CN211007872U - Electric iron tower reinforcing apparatus convenient to installation - Google Patents
Electric iron tower reinforcing apparatus convenient to installation Download PDFInfo
- Publication number
- CN211007872U CN211007872U CN201921858970.XU CN201921858970U CN211007872U CN 211007872 U CN211007872 U CN 211007872U CN 201921858970 U CN201921858970 U CN 201921858970U CN 211007872 U CN211007872 U CN 211007872U
- Authority
- CN
- China
- Prior art keywords
- plate
- steel pipe
- nut
- threaded rod
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses an electricity railway tower reinforcing apparatus convenient to installation, including ground, the inner chamber on ground has been watered first concrete and second concrete respectively, the inner chamber of first concrete and second concrete runs through the first threaded rod of fixedly connected with and second threaded rod respectively, the top on ground is provided with connecting plate and bed plate respectively, the top of first threaded rod and second threaded rod runs through respectively to the top of connecting plate and bed plate and overlaps respectively and be equipped with first nut and second nut. The utility model discloses a cooperation that sets up ground, first nut, second nut, reinforcing plate, first steel pipe, third nut, fourth nut, second bolt, second steel pipe, second fixed plate, first bolt, gusset plate, connecting plate, second threaded rod, first threaded rod, bed plate, first concrete and second concrete is used, possesses and consolidates effectually, advantage that reinforcing apparatus installation effectiveness is high.
Description
Technical Field
The utility model relates to an iron tower technical field specifically is an iron tower reinforcing apparatus convenient to installation.
Background
The power transmission tower is a high-rise structure, is very sensitive to inclined deformation, has high requirements on uneven settlement of a foundation, is a supporting point of an overhead line, can be divided into a concrete pole, a steel pipe pole, an angle steel tower and a steel pipe tower according to the material properties, can be divided into a suspension type tower and a strain type tower according to the stress properties, and can be divided into a single-loop tower, a double-loop tower and a multi-loop tower according to the loop number.
The steel-pipe pole is also transmission tower's a kind, the steel-pipe pole is for conventional angle steel iron tower area little, the appearance is pleasing to the eye, processing is easy, construction convenience, the application of broadcasting has been obtained in the high-tension overhead line in urban area, the junction of two steel pipes of steel-pipe pole common at present only uses the bolt to carry out fixed connection, connection structure is simple like this, use in coastal city and meet the stormy weather, the junction of steel pipe breaks easily, in case the fracture will cause great incident and loss of property, and present most of reinforcing apparatus all accomplish through the welding, the installation technological requirement is high, the installation effectiveness is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric iron tower reinforcing apparatus convenient to installation possesses and consolidates effectually, and the advantage that reinforcing apparatus installation effectiveness is high has solved current steel-pipe pole installation structure simply, runs into the problem that bad weather breaks easily and reinforcing apparatus installation effectiveness is low.
In order to achieve the above object, the utility model provides a following technical scheme: a conveniently-installed electric iron tower reinforcing device comprises a ground, wherein a first concrete and a second concrete are respectively poured into an inner cavity of the ground, a first threaded rod and a second threaded rod respectively penetrate through the inner cavities of the first concrete and the second concrete, a connecting plate and a base plate are respectively arranged at the top of the ground, the tops of the first threaded rod and the second threaded rod respectively penetrate through the tops of the connecting plate and the base plate and are respectively sleeved with a first nut and a second nut, a first steel pipe is fixedly connected to the top of the base plate, a first fixing plate and a reinforcing plate are sequentially sleeved on the surface of the first steel pipe from top to bottom, a first bolt is arranged at the bottom of the reinforcing plate, the top of the first bolt sequentially penetrates through the connecting plate and the reinforcing plate and extends to the top of the reinforcing plate, a third nut is sleeved on the top of the first steel pipe, a second steel pipe is fixedly connected to the top of the first steel pipe, the surface cover of second steel pipe is equipped with the second fixed plate, the top of second fixed plate is provided with the second bolt, the bottom of second bolt runs through to the bottom of second fixed plate and first fixed plate in proper order and the cover is equipped with the fourth nut.
Preferably, the number of the first threaded rods, the first screw caps and the connecting plates is four, and the number of the second threaded rods and the second screw caps is eight.
Preferably, the top fixedly connected with reinforcing plate of bed plate, and the quantity of reinforcing plate is four, the surface of first steel pipe passes through welded fastening with the junction of reinforcing plate and is connected.
Preferably, the number of the first bolts and the third nuts is four, and the first bolts and the third nuts are uniformly distributed on the edge of the reinforcing plate.
Preferably, the joint of the top of the first steel pipe and the second steel pipe is fixedly connected through a third bolt, and the number of the second bolt and the number of the fourth nut are four.
Preferably, the surface of the first steel pipe is fixedly connected with the joint of the reinforcing plate and the first fixing plate by welding, and the surface of the second steel pipe is fixedly connected with the joint of the second fixing plate by welding.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a cooperation that sets up ground, first nut, second nut, reinforcing plate, first steel pipe, third nut, fourth nut, second bolt, second steel pipe, second fixed plate, first bolt, gusset plate, connecting plate, second threaded rod, first threaded rod, bed plate, first concrete and second concrete is used, possesses and consolidates effectually, and the advantage that reinforcing apparatus installation effectiveness is high is worth promoting.
2. The utility model can make the first steel pipe more stable by arranging the reinforcing plate;
the first threaded rod and the second threaded rod can be firmer by arranging the first concrete and the second concrete;
by arranging the base plate, the first steel pipe can be conveniently and fixedly arranged on the second concrete;
through setting up the gusset plate, can make things convenient for first steel pipe and connecting plate fixed connection.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a sectional view of the floor of the present invention;
fig. 3 is a top view of the reinforcing plate of the present invention.
In the figure: the concrete-reinforced concrete foundation comprises a ground surface 1, a first nut 2, a second nut 3, a reinforcing plate 4, a first steel pipe 5, a third nut 6, a fourth nut 7, a second bolt 8, a second steel pipe 9, a second fixing plate 10, a first fixing plate 11, a first bolt 12, a reinforcing plate 13, a connecting plate 14, a second threaded rod 15, a first threaded rod 16, a base plate 17, first concrete 18 and second concrete 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model provides a ground 1, first nut 2, second nut 3, reinforcing plate 4, first steel pipe 5, third nut 6, fourth nut 7, second bolt 8, second steel pipe 9, second fixed plate 10, first fixed plate 11, first bolt 12, gusset plate 13, connecting plate 14, second threaded rod 15, first threaded rod 16, bed plate 17, parts such as first concrete 18 and second concrete 19 are the general standard component or the part that technical person in the field knows, its structure and principle all can learn through the technical manual or learn through conventional experimental method for technical person in the field.
Referring to fig. 1-3, an electric iron tower reinforcing device convenient to install comprises a ground 1, a first concrete 18 and a second concrete 19 are respectively poured into an inner cavity of the ground 1, a first threaded rod 16 and a second threaded rod 15 are respectively fixedly connected to the inner cavities of the first concrete 18 and the second concrete 19 in a penetrating manner, a connecting plate 14 and a base plate 17 are respectively arranged at the top of the ground 1, the tops of the first threaded rod 16 and the second threaded rod 15 respectively penetrate to the tops of the connecting plate 14 and the base plate 17 and are respectively sleeved with a first nut 2 and a second nut 3, a first steel pipe 5 is fixedly connected to the top of the base plate 17, a first fixing plate 11 and a reinforcing plate 13 are sequentially sleeved on the surface of the first steel pipe 5 from top to bottom, a first bolt 12 is arranged at the bottom of the reinforcing plate 13, the top of the first bolt 12 sequentially penetrates through the connecting plate 14 and the reinforcing plate 13 and extends to the top of the reinforcing plate 13, the third nut 6 is sleeved on the first steel pipe 5, the top of the first steel pipe 5 is fixedly connected with a second steel pipe 9, a second fixing plate 10 is sleeved on the surface of the second steel pipe 9, a second bolt 8 is arranged on the top of the second fixing plate 10, the bottom of the second bolt 8 sequentially penetrates to the bottoms of the second fixing plate 10 and the first fixing plate 11, and a fourth nut 7 is sleeved on the bottom of the second fixing plate 8;
the number of the first threaded rods 16, the number of the first screw caps 2 and the number of the connecting plates 14 are four, and the number of the second threaded rods 15 and the number of the second screw caps 3 are eight;
the top of the base plate 17 is fixedly connected with four reinforcing plates 4, and the joint of the surface of the first steel pipe 5 and the reinforcing plates 4 is fixedly connected through welding;
the number of the first bolts 12 and the third nuts 6 is four, and the first bolts and the third nuts are uniformly distributed on the edge of the reinforcing plate 13;
the top of the first steel pipe 5 is fixedly connected with the joint of the second steel pipe 9 through a third bolt, and the number of the second bolts 8 and the number of the fourth nuts 7 are four;
the surface of the first steel pipe 5 is fixedly connected with the joint of the reinforcing plate 13 and the first fixing plate 11 through welding, and the surface of the second steel pipe 9 is fixedly connected with the joint of the second fixing plate 10 through welding;
the first steel pipe 5 can be more stable by arranging the reinforcing plate 4;
by providing the first concrete 18 and the second concrete 19, the first threaded rod 16 and the second threaded rod 15 can be made more firm;
by arranging the base plate 17, the first steel pipe 5 can be conveniently and fixedly arranged on the second concrete 19;
through setting up gusset plate 13, can make things convenient for first steel pipe 5 and connecting plate 14 fixed connection.
When in use, the first concrete 18 and the second concrete 19 are poured in, then the first threaded rod 16 and the second threaded rod 15 are respectively inserted in, after the first concrete 18 and the second concrete 19 are completely solidified, a base plate 17 is arranged on a second threaded rod 15, a second nut 3 is screwed up to be fixed, the top of the first steel pipe 5 is fixedly connected with a second steel pipe 9 through a third bolt, a first fixing plate 11 and a second fixing plate 10 are fixedly connected through a second bolt 8, can make more firm between first steel pipe 5 and the second steel pipe 9 like this, avoid breaking, first bolt 12 and third nut 6 and connecting plate 14 fixed connection are passed through to the bottom of gusset plate 13, and the other end of connecting plate 14 passes through first threaded rod 16 and first nut 2 and 18 fixed connection of first concrete, can make first steel pipe 5 more stable like this, avoids taking place to empty.
In summary, the following steps: this electric iron tower reinforcing apparatus convenient to installation, through ground 1, first nut 2, second nut 3, reinforcing plate 4, first steel pipe 5, third nut 6, fourth nut 7, second bolt 8, second steel pipe 9, second fixed plate 10, first fixed plate 11, first bolt 12, reinforcing plate 13, connecting plate 14, second threaded rod 15, first threaded rod 16, bed plate 17, first concrete 18 and second concrete 19, it is simple to have solved current steel pipe pole mounting structure, run into the problem that bad weather takes place fracture easily and reinforcing apparatus installation effectiveness is low.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an electricity iron tower reinforcing apparatus convenient to installation, includes ground (1), its characterized in that: the inner chamber of ground (1) has been watered first concrete (18) and second concrete (19) respectively, the inner chamber of first concrete (18) and second concrete (19) runs through fixedly connected with first threaded rod (16) and second threaded rod (15) respectively, the top on ground (1) is provided with connecting plate (14) and bed plate (17) respectively, the top of first threaded rod (16) and second threaded rod (15) runs through respectively to the top of connecting plate (14) and bed plate (17) and overlaps respectively and be equipped with first nut (2) and second nut (3), the top fixedly connected with first steel pipe (5) of bed plate (17), the surface of first steel pipe (5) is from last to overlapping first fixed plate (11) and gusset plate (13) down in proper order, the bottom of gusset plate (13) is provided with first bolt (12), the top of first bolt (12) runs through connecting plate (14) and gusset plate (13) in proper order and extends to the top of gusset plate (13), and the cover is equipped with third nut (6), the top fixedly connected with second steel pipe (9) of first steel pipe (5), the surface cover of second steel pipe (9) is equipped with second fixed plate (10), the top of second fixed plate (10) is provided with second bolt (8), the bottom of second bolt (8) runs through bottom and cover to second fixed plate (10) and first fixed plate (11) in proper order is equipped with fourth nut (7).
2. An electric iron tower reinforcing apparatus easy to install according to claim 1, wherein: the quantity of first threaded rod (16), first nut (2) and connecting plate (14) is four, the quantity of second threaded rod (15) and second nut (3) is eight.
3. An electric iron tower reinforcing apparatus easy to install according to claim 1, wherein: the top fixedly connected with reinforcing plate (4) of bed plate (17), and the quantity of reinforcing plate (4) is four, the junction of the surface of first steel pipe (5) and reinforcing plate (4) is through welded fastening connection.
4. An electric iron tower reinforcing apparatus easy to install according to claim 1, wherein: the number of the first bolts (12) and the third nuts (6) is four, and the first bolts and the third nuts are uniformly distributed on the edge of the reinforcing plate (13).
5. An electric iron tower reinforcing apparatus easy to install according to claim 1, wherein: the top of the first steel pipe (5) is fixedly connected with the joint of the second steel pipe (9) through a third bolt, and the number of the second bolts (8) and the number of the fourth nuts (7) are four.
6. An electric iron tower reinforcing apparatus easy to install according to claim 1, wherein: the surface of the first steel pipe (5) is fixedly connected with the joint of the reinforcing plate (13) and the first fixing plate (11) through welding, and the surface of the second steel pipe (9) is fixedly connected with the joint of the second fixing plate (10) through welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921858970.XU CN211007872U (en) | 2019-10-31 | 2019-10-31 | Electric iron tower reinforcing apparatus convenient to installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921858970.XU CN211007872U (en) | 2019-10-31 | 2019-10-31 | Electric iron tower reinforcing apparatus convenient to installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211007872U true CN211007872U (en) | 2020-07-14 |
Family
ID=71481916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921858970.XU Expired - Fee Related CN211007872U (en) | 2019-10-31 | 2019-10-31 | Electric iron tower reinforcing apparatus convenient to installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211007872U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114776125A (en) * | 2022-05-07 | 2022-07-22 | 江苏鹏创电力设计有限公司 | Steel pipe pole with shear key |
-
2019
- 2019-10-31 CN CN201921858970.XU patent/CN211007872U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114776125A (en) * | 2022-05-07 | 2022-07-22 | 江苏鹏创电力设计有限公司 | Steel pipe pole with shear key |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211007872U (en) | Electric iron tower reinforcing apparatus convenient to installation | |
CN202299573U (en) | Concrete pole for erecting distribution lines | |
CN208668300U (en) | A kind of bridges in highway engineering bridges and culverts support construction | |
CN202039377U (en) | Prestressed steel stranded wire-combined anchor bolt | |
CN201924349U (en) | Anchor ear type connecting clamp for uplift pipe piles | |
CN202099809U (en) | EHV steel pipe plug-type foundation and EHV iron tower | |
CN207069973U (en) | A kind of fishing light complementation photovoltaic support structure | |
CN215009450U (en) | Electric power calandria mounting structure | |
CN201924350U (en) | Bolt-type mechanical connecting clamp for pulling-resistant pipe pile | |
CN102312599B (en) | Multi-prism steel pipe pole of power transmission line | |
CN210396223U (en) | Photovoltaic power plant shaft tower reinforcing apparatus | |
CN212223937U (en) | Pile foundation protection device for highway bridge | |
CN209960150U (en) | Reinforced monitoring rod | |
CN217760338U (en) | Anti-corrosion concrete pole | |
CN203135365U (en) | Cable trench earthing device | |
CN102312600B (en) | Multi-prism plug-in type steel pipe pole of power transmission line | |
CN201434476Y (en) | Mounting bracket of out-door air-conditioner | |
CN210658425U (en) | Concrete pile for photovoltaic system | |
CN210957754U (en) | Mounting structure of outdoor cable terminal | |
CN204098029U (en) | Prestressed concrete is sheet pile linkage for no reason | |
CN220377978U (en) | Prestressed electric pole with fixing device | |
CN214305972U (en) | Inverter mounting bracket | |
CN212376392U (en) | 750KV transmission line iron tower | |
CN217232976U (en) | Steel pipe tower base reinforced structure | |
CN214883825U (en) | Modularized foundation structure of wind generating set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200714 Termination date: 20211031 |