CN210976621U - Concrete form pours device for civil engineering - Google Patents

Concrete form pours device for civil engineering Download PDF

Info

Publication number
CN210976621U
CN210976621U CN201921858716.XU CN201921858716U CN210976621U CN 210976621 U CN210976621 U CN 210976621U CN 201921858716 U CN201921858716 U CN 201921858716U CN 210976621 U CN210976621 U CN 210976621U
Authority
CN
China
Prior art keywords
walking
concrete
civil engineering
frame
concrete form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921858716.XU
Other languages
Chinese (zh)
Inventor
赵峰
李文斌
孙明东
程世强
景宏君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Ankang Highway Administration
Xian University of Science and Technology
Original Assignee
Shaanxi Ankang Highway Administration
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Ankang Highway Administration, Xian University of Science and Technology filed Critical Shaanxi Ankang Highway Administration
Priority to CN201921858716.XU priority Critical patent/CN210976621U/en
Application granted granted Critical
Publication of CN210976621U publication Critical patent/CN210976621U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete template pouring device for civil engineering, which comprises a support plate and a walking frame, wherein a slide rail is arranged on the upper surface of the support plate, a pouring table is slidably arranged on the slide rail, mounting grooves are arranged on the two symmetrical inner walls of the pouring table, and a separation component is embedded in the mounting grooves; the utility model discloses a concrete leveling machine, including backup pad, walking frame, support post, walking frame, support frame, the support frame is installed to backup pad four corners position department all installs the support post, be provided with walking assembly on the walking frame, two install the support frame between the walking assembly lateral wall, the scraper blade subassembly that is used for the flattening concrete is installed to the support frame below. Has the advantages that: the support frame is driven to move through the walking assembly, and the scraping plate assembly is used for scraping the surface of the concrete, so that the labor intensity of workers is reduced; adopt and to separate the subassembly, can freely adjust the concrete placement template size according to civil engineering's building needs, promoted concrete formwork's machining efficiency, the practicality is strong.

Description

Concrete form pours device for civil engineering
Technical Field
The utility model relates to a civil engineering equipment technical field, concretely relates to device is pour to concrete form for civil engineering.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost. The concrete formwork is used as a basic material in daily building work and is widely applied to various building projects.
In order to ensure the pouring efficiency of the concrete template, a special template pouring device is generally adopted for pouring treatment, and the existing building template has the main problems that the concrete template plane needs to be scraped and leveled manually after the material is placed, the leveling difficulty of the concrete template with a large area is high, workers need to use other tools for treatment, and the practicability is poor; meanwhile, due to the adoption of the design of a single pouring platform, the pouring size of the concrete template can not be freely adjusted according to the use requirement, and the adaptability is insufficient when the concrete template is poured according to the requirement of multiple sizes, so that the concrete template is required to be further improved on the basis of the existing equipment.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a device is pour to concrete form for civil engineering just in order to solve above-mentioned problem to solve technical problem on the present market among the prior art. The utility model provides an optimal technical scheme among the technical schemes drives the support frame to move through the walking assembly, thereby the scraper blade assembly installed on the support frame scrapes the concrete surface, the manual operation is not needed, the flatness of the concrete surface can be ensured, and the labor intensity of workers is reduced; adopt to have the partition subassembly, can freely adjust the concrete placement template size according to civil engineering's building needs, promoted concrete template's machining efficiency, technical effect such as practicality is strong sees the explanation below in detail.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides a concrete template pouring device for civil engineering, including backup pad and walking frame, the surface mounting has the slide rail in the backup pad, slidable mounting has the platform of pouring on the slide rail, set up the mounting groove on the two symmetrical inner walls of platform of pouring, the inside inlay card of mounting groove is installed and is separated the subassembly;
supporting stand columns are installed at the four corners of each supporting plate, two walking frames are symmetrically installed at the tops of the supporting stand columns, guide rails are arranged on the upper surfaces of the walking frames, walking assemblies are arranged on the walking frames, a supporting frame is installed between the side walls of the two walking assemblies, and a scraping plate assembly for leveling concrete is installed below the supporting frame;
the scraper blade subassembly includes scraper blade and two telescopic cylinder, two telescopic cylinder symmetry is installed on the support frame lower surface, the scraper blade upper surface with telescopic cylinder bottom work end is connected.
When the concrete formwork pouring device for civil engineering is used, an operator can freely select the installation position of the separation component according to the processing requirement of the concrete formwork, and is matched with the mounting groove for fixing, after the mounting is finished, an operator fills concrete into the pouring platform, after the filling is finished, the walking assembly moves on the walking frame, thereby driving the support frame to move, the scraper component can scrape the surface of the concrete in the moving process of the support frame, thereby realizing the surface leveling treatment of the concrete template, after the leveling is finished, an operator unloads the pouring platform through the slide rail for the next treatment, and meanwhile, the pouring platform which is not filled with concrete is installed on the supporting plate through the sliding rail again, and then the operation is repeated, so that the pouring treatment of the concrete template is completed.
Preferably, the walking assembly comprises a linear motor and a guide rail wheel, the linear motor is installed on the side wall of the supporting frame, and the guide rail wheel is installed at the transmission end of the linear motor.
As preferred, separate the mount pad that the subassembly includes backplate, preceding baffle and two symmetrical arrangement, the mounting pad unilateral runs through and has seted up the sliding tray, the inside being provided with of sliding tray the backplate with preceding baffle, just the backplate with preceding baffle parallel arrangement, the backplate with the bearing border is all installed to preceding baffle both sides, preceding baffle passes through the bearing border welding is in on the sliding tray inner wall, install adjusting bolt on the mount pad outer wall, adjusting bolt pass through the screw thread with the bearing border of backplate both sides is connected.
Preferably, a handle is fixedly mounted on the upper surface of the mounting seat.
Preferably, the lower surface of the mounting seat is provided with a limiting bulge, and the bottom of the limiting bulge is an inclined plane.
Preferably, the bottom of the support upright is welded with a base, and the bottom of the base is provided with anti-skid grains.
Preferably, the lower surface of the pouring table is provided with a sliding groove used for being matched with the sliding rail to slide.
Has the advantages that:
1. the support frame is driven to move by the walking assembly, so that the scraping plate assembly arranged on the support frame scrapes the surface of the concrete, the flatness of the surface of the concrete can be ensured without manual operation, and the labor intensity of workers is reduced;
2. adopt and to separate the subassembly, can freely adjust the concrete placement template size according to civil engineering's building needs, promoted concrete formwork's machining efficiency, the practicality is strong.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is an internal structural view of the walking assembly of the present invention;
FIG. 4 is a main structural view of the squeegee assembly of the present invention;
figure 5 is a top view of the partition assembly of the present invention;
figure 6 is a main structural view of the partition assembly of the present invention.
The reference numerals are explained below:
1. a pouring platform; 101. mounting grooves; 2. supporting the upright post; 3. a walking frame; 301. a guide rail; 4. a squeegee assembly; 401. a squeegee; 402. a telescopic cylinder; 5. a support frame; 6. a walking assembly; 601. a linear motor; 602. a guide rail wheel; 8. a base; 9. a slide rail; 10. a support plate; 11. a partition assembly; 1101. a mounting seat; 1102. a handle; 1103. a tailgate; 1104. adjusting the bolt; 1105. a sliding groove; 1106. supporting the edge; 1107. a front baffle; 1108. and a limiting bulge.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-6, the utility model provides a concrete template pouring device for civil engineering, including a support plate 10 and a walking frame 3, a slide rail 9 is installed on the upper surface of the support plate 10, the slide rail 9 is used for cooperating with a slide groove at the bottom of a pouring table 1 to move, the pouring table 1 is installed on the slide rail 9 in a sliding manner, the pouring table 1 is used for pouring concrete templates, a mounting groove 101 is formed on the two symmetrical inner walls of the pouring table 1, the mounting groove 101 is used for cooperating with a separation component 11 to install and fix, the separation component 11 is installed in the mounting groove 101 in a clamping and embedding manner, and after the separation component 11 is installed, the top edge of the separation component is flush with the top edge of the;
the device comprises a supporting plate 10, supporting columns 2 are arranged at four corners of the supporting plate 10, the supporting columns 2 are used for providing support for the device and relieving vibration caused in the pouring process, two walking frames 3 are arranged and symmetrically arranged at the tops of the supporting columns 2, guide rails 301 are arranged on the upper surfaces of the walking frames 3, the guide rails 301 are used for being matched with guide rail wheels 602 to move a scraping plate assembly 4, walking assemblies 6 are arranged on the walking frames 3, a supporting frame 5 is arranged between the side walls of the two walking assemblies 6, the supporting frame 5 is used for installing the scraping plate assembly 4, and a scraping plate assembly 4 used for leveling concrete is arranged below the supporting frame 5;
the scraper blade subassembly 4 includes scraper blade 401 and two telescopic cylinder 402, two telescopic cylinder 402 symmetries are installed on 5 lower surfaces of support frame, the scraper blade 401 upper surface is connected with telescopic cylinder 402 bottom work end, the tip that telescopic cylinder 402 was kept away from to scraper blade 401 adopts rubber materials to make, at scraper blade subassembly 4 during operation, telescopic cylinder 402 work drives scraper blade 401 and moves down, until scraper blade 401 and concrete surface contact, in the subassembly 6 removal processes of walking, scrape through scraper blade 401 to the concrete surface and get smoothly.
As an optional embodiment, the traveling assembly 6 includes a linear motor 601 and a guide wheel 602, the linear motor 601 is installed on a side wall of the support frame 5, the guide wheel 602 is installed at a transmission end of the linear motor 601, and when the traveling assembly 6 operates, the linear motor 601 operates to drive the guide wheel 602 to rotate, so as to drive the guide wheel 602 to move in cooperation with the guide rail 301, thereby driving the support frame 5 to move. In specific implementation, the linear motor 601 may be controlled by a motor controller, so as to control the moving component 6 to move on the moving frame 3.
As an optional embodiment, the partition assembly 11 includes a rear baffle 1103, a front baffle 1107 and two symmetrically arranged installation seats 1101, a sliding groove 1105 is formed through one side of the installation seat 1101, the rear baffle 1103 and the front baffle 1107 are arranged inside the sliding groove 1105, the rear baffle 1103 and the front baffle 1107 are arranged in parallel, bearing edges 1106 are respectively arranged on both sides of the rear baffle 1103 and the front baffle 1107, the front baffle 1107 is welded on the inner wall of the sliding groove 1105 through the bearing edge 1106, an adjusting bolt 1104 is arranged on the outer wall of the installation seat 1101, the adjusting bolt 1104 is connected with the bearing edges 1106 on both sides of the rear baffle 1103 through a screw, when the partition assembly 11 is used, an operator moves the installation seat 1101 according to the processing requirement of the concrete formwork and inserts the limiting protrusion 1108 into the installation groove 101 for fixing, after the fixing is completed, the operator rotates the adjusting bolt 1104 on the side wall of the installation seat 1101, it removes to drive backplate 1103 along the inside preceding baffle 1107 direction of keeping away from of sliding tray 1105 through screw drive, thereby separation between baffle 1107 and the backplate 1103 before realizing, thereby reserve the isolated position, and then operating personnel pours the concrete form, pour the back that finishes, treat when concrete cooling is accomplished, operating personnel counter-rotation adjusting bolt 1104, it removes to be close to preceding baffle 1107 direction along the inside sliding tray 1105 along backplate 1103 through screw drive, the laminating between baffle 1107 and the backplate 1103 before realizing, at this moment, operating personnel can take out partition subassembly 11, realize the separation of preceding baffle 1107 and backplate 1103. A handle 1102 is fixedly mounted to the upper surface of the mounting block 1101 so that an operator can move the partition assembly 11. The lower surface of the mounting seat 1101 is provided with a limiting protrusion 1108, and the bottom of the limiting protrusion 1108 is an inclined surface, so that the arrangement is convenient for an operator to align the mounting groove 101. The welding of 2 bottoms of support post has base 8, and 8 bottoms of base are offered and are used for skid-proof line, set up the anti-skidding performance that can promote base 8 like this. Pour 1 lower surface of platform and offer and be used for cooperating slide rail 9 to carry out gliding spout, set up like this and can accomplish the back at concrete placement, will pour platform 1 and take off, be convenient for concrete form's unloading takes out.
Adopt above-mentioned structure, during the use device, operating personnel is according to the processing needs of concrete form, the mounted position of subassembly 11 is separated to the free choice, and cooperation mounting groove 101 is fixed, the back that finishes the installation, operating personnel fills the concrete to pouring platform 1, the back that finishes filling, walking subassembly 6 removes on walking frame 3, thereby drive support frame 5 and remove, the in-process that support frame 5 removed, scraper blade subassembly 4 can scrape the concrete surface and get, thereby realize the surface leveling of concrete form and handle, the back that finishes the leveling, operating personnel will pour platform 1 through slide rail 9 and lift off, carry out processing on next step, simultaneously will not fill pouring platform 1 of concrete and install on backup pad 10 through slide rail 9 again, then repeat above-mentioned operation, accomplish the pouring of concrete form promptly and handle.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (7)

1. The utility model provides a device is pour to concrete form for civil engineering which characterized in that: the device comprises a supporting plate (10) and a walking frame (3), wherein a sliding rail (9) is installed on the upper surface of the supporting plate (10), a pouring table (1) is installed on the sliding rail (9) in a sliding mode, installation grooves (101) are formed in two symmetrical inner walls of the pouring table (1), and partition components (11) are installed in the installation grooves (101) in a clamping and embedding mode;
supporting upright posts (2) are respectively installed at four corners of the supporting plate (10), two walking frames (3) are symmetrically installed at the tops of the supporting upright posts (2), a guide rail (301) is arranged on the upper surface of each walking frame (3), a walking assembly (6) is arranged on each walking frame (3), a supporting frame (5) is installed between the side walls of the two walking assemblies (6), and a scraper assembly (4) for leveling concrete is installed below each supporting frame (5);
the scraper component (4) comprises a scraper (401) and two telescopic cylinders (402), the two telescopic cylinders (402) are symmetrically arranged on the lower surface of the support frame (5), and the upper surface of the scraper (401) is connected with the bottom working end of each telescopic cylinder (402).
2. The concrete form pouring device for civil engineering as claimed in claim 1, wherein: the walking assembly (6) comprises a linear motor (601) and a guide rail wheel (602), the linear motor (601) is installed on the side wall of the support frame (5), and the guide rail wheel (602) is installed at the transmission end of the linear motor (601).
3. The concrete form pouring device for civil engineering as claimed in claim 1, wherein: partition subassembly (11) includes backplate (1103), preceding baffle (1107) and two symmetrical arrangement's mount pad (1101), slide tray (1105) have been seted up in the unilateral run-through of mount pad (1101), slide tray (1105) inside be provided with backplate (1103) with preceding baffle (1107), just backplate (1103) with preceding baffle (1107) parallel arrangement, backplate (1103) with bearing border (1106) are all installed to preceding baffle (1107) both sides, preceding baffle (1107) pass through bearing border (1106) welding is in on slide tray (1105) inner wall, install adjusting bolt (1104) on mount pad (1101) outer wall, adjusting bolt (1104) through the screw with the bearing border (1106) of backplate (1103) both sides are connected.
4. The concrete form pouring device for civil engineering as claimed in claim 3, wherein: and a handle (1102) is fixedly arranged on the upper surface of the mounting seat (1101).
5. The concrete form pouring device for civil engineering as claimed in claim 3, wherein: spacing arch (1108) is installed to mount pad (1101) lower surface, just spacing arch (1108) bottom is the inclined plane.
6. The concrete form pouring device for civil engineering as claimed in claim 1, wherein: the anti-skid device is characterized in that a base (8) is welded at the bottom of the supporting upright column (2), and anti-skid grains are arranged at the bottom of the base (8).
7. The concrete form pouring device for civil engineering as claimed in claim 1, wherein: the lower surface of the pouring table (1) is provided with a sliding groove used for being matched with the sliding rail (9) to slide.
CN201921858716.XU 2019-10-31 2019-10-31 Concrete form pours device for civil engineering Expired - Fee Related CN210976621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921858716.XU CN210976621U (en) 2019-10-31 2019-10-31 Concrete form pours device for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921858716.XU CN210976621U (en) 2019-10-31 2019-10-31 Concrete form pours device for civil engineering

Publications (1)

Publication Number Publication Date
CN210976621U true CN210976621U (en) 2020-07-10

Family

ID=71454970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921858716.XU Expired - Fee Related CN210976621U (en) 2019-10-31 2019-10-31 Concrete form pours device for civil engineering

Country Status (1)

Country Link
CN (1) CN210976621U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112729968A (en) * 2021-02-05 2021-04-30 江苏颉泰冶金废渣利用有限公司 Automatic material taking device for rapidly measuring working performance of concrete
CN112962952A (en) * 2021-02-19 2021-06-15 马超 Concrete formwork pouring structure and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112729968A (en) * 2021-02-05 2021-04-30 江苏颉泰冶金废渣利用有限公司 Automatic material taking device for rapidly measuring working performance of concrete
CN112962952A (en) * 2021-02-19 2021-06-15 马超 Concrete formwork pouring structure and using method thereof

Similar Documents

Publication Publication Date Title
CN210976621U (en) Concrete form pours device for civil engineering
CN109290871B (en) Panel side grinding device
CN110924653A (en) Wall brick tiling machine
CN105352705A (en) Fiber end face detection device
CN210527567U (en) Conveying equipment with adjustable height
CN220580571U (en) Concrete frame building carrier plate pours auxiliary device
CN205243067U (en) Girder support frame for civil engineering
CN210413872U (en) Burr removing device for automobile gear production
CN210060480U (en) Quick clamping and positioning fixture of casting special control machining center
CN217552034U (en) Burr grinding device is used in production of combined material well lid
CN211517242U (en) Clamping device is used in processing of heat-resistant steel foundry goods
CN201679103U (en) Movable outer-wall heat preservation plate on-site slurry wiping machine
CN210508408U (en) Concrete pouring workbench for house construction
CN215202156U (en) Post-cast strip PVC pipe internally filled concrete strut dismantling device
CN105755530A (en) Laser template polishing fixture
CN217973977U (en) Crack processing apparatus for highway engineering
CN215147643U (en) Angle grinding equipment for quartz stone processing
CN216739133U (en) Even case that paves of just preventing breakdown of emulsion
CN218693416U (en) Reinforcing bar cuts equipment for highway construction
CN209936549U (en) Deburring device for stainless steel casting
CN216608307U (en) Automobile steel plate processing suspension device
CN219490611U (en) Highway engineering template strutting arrangement
CN211465752U (en) Engineering board processing corner grinding device
CN218254298U (en) Side grinding device of regulator cubicle steel sheet
CN217433901U (en) Bridge type multifunctional rock plate chamfering machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200710

Termination date: 20211031

CF01 Termination of patent right due to non-payment of annual fee