CN211010595U - An adjustable support device - Google Patents
An adjustable support device Download PDFInfo
- Publication number
- CN211010595U CN211010595U CN201921322763.2U CN201921322763U CN211010595U CN 211010595 U CN211010595 U CN 211010595U CN 201921322763 U CN201921322763 U CN 201921322763U CN 211010595 U CN211010595 U CN 211010595U
- Authority
- CN
- China
- Prior art keywords
- sliding trolley
- construction equipment
- bracket
- connecting truss
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及支座装置技术领域,具体是一种可调式支座装置,包括底座、滑动小车、上部升降支架和连接桁架,底座包括底部支架、液压支腿和驱动轮,底部支架包括两横向支架和两纵向支架,两横向支架顶部在横向方向上均设有一滑槽,滑动小车的四滑轮均放置于两横向支架的滑槽内,滑动小车底部左侧连接有两横向推拉杆,上部升降支架通过四电动杆连接于滑动小车的顶部,连接桁架通过插销与上部升降支架顶部相连。本实用新型横向推拉杆和电动杆的设计,可以对施工设备的位置进行微调,保证了施工设备的精准定位;连接桁架的可加长设计,可以调节施工设备的下放深度,用于施工设备的粗定位。
The utility model relates to the technical field of support devices, in particular to an adjustable support device, comprising a base, a sliding trolley, an upper lifting bracket and a connecting truss, the base includes a bottom bracket, a hydraulic outrigger and a driving wheel, and the bottom bracket includes two transverse The bracket and the two longitudinal brackets, the top of the two horizontal brackets are provided with a chute in the horizontal direction, the four pulleys of the sliding trolley are placed in the chutes of the two horizontal brackets, and the left side of the bottom of the sliding trolley is connected with two horizontal push-pull rods, and the upper part is lifted up and down The bracket is connected to the top of the sliding trolley through four electric poles, and the connecting truss is connected to the top of the upper lifting bracket through a latch. The design of the horizontal push-pull rod and the electric rod of the utility model can fine-tune the position of the construction equipment and ensure the precise positioning of the construction equipment; the lengthening design of the connecting truss can adjust the lowering depth of the construction equipment, which is used for the roughness of the construction equipment. position.
Description
技术领域technical field
本实用新型涉及支座装置技术领域,具体是一种可调式支座装置。The utility model relates to the technical field of support devices, in particular to an adjustable support device.
背景技术Background technique
在地下连续墙施工中,传统的地下连续墙施工设备升降方式都是现场采用吊车进行水平和竖直方向位移,由于吊车的钢丝绳是柔性部件,故吊装过程中会产生水平晃动,对现场工作人员安全产生隐患,且设备左右摆动也不利于现场位置找准对正,同时由于地连墙施工周期长,吊车必须一直在现场工作,租赁费用也会提高,增大了施工成本。In the construction of underground diaphragm wall, the traditional lifting method of underground diaphragm wall construction equipment is to use cranes for horizontal and vertical displacement on site. Since the wire rope of the crane is a flexible part, horizontal shaking will occur during the hoisting process. There are hidden dangers in safety, and the swinging of the equipment is not conducive to the alignment of the site position. At the same time, due to the long construction period of the ground wall, the crane must always work on the site, and the rental cost will also increase, increasing the construction cost.
实用新型内容Utility model content
本实用新型的目的就是为了解决现有技术中的上述技术问题,提供一种结构新颖、安全可靠、施工方便的可调式支座装置。The purpose of this utility model is to solve the above-mentioned technical problems in the prior art, and to provide an adjustable support device with novel structure, safety and reliability, and convenient construction.
为实现上述目的,提供一种可调式支座装置,其特征在于,包括底座、滑动小车、上部升降支架和连接桁架,In order to achieve the above purpose, an adjustable support device is provided, which is characterized in that it includes a base, a sliding trolley, an upper lifting bracket and a connecting truss,
所述底座包括底部支架、液压支腿和驱动轮,所述底部支架包括两横向支架和两纵向支架,两横向支架顶部在横向方向上均设有一滑槽,所述滑动小车的四滑轮均放置于两横向支架的滑槽内,所述滑动小车底部左侧连接有两横向推拉杆,所述上部升降支架通过四电动杆连接于所述滑动小车的顶部,所述连接桁架通过插销与所述上部升降支架顶部相连。The base includes a bottom bracket, hydraulic outriggers and driving wheels, the bottom bracket includes two lateral brackets and two longitudinal brackets, the tops of the two lateral brackets are both provided with a chute in the lateral direction, and the four pulleys of the sliding trolley are placed. In the chute of the two transverse supports, two transverse push-pull rods are connected to the left side of the bottom of the sliding trolley, the upper lifting support is connected to the top of the sliding trolley through four electric rods, and the connecting truss is connected to the The top of the upper lift bracket is attached.
优选地,所述连接桁架设有销钉孔,且所述连接桁架可以通过销钉进行连接加长。Preferably, the connecting truss is provided with pin holes, and the connecting truss can be connected and lengthened by pins.
优选地,所述液压支腿和所述驱动轮均安装于所述底部支架的底部。Preferably, both the hydraulic outrigger and the drive wheel are mounted on the bottom of the bottom bracket.
优选地,两所述横向推拉杆由一牵引装置驱动。Preferably, the two lateral push-pull rods are driven by a traction device.
本实用新型同现有技术相比,其优点在于:Compared with the prior art, the utility model has the advantages of:
1.本实用新型横向推拉杆和电动杆的设计,可以对施工设备的位置进行微调,保证了施工设备的精准定位;1. The design of the horizontal push-pull rod and the electric rod of the present utility model can fine-tune the position of the construction equipment, ensuring the precise positioning of the construction equipment;
2.本实用新型连接桁架的可加长设计,可以调节施工设备的下放深度,用于施工设备的粗定位;2. The extension design of the connecting truss of the present invention can adjust the lowering depth of the construction equipment and is used for the rough positioning of the construction equipment;
3.本实用新型的使用方法适用范围较广,施工简便,可靠性高;3. The use method of the present utility model has a wide range of application, simple construction and high reliability;
4.本实用新型的施工速度快,可以减少现场吊车使用,降低租赁费用,节约施工成本。4. The construction speed of the utility model is fast, the use of on-site cranes can be reduced, the rental cost can be reduced, and the construction cost can be saved.
附图说明Description of drawings
图1为本实用新型的一种可调式支座装置的俯视图;Fig. 1 is a top view of an adjustable support device of the present invention;
图2为本实用新型的一种可调式支座装置的主视图;2 is a front view of an adjustable support device of the present invention;
图3为本实用新型的连接桁架的结构示意图;3 is a schematic structural diagram of a connecting truss of the present invention;
图4为本实用新型的实施例的示意图。FIG. 4 is a schematic diagram of an embodiment of the present invention.
如图所示,图中:As shown in the figure, in the figure:
1. 横向支架 2. 纵向支架 3. 液压支腿 4. 驱动轮 5. 滑槽 6. 横向推拉杆7. 上部升降支架 8. 电动杆 9. 连接桁架 10. 销钉孔 11. 滑动小车12.滑轮13. 水下切割装置。1.
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步说明,这种装置的结构和原理对本专业的人来说是非常清楚的。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。The present utility model will be further described below in conjunction with the accompanying drawings. The structure and principle of this device are very clear to those skilled in the art. It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not intended to limit the present invention.
如图1至图3所示,本实用新型为一种可调式支座装置,包括底座、滑动小车、上部升降支架和连接桁架,底座包括底部支架、液压支腿和驱动轮,底部支架包括两横向支架和两纵向支架,两横向支架顶部在横向方向上均设有一滑槽,滑动小车的四滑轮均放置于两横向支架的滑槽内,滑动小车底部左侧连接有两横向推拉杆,两横向推拉杆由一牵引装置驱动,牵引装置驱动两横向推拉杆在水平方向上运动,横向推拉杆带动滑动小车在滑槽内移动,通过调节横向推拉杆的伸缩距离和速度,可以使施工设备在水平方向调整。As shown in Figures 1 to 3, the utility model is an adjustable support device, including a base, a sliding trolley, an upper lifting bracket and a connecting truss, the base includes a bottom bracket, a hydraulic outrigger and a driving wheel, and the bottom bracket includes two A horizontal bracket and two vertical brackets. The top of the two horizontal brackets is provided with a chute in the horizontal direction. The four pulleys of the sliding trolley are placed in the chutes of the two horizontal brackets. The lateral push-pull rod is driven by a traction device, the traction device drives two lateral push-pull rods to move in the horizontal direction, and the lateral push-pull rod drives the sliding trolley to move in the chute. By adjusting the telescopic distance and speed of the lateral push-pull rod, the construction equipment can be Horizontal adjustment.
上部升降支架通过四电动杆连接于滑动小车的顶部,连接桁架通过插销与上部升降支架顶部相连,可以将施工设备与连接桁架底部连接,通过连接桁架将施工设备下放,且四根电动杆同时伸缩,保证了施工设备在竖直方向移动的平稳,此外,连接桁架设有销钉孔,且连接桁架可以通过销钉进行连接加长,以满足施工设备不同的下放深度。The upper lifting bracket is connected to the top of the sliding trolley through four electric poles, and the connecting truss is connected to the top of the upper lifting bracket through bolts. The construction equipment can be connected to the bottom of the connecting truss. , to ensure the smooth movement of the construction equipment in the vertical direction. In addition, the connecting trusses are provided with pin holes, and the connecting trusses can be connected and lengthened by pins to meet the different laying depths of the construction equipment.
液压支腿和驱动轮均安装于底部支架的底部。使用者可以将液压支腿收起,通过驱动轮带动装置的移动;使用者也可以将液压支腿伸出,用于支撑固定装置。Both hydraulic outriggers and drive wheels are mounted on the bottom of the bottom bracket. The user can retract the hydraulic outrigger to drive the movement of the device through the driving wheel; the user can also extend the hydraulic outrigger to support the fixing device.
本实用新型还包括一种可调式支座装置的使用方法,该使用方法包括以下步骤:The utility model also includes a method for using the adjustable support device, which comprises the following steps:
1.施工准备:完成资料准备,场地布置,做好临时配电。1. Construction preparation: complete data preparation, site layout, and temporary power distribution.
2. 安放装置:将装置移动至预设位置。2. Place the device: Move the device to the preset position.
3. 伸开液压支腿,固定底座位置:将底部支架的液压支腿伸开,通过液压支腿固定支撑装置。3. Extend the hydraulic outriggers and fix the base position: Extend the hydraulic outriggers of the bottom bracket and fix the support device through the hydraulic outriggers.
4.将待下放的施工设备与连接桁架在地面完成连接。4. Complete the connection between the construction equipment to be deployed and the connecting truss on the ground.
5.将施工设备和连接桁架吊入装置。5. Hoist the construction equipment and connecting trusses into the unit.
6.根据施工设备的下放深度,接长连接桁架,到达指定位置。6. According to the laying depth of the construction equipment, the connecting trusses are lengthened to reach the designated position.
7.调节横向推拉杆和电动杆,用于施工设备的位置找正,对施工设备进行精准定位。7. Adjust the horizontal push-pull rod and electric rod to align the position of the construction equipment and accurately position the construction equipment.
8.施工设备工作。8. Construction equipment work.
9.施工完毕,收缩液压支腿,推动装置至下一工位。9. After the construction is completed, shrink the hydraulic outriggers and push the device to the next station.
10.进行下一工序:重复以上操作。10. Proceed to the next process: repeat the above operations.
实施例Example
如图4所示,本实施例的施工设备为专利号CN208513767U的一种水下切割装置,可以将该水下切割装置通过螺栓与连接桁架连接,将水下切割装置下放,通过调节横向推拉杆和电动杆的位置来微调水下切割装置,精准定位水下切割装置的位置,进而提高水下切割装置的工作效率。As shown in Figure 4, the construction equipment of this embodiment is an underwater cutting device with the patent number CN208513767U. The underwater cutting device can be connected to the connecting truss through bolts, the underwater cutting device can be lowered, and the horizontal push-pull rod can be adjusted by adjusting the underwater cutting device. And the position of the electric rod to fine-tune the underwater cutting device, accurately locate the position of the underwater cutting device, and then improve the working efficiency of the underwater cutting device.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921322763.2U CN211010595U (en) | 2019-08-15 | 2019-08-15 | An adjustable support device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921322763.2U CN211010595U (en) | 2019-08-15 | 2019-08-15 | An adjustable support device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211010595U true CN211010595U (en) | 2020-07-14 |
Family
ID=71504967
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921322763.2U Expired - Fee Related CN211010595U (en) | 2019-08-15 | 2019-08-15 | An adjustable support device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211010595U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110553127A (en) * | 2019-08-15 | 2019-12-10 | 中铁上海工程局集团有限公司 | An adjustable support device and its use method |
-
2019
- 2019-08-15 CN CN201921322763.2U patent/CN211010595U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110553127A (en) * | 2019-08-15 | 2019-12-10 | 中铁上海工程局集团有限公司 | An adjustable support device and its use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206655129U (en) | A kind of nacelle device of bridge construction | |
| CN102242602A (en) | Spiral pile drilling machine | |
| CN207332754U (en) | Electric pole is digged pit upright bar integrated apparatus | |
| CN206290270U (en) | A kind of simple chassis of multifunctional tunnel preliminary bracing | |
| CN205257825U (en) | Offshore platform fan hoisting system | |
| CN107879269A (en) | The electronic lifting bracket of cable tunnel inner column formula cable | |
| CN110578476B (en) | Slope drilling construction platform | |
| CN211010595U (en) | An adjustable support device | |
| CN111749259B (en) | A construction method suitable for rock-embedded construction of offshore wind power high pile cap foundation | |
| CN110552359B (en) | Support hanging basket type high and steep slope anchoring construction method | |
| CN110552357B (en) | Tower crane type high and steep slope anchoring construction method | |
| CN105544541B (en) | The opposed lightened piling machine of high frequency | |
| CN204827251U (en) | Novel suit derrick upright | |
| CN206972169U (en) | Drilling equipment | |
| CN221941332U (en) | Offshore photovoltaic pile piling device and offshore photovoltaic pile driving platform | |
| CN113756716A (en) | A rotary drilling rig | |
| CN110553127A (en) | An adjustable support device and its use method | |
| CN217942432U (en) | Integral standard festival shaping frock of tower machine fishplate | |
| CN216807824U (en) | Pipeline mobile device for hydraulic engineering | |
| CN110552358A (en) | Construction equipment for anchoring tower crane type high and steep slope | |
| CN213827696U (en) | Tubular pile tip auxiliary device for welding for building construction | |
| CN109236211A (en) | A kind of production rig | |
| CN215105317U (en) | A construction device for foundation engineering | |
| CN202493276U (en) | Adjustable support for arch frame | |
| CN208252046U (en) | A kind of anchor cable of adjustable-angle pulls out light rig job platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 200436 No. 278, three JIANGCHANG Road, Jingan District, Shanghai Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC Patentee after: China Railway Municipal Environmental Construction Co.,Ltd. Address before: 200436 No. 278, three JIANGCHANG Road, Jingan District, Shanghai Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC Patentee before: China Railway Shanghai Engineering Bureau Group Municipal Engineering Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200714 |