CN211114232U - Anti-leakage shear wall with split bolt holes - Google Patents

Anti-leakage shear wall with split bolt holes Download PDF

Info

Publication number
CN211114232U
CN211114232U CN201921515615.2U CN201921515615U CN211114232U CN 211114232 U CN211114232 U CN 211114232U CN 201921515615 U CN201921515615 U CN 201921515615U CN 211114232 U CN211114232 U CN 211114232U
Authority
CN
China
Prior art keywords
split
split bolt
plugging
leakage
cork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921515615.2U
Other languages
Chinese (zh)
Inventor
王健
张桂松
李映潭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201921515615.2U priority Critical patent/CN211114232U/en
Application granted granted Critical
Publication of CN211114232U publication Critical patent/CN211114232U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gasket Seals (AREA)

Abstract

The utility model discloses an anti-leakage shear wall with split bolt holes, wherein the wall body is provided with split screw holes, the split screw holes penetrate through the wall body, the outer ends of the split screw holes are inserted with blocking soft plugs capable of elastic deformation, the blocking soft plugs are in interference fit with the split screw holes, the blocking soft plugs are elastically deformed when being inserted into the split screw holes, and the outer sides of the blocking soft plugs are kept in close contact with the split screw holes so as to achieve the sealing effect; a foaming agent is filled in the inner cavity of the split screw hole, and the foaming agent expands and fills the inner cavity of the split screw hole, so that a certain sealing effect is achieved; because the utility model discloses a but elastic deformation's shutoff cork realizes the sealed effect to drawing the screw outer end, and is sealed for the mortar, even receive for a long time to blow to drench the condition that also is difficult for appearing the fracture, plays better sealed and antiseep effect.

Description

Anti-leakage shear wall with split bolt holes
Technical Field
The utility model relates to a construction technical field further relates to a split bolt hole antiseep shear force wall.
Background
When the shear wall is a vertical bearing component in a building and is mainly borne by a wall body, the wall body bears the vertical load transmitted by a horizontal component and simultaneously bears the horizontal earthquake action transmitted by wind power or earthquake action. When the shear wall is built, templates are erected firstly and connected through split bolts, concrete is poured between the two templates, sleeves are sleeved outside the split bolts and embedded in the concrete shear wall, the templates are removed after the shear wall is formed, the split bolts are pulled out of the sleeves, and the sleeves form split bolt holes; after the main part construction finishes, need carry out the shutoff to the bolt hole that draws, guarantee that the outer wall can not take place the seepage and convenient construction of plastering on next step.
The plugging mode in the prior art is that mortar is used for plugging two ends of a split bolt hole, and the mortar is flush with a wall surface; in the actual construction process, the mortar is easy to crack due to the problems of poor maintenance or poor subsequent construction protection and the like, so that the hidden danger of leakage of the outer wall in the later period is caused, the owner complaints and maintenance are caused, and the unnecessary construction cost is increased.
For those skilled in the art, how to prevent the split bolt holes from cracking and leaking due to mortar plugging is a technical problem to be solved at present.
SUMMERY OF THE UTILITY MODEL
The utility model provides a to drawing bolt hole antiseep shear force wall can prevent to cause the seepage because of the fracture appears in the mortar shutoff, and concrete scheme is as follows:
an anti-leakage shear wall with split bolt holes comprises a wall body, wherein split bolt holes are formed in the wall body, blocking soft plugs capable of elastically deforming are inserted into the outer ends of the split bolt holes, and the blocking soft plugs are in interference fit with the split bolt holes; and foaming agents are filled in the inner cavity of the split screw hole.
Optionally, the plugging soft plug is in a shape of a truncated cone, and one end with a smaller outer diameter is inserted into the sleeve in the split screw hole.
Optionally, the difference between the diameters of the two ends of the plugging soft plug is not more than 2 mm.
Optionally, the plugging cork is a wooden cork treated with a chemical preservative.
Optionally, the inner end and the outer end of the split screw hole are respectively inserted with the plugging soft plug.
Optionally, the outer side surface of the wall body is coated with a polyurethane waterproof coating to cover the plugging soft plug.
The utility model provides an anti-leakage shear wall with split bolt holes, wherein the wall body is provided with split screw holes, the split screw holes penetrate through the wall body, the outer ends of the split screw holes are inserted with blocking soft plugs capable of elastic deformation, the blocking soft plugs are in interference fit with the split screw holes, the blocking soft plugs are elastically deformed when being inserted into the split screw holes, and the outer sides of the blocking soft plugs are kept in close contact with the split screw holes so as to achieve the sealing effect; a foaming agent is filled in the inner cavity of the split screw hole, and the foaming agent expands and fills the inner cavity of the split screw hole, so that a certain sealing effect is achieved; because the utility model discloses a but elastic deformation's shutoff cork realizes the sealed effect to drawing the screw outer end, and is sealed for the mortar, even receive for a long time to blow to drench the condition that also is difficult for appearing the fracture, plays better sealed and antiseep effect.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a cross-sectional view of the anti-leakage shear wall with split bolt holes provided by the present invention;
fig. 2A and 2B are a front view and a side view, respectively, of the soft plugging plug.
The figure includes:
wall body 1, split bolt hole 2, shutoff cork 3.
Detailed Description
The utility model discloses a core lies in providing a split bolt hole antiseep shear force wall, can prevent to cause the seepage because of the fracture appears in the mortar shutoff.
In order to make those skilled in the art better understand the technical solution of the present invention, the anti-leakage shear wall with split bolt holes of the present invention will be described in detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1, which is a cross-sectional view of the anti-leakage shear wall with split bolt holes provided by the present invention, wherein the shear wall includes a wall body 1, a split bolt hole 2 is provided on the wall body 1, the split bolt hole 2 is a through hole formed by a split bolt of a positioning template when the shear wall is poured, the left side of the wall body 1 shown in fig. 1 represents an outer surface, the right side represents an inner surface, an elastically deformable plugging cork 3 is inserted in the outer end of the split bolt hole 2, that is, the elastically deformable plugging cork 3 is inserted in the left end of the split bolt hole 2, the plugging cork 3 is extruded by external force and inserted into the split bolt hole 2, the plugging cork 3 generates elastic deformation, the plugging cork 3 keeps interference fit with the split bolt hole 2, and the plugging cork 3 keeps relatively fixed fit with the split bolt hole 2 by friction force; filling foaming agent in the inner cavity of the split screw hole 2, filling the inner cavity of the split screw hole 2 through the foaming agent, playing a sealing effect to a certain extent, and adopting polyurethane foaming agent and the like.
Because the utility model discloses a but elastic deformation's shutoff cork realizes the sealed of split screw outer end, and the shutoff cork all the time with keep the interference seal fit to split screw 2, sealed for the mortar, even receive for a long time blowing and drenching the condition that also is difficult for appearing the fracture, play better sealed and antiseep effect.
On the basis of the scheme, the plugging soft plug 3 in the utility model is in a cone frustum shape, as shown in fig. 2A and fig. 2B, which are respectively a front view and a side view of the plugging soft plug 3; the cross section of the plugging soft plug 3 is circular, the diameters of the sections of the plugging soft plug 3 in the length direction are different, and the side surface is a conical surface; sleeving a sleeve outside the split bolt, taking out the split bolt after pouring, remaining the sleeve in the wall to form a split screw hole 2, and inserting one end of the plugging soft plug 3 with a smaller outer diameter into the sleeve in the split screw hole 2; the length of the sleeve pipe is equal to the thickness of the wall body 1, the sleeve pipe is of a cylindrical structure, and as the plugging soft plug 3 is in a cone frustum shape, the larger the length of the plugging soft plug 3 extending into the counter-pulling screw hole 2 is, the larger the deformation degree of the plugging soft plug 3 is, the tighter the plugging soft plug 3 is in contact with the counter-pulling screw hole 2, and the better the sealing effect is. For columniform structure, the utility model discloses an adopt soft stopper 3 of shutoff of circular cone frustum shape to realize inseparabler sealed effect.
Preferably, in order to avoid the size difference of the two ends of the soft plug 3 too big, cause the unable inserted condition, the utility model discloses the diameter difference of injecing the soft plug 3 both ends of shutoff is no longer than 2 mm.
Preferably, the utility model provides a shutoff cork 3 is the wooden plug through chemical preservative processing, after adding chemical preservative with ordinary timber through the manual work, makes it have characteristics such as anticorrosion, dampproofing, fungi-proofing, protection against insects ant, mildew and waterproof.
Preferably, plugging soft plugs 3 are respectively inserted into the inner end and the outer end of the split screw hole 2, and foaming agent is filled between the two plugging soft plugs 3.
In order to achieve a better waterproof effect, the outer side surface of the wall body 1 is coated with polyurethane waterproof paint, generally three layers of polyurethane waterproof paint are coated, and the plugging soft plug 3 is covered.
When in construction, the plugging soft plug 3 is firstly knocked into the split bolt hole by using external force at the outer end of the split bolt hole 2, so as to ensure that the plugging soft plug 3 is flush with the surface of an outer wall; then, foaming agent is poured into the split screw holes 2 from one side of the inner wall; and finally, the inner side plugging soft plug 3 is knocked into the split screw hole 2 by using an external force, the plugging soft plug 3 is flush with the surface of the inner wall, and the split screw hole 2 is tightly plugged so as to achieve the purpose of preventing the outer wall from leaking.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The anti-leakage shear wall with the split bolt holes is characterized by comprising a wall body (1), wherein the wall body (1) is provided with split bolt holes (2), the outer ends of the split bolt holes (2) are inserted with blocking soft plugs (3) capable of elastically deforming, and the blocking soft plugs (3) are in interference fit with the split bolt holes (2); and foaming agents are filled in the inner cavity of the split screw hole (2).
2. The split bolt hole anti-leakage shear wall as claimed in claim 1, wherein the plugging cork (3) is in the shape of a truncated cone, and one end with smaller outer diameter is inserted into a sleeve in the split bolt hole (2).
3. The split bolt hole anti-leakage shear wall as claimed in claim 2, wherein the difference of the diameters of the two ends of the plugging cork (3) is not more than 2 mm.
4. The split bolt hole anti-leakage shear wall according to claim 2, wherein the plugging cork (3) is a wood cork treated with chemical preservative.
5. The split bolt hole anti-leakage shear wall as claimed in claim 4, wherein the plugging cork (3) is respectively inserted at the inner end and the outer end of the split bolt hole (2).
6. The split bolt hole anti-leakage shear wall as claimed in claim 5, wherein the outer side surface of the wall body (1) is coated with polyurethane waterproof paint to cover the plugging cork (3).
CN201921515615.2U 2019-09-11 2019-09-11 Anti-leakage shear wall with split bolt holes Active CN211114232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921515615.2U CN211114232U (en) 2019-09-11 2019-09-11 Anti-leakage shear wall with split bolt holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921515615.2U CN211114232U (en) 2019-09-11 2019-09-11 Anti-leakage shear wall with split bolt holes

