CN211113192U - Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge - Google Patents

Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge Download PDF

Info

Publication number
CN211113192U
CN211113192U CN201921471334.1U CN201921471334U CN211113192U CN 211113192 U CN211113192 U CN 211113192U CN 201921471334 U CN201921471334 U CN 201921471334U CN 211113192 U CN211113192 U CN 211113192U
Authority
CN
China
Prior art keywords
bellows
buried
slip casting
bridge floor
reservation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921471334.1U
Other languages
Chinese (zh)
Inventor
黄垚
明道恒
曹彦丰
毛涌凡
杨威
王守钱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Investment And Construction Co ltd
Original Assignee
Guizhou Investment And Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Investment And Construction Co ltd filed Critical Guizhou Investment And Construction Co ltd
Priority to CN201921471334.1U priority Critical patent/CN211113192U/en
Application granted granted Critical
Publication of CN211113192U publication Critical patent/CN211113192U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a prestressing force letter bridge floor hogging moment slip casting device, including pre-buried reservation bellows in the bridge floor, reserve the bellows and reserve continuous end position in advance, insert pre-buried slip casting pipe in the reservation bellows of bridge floor continuous end department wherein one side, insert pre-buried blast pipe in the reservation bellows of opposite side, the upper end of two adjacent reservation bellows is passed through the continuous section bellows and is connected, and the tip of pre-buried slip casting pipe and pre-buried blast pipe stretches out from the continuous section bellows respectively and the bellows junction between the reservation bellows. Adopt the utility model discloses afterwards, the operation personnel alright through pre-buried slip casting pipe to bridge floor hogging moment slip casting on the bridge floor, the gas alright follow pre-buried blast pipe discharge that the slip casting in-process produced. Therefore, the operator does not need to use the hanging basket to carry out grouting construction under the bridge floor, and the potential safety hazard of the operator in the grouting process is reduced.

