CN221001946U - Quick formwork supporting tool for floor terrace construction of high-low span - Google Patents

Quick formwork supporting tool for floor terrace construction of high-low span Download PDF

Info

Publication number
CN221001946U
CN221001946U CN202322424900.6U CN202322424900U CN221001946U CN 221001946 U CN221001946 U CN 221001946U CN 202322424900 U CN202322424900 U CN 202322424900U CN 221001946 U CN221001946 U CN 221001946U
Authority
CN
China
Prior art keywords
plate
formwork
vertical
floor
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322424900.6U
Other languages
Chinese (zh)
Inventor
魏彬
黄日晓
王耀军
刘小
宋伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202322424900.6U priority Critical patent/CN221001946U/en
Application granted granted Critical
Publication of CN221001946U publication Critical patent/CN221001946U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a rapid formwork supporting tool for high-low span floor terrace construction, which comprises a horizontal plate, a vertical plate and a formwork fixer, wherein the horizontal plate is fixedly connected with the vertical plate; the plate surface of the horizontal plate is provided with a plurality of through holes which can be fixed with the high-span floor slab through expansion bolts; one end of the vertical plate is fixedly connected with one end of the lower plate surface of the horizontal plate; one plate surface of the vertical plate can be tightly attached to the wall surface of the high-low span wall body; the template fixer is fixed on the upper plate surface of the horizontal plate and is used for fastening the template at the construction edge of the high-span and high-span floor terrace. The rapid formwork supporting tool provided by the utility model is used for constructing the floor with high and low spans, the formwork at the edge of the floor with high and low spans can be rapidly installed, the edge of the floor is prevented from flowing pulp in the pouring process, meanwhile, the working efficiency of operators is improved, and the molding quality of the floor is ensured.