Publications (1)

Publication Number Publication Date
CN211114232U true CN211114232U (en) 2020-07-28

Family

ID=71694230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921515615.2U Active CN211114232U (en) 2019-09-11 2019-09-11 Anti-leakage shear wall with split bolt holes

Country Status (1)

Country Link
CN (1) CN211114232U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622708A (en) * 2021-09-16 2021-11-09 北京路鹏达建设发展有限责任公司 Construction method for plugging split bolt hole of building outer wall
CN113668896A (en) * 2021-09-24 2021-11-19 北京天润建设有限公司 Plugging method for bolt hole of outer wall
CN114215200A (en) * 2021-12-03 2022-03-22 天津一冶建设工程有限公司 Heat-insulating nail and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622708A (en) * 2021-09-16 2021-11-09 北京路鹏达建设发展有限责任公司 Construction method for plugging split bolt hole of building outer wall
CN113668896A (en) * 2021-09-24 2021-11-19 北京天润建设有限公司 Plugging method for bolt hole of outer wall
CN114215200A (en) * 2021-12-03 2022-03-22 天津一冶建设工程有限公司 Heat-insulating nail and construction method

Similar Documents

Publication Publication Date Title
CN211114232U (en) Anti-leakage shear wall with split bolt holes
CN209924489U (en) Screw hole plugging structure
CN206279789U (en) A kind of plugging structure of exterior wall Screw arbor with nut at both-ends hole
CN103711205A (en) Waterproof wall split bolt hole plugging structure and construction method thereof
CN207633757U (en) A kind of leakage-resistant device in split bolt hole
CN203684414U (en) Rapid blocking structure of screw hole of concrete structure outer wall
CN111350294A (en) Shear wall outer wall through-wall screw hole plugging device and construction method thereof
CN113802698A (en) Construction method for plugging split bolt holes of shear wall
JP2018109337A (en) Method of constructing anchor provided in existing masonry structure and post-constructing anchor
CN212743485U (en) Screw hole plugging node
CN206707255U (en) Combined type wall attaching parts for external scaffolding
CN203961067U (en) The external wall structure in a kind of shutoff screw rod hole
CN108729562B (en) Waterproof plugging device
KR20020029009A (en) Spacer of Ornamental Brick Wall
JP3062388B2 (en) Combination of embedded condenser stopper and embedded condenser
CN217557701U (en) Three-section type wall bushing of pull bolt
CN219954547U (en) Waterproof structure of special-shaped embedded sleeve
JPS5947782B2 (en) Wall insulation method
CN218541001U (en) Anti-leakage plugging structure for outer wall bolt hole
CN206205438U (en) Circular platform type stops slurry rubber stopper and its concrete component structure
CN112854792A (en) Double-layer wall connecting anchor rod, hollow double-layer wall structure and reinforcing construction method
CN205829073U (en) PVC cable impermeable protection sleeve pipe
CN217204695U (en) Outer wall bolt hole plugging structure
CN110820962A (en) Construction screw hole plugging head and method for plugging screw hole
CN219060390U (en) Plugging structure of opposite-pulling screw hole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant