CN209308154U - Coal-burning boiler sewage discharge pipe dredger - Google Patents

Coal-burning boiler sewage discharge pipe dredger Download PDF

Info

Publication number
CN209308154U
CN209308154U CN201821902861.9U CN201821902861U CN209308154U CN 209308154 U CN209308154 U CN 209308154U CN 201821902861 U CN201821902861 U CN 201821902861U CN 209308154 U CN209308154 U CN 209308154U
Authority
CN
China
Prior art keywords
sewage discharge
wirerope
bend wheel
hole
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821902861.9U
Other languages
Chinese (zh)
Inventor
徐强
杨玉武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ansteel Mining Co Ltd
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN201821902861.9U priority Critical patent/CN209308154U/en
Application granted granted Critical
Publication of CN209308154U publication Critical patent/CN209308154U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model relates to a kind of coal-burning boiler sewage discharge pipe dredgers, including underground blow-off line, the the first sewage discharge well and the second sewage discharge well being connected to respectively with underground blow-off line, it is characterized in that the sewage pipe dredger is arranged between the first sewage discharge well and the second sewage discharge well, the sewage pipe dredger includes wirerope, pipe cleaning device in the middle part of wirerope is set, it is connect with wirerope both ends, and the second wirerope coiled body on the second sewage discharge well top of the first wirerope coiled body and setting on the first sewage discharge well top is set.The advantages of utility model is: structure is simple, dismantle, install it is easy to operate, be not necessarily to specific purpose tool, working efficiency can be significantly improved.And its device fabrication is easy, and is easily processed, so that the work of pipe-dredging is more efficient, avoids wirerope and tube contacts, friction, it is low in cost.