Description

Quick formwork supporting tool for floor terrace construction of high-low span
Technical Field
The utility model relates to the technical field of floor engineering template installation in constructional engineering, in particular to a rapid formwork supporting tool for floor construction of high-low span floors.
Background
Building height spans refer to two units of a building, but the bottom surface is not at one elevation position, namely the heights of two adjacent spans are inconsistent. The floor construction refers to floor upper portion ground concrete placement, before pouring, need to carry out the template installation to high low span floor edge, the template height is greater than the floor thickness of pouring, guarantees not leak thick liquid between template and the high span floor, plays the interception effect to the concrete of pouring in-process, prevents that the concrete from having high span to low span department flow.
The high-low span formwork supporting device used in the existing building engineering has the problems of difficult formwork supporting, long time consumption, poor forming quality effect at high-low span parts after the terrace pouring is completed, serious concrete grouting, material waste in the construction process and the like.
Therefore, how to provide a quick formwork tool for construction of high-low span floor terrace, prevent that the condition of leaking thick liquid from appearing in the high-low span floor terrace pouring process, solve the problem of high-low span building template installation difficulty, prop up fast through appurtenance to the template of high-low span floor edge department, improve on-the-spot efficiency of construction, be the problem that the technical skill in the art needs to solve urgently.
Disclosure of utility model
In view of the above, the utility model provides a rapid formwork supporting tool for construction of high-low span floor terraces, which aims to solve the technical problems.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
A quick formwork instrument for construction of high low span floor terrace includes:
The plate surface of the horizontal plate is provided with a plurality of through holes, and the through holes can be fixed with the high-span floor slab through expansion bolts;
One end of the vertical plate is fixedly connected with one end of the lower plate surface of the horizontal plate, and a 7-shaped structure is formed; one plate surface of the vertical plate can be tightly attached to the wall surface of the high-low span wall body;
The template fixer is fixed on the upper plate surface of the horizontal plate and is used for fastening templates at the construction edges of the high-span and high-span floor terrace.
The technical scheme has the advantages that the horizontal plate can be fixed with the floor slab of the main structure of the high span through the expansion bolts, the vertical plate can be used for limiting the vertical surface position of the wall body between the high span and the low span, the whole auxiliary tool is prevented from shaking or sliding left and right, the template fixer can provide lateral support for installing the construction template of the terrace of the high span and the low span, and the stability of the template is ensured; by adopting the auxiliary tool, the template at the edge of the floor slab with the high span and the low span can be quickly installed, the template is ensured to be clung to the edge of the main structure with the high span and the low span, and the occurrence of slurry leakage phenomenon at the edge position with the high span and the low span in the terrace pouring process is prevented.
Preferably, in the above-mentioned rapid formwork tool for construction of high-low span floor terrace, the formwork holder includes a horizontal rod and a vertical rod; the rod wall of the horizontal rod is welded on the upper plate surface of the horizontal plate; one end of the vertical rod is fixedly connected with one end of the horizontal rod to form an L-shaped rod, and the joint of the vertical rod and the horizontal rod forms an arc corner. The horizontal rod and the vertical rod are welded into a whole, the vertical rod can be used as a lateral support of the template at the edge during construction of the high-span floor terrace, and the template installation efficiency is improved.
Preferably, in the above-mentioned quick formwork tool for construction of high-low span floor terrace, the vertical rods and the vertical plates are respectively arranged at two sides of the plate surface of the horizontal plate and are arranged in a staggered manner.
Preferably, in the rapid formwork erecting tool for high-low span floor terrace construction, a distance between the vertical rod and the vertical line of the vertical plate is equal to a thickness of the formwork.
The technical scheme has the beneficial effects that the horizontal plates and the vertical plates are attached to the floor slab and the wall body in a high-low span mode, the horizontal rods and the vertical rods are used as formwork supports, the structure is ingenious and simple, the installation and the use are convenient, the formwork installation speed in the floor slab terrace construction process in a high-low span mode is improved, and the labor intensity of workers is reduced.
Preferably, in the above-mentioned quick formwork tool for constructing a floor terrace with a high span and a low span, the horizontal plate and the vertical plate are made of flat iron with a thickness of 4 x 30mm, 4 x 40mm or 5 x 50 mm. The horizontal plate and the vertical plate are welded and formed by adopting the flat iron, and the quality of the pouring of the terrace cannot be influenced due to the ultrathin characteristic of the flat iron, and the flat iron can be used as a lightning protection member after the pouring is finished, so that the conductivity of the whole building is improved.
Preferably, in the rapid formwork supporting tool for constructing the floor with the high and low spans, the formwork fixer is integrally manufactured and formed by adopting round steel with the diameter of 10-16 mm.
Preferably, in the above-mentioned quick formwork tool for construction of high-low span floor terrace, a plurality of clamping grooves are formed below the formwork, and the plurality of clamping grooves are clamped with the formwork fixer.
The technical scheme has the beneficial effects that the template can be clamped with the arc corner at the template fixer through the clamping groove, a structure similar to a shuttle toothed plate is formed below the template, slurry leakage can be effectively avoided, material waste is reduced, meanwhile, the template and the template fixer are firmly clamped, and finally the appearance quality of the formed terrace meets the requirements.
Compared with the prior art, the rapid formwork supporting tool for construction of the floor terrace with the high span and the low span is simple in structure, convenient to use, capable of effectively preventing concrete from flowing and sizing after installation, solving the problem of difficult formwork supporting in construction of the floor terrace with the high span and the low span, improving site construction efficiency, effectively reducing material waste of concrete at the position, improving forming quality of the floor terrace with the high span and the low span, and reducing later repairing.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are required to be used in the embodiments or the description of the prior art will be briefly described below, and it is obvious that the drawings in the following description are only embodiments of the present utility model, and that other drawings can be obtained according to the provided drawings without inventive effort for a person skilled in the art.
FIG. 1 is a front view of a template construction auxiliary tool provided by the utility model;
FIG. 2 is a top view of the template construction auxiliary tool provided by the utility model;
FIG. 3 is a side view of the template construction aid provided by the present utility model;
FIG. 4 is an elevation view of the template construction aid provided by the present utility model;
fig. 5 is a side view of the template construction auxiliary tool provided by the utility model.
Wherein:
1-a horizontal plate; 11-through holes;
2-a template holder; 21-horizontal bars; 22-vertical bars; 23-arc turning angle;
3-vertical plates; 4-high span floor slab; 5-high-low span wall body; 6-template.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1:
Referring to fig. 1-3, the embodiment of the utility model discloses a rapid formwork supporting tool for high-low span floor terrace construction, which comprises:
The horizontal plate 1 is provided with a plurality of through holes 11 on the plate surface of the horizontal plate 1, and the through holes 11 can be fixed with the high-span floor slab 4 through expansion bolts;
the vertical plate 3, one end of the vertical plate 3 is fixedly connected with one end of the lower plate surface of the horizontal plate 1, and a 7-shaped structure is formed; one plate surface of the vertical plate 3 can be tightly attached to the wall surface of the high-low span wall body 5;
The template fixer 2, the template fixer 2 is fixed on the upper plate surface of the horizontal plate 1 for fastening the template 6 at the construction edge of the high-span floor terrace.
Referring to fig. 1, the formwork holder 2 includes a horizontal bar 21 and a vertical bar 22; the rod wall of the horizontal rod 21 is welded on the upper plate surface of the horizontal plate 1; one end of the vertical rod 22 is fixedly connected with one end of the horizontal rod 21 to form an L-shaped rod, and the joint of the vertical rod 22 and the horizontal rod 21 forms an arc corner 23.
In order to further optimize the technical scheme, the appearance quality of the poured terrace is ensured to meet the requirement, the concrete at the edge of the high-low span floor slab is straight, and the vertical rods 22 and the vertical plates 3 are respectively arranged at two sides of the plate surface of the horizontal plate 1 and are staggered; the distance between the vertical bars 22 and the vertical lines of the vertical plates 3 is equal to the thickness of the formwork 6.
In this embodiment, the horizontal plate 1 and the vertical plate 3 are made of flat iron of 4 x 30mm, 4 x 40mm or 5 x 50mm. The horizontal plate and the vertical plate are poured in the terrace concrete, and the flat iron structure is adopted, so that the flat iron can also be used as a lightning protection grounding device, and the lightning protection effect of the whole building structure is provided.
In this embodiment, the die plate holder 2 is integrally formed of a round steel of 10 to 16 mm.
Example 2:
referring to fig. 4 to 5, the high-low span floor terrace pouring is performed by adopting a plurality of quick formwork supporting tools in the embodiment 1, the quick formwork supporting tools are tightly attached to the external corners of the high-low span floor main body mechanism, and the principle is as follows:
referring to fig. 4, the horizontal plate 1 is tightly attached to the top surface of the high-span floor slab 4, and since the plurality of through holes 11 are formed in the horizontal plate 1, the expansion bolts can fix the horizontal plate 1 and the high-span floor slab 4 together through the plurality of through holes 11, at this time, the plate surface of the vertical plate 3 is tightly attached to the wall surface of the high-low-span wall body 5, so that the whole formwork tool can be prevented from shaking, and the stability of the formwork tool can be improved;
The horizontal rod 21 is welded with the upper plate surface of the horizontal plate 1 into a whole, the horizontal rod 22 and the vertical plate 3 are arranged at two sides of the plate surface of the horizontal plate 1 in a staggered manner, as shown in fig. 4, the horizontal rod 22 is far away from the high-low span wall 5, the vertical plate 3 is tightly attached to the high-low span wall 5, and the distance between the horizontal rod 22 and the vertical plate 3 is the thickness of the template;
Referring to fig. 5, a plurality of clamping grooves 61 are formed in the bottom of the template 6, the plurality of clamping grooves 61 are clamped with the plurality of template holders 2, and it should be noted that the inner diameter of the notch of the clamping groove 61 is slightly larger than the outer diameter of the template holders, so as to facilitate the clamping connection between the template 6 and the template holders 2.
The rapid formwork supporting tool provided by the utility model is used for assisting the installation of the high-low span floor construction template, so that the template can be effectively ensured to be clung to the edge of the high-span floor, the slurry flowing at the edge of the high-low span floor in the terrace pouring process is reduced, the waste of concrete materials is reduced, the molding quality of the terrace is ensured, the later repair is reduced, and the working efficiency of an operator is improved.
In the present specification, each embodiment is described in a progressive manner, and each embodiment is mainly described in a different point from other embodiments, and identical and similar parts between the embodiments are all enough to refer to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant points refer to the description of the method section.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present utility model. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present utility model is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (7)

1. A quick formwork instrument for construction of high low span floor terrace, its characterized in that includes:
The horizontal plate (1), a plurality of through holes (11) are formed in the plate surface of the horizontal plate (1), and the through holes (11) can be fixed with the high-span floor slab (4) through expansion bolts;
The vertical plate (3), one end of the vertical plate (3) is fixedly connected with one end of the lower plate surface of the horizontal plate (1) and forms a 7-shaped structure; one plate surface of the vertical plate (3) can be tightly attached to the wall surface of the high-low span wall body (5);
The template fixer (2), template fixer (2) are fixed in the face of going up of horizontal plate (1) for fasten template (6) of high span floor terrace construction edge department.
2. A rapid formwork tool for high and low span floor construction according to claim 1, wherein the formwork holder (2) comprises a horizontal bar (21) and a vertical bar (22); the rod wall of the horizontal rod (21) is welded on the upper plate surface of the horizontal plate (1); one end of the vertical rod (22) is fixedly connected with one end of the horizontal rod (21) to form an L-shaped rod, and an arc corner (23) is formed at the joint of the vertical rod (22) and the horizontal rod (21).
3. The rapid formwork supporting tool for construction of high-low span floor terraces according to claim 2, wherein the vertical rods (22) and the vertical plates (3) are respectively arranged on two sides of the plate surface of the horizontal plate (1) and are arranged in a staggered mode.
4. A rapid formwork tool for high and low span floor construction according to claim 3, characterized in that the distance between the vertical bars (22) and the vertical lines of the vertical plates (3) is equal to the thickness of the formwork (6).
5. The rapid formwork support tool for constructing a high-low span floor terrace according to claim 1, wherein the horizontal plate (1) and the vertical plate (3) are manufactured by adopting 4 x 30mm, 4 x 40mm or 5 x 50mm flat iron.
6. The rapid formwork support tool for construction of high and low span floor terraces according to claim 1, wherein the formwork fixer (2) is integrally manufactured and molded by adopting round steel with the thickness of 10-16 mm.
7. The rapid formwork supporting tool for construction of high-low span floor terraces according to claim 1, wherein a plurality of clamping grooves (61) are formed below the formwork (6), and the clamping grooves (61) are clamped with the formwork fixer (2).
CN202322424900.6U 2023-09-07 2023-09-07 Quick formwork supporting tool for floor terrace construction of high-low span Active CN221001946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322424900.6U CN221001946U (en) 2023-09-07 2023-09-07 Quick formwork supporting tool for floor terrace construction of high-low span

