CN211038505U - Blasting construction is with starting hole excavating gear - Google Patents

Blasting construction is with starting hole excavating gear Download PDF

Info

Publication number
CN211038505U
CN211038505U CN201922172412.4U CN201922172412U CN211038505U CN 211038505 U CN211038505 U CN 211038505U CN 201922172412 U CN201922172412 U CN 201922172412U CN 211038505 U CN211038505 U CN 211038505U
Authority
CN
China
Prior art keywords
sets
fixedly connected
wall
organism
blasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922172412.4U
Other languages
Chinese (zh)
Inventor
傅鑫彬
李庆刚
王琨
陈付时
李汕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Harbour Engineering Co Ltd
Original Assignee
China Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Harbour Engineering Co Ltd filed Critical China Harbour Engineering Co Ltd
Priority to CN201922172412.4U priority Critical patent/CN211038505U/en
Application granted granted Critical
Publication of CN211038505U publication Critical patent/CN211038505U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an excavating equipment technical field just discloses a blasting construction is with starting hole excavating gear, which comprises a bod, the top of organism is provided with the handle, and is provided with four group's universal wheels in the bottom of organism, has seted up the cavity in the inside of organism, and has seted up the spout in the bottom of cavity, and has seted up two sets of chambeies and two sets of shifting chutes of placing in the inside of organism, and places the rear side that the chamber is located the shifting chute, at the inner wall fixedly connected with rack of placing the chamber. This blasting construction is with starting hole excavating gear, through setting up two sets of drilling equipment, and then when seting up the big gun hole, promote the device to assigned position, then control two sets of drilling equipment and remove to two sets of tops that set up the big gun hole in the area, then open drilling equipment and can bore ground to quick two sets of big gun holes of seting up out, the device can carry out quick seting up to two sets of big gun holes of distance difference simultaneously, has reduced operating personnel's the work degree of difficulty and inconvenience from this.

Description

Blasting construction is with starting hole excavating gear
Technical Field
The utility model relates to an excavating equipment technical field specifically is a blasting hole excavating gear for blasting construction.
Background
In blasting construction, need drill a plurality of big gun holes on the blasting face earlier, place each big gun hole after having configured the explosive package according to the blasting parameter of predesign again, then detonate again to accomplish blasting construction, now, when blasting treatment in the tunnel excavation work progress, all adopt measuring tool to confirm the hole site of each big gun hole earlier usually, later by the manual work adopt rig or blast hole excavating equipment to set up the big gun hole on the country rock one by one again, the time of seting up multiunit big gun hole cost is longer, influence tunnel construction cycle in the very big degree.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a blasting construction is with starting to explode hole excavating gear has solved the longer problem of time that current hole excavating equipment that explodes seted up multiunit big gun hole cost.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a blasting construction is with starting hole excavating gear, which comprises a bod, the top of organism is provided with the handle, and be provided with four sets of universal wheels in the bottom of organism, the cavity has been seted up in the inside of organism, and the spout has been seted up in the bottom of cavity, and set up two sets of chamber and two sets of shifting chutes of placing in the inside of organism, and place the rear side that the chamber is located the shifting chute, inner wall fixedly connected with rack in placing the chamber, the balancing groove has been seted up at the top of cavity, and the inside sliding connection of balancing groove has two sets of drilling equipment, and drilling equipment's both sides all run through the shifting chute and extend to placing the intracavity, and drilling equipment's both sides respectively with two sets.
Preferably, the drilling device comprises a moving column, the moving column is slidably connected in the balance groove, a sleeve is fixedly connected to the outer side of the moving column, connecting rods are fixedly connected to the front side and the rear side of the sleeve, one end of each connecting rod, far away from the sleeve, penetrates through the moving groove and extends into the placing cavity, a rotating motor is fixedly connected to the inner portion of each connecting rod, a gear is fixedly connected to the output end of the rotating motor and meshed with a rack, a hollow groove is formed in the moving column, a first fixing block and a second fixing block are fixedly connected to the inner wall of each hollow groove, a through hole is formed in the second fixing block, a spring is fixedly connected to the bottom of the second fixing block, one end, far away from the second fixing block, of the spring is fixedly connected with the movable disc, a push rod motor is fixedly connected to the bottom of the first fixing block, and the output end of the push rod, the bottom of the movable disc is fixedly connected with a motor, and the output end of the motor is fixedly connected with a drill bit.
Preferably, the bottom end of the drill bit is conical, and the diameter of the drill bit is smaller than the width of the inner wall of the sliding chute.
Preferably, the diameter of the spring is larger than that of the inner wall of the through hole, and the spring is positioned on the outer side of the output end of the push rod motor.
Preferably, the width of the inner wall of the balance groove is matched with the diameter of the movable column, and the length of the inner wall of the balance groove is matched with the length of the inner wall of the sliding groove.
Preferably, the connecting rod is provided with a groove inside, and the rotating motor is fixedly connected to the inner wall of the groove.
(III) advantageous effects
Compared with the prior art, the utility model provides a blasting construction is with starting hole excavating gear possesses following beneficial effect:
1. this blasting construction is with starting hole excavating gear, through setting up two sets of drilling equipment, and then when seting up the big gun hole, promote the device to assigned position, then control two sets of drilling equipment and remove to two sets of tops that set up the big gun hole in the area, then open drilling equipment and can bore ground to quick two sets of big gun holes of seting up out, the device can carry out quick seting up to two sets of big gun holes of distance difference simultaneously, has reduced operating personnel's the work degree of difficulty and inconvenience from this.
2. This blasting construction is with starting hole excavating gear, through setting up universal wheel and handle, and then universal wheel and handle make operating personnel more comfortable and convenient when removing the device, through the cooperation between gear and the rack, and then can drive two sets of drilling equipment and remove, and two sets of drilling equipment's removal makes the device can bore two sets of big gun holes of distance difference, has increased the device's application range from this.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a sectional view of the structure of the body of the present invention;
fig. 3 is a structural sectional view of the drilling device of the present invention.
In the figure: 1. a body; 2. a drilling device; 201. moving the column; 202. a drill bit; 203. a sleeve; 204. a connecting rod; 205. a gear; 206. an empty groove; 207. a first fixed block; 208. a second fixed block; 209. a spring; 210. a motor; 211. a movable tray; 212. a through hole; 213. a rotating electric machine; 214. a push rod motor; 3. a chute; 4. a universal wheel; 5. a handle; 6. a moving groove; 7. a cavity; 8. a balancing tank; 9. a rack; 10. a placement chamber.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a blasting hole excavating device for blasting construction includes a machine body 1, a handle 5 is disposed on the top of the machine body 1, four universal wheels 4 are disposed on the bottom of the machine body 1, the four universal wheels 4 are disposed at four corners of the bottom of the machine body 1, the universal wheels 4 and the handle 5 are disposed, and the universal wheels 4 and the handle 5 make an operator feel more comfortable and convenient when moving the device, a cavity 7 is disposed in the machine body 1, a sliding groove 3 is disposed at the bottom of the cavity 7, two placing cavities 10 and two moving grooves 6 are disposed in the machine body 1, the placing cavities 10 are disposed at the rear sides of the moving grooves 6, a rack 9 is fixedly connected to the inner wall of the placing cavities 10, the moving grooves 6 are used for moving a connecting rod 204, a balance groove 8 is disposed at the top of the cavity 7, the balance groove 8 is used for keeping balance of a moving column 201 during moving, and the inside sliding connection of compensating groove 8 has two sets of drilling equipment 2, through setting up two sets of drilling equipment 2, and then when seting up the big gun hole, promote the device to assigned position, then control two sets of drilling equipment 2 and remove to two sets of tops of seting up the big gun hole in area, then open drilling equipment 2 and can bore ground, thereby the quick two sets of big gun holes of seting up out, the device can carry out quick the seting up to two sets of big gun holes of distance difference simultaneously, operating personnel's the work degree of difficulty and inconvenience have been reduced from this, and drilling equipment 2's both sides all run through the shifting chute 6 and extend to placing in the chamber 10, and drilling equipment 2's both sides respectively with two sets of rack 9 meshing.
Specifically, in order to enable the device to rapidly open blast holes with different distances, a drilling device 2 is provided, the drilling device 2 comprises a moving column 201, the moving column 201 is a shell of the drilling device 2, the moving column 201 is slidably connected in a balance groove 8, a sleeve 203 is fixedly connected to the outer side of the moving column 201, connecting rods 204 are fixedly connected to the front side and the rear side of the sleeve 203, one end, away from the sleeve 203, of each connecting rod 204 penetrates through the moving groove 6 and extends into the placing cavity 10, a rotating motor 213 is fixedly connected to the inner portion of each connecting rod 204, a gear 205 is fixedly connected to the output end of the rotating motor 213, the gear 205 is meshed with a rack 9, when the rotating motor 213 is opened, the output end of the rotating motor 213 drives the gear 205 to be dislocated with the rack 9 meshed with the gear 205, so as to generate reverse motion, and therefore, the opening of the rotating motor 213 can drive the, the gear 205 is matched with the rack 9, so that the two groups of drilling devices 2 can be driven to move, and the two groups of drilling devices 2 move, so that the device can drill two groups of blast holes with different distances, thereby increasing the application range of the device, a hollow groove 206 is arranged in the moving column 201, a first fixed block 207 and a second fixed block 208 are fixedly connected with the inner wall of the hollow groove 206, the second fixed block 208 is positioned below the first fixed block 207, a through hole 212 is arranged in the second fixed block 208, a spring 209 is fixedly connected with the bottom of the second fixed block 208, one end of the spring 209 far away from the second fixed block 208 is fixedly connected with the movable disc 211, a push rod motor 214 is fixedly connected with the bottom of the first fixed block 207, the output end of the push rod motor 214 penetrates through the through hole 212 and is contacted with the movable disc 211, when the output end of the push rod motor 214 pushes against the movable disc 211, the spring 209 is stretched, and when the output end of the push rod motor 214 no longer pushes against the movable disc 211, the spring 209 will drive the movable disc 211 to contract, the motor 210 is fixedly connected to the bottom of the movable disc 211, the drill bit 202 is fixedly connected to the output end of the motor 210, when the output end of the push rod motor 214 pushes against the movable disc 211, the movable disc 211 drives the drill bit 202 to move downwards, and the drill bit 202 contacts the ground, then the motor 210 is started, so that the drill bit 202 can open holes on the ground in the rotation process, and therefore the two sets of drilling devices 2 can be rapidly arranged on blast holes with different distances.
Specifically, in order to make the drill 202 bore the ground better, the bottom end of the drill 202 is set to be conical, and the diameter of the drill 202 is smaller than the width of the inner wall of the chute 3, so that the drill 202 can bore the ground better, and the drill 202 is not blocked by the chute 3.
Specifically, in order that the spring 209 does not affect the normal use of the push rod motor 214, the diameter of the spring 209 is set to be larger than the diameter of the inner wall of the through hole 212, and the spring 209 is located at the outer side of the output end of the push rod motor 214, so that the spring 209 does not affect the normal use of the push rod motor 214.
Specifically, in order to enable the movable column 201 to move smoothly, the width of the inner wall of the balance groove 8 is matched with the diameter of the movable column 201, and the length of the inner wall of the balance groove 8 is matched with the length of the inner wall of the sliding groove 3, so that the movable column 201 can move smoothly without being clamped by the balance groove 8.
Specifically, in order to stably place the rotating electrical machine 213, a groove is formed in the connecting rod 204, and the rotating electrical machine 213 is fixedly connected to an inner wall of the groove, thereby stably placing the rotating electrical machine 213.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the device is used, the device is pushed to the position above two groups of blast holes to be drilled, then the rotating motor 213 is started, so that the output end of the rotating motor 213 drives the gear 205 to rotate, when the gear 205 rotates, the gear 205 forms dislocation of teeth with the meshed rack 9 to generate reverse motion, therefore, the starting of the rotating motor 213 drives the moving column 201 to move, when the two groups of drill bits 202 are positioned above the drilled blast holes, the push rod motor 214 and the motor 210 are controlled to be started, so that the output end of the push rod motor 214 pushes the moving disc 211 to move downwards and make the drill bits 202 touch the ground and continue to move downwards, meanwhile, the output end of the motor 210 drives the drill bits 202 to rotate, thereby the drill bits 202 can drill towards the ground in the rotation process, and the two groups of blast holes with different distances can be drilled quickly.
To sum up, this blasting construction is with starting hole excavating gear through setting up two sets of drilling equipment 2, and then when seting up the big gun hole, promotes the device to assigned position, then controls two sets of drilling equipment 2 and removes to two sets of areas and set up the top of big gun hole, then opens drilling equipment 2 and can bore ground to quick seting up two sets of big gun holes, the device can carry out quick seting up to two sets of big gun holes of distance difference simultaneously, has reduced operating personnel's the work degree of difficulty and inconvenience from this.
This blasting construction is with starting hole excavating gear, through setting up universal wheel 4 and handle 5, and then universal wheel 4 and handle 5 make operating personnel more comfortable and convenient when removing the device, through the cooperation between gear 205 and the rack 9, and then can drive two sets of drilling equipment 2 and remove, and the removal of two sets of drilling equipment 2, make the device can bore two sets of big gun holes of distance difference and move, increased the device's application range from this.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a blasting construction is with starting hole excavating gear, includes organism (1), its characterized in that: the top of organism (1) is provided with handle (5), and be provided with four sets of universal wheels (4) in the bottom of organism (1), cavity (7) have been seted up in the inside of organism (1), and spout (3) have been seted up in the bottom of cavity (7), and set up two sets of chamber (10) and two sets of shifting chute (6) of placing in the inside of organism (1), and place the rear side that chamber (10) are located shifting chute (6), inner wall fixedly connected with rack (9) placing chamber (10), balancing tank (8) have been seted up at the top of cavity (7), and the inside sliding connection of balancing tank (8) has two sets of drilling equipment (2), and the both sides of drilling equipment (2) all run through shifting chute (6) and extend to placing chamber (10) in, and the both sides of drilling equipment (2) mesh with two sets of rack (9) respectively.
2. The blasting hole excavating device for blasting construction according to claim 1, wherein: the drilling device (2) comprises a moving column (201), the moving column (201) is connected in a balance groove (8) in a sliding mode, a sleeve (203) is fixedly connected to the outer side of the moving column (201), connecting rods (204) are fixedly connected to the front side and the rear side of the sleeve (203), one end, far away from the sleeve (203), of each connecting rod (204) penetrates through the moving groove (6) and extends into the placement cavity (10), a rotating motor (213) is fixedly connected to the inner portion of each connecting rod (204), a gear (205) is fixedly connected to the output end of each rotating motor (213), the gear (205) is meshed with a rack (9), a hollow groove (206) is formed in the moving column (201), a first fixing block (207) and a second fixing block (208) are fixedly connected to the inner wall of the hollow groove (206), a through hole (212) is formed in the second fixing block (208), and a spring (209) is fixedly connected to the bottom of the second fixing block (208), and one end of the spring (209) far away from the second fixed block (208) is fixedly connected with the movable disc (211), the bottom of the first fixed block (207) is fixedly connected with the push rod motor (214), the output end of the push rod motor (214) penetrates through the through hole (212) and is in contact with the movable disc (211), the bottom of the movable disc (211) is fixedly connected with the motor (210), and the output end of the motor (210) is fixedly connected with the drill bit (202).
3. The blasting hole excavating device for blasting construction according to claim 2, wherein: the bottom end of the drill bit (202) is conical, and the diameter of the drill bit (202) is smaller than the width of the inner wall of the sliding chute (3).
4. The blasting hole excavating device for blasting construction according to claim 2, wherein: the diameter of the spring (209) is larger than that of the inner wall of the through hole (212), and the spring (209) is positioned on the outer side of the output end of the push rod motor (214).
5. The blasting hole excavating device for blasting construction according to claim 2, wherein: the width of the inner wall of the balance groove (8) is matched with the diameter of the movable column (201), and the length of the inner wall of the balance groove (8) is matched with the length of the inner wall of the sliding groove (3).
6. The blasting hole excavating device for blasting construction according to claim 2, wherein: the inside of connecting rod (204) is seted up flutedly, and rotating electrical machines (213) fixed connection is at the inner wall of recess.
CN201922172412.4U 2019-12-06 2019-12-06 Blasting construction is with starting hole excavating gear Expired - Fee Related CN211038505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922172412.4U CN211038505U (en) 2019-12-06 2019-12-06 Blasting construction is with starting hole excavating gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922172412.4U CN211038505U (en) 2019-12-06 2019-12-06 Blasting construction is with starting hole excavating gear

Publications (1)

Publication Number Publication Date
CN211038505U true CN211038505U (en) 2020-07-17

Family

ID=71569112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922172412.4U Expired - Fee Related CN211038505U (en) 2019-12-06 2019-12-06 Blasting construction is with starting hole excavating gear

Country Status (1)

Country Link
CN (1) CN211038505U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982485A (en) * 2021-10-23 2022-01-28 浙江必利夫检测科技有限公司 Mine trade hand-transmission vibration harm alleviate support appearance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982485A (en) * 2021-10-23 2022-01-28 浙江必利夫检测科技有限公司 Mine trade hand-transmission vibration harm alleviate support appearance
CN113982485B (en) * 2021-10-23 2023-12-15 浙江必利夫检测科技有限公司 Support appearance is alleviated to mine trade hand vibration harm

Similar Documents

Publication Publication Date Title
CN110470507B (en) Automatic reaming device for soil collection
CN110318760B (en) Mining shaft drilling equipment capable of avoiding collapse
CN211038505U (en) Blasting construction is with starting hole excavating gear
CN210863229U (en) Sampling device for geological exploration
CN215718506U (en) Novel geological exploration for oil field device
CN108189250A (en) A kind of building concrete metope automatic positioning punching excavator
CN113358404A (en) Exploration nail position coring device suitable for sandstone type uranium deposit
CN207991850U (en) A kind of soil layer sampling apparatus used for geological prospecting
CN105965445B (en) A kind of portable hammer
CN212453049U (en) Municipal administration pipeline mediation equipment
CN104959650A (en) Retreating assisting electrical drilling machine
CN107288567A (en) A kind of reversible set milling fishing integrated device and its Refloatation method
CN114592789A (en) Hand-held type rock drilling device that road construction used
CN209892111U (en) Directional blasting positioning and punching device
CN112211594A (en) Well pull throughs is gathered to oil well
CN219810762U (en) Foundation concrete strength detection device with fixing effect
CN109746681A (en) A kind of electric vehicle hub porous tapping machine
CN209354907U (en) A kind of mining heading equipment bracket
CN215256090U (en) Combined hydraulic chuck assembly of crawler-type full-hydraulic tunnel drilling machine for coal mine
CN208164020U (en) A kind of blasting boreholes device
CN109128282A (en) A kind of check-valves and its application method of compressor
CN220353868U (en) Hole processing apparatus is collapsed in well lane blasting big gun hole
CN215485891U (en) Miniature perforator of engineering geological exploration
CN214871744U (en) Drilling machine for geotechnical engineering
CN215108763U (en) A combination formula perforating device for water conservancy construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200717

Termination date: 20201206

CF01 Termination of patent right due to non-payment of annual fee