CN211006199U - Prevent brick that permeates water of jam - Google Patents

Prevent brick that permeates water of jam Download PDF

Info

Publication number
CN211006199U
CN211006199U CN201921678830.4U CN201921678830U CN211006199U CN 211006199 U CN211006199 U CN 211006199U CN 201921678830 U CN201921678830 U CN 201921678830U CN 211006199 U CN211006199 U CN 211006199U
Authority
CN
China
Prior art keywords
groove
permeable brick
water permeable
water
hydrophobic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921678830.4U
Other languages
Chinese (zh)
Inventor
毕研胜
朱启栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zibo Zhongbo Building Materials Co ltd
Original Assignee
Zibo Zhongbo Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zibo Zhongbo Building Materials Co ltd filed Critical Zibo Zhongbo Building Materials Co ltd
Priority to CN201921678830.4U priority Critical patent/CN211006199U/en
Application granted granted Critical
Publication of CN211006199U publication Critical patent/CN211006199U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a water permeable brick for preventing blockage, which comprises a water permeable brick body, a first groove and a hydrophobic structure; a first groove is formed in the brick body of the water permeable brick, and a hydrophobic structure is arranged in the first groove; the hydrophobic structure comprises a hydrophobic hole, a shunting channel and a drainage port; one end of the drain hole penetrates through the bottom of the first groove, and the other end of the drain hole is connected with a shunt channel; the bottom equidistance of reposition of redundant personnel passageway distributes and has a plurality of drainage mouth and a plurality of the bottom of drainage mouth passes the brick body of permeating water. The water permeable brick for preventing blockage can effectively improve the water drainage effect by arranging a plurality of water drainage structures; the plurality of bulges can avoid slipping when people walk; through setting up draw-in groove and buckle, can become a whole with a plurality of bricks of permeating water, guaranteed the stability of brick overall structure that permeates water.