Description

Coal-burning boiler sewage discharge pipe dredger
Technical field
The utility model relates to pipe technology fields, and in particular to a kind of coal-burning boiler sewage discharge pipe dredger.
Background technique
The waste water of coal-burning boiler production discharge, discharges into sewage treatment plant by underground blow-off line, due to coal-burning boiler Particularity, discharge waste water in, contain the substances such as a large amount of ashes, cinder, substance of this kind water suction be saturated after, be settled down to pipeline Lower part after long-term accumulation, is caused pipeline silting, is lauched unsmooth.Especially boiler is lauched well under outlet section, is influenced by caliber, Silting is particularly acute.Since coal-burning boiler contains the substances such as a large amount of ashes, cinder, silting object is difficult to dredge, and causes to use Drain cleaner dredging effect cannot reach requirement;And giant dredging mode is at high cost.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and it is thin to provide a kind of sewage pipe efficiently, safe Exchange device.
The purpose of this utility model is realized by following technical proposals:
A kind of coal-burning boiler sewage discharge pipe dredger of the utility model, including underground blow-off line, respectively with ground The the first sewage discharge well and the second sewage discharge well of down blow pipeline connection, it is characterised in that the sewage pipe dredger It is arranged between the first sewage discharge well and the second sewage discharge well, the sewage pipe dredger includes wirerope, pipeline Sweeper, the first wirerope coiled body and the second wirerope coiled body, the first wirerope coiled body setting exist First sewage discharge Jing Jingkouchu, the pedestal I including the first sewage discharge well well head top is arranged in, is arranged on pedestal I The driving elevator I in left side, the bend wheel I that the fixed pulley I on pedestal I at well head is set, is arranged in the first sewage discharge well With the bend wheel positioning mechanism I being connect with bend wheel I, wirerope reach through hole I is equipped at well head on pedestal and bend wheel positions Mechanism reach through hole I;The second wirerope coiled body setting is in the second sewage discharge Jing Jingkouchu, including is arranged second The driving elevator II on the right side on pedestal II is arranged in the pedestal II on sewage discharge well well head top, and well is arranged on pedestal II Fixed pulley II, the bend wheel II being arranged in the second sewage discharge well and the bend wheel localization machine being connect with bend wheel II at mouthful Structure II is provided with wirerope reach through hole II I and bend wheel positioning mechanism reach through hole II on pedestal at well head;
The wirerope is arranged in the first sewage discharge well, the second sewage discharge well and underground blow-off line, one end Around bend wheel I, wirerope reach through hole I is passed through, then is connected through fixed pulley I with driving elevator I, the other end bypasses bend wheel II, wirerope reach through hole II is passed through, then be connected with driving elevator II through fixed pulley II, pipe cleaning device is arranged in ground down blow Position among steel cable in pipeline.
As the further preferred of above scheme, it is delta link tune that the bend wheel positioning mechanism, which places through-hole I, Knothole.
As the further preferred of above scheme, the bend wheel positioning mechanism I is the connecting rod of longitudinal movement, in longitudinal direction Mobile connecting rod middle and upper part is provided with 2-3 pin shaft location hole I, is provided with 2-3 positioning pin in the side of delta link adjustment hole I The connecting rod in hole I, the longitudinal movement passes through delta link adjustment hole I, and lower end is fixedly connected with bend wheel I, and positioning pin is worn Crossing dowel hole I and pin shaft location hole I will be fixedly connected in the middle part of the connecting rod of longitudinal movement with pedestal, the bend wheel localization machine Structure II is identical as I structure of bend wheel positioning mechanism.
As the further preferred of above scheme, the pipe cleaning device is spiral cleaning device.
The utility model has the advantages that:
The utility model structure is simple, dismantle, install it is easy to operate, be not necessarily to specific purpose tool, can significantly improve work effect Rate.And its device fabrication is easy, and is easily processed so that the work of pipe-dredging is more efficient, avoid wirerope and tube contacts, Friction, it is low in cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
A specific embodiment of the invention is further illustrated with reference to the accompanying drawing.
As shown in Figure 1, a kind of coal-burning boiler sewage discharge pipe dredger of the utility model, including underground blow-off line C, the first sewage discharge well A being connected to respectively with underground blow-off line C and the second sewage discharge well B, it is characterised in that described Sewage pipe dredger is arranged between the first sewage discharge well A and the second sewage discharge well B, the sewage pipe dredger Including wirerope 1, pipe cleaning device 2, the first wirerope coiled body and the second wirerope coiled body, first steel wire Coiled body of restricting is arranged at the first sewage discharge well A well head, the pedestal including the first sewage discharge well A well head top is arranged in I 31, the driving elevator I 32 in the left side on pedestal I 31 is set, the fixed pulley I 33 on pedestal I 31 at well head is set, is arranged Bend wheel I 37 in the first sewage discharge well and the bend wheel positioning mechanism I being connect with bend wheel I 37, the well head on pedestal Place is equipped with wirerope reach through hole I and bend wheel positioning mechanism reach through hole I 36;The described second wirerope coiled body setting is the At two sewage discharge well B well heads, the pedestal II 41 including the second sewage discharge well B well head top is arranged in is arranged in pedestal II The fixed pulley II 43 on pedestal II 42 at well head is arranged in the driving elevator II 42 on the right side on 41, setting is arranged in the second sewage The bend wheel positioning mechanism II putting the bend wheel II 47 in well B and connecting with bend wheel II 47, is opened at well head on pedestal II 41 There are wirerope reach through hole II I and bend wheel positioning mechanism to place through-hole II 46;
The wirerope 1 is arranged in the first sewage discharge well A, the second sewage discharge well B and underground blow-off line C, One end bypass bend wheel I 37, pass through wirerope reach through hole I, then through fixed pulley I 33 with drive elevator I 32 be connected, the other end around Bend wheel II 47 is crossed, passes through wirerope reach through hole II, then be connected with driving elevator II 42 through fixed pulley II 43, pipe cleaning device 2 are arranged in the intermediate position of steel cable 1 in the blow-off line C of underground, and the pipe cleaning device is spiral cleaning device.
As the further preferred of above scheme, the bend wheel positioning mechanism reach through hole I 36 is delta link tune Knothole, bend wheel positioning mechanism reach through hole II 36 are identical as bend wheel positioning mechanism I 36 structures of reach through hole.
As the further preferred of above scheme, the bend wheel positioning mechanism I is the connecting rod 34 of longitudinal movement, vertical It is provided with 2-3 pin shaft location hole I to mobile 34 middle and upper part of connecting rod, 2-3 is provided in the side of delta link adjustment hole I and determines The connecting rod 34 of position pin hole I, the longitudinal movement passes through delta link adjustment hole I, and lower end is fixedly connected with bend wheel I 37, Positioning pin 35 passes through dowel hole I and pin shaft location hole I and is fixedly connected at 34 middle part of connecting rod of longitudinal movement with pedestal 31, described Bend wheel positioning mechanism II it is identical as I structure of bend wheel positioning mechanism.44 move in figure for the longitudinal of bend wheel positioning mechanism II Dynamic connecting rod, 45 be the positioning pin of bend wheel positioning mechanism II.Therefore, as long as moving up and down the connecting rod 34 of longitudinal movement According to sewage pipe depth, the position of bend wheel and wirerope is installed, determined, then uses the connecting rod by longitudinal movement of fixed pin 35 34 are capable of fixing on the support,
The utility model is dredged two sides by the way that sewage pipe dredger is arranged in the sewage well of underground blow-off line two sides Steel cable rope between exchange device is attached, and spiral cleaning device is installed among wirerope, and then according to sewage pipe depth, installation is vertical To mobile connecting rod 34, the position of bend wheel and steel cable rope, then, starting two are determined by the connecting rod 34 of mobile longitudinal movement Side elevator, slowly pulls steel cable repeatedly, by intermediate conveyor screw sweeper, loosens, cleans sediment among pipeline, final to realize pipe The dredging in road.

Claims (4)

1. a kind of coal-burning boiler sewage discharge pipe dredger, including underground blow-off line, are connected to underground blow-off line respectively The first sewage discharge well and the second sewage discharge well, it is characterised in that the sewage pipe dredger is arranged in the first sewage Between drainage well and the second sewage discharge well, the sewage pipe dredger includes wirerope, pipe cleaning device, the first steel wire Rope coiled body and the second wirerope coiled body, the first wirerope coiled body are arranged in the first sewage discharge Jing Jing At mouthful, the driving elevator I in the left side on pedestal I is arranged in the pedestal I including the first sewage discharge well well head top is arranged in, Fixed pulley I on pedestal I at well head, the bend wheel I being arranged in the first sewage discharge well are set and connect with bend wheel I Bend wheel positioning mechanism I is equipped with wirerope reach through hole I and bend wheel positioning mechanism reach through hole I on pedestal at well head;Described The setting of second wirerope coiled body is in the second sewage discharge Jing Jingkouchu, including is arranged on the second sewage discharge well well head top Pedestal II, the driving elevator II on the right side on pedestal II is set, fixed pulley II on pedestal II at well head, setting are set Bend wheel II in the first sewage discharge well and the bend wheel positioning mechanism II being connect with bend wheel II, on pedestal at well head It is provided with wirerope reach through hole II I and bend wheel positioning mechanism reach through hole II;
The wirerope is arranged in the first sewage discharge well, the second sewage discharge well and underground blow-off line, and one end bypasses Bend wheel I passes through wirerope reach through hole I, then is connected through fixed pulley I with driving elevator I, and the other end bypasses bend wheel II, wears Wirerope reach through hole II is crossed, then is connected through fixed pulley II with driving elevator II, pipe cleaning device is arranged in underground blow-off line Position among interior steel cable.
2. coal-burning boiler sewage discharge pipe dredger according to claim 1, it is characterised in that the bend wheel is fixed The lever regulated hole that through-hole I is triangle building sky is placed by position mechanism.
3. coal-burning boiler sewage discharge pipe dredger according to claim 2, it is characterised in that the bend wheel is fixed Position mechanism I is the connecting rod of longitudinal movement, is provided with 2-3 pin shaft location hole I in the connecting rod middle and upper part of longitudinal movement, is connected in triangle The side of bar adjustment hole I is provided with 2-3 dowel hole I, and the connecting rod of the longitudinal movement passes through delta link adjustment hole I, Lower end is fixedly connected with bend wheel I, pin shaft 35 pass through dowel hole I and pin shaft location hole I by the middle part of the connecting rod of longitudinal movement with Pedestal is fixedly connected, and the bend wheel positioning mechanism II is identical as I structure of bend wheel positioning mechanism.
4. sewage pipe dredger according to claim 1, it is characterised in that the pipe cleaning device is spiral cleaning Device.
CN201821902861.9U 2018-11-19 2018-11-19 Coal-burning boiler sewage discharge pipe dredger Active CN209308154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821902861.9U CN209308154U (en) 2018-11-19 2018-11-19 Coal-burning boiler sewage discharge pipe dredger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821902861.9U CN209308154U (en) 2018-11-19 2018-11-19 Coal-burning boiler sewage discharge pipe dredger

Publications (1)

Publication Number Publication Date
CN209308154U true CN209308154U (en) 2019-08-27

Family

ID=67673636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821902861.9U Active CN209308154U (en) 2018-11-19 2018-11-19 Coal-burning boiler sewage discharge pipe dredger

Country Status (1)

Country Link
CN (1) CN209308154U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535419A (en) * 2020-04-27 2020-08-14 台州市市政基础设施开发集团有限公司 Municipal pipeline and construction method thereof
CN115532741A (en) * 2022-09-16 2022-12-30 中煤能源研究院有限责任公司 Long-distance slurry conveying pipeline rapid dredging device and dredging method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535419A (en) * 2020-04-27 2020-08-14 台州市市政基础设施开发集团有限公司 Municipal pipeline and construction method thereof
CN111535419B (en) * 2020-04-27 2021-05-14 台州市市政基础设施开发集团有限公司 Municipal pipeline and construction method thereof
CN115532741A (en) * 2022-09-16 2022-12-30 中煤能源研究院有限责任公司 Long-distance slurry conveying pipeline rapid dredging device and dredging method

Similar Documents

Publication Publication Date Title
CN209308154U (en) Coal-burning boiler sewage discharge pipe dredger
CN111139921B (en) Pipeline composite dredging and dust removing device and dredging and dust removing method thereof
CN209556114U (en) A kind of municipal pipeline dredging device
CN209779855U (en) Sewage pipe network purification treatment device
CN109736193B (en) Bridge girder
CN107143027A (en) A kind of multifunctional pipe dredging vehicle
CN201704787U (en) Large-diameter sewage conduit dredging system
CN210562572U (en) Pipeline dredging robot
KR101201255B1 (en) Circle sewer for dredging and repair apparatus
CN102233343A (en) Pipeline dredging and cleaning device
CN104818768A (en) Device for unchoking rainwater and sewage pipeline of factory
CN101564727A (en) Dirt rain pipe dredging tube-pulling apparatus
CN206015822U (en) Impact type drain cleaner
CN206815509U (en) A kind of multifunctional pipe dredging vehicle
CN204357356U (en) Drilling rod thread washer
CN101694108B (en) Sewage level controlling device of dredging system for sewage pipeline with large-pipe diameter
CN110056048A (en) A kind of sanitary wastewater removes the water supply and sewerage pipeline of silt with inner wall automatically
CN2302064Y (en) Cleaning device for pipe scale
CN210887556U (en) Dredging equipment for water supply and drainage pipeline
CN113982075A (en) Dredging device for drain pipe
CN201614654U (en) Wastewater level control device of large pipe diameter wastewater pipe dredging system
CN202850149U (en) Household pipe cleaner
CN113863473B (en) Municipal drainage structure and construction method thereof
CN104278743A (en) Sludge cleaning vehicle
CN106284638A (en) A kind of pipeline drainer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant