CN211099627U - Quick blowdown pull throughs when cyclone maintains - Google Patents

Quick blowdown pull throughs when cyclone maintains Download PDF

Info

Publication number
CN211099627U
CN211099627U CN201921777643.1U CN201921777643U CN211099627U CN 211099627 U CN211099627 U CN 211099627U CN 201921777643 U CN201921777643 U CN 201921777643U CN 211099627 U CN211099627 U CN 211099627U
Authority
CN
China
Prior art keywords
pipe
connecting part
sewage discharge
conveying belt
water conveying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921777643.1U
Other languages
Chinese (zh)
Inventor
尹涛
程永胜
姚琳
罗刚
张光杰
董泽峰
郭宇飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
National Pipeline Network Group Sichuan to East Natural Gas Pipeline Co Ltd
Original Assignee
Sinopec Sichuan East Gas Pipeline Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Sichuan East Gas Pipeline Co Ltd filed Critical Sinopec Sichuan East Gas Pipeline Co Ltd
Priority to CN201921777643.1U priority Critical patent/CN211099627U/en
Application granted granted Critical
Publication of CN211099627U publication Critical patent/CN211099627U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cyclones (AREA)

Abstract

The utility model belongs to the technical field of long defeated natural gas equipment maintenance, swift blowdown pull throughs when concretely relates to cyclone maintains, it includes: the sewage discharge pipe is also provided with a side pipe communicated with the interior of the sewage discharge pipe, the side pipe is provided with a valve, and one end of the side pipe, which is far away from the sewage discharge pipe, is provided with a third connecting part; the hand-operated pipeline dredger comprises a connecting pipe, a dredging spring and a base, wherein a fourth connecting part is arranged at one end, far away from the base, of the connecting pipe; the water conveying belt is fixedly connected with the third connecting part through the connecting piece at one end, the water conveying belt is fixedly connected with the fourth connecting part through the connecting piece at the other end, the dredging spring penetrates through the connecting pieces, the water conveying belt and the side pipe, extends into the sewage pipe, and extends out of the sewage pipe from one end where the first connecting part is located. The utility model discloses the device can make things convenient for quick discharges the impurity mixed water in the cyclone fast to when impurity blocks up the blow off pipe export, conveniently dredge.

Description

Quick blowdown pull throughs when cyclone maintains
Technical Field
The utility model belongs to the technical field of long defeated natural gas equipment maintenance, swift blowdown pull throughs when concretely relates to cyclone maintains.
Background
The cyclone separator is the necessary equipment for separating natural gas and impurities in the existing long-distance natural gas transmission station. In cyclone blind plate maintenance, for example, cyclone in the cyclone station that well petrochemical nature gas chuandong pipeline limited company Yichang gas transmission station set up, the common method is to open the blind plate mouth and then dismantle the blowdown pipeline section earlier, the water injection lets impurity mixed water flow from the blowdown mouth of pipe, waterproof cloth is laid in the exit, nevertheless do like this and transport impurity mixed water, the inside very time that takes of clearance separator, if impurity is many then block up the blow off pipe easily, need earlier with partial dredge blow off pipe of instrument scooping out again, very time and energy. In view of this, it is urgently needed to design a quick sewage draining and dredging device for maintenance of a cyclone separator blind plate.
The prior art provides hand pipeline dredge, including the hand pipeline dredge that can purchase from the market, its major structure includes connecting pipe, sleeve handle, base, rocking handle, mediation spring etc.. Wherein, connecting pipe one end fixed connection base, the one end of other end fixed connection mediation spring, base fixed connection rocking handle. And the sleeve is sleeved outside the connecting pipe and axially limited and is rotationally connected with the connecting pipe, and the sleeve is also provided with a sleeve handle. When the handle is used, the sleeve handle can be held by one hand, and the rocking handle can be rotated by the other hand. The rocking handle drives the base and rotates, and the base rotates and drives the connecting pipe and rotate, thereby the connecting pipe drives the mediation spring and rotates to the effect of mediation. A hand pipeline dredging device with the application number of CN207959393U and a hand pipeline dredging device with the application number of CN206015821U are similar to the structure before improvement.
SUMMERY OF THE UTILITY MODEL
For solving the defects of the prior art, the utility model provides a quick sewage discharge dredging device when the cyclone separator is maintained. The utility model discloses the device can make things convenient for quick discharges the impurity mixed water in the cyclone fast to when impurity blocks up the blow off pipe export, conveniently dredge.
The utility model provides a technical scheme as follows:
a quick blowdown pull throughs when cyclone maintains, includes:
the first connecting part which can be connected with a sewage outlet of the cyclone separator is arranged at one end of the sewage discharge pipe, the sewage discharge pipe is also provided with a side pipe communicated with the interior of the sewage discharge pipe, the side pipe is provided with a valve, and a third connecting part is arranged at one end of the side pipe, which is far away from the sewage discharge pipe;
the hand-operated pipeline dredging device comprises a connecting pipe, a dredging spring fixedly connected with one end of the connecting pipe and a base fixedly connected with the other end of the connecting pipe, wherein a fourth connecting part is arranged at one end, far away from the base, of the connecting pipe;
the dredging spring penetrates through the connecting pieces, the water conveying belt and the side pipe, extends into the sewage discharge pipe, and extends out of the sewage discharge pipe from one end where the first connecting part is located.
Swift blowdown pull throughs when cyclone maintains that provides based on above-mentioned technical scheme, when carrying out cyclone blind plate and maintaining, take off cyclone blow off pipe nipple joint, swift blowdown pull throughs passes through first connecting portion and connects the drain when maintaining cyclone, close valve discharge sewage earlier, then, can open the valve, the elasticity based on water conveying area, the mediation spring with hand formula pipeline pull throughs runs through each connecting piece, water conveying area and side pipe, stretch into in the blow off pipe, and stretch out the blow off pipe from the one end at first connecting portion place, pull out from blind plate mouth department again. Later, based on the soft characteristic of water conveying belt, can make a round trip to rotate mediation spring, also can make a round trip to pull mediation spring between blind plate mouth and drain to play the purpose that does benefit to the mediation.
Furthermore, the other end of the sewage discharge pipe is provided with a second connecting part, and the second connecting part is connected with a sewage discharge water hose or a sewage discharge pipeline.
Based on the technical scheme, the sewage can be led to a proper place.
Specifically, the sewage discharge pipe is a sewage discharge bent pipe.
Based on above-mentioned technical scheme, be convenient for guide the blowdown downwards.
Specifically, the first connecting portion is a connecting flange.
Based on the technical scheme, the cyclone separator is convenient to be connected with a sewage draining outlet of the cyclone separator during maintenance.
Specifically, the third connecting portion is a screw thread.
Based on the technical scheme, the connection with the water conveying belt can be conveniently realized, and the device is convenient to assemble and disassemble during maintenance operation.
Specifically, the fourth connecting portion is a screw thread.
Based on the technical scheme, the connection with the water conveying belt can be conveniently realized, and the device is convenient to assemble and disassemble during maintenance operation.
Specifically, each connecting piece is a connecting ring, one end of each connecting ring is provided with a thread matched with the third connecting part or the fourth connecting part and is in threaded connection with the third connecting part or the fourth connecting part, and the other end of each connecting ring is sleeved in one end of the water conveying belt and is fixedly connected with the water conveying belt.
Based on the technical scheme, the water conveying belt can be conveniently connected with the side pipe and the hand-operated pipeline dredging device, and the device is convenient to assemble and disassemble during maintenance operation.
Generally, the utility model provides a swift blowdown pull throughs when cyclone maintains can be convenient for the cyclone blind plate when maintaining the operation clear up sewage and impurity in the cyclone.
The utility model discloses still have following beneficial effect:
1) different from the common manual collection of impurities and cleaning of the separator, the device has the advantages of small structure, convenient assembly and great labor saving. The universality is higher, the line arrangement is flexible, meanwhile, the discharge and the reception of impurities are convenient, and the cleanness of an operation site is ensured.
2) When the blockage occurs, the blockage is removed in a time-consuming and labor-consuming way, and the blockage is removed by combining a sewage discharge pipe and a pipeline dredging device, so that the efficiency is greatly improved.
3) The dredging effect is good, the time and the labor are saved, the disassembly and inspection time of the separator is shortened, and the safety benefit is great.
Drawings
Fig. 1 is a schematic structural view of the quick sewage draining and dredging device for maintaining the cyclone separator provided by the utility model.
Fig. 2 is a working state diagram of the quick sewage draining and dredging device when the cyclone separator is maintained.
In fig. 1 and 2, the structures represented by the reference numerals are listed as follows:
1. the device comprises a sewage discharge pipe, 2, a side pipe, 3, a valve, 4, a hand-operated pipeline dredging device, 401, a connecting pipe, 402, a dredging spring, 403, a base, 5, a water conveying belt, 6, a cyclone separator, 601 and a blind plate opening.
Detailed Description
The following description is made for the purpose of illustrating the principles and features of the present invention, and is not intended to limit the scope of the invention.
In one embodiment, as shown in fig. 1, the quick sewage dredging device for maintaining the cyclone separator comprises a sewage discharge pipe 1, a water conveying belt 5 and a hand-operated pipeline dredging device 4.
One end of the drain pipe 1 is provided with a first connecting part which can be connected with a drain outlet of the cyclone separator, the drain pipe 1 is also provided with a side pipe 2 communicated with the inside of the drain pipe, the side pipe 2 is provided with a valve 3, and one end of the side pipe 2 far away from the drain pipe 1 is provided with a third connecting part.
Hand formula pipeline dredge 4 can be based on the hand formula pipeline dredge that prior art provided, 4 have connecting pipe 401, the mediation spring 402 of the one end of fixed connection connecting pipe 401 and the base 403 of the other end of fixed connection connecting pipe 401, and the one end that base 403 was kept away from to connecting pipe 401 is provided with the fourth connecting portion.
The both ends of water conveying belt 5 are provided with the connecting piece respectively, and water conveying belt 5 passes through the connecting piece fixed connection third connecting portion of one end, and water conveying belt 5 passes through the connecting piece fixed connection fourth connecting portion of the other end, dredges spring 402 and runs through each connecting piece, water conveying belt 5 and bypass pipe 2, stretches into in the blow off pipe 1 to stretch out blow off pipe 1 from the one end at first connecting portion place.
Based on this technical scheme, when carrying out cyclone blind plate and maintaining, take off cyclone blow off pipe nipple joint, swift blowdown pull throughs passes through first connecting portion and connects the drain when maintaining cyclone, close valve discharge sewage earlier, then, can open the valve, based on the elasticity of water conveying area, the mediation spring with hand formula pipeline pull throughs runs through each connecting piece, water conveying area and side pipe, stretch into in the blow off pipe, and stretch out the blow off pipe from the one end at first connecting portion place, pull out from blind plate mouth department again. Later, based on the soft characteristic of water conveying belt, can make a round trip to rotate mediation spring, also can make a round trip to pull mediation spring between blind plate mouth and drain to play the purpose that does benefit to the mediation.
In one embodiment, the other end of the sewage drain pipe 1 is provided with a second connection part, and the second connection part is connected with a sewage hose or a sewage drain pipeline, and the arrangement can lead sewage to a proper place.
In one embodiment, the waste pipe 1 is a waste trap. One end of the sewage discharge bent pipe is connected with the sewage discharge port, and the other end of the sewage discharge bent pipe is arranged downwards, so that the sewage discharge is conveniently guided downwards.
In one embodiment, the first connection is a connection flange to facilitate connection to a drain outlet of the cyclone separator during maintenance.
In one embodiment, the third connecting portion is a screw thread, the fourth connecting portion is a screw thread, each connecting member is a connecting ring, one end of the connecting ring is provided with a screw thread matching with the third connecting portion or the fourth connecting portion and is in threaded connection with the third connecting portion or the fourth connecting portion, and the other end of the connecting ring is sleeved in one end of the water conveying belt 5 and is fixedly connected with the water conveying belt 5, for example, gluing, steel wire tightening and other existing methods. The water conveying belt can be conveniently connected with the side pipe and the hand-operated pipeline dredging device, and the device is convenient to assemble and disassemble during maintenance operation.
As shown in fig. 2, when carrying out cyclone 6 and carrying out the blind plate and maintain, take off cyclone blow off pipe nipple joint, swift blowdown pull throughs passes through first connecting portion and connects the drain when maintaining cyclone, close valve exhaust sewage earlier, then, can open the valve, based on the elasticity of water conveying area, the mediation spring with hand formula pipeline pull throughs runs through each connecting piece, water conveying area and side pipe, stretch into in the blow off pipe, and stretch out the blow off pipe from the one end at first connecting portion place, pull out from blind plate mouth 601 again. Afterwards can also can make a round trip to rotate the mediation spring, also can make a round trip to pull the mediation spring with the both ends of hand formula pipeline dredge between blind plate mouth and drain to play the purpose that does benefit to the mediation. Wherein, hand formula pipeline mediation plays the effect of being convenient for to rotate, and the sleeve handle plays the effect of being convenient for to drag. Because the water conveying belt is soft, axial twisting can be carried out to a large extent, and the sleeve of the hand-operated pipeline dredger is supported to rotate in the same direction for multiple circles, so that the dredging spring rotates for multiple circles. And the separator blow-off pipe has a corner, and when the dredging spring cannot stretch past, the rotation of the pipeline dredging device can drive the dredging spring to bypass the corner pipeline. Thereafter, the rotation can be reversed. And the dredging effect of forward and reverse alternate rotation is good. Similarly, because the water conveying belt is soft, the water conveying belt can be axially folded, and therefore when two ends of the hand-operated pipeline dredger pull and dredge springs back and forth between the blind plate port and the sewage discharge port, the change of the distance between the hand-operated pipeline dredger and the side pipe is realized.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (7)

1. A quick blowdown pull throughs when cyclone maintains, its characterized in that includes:
the device comprises a sewage discharge pipe (1), wherein one end of the sewage discharge pipe (1) is provided with a first connecting part which can be connected with a sewage discharge port of a cyclone separator, the sewage discharge pipe (1) is also provided with a side pipe (2) communicated with the interior of the sewage discharge pipe, the side pipe (2) is provided with a valve (3), and one end of the side pipe (2) far away from the sewage discharge pipe (1) is provided with a third connecting part;
the hand-operated pipeline dredging device (4) is provided with a connecting pipe (401), a dredging spring (402) fixedly connected with one end of the connecting pipe (401) and a base (403) fixedly connected with the other end of the connecting pipe (401), and a fourth connecting part is arranged at one end, far away from the base (403), of the connecting pipe (401);
and the two ends of the water conveying belt (5) are respectively provided with a connecting piece, the water conveying belt (5) is fixedly connected with the third connecting part through the connecting piece at one end, the water conveying belt (5) is fixedly connected with the fourth connecting part through the connecting piece at the other end, and the dredging spring (402) penetrates through the connecting pieces, the water conveying belt (5) and the side pipe (2), extends into the sewage pipe (1), and extends out of the sewage pipe (1) from one end where the first connecting part is located.
2. The quick drain pull during maintenance of a cyclone separator as claimed in claim 1, wherein: the other end of the sewage discharge pipe (1) is provided with a second connecting part, and the second connecting part is connected with a sewage discharge water hose or a sewage discharge pipeline.
3. The quick drain pull during maintenance of a cyclone separator as claimed in claim 1, wherein: the sewage discharge pipe (1) is a sewage discharge bent pipe.
4. The quick drain pull during maintenance of a cyclone separator as claimed in claim 1, wherein: the first connecting part is a connecting flange.
5. The quick drain pull-off device for cyclone separator maintenance according to any one of claims 1 to 4, wherein: the third connecting portion is a thread.
6. The quick drain pull during maintenance of a cyclone separator as claimed in claim 5, wherein: the fourth connecting portion is a thread.
7. A quick drain pull during maintenance of a cyclone separator as claimed in claim 6, wherein: each connecting piece is a connecting ring, one end of each connecting ring is provided with threads matched with the third connecting part or the fourth connecting part and is in threaded connection with the third connecting part or the fourth connecting part, and the other end of each connecting ring is sleeved in one end of the water conveying belt (5) and is fixedly connected with the water conveying belt (5).
CN201921777643.1U 2019-10-22 2019-10-22 Quick blowdown pull throughs when cyclone maintains Active CN211099627U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921777643.1U CN211099627U (en) 2019-10-22 2019-10-22 Quick blowdown pull throughs when cyclone maintains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921777643.1U CN211099627U (en) 2019-10-22 2019-10-22 Quick blowdown pull throughs when cyclone maintains

Publications (1)

Publication Number Publication Date
CN211099627U true CN211099627U (en) 2020-07-28

Family

ID=71721186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921777643.1U Active CN211099627U (en) 2019-10-22 2019-10-22 Quick blowdown pull throughs when cyclone maintains

Country Status (1)

Country Link
CN (1) CN211099627U (en)

Similar Documents

Publication Publication Date Title
CN206837624U (en) A kind of environmental protection equipment for Industrial Wastewater Treatment
CN108591674A (en) A kind of water conservancy cleaning pipeline being convenient to clean
CN211099627U (en) Quick blowdown pull throughs when cyclone maintains
CN105735437A (en) Sewer dredging device and application method thereof
CN101220607B (en) Interactive water drain dredge equipment of water-gas
CN105032859B (en) A kind of mortar tube inwall dust remover
CN201687703U (en) Clean water pump water supply pipe filtering device, clean water pump water supply pipe and clean water pipe
CN106141322A (en) Tubing string inner burr scraper
KR102417313B1 (en) An apparatus for cleaning pipes
CN104818768A (en) Device for unchoking rainwater and sewage pipeline of factory
CN209308154U (en) Coal-burning boiler sewage discharge pipe dredger
CN201095787Y (en) Water gas interaction type sewer dredging device
CN204114465U (en) Open Filter valve device and the linkage structure with water pipe thereof soon
CN203635600U (en) Machining dust removal system
CN208329070U (en) A kind of water pipe preventing blocking
CN206815506U (en) A kind of combined suction sewage truck soil pick-up reel pipe racking device
CN208565909U (en) A kind of anticlogging energy saving water segregator
CN205673304U (en) Flexible pipe water drilling cleans device
CN209342459U (en) A kind of environment monitoring device of easy access
CN207204783U (en) Multifunctional spiral water drilling pipeline cleaning
KR20100111535A (en) Drain pipe washing method of construction to use body of rotation
CN208267075U (en) Hand municipal pipeline dredge
CN205606745U (en) Quick connected system of fan coil
CN209876218U (en) Water supply and drainage pipeline connecting device
CN204974669U (en) Self -cleaning cleaning tube dust collecting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200918

Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee after: China Petroleum & Chemical Corp.

Patentee after: SINOPEC CHUANQI DONGSONG NATURAL GAS PIPELINE Co.,Ltd.

Address before: 432400 No.126, Guanggu Avenue, Donghu New Technology Development Zone, Wuhan City, Hubei Province

Patentee before: SINOPEC CHUANQI DONGSONG NATURAL GAS PIPELINE Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee after: CHINA PETROLEUM & CHEMICAL Corp.

Patentee after: Sichuan East Natural Gas Pipeline Co.,Ltd.

Address before: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee before: CHINA PETROLEUM & CHEMICAL Corp.

Patentee before: SINOPEC CHUANQI DONGSONG NATURAL GAS PIPELINE Co.,Ltd.

CP01 Change in the name or title of a patent holder