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322424900.6U CN221001946U (en) 2023-09-07 2023-09-07 Quick formwork supporting tool for floor terrace construction of high-low span

Publications (1)

Publication Number Publication Date
CN221001946U true CN221001946U (en) 2024-05-24

Family

ID=91114045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322424900.6U Active CN221001946U (en) 2023-09-07 2023-09-07 Quick formwork supporting tool for floor terrace construction of high-low span

Country Status (1)

Country Link
CN (1) CN221001946U (en)

Similar Documents

Publication Publication Date Title
CN104196055B (en) Outer wall of basement lower die board construction method
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN112459472A (en) Construction method of constructional column after secondary masonry structure is finished
CN221001946U (en) Quick formwork supporting tool for floor terrace construction of high-low span
CN213682129U (en) Deep foundation pit unilateral die carrier
CN112459129A (en) Expansion joint shaping mold device and construction method
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN218264944U (en) Arc roof beam construction side form reinforcing apparatus
CN213114883U (en) Frock for concrete placement based on drainage ditch of falling trapezoidal form
CN210976452U (en) Ground keel frame with flatness adjusted by screw
CN210316538U (en) Aluminum mold supporting system for floor lower extension lintel
CN216949496U (en) Anti-bank reinforcing apparatus in bathroom
CN206174461U (en) Mould plugging device
CN206737420U (en) A kind of concrete collar tie beam or the place's fixing templates that bear down on one
CN216476353U (en) Novel aluminum alloy template large mould prevents mould reinforcement member that rises
CN104912209A (en) Plugging device for pipeline reserved hole of cast-in-situ slab and machining and plugging construction method
CN211572563U (en) Rammed earth wall template of two-way restraint
CN220814887U (en) Contain waterstop side wall end wall structure template
CN213203645U (en) General mould for ballastless track bed board
CN216787587U (en) Installation mechanism for independently supporting and finely adjusting template of post-cast strip of assembled type laminated floor
CN216446048U (en) Stagnant water steel sheet bearing structure in base bottom plate post-cast strip
CN218176647U (en) Building has water room to end water platform regularization template reinforcing tool
CN211446443U (en) New and old concrete joint grout blocking device
CN203174780U (en) Concrete construction joint reserving structure
CN212802531U (en) Template reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant