CN211014369U CN201921611606.3U CN201921611606U CN211014369U CN 211014369 U CN211014369 U CN 211014369U CN 201921611606 U CN201921611606 U CN 201921611606U CN 211014369 U CN211014369 U CN 211014369U
Authority
CN
China
Prior art keywords
fixture block
simulation platform
groove
platform body
lower extreme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921611606.3U
Other languages
Chinese (zh)
Inventor
范教领
李静
赵路辉
李建鹏
耿光友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Ruimu Intelligent Technology Co.,Ltd.
Original Assignee
Henan Ruimu Electric Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Ruimu Electric Power Technology Co ltd filed Critical Henan Ruimu Electric Power Technology Co ltd
Priority to CN201921611606.3U priority Critical patent/CN211014369U/en
Application granted granted Critical
Publication of CN211014369U publication Critical patent/CN211014369U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses an indoor type high supply gaugement special transformer user electricity inspection simulation platform, including emulation platform body and mounting panel, the first fixture block of lower extreme fixedly connected with on emulation platform body right side, the left lower extreme fixedly connected with L type fixture block of emulation platform body, the left side of emulation platform body and the lower extreme that is located L type fixture block have first layer board through first spring swing joint, the mounting groove has been seted up to the middle-end at mounting panel top, the draw-in groove has been seted up to the lower extreme on mounting groove right side, the left end of mounting groove bottom has the second layer board through second spring swing joint, the utility model discloses a first fixture block, the draw-in groove, the push rod, the connecting rod, the second fixture block, first spring, first layer board, L type fixture block, the effect of second spring and second layer board to reached the mesh of being convenient for the installation, solved current emulation platform and be not convenient for the installation, need the installation that the staff wastes time and energy, increased staff intensity.

Description

Indoor high-power-supply high-count special transformer user electricity utilization inspection simulation platform
Technical Field
The utility model relates to a simulation platform technical field specifically is an indoor type height supplies high count special transformer user power consumption inspection simulation platform.
Background
The high-power supply high-count means that high-voltage power supply measures at high-voltage device PT, CT simultaneously, high-power supply low-count means high-voltage power supply, measure at low pressure side device CT, "high-power supply low-count" high-power supply high-count "supplies the electric power of user all to be the high pressure, indoor type high-power supply high-count special transformer user power consumption inspection needs to be regulated and control with simulation platform, and current simulation platform is not convenient for install, the installation that needs the staff to waste time and energy, staff's intensity of labour has been increased, for this reason, we provide an indoor type high-power supply high-count special transformer user power consumption inspection simulation platform.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an indoor type height supplies the gauged special change user power consumption inspection simulation platform to solve the problem that provides in the above-mentioned background art.
In order to achieve the purpose, the utility model provides a following technical scheme is that indoor type height supplies high count special transformer user electricity inspection simulation platform, including simulation platform body and mounting panel, the lower extreme fixedly connected with first fixture block on simulation platform body right side, the left lower extreme fixedly connected with L type fixture block of simulation platform body, the left side of simulation platform body and the lower extreme that is located L type fixture block have first layer board through first spring swing joint, the mounting groove has been seted up to the middle-end at mounting panel top, the draw-in groove has been seted up to the lower extreme on mounting groove right side, the left end of mounting groove bottom has the second layer board through second spring swing joint, the top sliding connection of second layer board has the connecting rod, the right-hand member fixedly connected with second fixture block of connecting rod, the left end fixedly connected with push rod of connecting rod.
Preferably, a through groove is formed in the left end of the top of the mounting plate, and a push rod is inserted into an inner cavity of the through groove.
Preferably, the first clamping block is clamped with the clamping groove.
Preferably, the second latch is clamped with the L-type latch.
Preferably, the top of the push rod is spherical, and the bottom of the push rod is slidably connected to the top of the second supporting plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses first fixture block has been set up, the draw-in groove, the push rod, the connecting rod, the second fixture block, first spring, first layer board, L type fixture block, second spring and second layer board, when people need install the emulation platform body, at first put into the mounting groove with the right lower extreme of emulation platform body, make first fixture block on the emulation platform body inject in the draw-in groove simultaneously, then put into the mounting groove with the left end of emulation platform body, then press the push rod downwards, when the push rod reachs the lower extreme, promote the push rod right, the push rod can drive the connecting rod at the top of second layer board and remove right, the connecting rod can drive the second fixture block and remove right when removing the right extreme, when the second fixture block removes the right extreme, loosen the push rod, the elasticity of second spring can drive the second fixture block rebound through the second layer board, the elasticity of first spring can drive the second fixture block and remove left through first layer board, make second fixture block and L type fixture block joint, make emulation platform body fixed mounting on the mounting panel, thereby the mesh of being convenient to install, the current emulation platform that needs the installation staff hard to labor has been solved, the labour problem that the installation has wasted time and labor intensity.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic view of the a position of the present invention.
In the figure, the simulation platform comprises a simulation platform body 1, a mounting plate 2, a first clamping block 3, a clamping groove 4, a clamping groove 5, a mounting groove 6, a push rod 7, a second clamping block 7, a first spring 8, a first supporting plate 9, a clamping block 10, an L type clamping block 11, a second spring 12, a second supporting plate 13, a through groove 14 and a connecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses a simulation platform body 1, mounting panel 2, first fixture block 3, draw-in groove 4, mounting groove 5, push rod 6, second fixture block 7, first spring 8, first layer board 9, L type fixture block 10, second spring 11, second layer board 12, lead to groove 13 and connecting rod 14 part and be the general standard component or the part that technical staff in the field knows, and its structure and principle all are that this technical staff all can learn through the technical manual or learn through conventional experimental method.
Referring to fig. 1-2, an indoor type high supply height meter special change user electricity inspection simulation platform, including simulation platform body 1 and mounting panel 2, a through groove 13 is provided at a left end of a top of the mounting panel 2, a push rod 6 is inserted into an inner cavity of the through groove 13, a first fixture block 3 is fixedly connected to a lower end of a right side of the simulation platform body 1, the first fixture block 3 is connected to a clamping groove 4 in a clamping manner, a L type fixture block 10 is fixedly connected to a left lower end of the simulation platform body 1, a left end of the simulation platform body 1 and a lower end of a L type fixture block 10 are movably connected to a first support plate 9 through a first spring 8, a mounting groove 5 is provided at a middle end of the top of the mounting panel 2, a clamping groove 4 is provided at a lower end of the right side of the mounting panel 5, a left end of the bottom of the mounting groove 5 is movably connected to a second support plate 12 through a second spring 11, a connecting rod 14 is slidably connected to a top of the second support plate 12, a right end of the connecting rod 14 is fixedly connected to a second fixture block 7, the second fixture block 7 is connected to the clamping groove 10 connected to the clamping manner, the second fixture block 7 and the fixture block 6 is connected to the clamping groove 6, when people need to mount the simulation platform body 1, the simulation platform body can move, when the simulation platform body, the simulation platform can move, the simulation platform body, the simulation platform can move to the push rod 6, the simulation platform body, the simulation platform can move to the push rod 6, the simulation platform body, the push rod 6, the simulation platform can move to the.
When the simulation platform is used, the first fixture block 3, the clamping groove 4, the push rod 6, the connecting rod 14, the second fixture block 7, the first spring 8, the first supporting plate 9, the L-type fixture block 10, the second spring 11 and the second supporting plate 12 are arranged, when people need to install the simulation platform body 1, firstly, the right lower end of the simulation platform body 1 is placed into the installation groove 5, meanwhile, the first fixture block 3 on the simulation platform body 1 is inserted into the clamping groove 4, then, the left end of the simulation platform body 1 is placed into the installation groove 5, then, the push rod 6 is pressed downwards, when the push rod 6 reaches the lowest end, the push rod 6 is pushed rightwards, the push rod 6 can drive the connecting rod 14 to move rightwards at the top of the second supporting plate 12, the connecting rod 14 can drive the second fixture block 7 to move rightwards while moving rightwards, when the second fixture block 7 moves to the rightmost end, the push rod 6 is loosened, the elastic force of the second spring 11 can drive the second fixture block 7 to move upwards through the second supporting plate 12, the elastic force of the first spring 8 can drive the second fixture block 7 to move rightwards, the labor intensity of the installation of the simulation platform body 352 is increased, and labor intensity of the installation of the existing simulation platform is increased, and the labor intensity of the installation platform.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides an indoor type height supplies to count special change user electricity inspection simulation platform, includes simulation platform body (1) and mounting panel (2), its characterized in that the lower extreme fixedly connected with first fixture block (3) on simulation platform body (1) right side, the left lower extreme fixedly connected with L type fixture block (10) of simulation platform body (1), the left side of simulation platform body (1) and the lower extreme that is located L type fixture block (10) have first layer board (9) through first spring (8) swing joint, mounting groove (5) have been seted up to the middle-end at mounting panel (2) top, draw-in groove (4) have been seted up to the lower extreme on mounting groove (5) right side, the left end of mounting groove (5) bottom has second layer board (12) through second spring (11) swing joint, the top sliding connection of second layer board (12) has connecting rod (14), the right-end fixedly connected with second fixture block (7) of connecting rod (14), the left end fixedly connected with push rod (6) of connecting rod (14).
2. The indoor high-supply-and-high-count special transformer user electricity inspection simulation platform according to claim 1, wherein: a through groove (13) is formed in the left end of the top of the mounting plate (2), and a push rod (6) is inserted into an inner cavity of the through groove (13).
3. The indoor high-supply-and-high-count special transformer user electricity inspection simulation platform according to claim 1, wherein: the first clamping block (3) is clamped with the clamping groove (4).
4. The indoor high-supply-and-high-count special transformer user electricity inspection simulation platform according to claim 1, wherein the second fixture block (7) is clamped with the L-type fixture block (10).
5. The indoor high-supply-and-high-count special transformer user electricity inspection simulation platform according to claim 1, wherein: the top of the push rod (6) is spherical, and the bottom of the push rod (6) is connected to the top of the second supporting plate (12) in a sliding mode.
CN201921611606.3U 2019-09-26 2019-09-26 Indoor high-power-supply high-count special transformer user electricity utilization inspection simulation platform Active CN211014369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921611606.3U CN211014369U (en) 2019-09-26 2019-09-26 Indoor high-power-supply high-count special transformer user electricity utilization inspection simulation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921611606.3U CN211014369U (en) 2019-09-26 2019-09-26 Indoor high-power-supply high-count special transformer user electricity utilization inspection simulation platform

Publications (1)

Publication Number Publication Date
CN211014369U true CN211014369U (en) 2020-07-14

Family

ID=71478533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921611606.3U Active CN211014369U (en) 2019-09-26 2019-09-26 Indoor high-power-supply high-count special transformer user electricity utilization inspection simulation platform

Country Status (1)

Country Link
CN (1) CN211014369U (en)

Similar Documents

Publication Publication Date Title
CN110364658A (en) A kind of forklift battery of antidetonation shatter-resistant
CN209516743U (en) A kind of photovoltaic energy monitoring data acquisition terminal
CN211014369U (en) Indoor high-power-supply high-count special transformer user electricity utilization inspection simulation platform
CN211557015U (en) Motor convenient to temporarily install
CN209981738U (en) Control device for micro-grid for storage battery SOC adjustment
CN210807058U (en) But quick assembly disassembly's switching power supply
CN108736344B (en) Base for installing power equipment
CN208226316U (en) Armouring mobile AC metal enclosed switchgear
CN203277971U (en) Back side crossbeam
CN203706942U (en) Outdoor isolation switch mechanical locking device of transformer station
CN221502854U (en) Emergency power supply device for power distribution room
CN204967085U (en) Join in marriage and become rack wiring operation platform
CN204156394U (en) The fixed closed looped network switch apparatus of box
CN210201756U (en) Photovoltaic equipment's removal storage device
CN218416190U (en) DC power supply device matched with smart grid
CN211061589U (en) Adjustable direct-current power supply for switch test
CN220382543U (en) Magnetic coagulation power distribution cabinet
CN214381876U (en) Improved generation new forms of energy wind-powered electricity generation converter cabinet
CN212749029U (en) Voltage and current detection equipment convenient to install
CN217599166U (en) Real device of instructing of electric automatization engineering
CN215071174U (en) Movable power cabinet
CN210487831U (en) Adjustable simulation load device for LED light source
CN213401930U (en) Contact cabinet of low-voltage intelligent power distribution cabinet
CN205430114U (en) Combined type miner high pressure, middling pressure and low pressure auto -change over device
CN214958065U (en) Sealing door structure for high-voltage equipment power distribution cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450001 floor 4, building 5, University Science Park, Zhongyuan Institute of technology, Longhu Town, Xinzheng City, Zhengzhou City, Henan Province

Patentee after: Henan Ruimu Intelligent Technology Co.,Ltd.

Address before: 450001 floor 4, building 5, University Science Park, Zhongyuan Institute of technology, Longhu Town, Xinzheng City, Zhengzhou City, Henan Province

Patentee before: Henan Ruimu Electric Power Technology Co.,Ltd.