Description

Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge
Technical Field
The utility model relates to a prestressing force letter bridge floor hogging moment slip casting device belongs to letter bridge floor prestressing force construction technical field.
Background
At present, the negative moment grouting construction of the bridge deck of the existing prestressed T-beam simply-supported beam bridge mainly adopts a worker to cooperate with a bridge deck grouting machine to perform construction grouting at the negative moment position under a T-beam wing plate through a hanging basket, and the construction mode has the following defects:
1. in the prior art, a worker carries out construction under a bridge floor through a hanging basket, so that huge potential safety hazards exist to the worker;
2. bridge floor wet joint reinforcement and concrete placement just can carry out among the prior art bridge floor expansion joint slip casting and accomplish the back, influence bridge floor construction period.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a prestressing force simple beam bridge floor hogging moment slip casting device, the device possess reduce operation personnel potential safety hazard, the later stage inspection of being convenient for, advantage such as reduction of erection time, have solved current bridge floor hogging moment slip casting construction safety, bridge floor construction period's problem.
The technical scheme of the utility model is realized like this: the utility model provides a prestressing force simply supported girder bridge floor hogging moment slip casting device, includes the pre-buried bellows that reserves in the bridge floor, the upper end of reserving the bellows stretches out from the bridge floor expansion joint, and its lower extreme stretches out from the bridge floor hogging moment, and it has pre-buried slip casting pipe to insert in the reservation bellows of one side wherein of bridge floor expansion joint department, has inserted pre-buried blast pipe in the reservation bellows of opposite side, and the upper end of two adjacent reservation bellows is passed through the continuous section bellows and is connected, and the tip of pre-buried slip casting pipe and pre-buried blast pipe stretches out from the continuous section bellows respectively and the bellows junction between the reservation bellows.
Further, the both ends of continuous section bellows are connected with the bellows connector, the bellows connector cover is in the upper end of reserving the bellows, has all seted up the triangular groove in the tip of bellows connector and the upper end of reserving the bellows, and pre-buried slip casting pipe or pre-buried blast pipe are stretched out from the triangular groove.
Further, the embedded grouting pipe and the embedded exhaust pipe extend out of the corrugated pipe from the connecting position of the corrugated pipe by 20-50 cm.
Since the technical scheme is used, the utility model has the advantages that:
1. adopt the utility model discloses afterwards, the operation personnel alright through pre-buried slip casting pipe to bridge floor hogging moment slip casting on the bridge floor, the gas alright follow pre-buried blast pipe discharge that the slip casting in-process produced. Therefore, the operator does not need to use the hanging basket to carry out grouting construction under the bridge floor, and the potential safety hazard of the operator in the grouting process is reduced.
2. The construction of the wet joint of the bridge deck is not required to be carried out after grouting is finished, and the construction period of the bridge deck is shortened.
Drawings
Fig. 1 is a top view of a schematic structural diagram of the present invention;
fig. 2 is a front view of the structure diagram of the present invention;
FIG. 3 is a schematic structural view of a bellows joint;
fig. 4 is a schematic view of a connection structure of the bellows connector and the reserved bellows.
Description of reference numerals: 1-a bellows connector; 2-reserving a corrugated pipe; 3-grouting pipe; 4-grouting pipe installation; 5-continuous end corrugated pipe; 6-pre-burying an exhaust pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a: referring to fig. 1-4, a prestressing force simply supported girder bridge floor hogging moment slip casting device, including pre-buried reservation bellows 2 in the bridge floor, the upper end of reservation bellows 2 stretches out from bridge floor continuous end department, has pre-buried slip casting pipe 3 in the reservation bellows 2 of one side wherein of the bridge floor, has pre-buried blast pipe 6 in the reservation bellows 2 of opposite side, and the upper end of two adjacent reservation bellows 2 is connected through continuous section bellows 5, and the tip of pre-buried slip casting pipe 3 and pre-buried blast pipe 6 stretches out from continuous section bellows 5 and the bellows junction 4 between the reservation bellows 2 respectively. The both ends of continuous section bellows 5 are connected with bellows connector 1, bellows connector 1 cover is in the upper end of reserving bellows 2, has all seted up the triangular groove in the tip of bellows connector 1 and the upper end of reserving bellows 2, and pre-buried slip casting pipe 3 or pre-buried blast pipe 6 are followed the triangular groove and are stretched out. The embedded grouting pipe 3 and the embedded exhaust pipe 6 extend out of the corrugated pipe joint 4 by 20-50 cm respectively.
During construction, the reserved corrugated pipes 2 are pre-buried in the bridge deck, the upper ends of the reserved corrugated pipes 2 are arranged at the continuous end of the bridge deck, then the upper ends of two adjacent reserved corrugated pipes 2 are connected through the continuous section corrugated pipes 5 at the continuous end of the bridge deck, the pre-buried grouting pipes 3 and the pre-buried exhaust pipes 6 are inserted into the reserved corrugated pipes 2 from triangular grooves on two sides respectively until the lower ends of the pre-buried grouting pipes 3 and the pre-buried exhaust pipes 6 extend out of the continuous end of the bridge deck, the upper ends of the pre-buried grouting pipes 3 and the pre-buried exhaust pipes 6 extend out of the corrugated pipes from the corrugated pipe joints 4 by 20-50 cm respectively, and therefore an operator can perform grouting on the bridge deck through the pre-buried grouting pipes 3 to the negative bending moment of the bridge deck, and gas generated in the grouting process. Therefore, the operator does not need to use the hanging basket to carry out grouting construction under the bridge floor, and the potential safety hazard of the operator in the grouting process is reduced; meanwhile, the construction of the wet joint of the bridge deck is not performed after grouting is finished, and the construction period of the bridge deck is shortened.

Claims (3)

1. The utility model provides a prestressing force simply supported girder bridge floor hogging moment slip casting device, includes pre-buried reservation bellows (2), slip casting pipe (3) in the bridge face, its characterized in that: reserve bellows (2) and reserve 20cm, reserve at bridge floor continuous end department, at the bridge floor wherein the reservation bellows (2) of one side insert pre-buried slip casting pipe (3), the reservation bellows (2) of opposite side insert pre-buried blast pipe (6), the upper end of two adjacent reservation bellows (2) is passed through continuous section bellows (5) and is connected, and the tip of pre-buried slip casting pipe (3) and pre-buried blast pipe (6) stretches out from continuous section bellows (5) and bellows junction (4) between reservation bellows (2) respectively.
2. The device of claim 1, wherein the device comprises: the both ends of continuous section bellows (5) are connected with bellows connector (1), bellows connector (1) cover is in the upper end of reserving bellows (2), has all seted up the triangular groove in the tip of bellows connector (1) and the upper end of reserving bellows (2), and pre-buried slip casting pipe (3) or pre-buried blast pipe (6) are followed the triangular groove and are stretched out.
3. The device of claim 1, wherein the device comprises: the embedded grouting pipe (3) and the embedded exhaust pipe (6) extend out of the corrugated pipe joint (4) by 20-50 cm.
CN201921471334.1U 2019-09-05 2019-09-05 Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge Expired - Fee Related CN211113192U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921471334.1U CN211113192U (en) 2019-09-05 2019-09-05 Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921471334.1U CN211113192U (en) 2019-09-05 2019-09-05 Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge

Publications (1)

Publication Number Publication Date
CN211113192U true CN211113192U (en) 2020-07-28

Family

ID=71699961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921471334.1U Expired - Fee Related CN211113192U (en) 2019-09-05 2019-09-05 Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge

Country Status (1)

Country Link
CN (1) CN211113192U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962407A (en) * 2020-09-11 2020-11-20 中国五冶集团有限公司 Method for treating incomplete grouting of hogging moment prestress hole channel of continuous beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962407A (en) * 2020-09-11 2020-11-20 中国五冶集团有限公司 Method for treating incomplete grouting of hogging moment prestress hole channel of continuous beam

Similar Documents

Publication Publication Date Title
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN103741601B (en) Tower, beam and cable synchronous bridge forming technology
CN202139833U (en) Cantilever scaffold for building construction
CN101100902A (en) Inclined drawing steel truss high-supported formwork structure system and construction method thereof
CN204551483U (en) A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication
CN108867383A (en) A kind of across the steel case trusses cable-stayed bridge rapid constructing method of double tower five
CN205036072U (en) A shaped steel formwork support that encorbelments for high altitude structure of encorbelmenting
CN211113192U (en) Bridge floor hogging moment grouting device for prestressed simply-supported beam bridge
CN204850414U (en) Shaped steel of encorbelmenting draws wire rope instrument formula anchor to one side
CN110468734A (en) Steel lagging jack pushing tow system and steel lagging jack push construction method
CN210766431U (en) Steel arch rib pushing system
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN204386608U (en) A kind of tunnel invert construction tool
CN202577129U (en) Negative moment beam bellows connector device for continuous beam bridge
CN110172915A (en) A kind of high tower shaped form crossbeam Joint Re-bar Construction
CN201474306U (en) Hoisting ring device used on discharging platform
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN109057331A (en) A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint
CN205741926U (en) Stretch-draw prepressing device in Cast-in-situ Beam steel pipe beret truss platform
CN212002245U (en) Aluminum mould board and wood mould board combination reinforcing apparatus
CN210104575U (en) Bending-resistant structure of large-span front supporting point guyed cradle
CN208966351U (en) A kind of short abutment wall constructing structure of D5 type section
CN209211934U (en) A kind of reinforced steel concrete framed floor structure
CN209228054U (en) Large cantilever combined type anchors Bailey beam operation platform
CN207862935U (en) A kind of steel construction plastering platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

Termination date: 20210905