.
3. The construction project management informatization management device according to claim 1, characterized in that: the top of carousel (310) is provided with angle set screw, the top surface of workstation (130) is provided with the screw with set screw matched with.
4. The construction project management informatization management device according to claim 1, characterized in that: the remote terminal (440) is a computer in an office.
5. The construction project management informatization management device according to claim 1, characterized in that: four corners of the bottom of the base (100) are fixedly provided with universal wheels, and the universal wheels are fixedly provided with limiters.
CN201922351976.4U 2019-12-24 2019-12-24 Construction project management informatization management device Active CN211118479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922351976.4U CN211118479U (en) 2019-12-24 2019-12-24 Construction project management informatization management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922351976.4U CN211118479U (en) 2019-12-24 2019-12-24 Construction project management informatization management device

Publications (1)

Publication Number Publication Date
CN211118479U true CN211118479U (en) 2020-07-28

Family

ID=71690929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922351976.4U Active CN211118479U (en) 2019-12-24 2019-12-24 Construction project management informatization management device

Country Status (1)

Country Link
CN (1) CN211118479U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111917958A (en) * 2020-08-07 2020-11-10 湖南文理学院 Acquisition terminal for image processing with supplementary stable leveling mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111917958A (en) * 2020-08-07 2020-11-10 湖南文理学院 Acquisition terminal for image processing with supplementary stable leveling mechanism

Similar Documents

Publication Publication Date Title
CN211118479U (en) Construction project management informatization management device
CN207559918U (en) A kind of solar photovoltaic generation system
CN102290470A (en) Solar cell device
CN105527982A (en) Double-shaft automatic sunlight tracking device
CN205153393U (en) Multi -functional complex has EVA panel of pressure examined
CN108583880A (en) A kind of sensorcraft with automatic regulating function
CN213363882U (en) Monitoring device based on thing networking
CN108974203A (en) A kind of shared bicycle bicycle basket solar energy tabula rasa protective device
CN219420721U (en) Photovoltaic string installs monitoring vibrating device additional
CN208028817U (en) A kind of household photovoltaic plant that can be kept off the rain automatically
CN207368943U (en) A kind of novel photovoltaic module adjusting apparatus
CN218455151U (en) Omnibearing photogrammetric device
CN218336198U (en) Electric power planning information management system
CN211831663U (en) Energy-saving and emission-reducing unit instrument brake cabinet
CN201682434U (en) Solar photoelectric conversion device
CN210775717U (en) Transient recording type remote transmission fault indicator acquisition unit
CN101814863A (en) Solar photovoltaic conversion device
CN116094431A (en) Fast-assembled photovoltaic panel for energy storage micro-grid and use method
CN214070381U (en) Micro-grid system of grid-connected power grid
CN214740315U (en) Lifting type stereo garage position
CN213585682U (en) High-conversion-efficiency solar photovoltaic module
CN217596932U (en) Device for conveniently loading and unloading power supply heat-insulation box of hydrological monitoring station
CN216216087U (en) Photovoltaic power plant communication computer lab power environment monitoring facilities
CN220699426U (en) Photovoltaic solar panel installs auxiliary structure
CN220067271U (en) Protection architecture for photovoltaic power plant photovoltaic board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant