CN211037786U - Civil engineering is with bearing stores pylon reinforcement joint - Google Patents
Civil engineering is with bearing stores pylon reinforcement joint Download PDFInfo
- Publication number
- CN211037786U CN211037786U CN201921837804.1U CN201921837804U CN211037786U CN 211037786 U CN211037786 U CN 211037786U CN 201921837804 U CN201921837804 U CN 201921837804U CN 211037786 U CN211037786 U CN 211037786U
- Authority
- CN
- China
- Prior art keywords
- civil engineering
- connector
- limiting groove
- laminating frame
- fixing bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model relates to a strengthening joint technical field specifically is a bearing stores pylon strengthening joint for civil engineering, including first mechanism and second mechanism, first mechanism includes first connector, first spacing groove, first laminating frame and the first hole of assembling, the inside of first connector is provided with first spacing groove, the first laminating frame of one end fixedly connected with of first connector. This bearing stores pylon attach the enhanced joint for civil engineering, through being provided with first mechanism and second mechanism, first laminating frame and the mutual block of second laminating frame, cooperation fixing bolt's is spacing, it is comparatively convenient to make the device in the installation, only need to put up first laminating frame and the mutual block of second laminating frame, alright liberation both hands wear to establish that fixing bolt carries out, be convenient for install, fixed effectual, the device's first mechanism and second mechanism all adopt a piece formula steel processing to form, such structural design, low cost, simple manufacture, still convenient to use.
Description
Technical Field
The utility model relates to a strengthening joint technical field specifically is a bearing stores pylon strengthening joint for civil engineering.
Background
When present civil engineering, generally adopt the monolithic pouring, need build the bearing plate earlier before pouring, the bearing plate generally is supported by the bearing stores pylon, the bearing stores pylon is established through hanging on the wall layer of having under construction, provide operation platform for the wall construction, when constructor carries out civil engineering on the bearing stores pylon, because construction operation platform is longer, the required main girder steel of solid bearing plate is also longer, make the bearing stores pylon lay many longerons, the longeron links into an organic whole with wall and main girder steel, thereby make the bearing plate through on main girder steel and the firm bearing stores pylon of many longerons.
The current load-bearing stores pylon for civil engineering strengthens the joint, and in specific use, it still has following shortcoming:
1. the existing beam part is a quadrangular prism, every two quadrangular prisms are mutually vertical, and the traditional joint cannot meet the use of a bearing hanger consisting of the quadrangular prisms;
2. the existing fixing method using iron wires has poor fixing effect.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a civil engineering is with bearing stores pylon attach enhance joint through first mechanism and second mechanism for the device is convenient for fixed, and is fixed effectual, has solved the problem of proposing among the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a bearing stores pylon additional strengthening for civil engineering, includes first mechanism and second mechanism, first mechanism includes first connector, first spacing groove, first laminating frame and the first hole of assembling, the inside of first connector is provided with first spacing groove, the first laminating frame of one end fixedly connected with of first connector, the first hole of assembling has been seted up to the inside of first connector, the first hole of assembling runs through the inside of first laminating frame, the hole is assembled to second mechanism including second connector, second spacing groove, second laminating frame and second, the inside of second connector is provided with the second spacing groove, one side fixedly connected with second laminating frame of second connector, the hole has been assembled to the second has been seted up to the inside of second connector.
Optionally, the first hole of assembling and the second hole of assembling are equal in size, a fixing bolt is arranged in the first hole of assembling, and the fixing bolt penetrates through the first hole of assembling and the second hole of assembling.
Optionally, the outer surface of the fixing bolt is provided with a forward thread, the outer surface of the fixing bolt is connected with a fixing nut in a threaded manner, and the inner wall of the fixing nut is provided with a reverse thread matched with the forward thread.
Optionally, the number of the fixing bolts is four.
Optionally, the first limiting groove and the second limiting groove are perpendicular to each other.
Optionally, the first limiting groove and the second limiting groove have the same length.
Optionally, the first mechanism and the second mechanism are fastened to each other.
Optionally, the number of the first attaching frames and the number of the second attaching frames are two, and the first attaching frames are symmetrically distributed at one end of the first connecting head.
(III) advantageous effects
The utility model provides a civil engineering is with bearing stores pylon attach fitting possesses following beneficial effect:
(1) this bearing stores pylon reinforced joint for civil engineering, in the use, through being provided with first mechanism and second mechanism, set up first spacing groove in the first mechanism, the second spacing groove has been seted up in the second mechanism, first spacing groove and second spacing groove mutually perpendicular, can fix mutually perpendicular's longeron, first spacing groove and the equal laminating longeron in second spacing groove, fixed effectual, moreover, first laminating frame and the mutual block of second laminating frame, cooperation fixing bolt's is spacing, make the device difficult not hard up in the use, fixed effectual, the practicality of the device has been improved greatly.
(2) This bearing stores pylon reinforcement joint for civil engineering, in the use, through being provided with first laminating frame and second laminating frame, first laminating frame and the mutual block of second laminating frame, cooperation fixing bolt's is spacing, it is comparatively convenient to make the device in the installation, only need to put up first laminating frame and the mutual block of second laminating frame, alright liberation both hands wear to establish fixing bolt, the installation of being convenient for, the practicality of the device has been improved greatly, not only so the device's first mechanism and second mechanism all adopt a piece formula steel processing to form, such structural design, low cost, simple manufacture, still convenient to use.
Drawings
FIG. 1 is a schematic structural view of a first embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a second embodiment of the present invention;
fig. 3 is a schematic structural diagram of the first mechanism of the present invention;
fig. 4 is a schematic structural diagram of the second mechanism of the present invention.
In the figure: 1-a first mechanism, 101-a first connecting head, 102-a first limiting groove, 103-a first attaching frame, 104-a first assembling hole, 2-a second mechanism, 201-a second connecting head, 202-a second limiting groove, 203-a second attaching frame, 204-a second assembling hole, 3-a fixing bolt and 4-a fixing nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: the first mechanism 1 comprises a first connector 101, a first limit groove 102, a first splicing frame 103 and a first splicing hole 104, the first limit groove 102 is arranged inside the first connector 101, one end of the first connector 101 is fixedly connected with the first splicing frame 103, the first splicing hole 104 is formed inside the first connector 101, the first splicing hole 104 penetrates through the inside of the first splicing frame 103, the second mechanism 2 comprises a second connector 201, a second limit groove 202, a second splicing frame 203 and a second splicing hole 204, the second connector 201 is internally provided with the second limit groove 202, one side of the second connector 201 is fixedly connected with the second splicing frame 203, the second connector 201 is internally provided with the second splicing hole 204, the first splicing hole 104 and the second splicing hole 204 are equal in size, the first splicing hole 104 is internally provided with a fixing bolt 3, the fixing bolt 3 penetrates through the inside of the first splicing hole 104 and the second splicing hole 204, forward screw thread has been seted up to fixing bolt 3's surface, fixing bolt 3's surface threaded connection has fixation nut 4, the reverse screw thread with forward screw thread looks adaptation is seted up to fixation nut 4's inner wall, fixing bolt 3's quantity is four, first spacing groove 102 and second spacing groove 202 mutually perpendicular, the length of first spacing groove 102 and second spacing groove 202 equals, first mechanism 1 and the mutual lock joint of second mechanism 2, the quantity of first laminating frame 103 and second laminating frame 203 is two, first laminating frame 103 symmetric distribution is in the one end of first connector 101, first mechanism 1 and second mechanism 2 all adopt a piece formula steel processing to form, such structural design, low cost, it is simple to make, still convenient to use.
When the mechanism is used, a beam which is perpendicular to the bearing hanging rack and located at the top is placed into the first limiting groove 102 of the first mechanism 1, then the second limiting groove 202 of the second mechanism 2 is attached to the outer surface of the beam which is perpendicular to the bearing hanging rack and located at the bottom, then the second attaching frame 203 is clamped with the first connector 101, meanwhile, the first attaching frame 103 is clamped with the second connector 201, the first assembling hole 104 and the second assembling hole 204 are aligned, at the moment, a worker can liberate two hands to fix the first mechanism 1 and the second mechanism 2 through the fixing bolt 3 and the fixing nut 4.
In conclusion, when the bearing hanger reinforced joint for civil engineering is used, the first mechanism 1 and the second mechanism 2 are arranged, the first limiting groove 102 is formed in the first mechanism 1, the second limiting groove 202 is formed in the second mechanism 2, the first limiting groove 102 and the second limiting groove 202 are perpendicular to each other, the longitudinal beams perpendicular to each other can be fixed, the first limiting groove 102 and the second limiting groove 202 are both attached to the longitudinal beams, the fixing effect is good, moreover, the first attaching frame 103 and the second attaching frame 203 are clamped with each other, and the limit of the fixing bolt 3 is matched, so that the bearing hanger reinforced joint for civil engineering is not easy to loosen in the using process, the fixing effect is good, and the practicability of the bearing hanger reinforced joint for civil engineering is greatly improved; through being provided with first laminating frame 103 and second laminating frame 203, the mutual block of first laminating frame 103 and second laminating frame 203, cooperation fixing bolt 3 is spacing, it is comparatively convenient to make the device in the installation, only need to laminate first laminating frame 103 and second laminating frame 203 mutual block, alright liberation both hands carry out wearing to establish of fixing bolt 3, the installation of being convenient for, the device's practicality has been improved greatly, not only so the device's first mechanism 1 and second mechanism 2 all adopt a piece formula steel processing to form, such structural design, low cost, simple manufacture, still convenient to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (8)
1. The utility model provides a civil engineering is with bearing stores pylon reinforcement joint, includes first mechanism (1) and second mechanism (2), its characterized in that: the first mechanism (1) comprises a first connecting head (101), a first limiting groove (102), a first attaching frame (103) and a first assembling hole (104), a first limiting groove (102) is arranged in the first connecting head (101), one end of the first connecting head (101) is fixedly connected with a first attaching frame (103), a first splicing hole (104) is arranged inside the first connecting head (101), the first assembling hole (104) penetrates through the inside of the first attaching frame (103), the second mechanism (2) comprises a second connector (201), a second limiting groove (202), a second attaching frame (203) and a second assembling hole (204), a second limiting groove (202) is arranged in the second connector (201), one side of the second connector (201) is fixedly connected with a second attaching frame (203), and a second assembling hole (204) is formed in the second connector (201).
2. The civil engineering load-bearing hanger reinforcement joint of claim 1, wherein: the size of the first assembling hole (104) is equal to that of the second assembling hole (204), a fixing bolt (3) is arranged inside the first assembling hole (104), and the fixing bolt (3) penetrates through the first assembling hole (104) and the second assembling hole (204).
3. The civil engineering load-bearing hanger reinforcement joint of claim 2, wherein: the outer surface of the fixing bolt (3) is provided with a forward thread, the outer surface of the fixing bolt (3) is in threaded connection with a fixing nut (4), and the inner wall of the fixing nut (4) is provided with a reverse thread matched with the forward thread.
4. The civil engineering load-bearing hanger reinforcement joint of claim 2, wherein: the number of the fixing bolts (3) is four.
5. The civil engineering load-bearing hanger reinforcement joint of claim 1, wherein: the first limiting groove (102) and the second limiting groove (202) are perpendicular to each other.
6. The civil engineering load-bearing hanger reinforcement joint of claim 1, wherein: the first limiting groove (102) and the second limiting groove (202) are equal in length.
7. The civil engineering load-bearing hanger reinforcement joint of claim 1, wherein: the first mechanism (1) and the second mechanism (2) are buckled with each other.
8. The civil engineering load-bearing hanger reinforcement joint of claim 1, wherein: the number of the first attaching frames (103) and the number of the second attaching frames (203) are two, and the first attaching frames (103) are symmetrically distributed at one end of the first connecting head (101).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921837804.1U CN211037786U (en) | 2019-10-29 | 2019-10-29 | Civil engineering is with bearing stores pylon reinforcement joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921837804.1U CN211037786U (en) | 2019-10-29 | 2019-10-29 | Civil engineering is with bearing stores pylon reinforcement joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211037786U true CN211037786U (en) | 2020-07-17 |
Family
ID=71564937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921837804.1U Expired - Fee Related CN211037786U (en) | 2019-10-29 | 2019-10-29 | Civil engineering is with bearing stores pylon reinforcement joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211037786U (en) |
-
2019
- 2019-10-29 CN CN201921837804.1U patent/CN211037786U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207862749U (en) | A kind of novel combination type sunpender | |
CN208310220U (en) | A kind of back cord locking structure at wall external corner | |
CN211037786U (en) | Civil engineering is with bearing stores pylon reinforcement joint | |
CN101575875B (en) | Construction method of cantilever steel girder | |
CN211897919U (en) | External prestress bearing device for reinforcing old bridge | |
CN110424576A (en) | A kind of swollen stone inner partition plate of assembled and faced wall | |
CN204151695U (en) | Be applicable to the combination Hanging Basket system of continuous rigid frame bridge or the full beam section construction of continuous girder bridge | |
CN210827981U (en) | Assembled steel construction externally-hung wallboard | |
CN206467778U (en) | A kind of modular architectural floor and beam attachment structure | |
CN213627018U (en) | Fixing device is used in civil engineering construction | |
CN115233833A (en) | Sleeve connection structure is exempted from to assembled shear force wall | |
CN210597873U (en) | Improved steel structure supporting beam | |
CN211597087U (en) | Beam and plate connecting node structure of assembled framework plate building | |
CN209339377U (en) | A kind of installation fixed structure of building wall board | |
CN111155657A (en) | Beam-plate connecting node structure of fabricated framework plate building and connecting method thereof | |
CN211229189U (en) | Steel concrete composite beam convenient to butt joint | |
CN213265226U (en) | Construction elevator attaches wall convenient to installation attaches wall device | |
CN210031879U (en) | Raft foundation detachable steel bar section steel support frame | |
CN217811637U (en) | Reinforced large-span laminated wood main beam connecting structure | |
CN211690985U (en) | Aerated concrete slab | |
CN203238778U (en) | Embedded part for composite floor slab | |
CN215104325U (en) | Pre-buried connecting piece of railway bridge accessory facility | |
CN114622478B (en) | Reinforced steel structure bridge prefabrication assembly | |
CN214062125U (en) | Steel grating fixing device convenient to disassemble | |
CN210797309U (en) | Water conservancy construction beam slab reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200717 Termination date: 20211029 |
|
CF01 | Termination of patent right due to non-payment of annual fee |