CN211114794U - Mould hoisting device for building - Google Patents

Mould hoisting device for building Download PDF

Info

Publication number
CN211114794U
CN211114794U CN201921835689.4U CN201921835689U CN211114794U CN 211114794 U CN211114794 U CN 211114794U CN 201921835689 U CN201921835689 U CN 201921835689U CN 211114794 U CN211114794 U CN 211114794U
Authority
CN
China
Prior art keywords
cross rod
rod
fixing
side wall
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921835689.4U
Other languages
Chinese (zh)
Inventor
王科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201921835689.4U priority Critical patent/CN211114794U/en
Application granted granted Critical
Publication of CN211114794U publication Critical patent/CN211114794U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a mould hoisting device for building, which comprises a side wall template, wherein the bottom of the side wall template is provided with a grouting plate, the grouting plate is fixed with the side wall template through a supporting mechanism, the joint of the side wall template and the grouting plate is provided with a foam strip, the side wall template is provided with a fixing mechanism with the fixing function, the supporting mechanism comprises a first sleeve, a screw rod in threaded connection with one end of the first sleeve, and a second sleeve connected with the other end of the screw rod, the thread directions of the two ends of the screw rod are opposite, the other end of the first sleeve and the other end of the second sleeve are both provided with a connecting plate, and the connecting plate is hinged with the other end of the first sleeve and the other end of the second sleeve, and the engineering quality is ensured.

Description

Mould hoisting device for building
Technical Field
The utility model relates to a building tool technical field, concretely relates to mould hoisting device for building.
Background
The hanging mould, also called hanging mould, is generally used in the position with height difference such as the turning-over beam, and the most obvious place to construct with other formworks is that the lower opening is not supported or fixed and supported by adopting a special mode, generally bearing the side load, keeping the stability, and enabling the levelness and verticality of the concrete member to meet the requirements; hang the mould and mainly lack corresponding support in the lateral wall that hangs the mould when establishing the problem that exists for hang the mould intensity relatively poor, at the in-process of pouring, take place bloated mould easily, influence the shaping quality of pouring, quality defects such as leak thick liquid, concrete pouring is loose, leak, seam quality difference appear in the root easily in addition, the leading cause hangs the mould and is difficult to fix under hanging the mould condition, makes the difficult vibrations of concrete closely knit, construction seam department unevenness etc..
Disclosure of Invention
The utility model aims at providing a mould hoisting device for building with pressure thick liquid board to above-mentioned prior art not enough, the utility model aims at providing a.
The purpose of the utility model is realized like this:
the utility model provides a mould hoisting device for building, is including being located the lateral wall template of waiting to pour structure width direction both sides, its characterized in that: the bottom of lateral wall template is equipped with the pressure thick liquid board, and the pressure thick liquid board is fixed with the lateral wall template through supporting mechanism, and the junction of lateral wall template and pressure thick liquid board is equipped with the foam strip, is equipped with the fixed establishment who plays the fixed action in the lateral wall template, and supporting mechanism includes first sleeve pipe, with first sleeve pipe one end threaded connection's screw rod, the second sleeve pipe of being connected with the screw rod other end, the screw thread opposite direction at screw rod both ends, the first sheathed tube other end and the sheathed tube other end of second all are equipped with the connecting plate, the connecting plate articulates with the first sheathed tube other end and the sheathed tube other end of second.
And internal threads matched with the threads at the two ends of the screw rod are respectively arranged in the first sleeve and the second sleeve.
The middle part of the screw rod is provided with a twisting handle which is vertical to the screw rod.
The fixing mechanism comprises a split screw rod penetrating through the side wall templates on two sides of the width direction of the structure to be poured, fixing nuts positioned at two ends of the split screw rod and used for fixing the split screw rod and the side wall templates, and water stop rings positioned between the fixing nuts and the side wall templates.
And a through hole for the opposite-pulling screw to pass through is formed in the center of the side wall template.
The fixing mechanism comprises a first cross rod and a second cross rod connected with one end of the first cross rod, a first connecting body and a second connecting body used for fixing the side wall formwork are respectively arranged on the lower surface of the first cross rod and the lower surface of the second cross rod, and the two ends of the first cross rod and the second cross rod are connected with the concrete surface through positioning screws.
The first connecting body comprises a first fixing rod which is positioned on the lower surface of the first cross rod and is vertical to the first cross rod, and a first connecting rod which is connected with the bottom of the first fixing rod and the first cross rod, and the second connecting body comprises a second fixing rod which is positioned on the lower surface of the second cross rod and is vertical to the second cross rod, and a second connecting rod which is connected with the bottom of the second fixing rod and the second cross rod.
One end of the first cross rod is provided with a first fixing plate, one end of the second cross rod is provided with a second fixing plate, and fixing holes for enabling the positioning screws to penetrate through are formed in the first fixing plate and the second fixing plate.
One end of the first cross rod is located in the second cross rod and moves along the length direction of the second cross rod, a first positioning hole is formed in the first cross rod, a second positioning hole is formed in the second cross rod, and the first cross rod and the second cross rod are fixedly connected through a bolt assembly.
Has the positive and beneficial effects that: the utility model discloses the setting of fixed establishment can make and wait to water the lateral wall template of building structure width direction both sides and fix, avoids appearing the bloated mould phenomenon, and the mud jacking board passes through supporting mechanism and waits to water the lateral wall template connection of building structure width direction both sides, avoids hanging the mould bottom and leaks thick liquid, guarantees the engineering quality, and the cost is lower, easy operation, reuse rate is high, improves the engineering quality, has fine application and promotion value.
Drawings
Fig. 1 is a schematic structural diagram of embodiment 1 of the present invention;
FIG. 2 is a schematic structural view of the supporting mechanism of the present invention;
fig. 3 is a schematic mechanism diagram of the template of embodiment 1 of the present invention;
fig. 4 is a schematic structural diagram of embodiment 2 of the present invention;
fig. 5 is a schematic structural view of a fixing mechanism according to embodiment 2 of the present invention;
in the figure, the following steps are carried out: the side wall formwork comprises a side wall formwork 1, a pulp pressing plate 2, a supporting mechanism 3, a foam strip 4, a fixing mechanism 5, a split screw 6, a fixing nut 7, a water stop ring 8, a first sleeve 9, a second sleeve 10, a screw 11, a twisting handle 12, a connecting plate 13, a pin shaft 14, a through hole 15, a first cross rod 16, a second cross rod 17, a first fixing rod 18, a first connecting rod 19, a second fixing rod 20, a second connecting rod 21, a bolt assembly 22, a first fixing plate 23, a second fixing plate 24, a positioning screw 25, a first positioning hole 26 and a second positioning hole 27.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Example 1
As shown in fig. 1 and 2, a formwork lifting device for buildings comprises side wall formworks 1 positioned on two sides of a structure to be poured in the width direction, a grout pressing plate 2 is arranged at the bottom of the side wall formwork 1, the grout pressing plate 2 avoids grout leakage of the side wall formwork 1, the height of the side wall formwork 1 is 500mm, the width of the grout pressing plate 2 is 300mm, the length of the side wall formwork 1 is equal to that of the grout pressing plate 1, the length of the side wall formwork 1 and the length of the grout pressing plate 2 are determined according to the field conditions, the grout pressing plate 2 is formed by formwork processing, material selection is simple, the grout pressing plate 2 is fixed with the side wall formwork 1 through a supporting mechanism 3, the supporting mechanism 3 can improve the strength of the lower end of the side wall formwork 1 to prevent mould expansion and facilitate improvement of construction quality, connecting blocks connected with the supporting mechanism are arranged on the grout pressing plate 2 and the side wall formwork 1, two ends of the supporting mechanism 3 are connected with the, the supporting mechanism 3 avoids the pulp pressing plate 2 moving relative to the side wall formwork 1, so as to ensure that the pulp pressing plate 2 is firmly connected with the side wall formwork 1, the foam strips 4 are arranged at the joint of the side wall formwork 1 and the pulp pressing plate 2, the arrangement of the foam strips 4 avoids the pulp leakage phenomenon at the joint of the side wall formwork and the pulp pressing plate 2, the side wall formwork 1 is provided with a fixing mechanism 5 for fixing, the supporting mechanism 3 comprises a first sleeve 9, a screw rod 11 in threaded connection with one end of the first sleeve 9 and a second sleeve 10 connected with the other end of the screw rod 11, the thread directions of two ends of the screw rod 11 are opposite, the other end of the first sleeve 9 and the other end of the second sleeve 10 are both provided with a connecting plate 13, the connecting plate 13 is hinged with the other end of the first sleeve 9 and the other end of the second sleeve 10, the connecting plate 13 is triangular, one vertex angle of the connecting plate 13 is respectively connected with the left end of the first sleeve 9 and the right, the connecting plate 13 is fixedly connected with the connecting blocks on the side wall template 1 and the grouting plate 2 through bolts, and internal threads matched with the threads at the two ends of the screw rod 11 are respectively arranged in the first sleeve 9 and the second sleeve 10. The middle part of screw rod 11 is equipped with and turns round handle 12, turns round handle 12 and screw rod 11 perpendicular, can change supporting mechanism 3's length through rotating screw rod 11, can realize supporting the regulation of the effort size on lateral wall template 1, can also use lateral wall template 1 on the different positions.
The fixing mechanism 5 comprises a split screw 6 penetrating through the side wall templates 1 on two sides of the width direction of the structure to be poured, a fixing nut 7 located at two ends of the split screw 6 and used for fixing the split screw 6 and the side wall templates 1, and a water stop ring 8 located between the fixing nut 7 and the side wall templates 1, wherein the center of each side wall template 1 is provided with a through hole 15 allowing the split screw 6 to penetrate through, when the side wall templates 1 are to be dismounted, the split screw 6 is reserved, an upper shear wall template is erected, the split screw 6 is reinforced, the strength of a component is increased, meanwhile, the water stop ring 8 is arranged around the through hole 15, the water stop ring 8 is sleeved on the split screw 6, the water stop ring 8 is in close contact with the through hole 15 through the fixing nut 7, and slurry leakage is avoided.
Example 2
A formwork hanging device for buildings comprises side wall formworks 1 which are positioned on two sides of a structure body to be poured in the width direction, a grout pressing plate 2 is arranged at the bottom of each side wall formwork 1, the grout pressing plate 2 prevents the side wall formworks 1 from leaking grout, the height of each side wall formwork 1 is 500mm, the width of each grout pressing plate 2 is 300mm, the length of each side wall formwork 1 is equal to that of each grout pressing plate 1, the length of each side wall formwork 1 and the length of each grout pressing plate 2 are determined according to the field condition, the grout pressing plates 2 are formed by formwork machining, material selection is simple, the grout pressing plates 2 are fixed with the side wall formworks 1 through supporting mechanisms 3, the supporting mechanisms 3 can improve the strength of the lower ends of the side wall formworks 1 and prevent formwork expansion and are favorable for improving construction quality, connecting blocks connected with the supporting mechanisms are arranged on the grout pressing plates 2 and the side wall formworks 1, two ends of the supporting mechanisms 3 are connected with the connecting blocks, the supporting mechanisms 3 prevent the, the grouting plate 2 is firmly connected with the side wall formwork 1, the foam strips 4 are arranged at the joint of the side wall formwork 1 and the grouting plate 2, the arrangement of the foam strips 4 avoids the phenomenon of slurry leakage at the joint of the side wall formwork and the grouting plate 2, the side wall formwork 1 is provided with a fixing mechanism 5 with a fixing effect, the supporting mechanism 3 comprises a first sleeve 9, a screw rod 11 in threaded connection with one end of the first sleeve 9 and a second sleeve 10 connected with the other end of the screw rod 11, the thread directions of the two ends of the screw rod 11 are opposite, the other end of the first sleeve 9 and the other end of the second sleeve 10 are respectively provided with a connecting plate 13, the connecting plate 13 is hinged with the other end of the first sleeve 9 and the other end of the second sleeve 10, the connecting plate 13 is triangular, one vertex angle of the connecting plate 13 is respectively connected with the left end of the first sleeve 9 and the right end of the second sleeve 10 through a pin shaft 14, the connecting plate 13 is fixedly connected with the connecting blocks on the side, and internal threads matched with the threads at two ends of the screw rod 11 are respectively arranged in the first sleeve 9 and the second sleeve 10. The middle part of screw rod 11 is equipped with and turns round handle 12, turns round handle 12 and screw rod 11 perpendicular, can change supporting mechanism 3's length through rotating screw rod 11, can realize supporting the regulation of the effort size on lateral wall template 1, can also use lateral wall template 1 on the different positions.
The fixing mechanism 5 comprises a first cross bar 16 and a second cross bar 17 connected with one end of the first cross bar 16, one end of the first cross bar 16 is positioned in the second cross bar 17 and moves along the length direction of the second cross bar 17, the first cross bar 16 is provided with a first positioning hole 26, the second cross bar 17 is provided with a second positioning hole 27, the first positioning holes 26 are provided in a plurality of numbers, the distance between two adjacent first positioning holes 26 is equal, the first cross bar 16 and the second cross bar 17 are fixedly connected through a bolt assembly 17, the bolt assembly 17 comprises a bolt and a bolt, the proper distance between the two ends of the first cross bar 16 and the second cross bar 17 is adjusted, then the first positioning hole 26 and the second positioning hole 27 are overlapped, the bolt penetrates through the first positioning hole and the second positioning hole and is fixed at the two ends of the bolt by nuts, the distance between the left end of the first cross bar 16 and the right end of the second cross bar 17 can be conveniently adjusted, and the fixing mechanism is suitable for templates, the lower surface of the first cross bar 16 and the lower surface of the second cross bar 17 are respectively provided with a first connecting body and a second connecting body for fixing the side wall formwork, the two ends of the first cross bar 16 and the second cross bar 17 are connected with the concrete surface through positioning screws 25, the bottom of the positioning screws 25 is provided with a fixing plate, the fixing plate is provided with holes, the positioning screws 25 are fixed with the concrete surface through anchor bolts, the first connecting body comprises first fixing rods 18 which are positioned on the lower surface of the first cross bar 16 and are perpendicular to the first cross bar 16, and first connecting rods 19 which are connected with the bottom of the first fixing rods 18 and the first cross bar 16, the second connecting body comprises second fixing rods 20 which are positioned on the lower surface of the second cross bar 17 and are perpendicular to the second cross bar 17, second connecting rods 21 which are connected with the bottom of the second fixing rods 20 and the second cross bar 17, the first fixing rods 18 and the second fixing rods 20 are positioned on the outer surfaces of the two sides of the side wall, the first connecting rod 19, the first cross rod 16 and the first fixing rod 18 form a triangle, the first connecting rod 19 is used for increasing firmness of the first fixing rod 18, the second connecting rod 21, the second cross rod 17 and the second fixing rod 20 form a triangle, and the second connecting rod 21 is used for increasing old fixation of the second fixing rod 20.
One end of the first cross rod 16 is provided with a first fixing plate 23, one end of the second cross rod 18 is provided with a second fixing plate 24, fixing holes for enabling the positioning screw rods 25 to penetrate through are formed in the first fixing plate 23 and the second fixing plate 24, the first cross rod 16 and the second cross rod 17 are convenient to contact with the concrete surface through the first fixing plate 23 and the second fixing plate 24, firmness is improved, supporting rods inside the hanging die are reduced, the later-stage face folding work of concrete is facilitated, the construction quality of the hanging die is guaranteed due to the fact that the first fixing plate 23 and the second fixing plate 24 have good stress performance, good social and economic performance is achieved, and the hanging die support with different sizes can be achieved.
The utility model discloses the setting of fixed establishment can make and wait to water the lateral wall template of building structure width direction both sides and fix, avoids appearing the bloated mould phenomenon, and the mud jacking board passes through supporting mechanism and waits to water the lateral wall template connection of building structure width direction both sides, avoids hanging the mould bottom and leaks thick liquid, guarantees the engineering quality, and the cost is lower, easy operation, reuse rate is high, improves the engineering quality, has fine application and promotion value.

Claims (9)

1. The utility model provides a mould hoisting device for building, is including being located the lateral wall template of waiting to pour structure width direction both sides, its characterized in that: the bottom of lateral wall template is equipped with the mud jacking board, the mud jacking board passes through supporting mechanism and is fixed with the lateral wall template, the junction of lateral wall template and mud jacking board is equipped with the foam strip, be equipped with the fixed establishment who plays the fixed action in the lateral wall template, supporting mechanism includes first sleeve pipe, with first sleeve pipe one end threaded connection's screw rod, the second sleeve pipe of being connected with the screw rod other end, the screw thread opposite direction at screw rod both ends, the first sheathed tube other end and the sheathed tube other end of second all are equipped with the connecting plate, the connecting plate is articulated with the first sheathed tube other end and the sheathed tube other end of second.
2. The formwork hanging device for construction according to claim 1, wherein: and internal threads matched with the threads at the two ends of the screw rod are respectively arranged in the first sleeve and the second sleeve.
3. The form lifting device for buildings according to claim 2, characterized in that: the middle part of the screw rod is provided with a twisting handle which is vertical to the screw rod.
4. The formwork hanging device for construction according to claim 1, wherein: the fixing mechanism comprises a split screw rod penetrating through the side wall templates on two sides of the width direction of the structure to be poured, fixing nuts positioned at two ends of the split screw rod and used for fixing the split screw rod and the side wall templates, and water stop rings positioned between the fixing nuts and the side wall templates.
5. The form lifting device for buildings according to claim 4, characterized in that: and a through hole for the opposite-pulling screw to pass through is formed in the center of the side wall template.
6. The formwork hanging device for construction according to claim 1, wherein: the fixing mechanism comprises a first cross rod and a second cross rod connected with one end of the first cross rod, a first connecting body and a second connecting body used for fixing the side wall formwork are respectively arranged on the lower surface of the first cross rod and the lower surface of the second cross rod, and the two ends of the first cross rod and the second cross rod are connected with the concrete surface through positioning screws.
7. The formwork hanging device for construction according to claim 6, wherein: the first connecting body comprises a first fixing rod which is positioned on the lower surface of the first cross rod and is vertical to the first cross rod, and a first connecting rod which is connected with the bottom of the first fixing rod and the first cross rod, and the second connecting body comprises a second fixing rod which is positioned on the lower surface of the second cross rod and is vertical to the second cross rod, and a second connecting rod which is connected with the bottom of the second fixing rod and the second cross rod.
8. The form lifting device for buildings according to claim 7, characterized in that: one end of the first cross rod is provided with a first fixing plate, one end of the second cross rod is provided with a second fixing plate, and fixing holes for enabling the positioning screws to penetrate through are formed in the first fixing plate and the second fixing plate.
9. The formwork hanging device for construction according to claim 8, wherein: one end of the first cross rod is located in the second cross rod and moves along the length direction of the second cross rod, a first positioning hole is formed in the first cross rod, a second positioning hole is formed in the second cross rod, and the first cross rod and the second cross rod are fixedly connected through a bolt assembly.
CN201921835689.4U 2019-10-29 2019-10-29 Mould hoisting device for building Expired - Fee Related CN211114794U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921835689.4U CN211114794U (en) 2019-10-29 2019-10-29 Mould hoisting device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921835689.4U CN211114794U (en) 2019-10-29 2019-10-29 Mould hoisting device for building

Publications (1)

Publication Number Publication Date
CN211114794U true CN211114794U (en) 2020-07-28

Family

ID=71719501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921835689.4U Expired - Fee Related CN211114794U (en) 2019-10-29 2019-10-29 Mould hoisting device for building

Country Status (1)

Country Link
CN (1) CN211114794U (en)

Similar Documents

Publication Publication Date Title
CN208009922U (en) A kind of prefabricated components bearing diagonal and its mounting structure
CN209958206U (en) Cast-in-situ box girder template
CN211114794U (en) Mould hoisting device for building
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN210916829U (en) CRTS III type ballastless track bed plate tool
CN206902768U (en) A kind of post-cast strip adjustable supporting
CN208056107U (en) A kind of combined steel formwork support system
CN216045822U (en) Adjustable fixing device of bending section pump line
CN206859658U (en) A kind of adjustable slab form support system
CN216238571U (en) Support device for well template in groove
CN215107294U (en) Special fixture for hanging die at seam of prefabricated laminated slab
CN211473374U (en) Shear force wall construction joint department template supports reinforcing apparatus based on BIM
CN211548764U (en) Stiffened column base integral template structure
CN103216087B (en) A kind of two-way self-bearing type construction formwork system
CN207988499U (en) A kind of building template supporting rod
CN215168091U (en) Bracing fixed knot constructs and aluminum alloy template bracing device
CN206625561U (en) A kind of novel building engineering forming module support meanss
CN219753974U (en) Simple and easy quick detach case template of narrow movement joint
CN206000197U (en) The late poured band support device being conveniently used in turn
CN221001946U (en) Quick formwork supporting tool for floor terrace construction of high-low span
CN218843736U (en) Novel hang mould reinforcement
CN213774473U (en) Aluminum template structure for settlement joint
CN213011594U (en) Device for fixing embedded sleeve during manufacturing of box girder hoisting hole
CN210263444U (en) Seam structure of assembled KT board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

CF01 Termination of patent right due to non-payment of annual fee