Description

Prevent brick that permeates water of jam
Technical Field
The utility model relates to a pavior brick specifically is a prevent brick that permeates water of jam.
Background
The water permeable bricks can be frequently used when paths such as park roads are built, and when weather with strong rainfall exists, the water permeable bricks can introduce part of water accumulated on the road surface into the soil, so that the water accumulation on the road surface is reduced. When the inside hydrophobic pores of the permeable bricks are blocked, the drainage function can not be realized, which leads to serious surface water accumulation and influences the walking of pedestrians.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prevent brick that permeates water of jam to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a water permeable brick for preventing blockage comprises a water permeable brick body, a first groove and a hydrophobic structure; a first groove is formed in the brick body of the water permeable brick, and a hydrophobic structure is arranged in the first groove; the hydrophobic structure comprises a hydrophobic hole, a shunting channel and a drainage port; one end of the drain hole penetrates through the bottom of the first groove, and the other end of the drain hole is connected with a shunt channel; the bottom equidistance of reposition of redundant personnel passageway distributes and has a plurality of drainage mouth and a plurality of the bottom of drainage mouth passes the brick body of permeating water.
As a further aspect of the present invention: the quantity of hydrophobic structure is a plurality of and the equidistance distributes at the bottom of first recess.
As a further aspect of the present invention: the brick body of the water permeable brick is also provided with a plurality of bulges which are distributed at equal intervals; the plurality of protrusions are vertically intersected with the first groove; the shape of the bulge is a semi-cylinder shape.
As a further aspect of the present invention: a plurality of second grooves are also formed in the water permeable brick body; a second groove is formed between the two bulges; the bottom of the second groove is positioned above the bottom of the first groove.
As a further aspect of the present invention: a fixed block is also fixed on the first groove; the bottom of the fixing block is positioned above the bottom of the second groove.
As a further aspect of the present invention: clamping grooves and clamping blocks are sequentially arranged on four sides of the brick body of the water permeable brick; a plurality of the permeable brick bodies are mutually matched through clamping grooves and clamping blocks to form a whole.
Compared with the prior art, the beneficial effects of the utility model are that: the hydrophobic effect can be effectively improved by arranging the plurality of hydrophobic structures; the plurality of bulges can avoid slipping when people walk; through setting up draw-in groove and buckle, can become a whole with a plurality of bricks of permeating water, guaranteed the stability of brick overall structure that permeates water.
Drawings
Fig. 1 is a schematic structural view of a water permeable brick for preventing clogging.
Fig. 2 is a schematic structural view of a water permeable brick provided with a fixing block and used for preventing blockage.
FIG. 3 is a schematic view of the drainage channel structure of the middle hydrophobic hole of the water permeable brick for preventing blockage.
Fig. 4 is a schematic structural view of a plurality of water permeable bricks for preventing blockage matching with each other.
In the figure: 1-water permeable brick body, 2-first groove, 3-hydrophobic hole, 4-bulge, 5-second groove, 6-diversion channel, 7-drainage port, 8-fixed block, 9-clamping groove and 10-clamping block.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Example 1
Referring to fig. 1-3, the present embodiment provides a water permeable brick for preventing blockage, which includes a water permeable brick body 1, a first groove 2 and a hydrophobic structure; a first groove 2 is formed in the water permeable brick body 1, and a hydrophobic structure is arranged in the first groove 2; the hydrophobic structure comprises a hydrophobic hole 3, a diversion channel 6 and a drainage port 7; one end of the drain hole 3 penetrates through the bottom of the first groove 2, and the other end of the drain hole is connected with a shunt channel 6; a plurality of drainage ports 7 are equidistantly distributed at the bottom of the diversion channel 6, and the bottoms of the drainage ports 7 penetrate through the water permeable brick body 1; when there is water on the road surface, the water flows into the first groove 2, flows into the drainage port 7 through the drainage hole 3, and finally flows into the soil.
In order to further promote hydrophobic effect, hydrophobic structure's quantity is a plurality of and the equidistance distributes in the bottom of first recess 2, through setting up a plurality of hydrophobic structures, can make ponding from the even discharge in the bottom of the brick body 1 of brick that permeates water, makes soil absorption rate accelerate.
In order to prevent the water permeable brick from being too smooth to slip after water is accumulated, a plurality of bulges 4 distributed at equal intervals are further arranged on the water permeable brick body 1; the plurality of the protrusions 4 are vertically intersected with the first grooves 2; the shape of the bulge 4 is not limited, in the embodiment, preferably, the bulge 4 is in the shape of a semi-cylinder, so that the friction force between the bulge 4 and the water permeable brick body 1 can be increased when a person walks, and the person can be effectively prevented from slipping and falling down when walking.
In order to make the drainage effect better, a plurality of second grooves 5 are also arranged on the water permeable brick body 1; a second groove 5 is arranged between the two bulges 4; the bottom of the second groove 5 is positioned above the bottom of the first groove 2; set up like this, not only can further improve the frictional force of the brick body 1 upper surface that permeates water, second recess 5 can further improve the drainage effect moreover, makes ponding flow into in the hydrophobic hole 3 of first recess 2 more smoothly.
In order to prevent the first groove 2 from being exposed outside and affecting the safety of people, a fixing block 8 is further fixed on the first groove 2; the bottom of fixed block 8 is located on the bottom of second recess 5, sets up like this, not only can prevent the influence that first recess 2 caused to the people, but also can protect hydrophobic hole 3, prevents that external foreign matter from directly entering into hydrophobic hole 3 and causing hydrophobic hole 3's jam.
The working principle of the embodiment is as follows: when the surface of the road has ponding, the ponding flows to the first groove 2 along the second groove 5 to shunt from a plurality of hydrophobic holes 3 in the first groove 2 and enter into the drainage port 7 at the bottom of the brick body 1 of the brick that permeates water, thereby make soil absorb moisture fast.
Example 2
Referring to fig. 4, the embodiment is further improved on the basis of embodiment 1, and the improvement is as follows: clamping grooves 9 and clamping blocks 10 are sequentially arranged on four sides of the water permeable brick body 1; a plurality of it is whole to mutually support through draw-in groove 9 and fixture block 10 between the brick body 1 to permeate water, sets up like this, can make a plurality of brick body 1's that permeate water structure more stable.
It should be noted that, as is obvious to a person skilled in the art, the invention is not limited to details of the above-described exemplary embodiments, but can be embodied in other specific forms without departing from the spirit or essential characteristics thereof.

Claims (6)

1. The water permeable brick for preventing blockage is characterized by comprising a water permeable brick body (1), a first groove (2) and a hydrophobic structure; a first groove (2) is formed in the water permeable brick body (1), and a hydrophobic structure is arranged in the first groove (2); the hydrophobic structure comprises a hydrophobic hole (3), a shunt channel (6) and a drainage port (7); one end of the drain hole (3) penetrates through the bottom of the first groove (2), and the other end of the drain hole is connected with a flow distribution channel (6); the bottom equidistance of reposition of redundant personnel passageway (6) distributes and has a plurality of drainage mouth (7) and a plurality of the bottom of drainage mouth (7) passes the brick body (1) that permeates water.
2. The water permeable brick for preventing blockage according to claim 1, wherein the number of the hydrophobic structures is multiple and is distributed at the bottom of the first groove (2) at equal intervals.
3. The water permeable brick for preventing blockage according to claim 2, characterized in that a plurality of bulges (4) are arranged on the water permeable brick body (1) at equal intervals; the plurality of bulges (4) are vertically intersected with the first groove (2); the shape of the bulge (4) is a semi-cylinder shape.
4. The water permeable brick for preventing blockage according to claim 3, wherein the brick body (1) is further provided with a plurality of second grooves (5); a second groove (5) is arranged between the two bulges (4); the bottom of the second groove (5) is positioned above the bottom of the first groove (2).
5. The water permeable brick for preventing blockage according to claim 3, wherein a fixing block (8) is further fixed on the first groove (2); the bottom of the fixing block (8) is positioned above the bottom of the second groove (5).
6. The water permeable brick for preventing blockage according to claim 4, wherein clamping grooves (9) and clamping blocks (10) are sequentially arranged on four sides of the water permeable brick body (1); a plurality of the permeable brick bodies (1) are mutually matched through clamping grooves (9) and clamping blocks (10) to form a whole.
CN201921678830.4U 2019-10-09 2019-10-09 Prevent brick that permeates water of jam Expired - Fee Related CN211006199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921678830.4U CN211006199U (en) 2019-10-09 2019-10-09 Prevent brick that permeates water of jam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921678830.4U CN211006199U (en) 2019-10-09 2019-10-09 Prevent brick that permeates water of jam

Publications (1)

Publication Number Publication Date
CN211006199U true CN211006199U (en) 2020-07-14

Family

ID=71497532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921678830.4U Expired - Fee Related CN211006199U (en) 2019-10-09 2019-10-09 Prevent brick that permeates water of jam

Country Status (1)

Country Link
CN (1) CN211006199U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267346A (en) * 2020-10-09 2021-01-26 中维建材科技(苏州)有限公司 Brick permeates water with antiskid function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267346A (en) * 2020-10-09 2021-01-26 中维建材科技(苏州)有限公司 Brick permeates water with antiskid function

Similar Documents

Publication Publication Date Title
CN211006199U (en) Prevent brick that permeates water of jam
CN214938918U (en) Ecological sponge bearing brick with high water permeability
CN210085963U (en) Environment-friendly stone-like water permeable brick
CN209798663U (en) Stepped ecological retaining wall with irrigation system
CN210561537U (en) Noise-reducing stagnation-storing water-permeable pavement brick for urban road
CN207484231U (en) A kind of ashlar brick
CN219298424U (en) Safety corridor
CN209602895U (en) A kind of bus shelter concrete permeable floor tile
CN203128976U (en) Blind sidewalk indicating brick
CN209509126U (en) A kind of surface drainage system
CN217758151U (en) Pervious anti-blocking concrete pavement brick
CN204849583U (en) Bridge drainage structures
CN209703717U (en) A kind of interior waterproof construction
CN103266581A (en) Biological channels of concrete-lined channel
CN207538069U (en) A kind of buttress type Ecological Retaining Wall structure
CN215366634U (en) Permeable brick for pavement and permeable pavement comprising same
CN204551165U (en) A kind of cement square bricks
CN214938913U (en) Water permeable brick
CN211285112U (en) A brick that permeates water that is used for trampling of sponge city construction to prevent splashing
CN220847657U (en) Rock soil slope protection structure
CN213087554U (en) Novel seamless walkway plate for swimming pool
CN219568530U (en) Municipal administration blind road that can drain
CN205077448U (en) Novel channel wild animal passageway of hiding oneself
CN207582300U (en) A kind of novel bridge rhone construction
CN211816071U (en) Gravity dam for retaining water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714

CF01 Termination of patent right due to non-payment of annual fee