CN210947529U - Quick mounting system of big board of pottery - Google Patents

Quick mounting system of big board of pottery Download PDF

Info

Publication number
CN210947529U
CN210947529U CN201921569013.5U CN201921569013U CN210947529U CN 210947529 U CN210947529 U CN 210947529U CN 201921569013 U CN201921569013 U CN 201921569013U CN 210947529 U CN210947529 U CN 210947529U
Authority
CN
China
Prior art keywords
riser
pottery
big board
seted
protruding type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921569013.5U
Other languages
Chinese (zh)
Inventor
马四建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Yiniya Ceramic Co ltd
Original Assignee
Foshan Yiniya Ceramic Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Yiniya Ceramic Co ltd filed Critical Foshan Yiniya Ceramic Co ltd
Priority to CN201921569013.5U priority Critical patent/CN210947529U/en
Application granted granted Critical
Publication of CN210947529U publication Critical patent/CN210947529U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a quick installing the system of big board of pottery, comprising a vertical plate, the square groove has all been seted up around the right side of riser, the several square hole has been seted up at the top of riser the back rigid coupling of riser has the rectangular plate, the left side of riser is equipped with to hang puts the mechanism, hang the left side swing joint who puts the mechanism and have fixed establishment. This quick installing the system of big board of pottery, through the bottom plate, the opening, the long slab, cooperation between protruding type pole and the protruding type hole, make the connection between a plurality of risers very inseparable, and then the compactness between the big board of pottery has been guaranteed, the problem of avoiding appearing the crack, and the installation is convenient, the dirty and disorderly problem of fitment site environment has been avoided, the user's later stage of being convenient for is cleared up, and this kind of mounting means, make the big board of pottery be convenient for change, when the maintenance after the damage, more labour saving and time saving, reduce the operation degree of difficulty, when using this quick installing the system of big board of pottery, the big board of pottery wholly receives the support.

Description

Quick mounting system of big board of pottery
Technical Field
The utility model relates to a big board installation technical field of pottery specifically is a big board quick installing the system of pottery.
Background
The ceramic large plate is fixed and installed in three modes of cement pasting, ceramic tile gluing and silicate glue pasting in the prior art, cement pasting is adopted, the service life is long, the problem of gap is easy to occur, decoration site environment is dirty and messy due to cement pasting, the weight of cement and the weight of the ceramic large plate are too heavy, construction difficulty is large, disassembly and replacement cannot be carried out, the mode of ceramic gluing is high in cost, the ceramic large plate is easy to break in a carrying process, the silicate glue pasting is adopted for dotting and pasting, a plurality of places without glue are uneven in gap stress, holes are not easy to open in the gap, the holes are punched, the ceramic large plate can break, the pasting strength is poor, disassembly and replacement cannot be carried out, and therefore the prior art cannot meet the needs of people.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick installing the system of big board of pottery, with propose cement paste in solving above-mentioned background art, the problem of cavity has appeared easily to live time is long, it is dirty in disorder to lead to fitment site environment through cement paste, cement weight is too heavy with big board weight of pottery, the construction difficulty is big, can not dismantle the change, the mode that the ceramic glue pasted is with high costs, the handling leads to the breaking of big board of pottery easily, the silica gel is pasted and is adopted to beat a little, many places do not have the glue and locally be the cavity atress inequality, the local difficult trompil of cavity, the hole of beating, can cause the breaking of big board of pottery, and paste the dynamics is poor, can not dismantle the problem of changing.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a quick installing the system of big board of pottery, includes the riser, the square groove has all been seted up around the right side of riser, several square hole has been seted up at the top of riser, the top of riser is equipped with three coupling assembling, the opening has been seted up in the front of riser, the back rigid coupling of riser has the rectangular slab, the left side of riser is equipped with hangs puts the mechanism, the left side swing joint who hangs and put the mechanism has fixed establishment.
Preferably, coupling assembling includes convex pole and protruding type hole, convex pole passes through convex hole and riser interference fit, the riser is run through in the convex hole, two pores have all been seted up around the right side in convex hole, the pore runs through the riser, and the right-hand member of first screw links to each other with convex pole screw thread.
Preferably, three convex rods are distributed at equal intervals in pairs.
Preferably, hang and put the mechanism and include the base plate, first opening has all been seted up from top to bottom on the right side of base plate, the internal clearance fit of first opening has first screw, the right-hand member of first screw links to each other with the left side screw thread of riser.
Preferably, two of the first openings are centrosymmetric with respect to the substrate.
Preferably, the fixing mechanism comprises a support, a second opening is formed in the upper portion of the side face of the support, and a second screw is in clearance fit with the inside of the second opening.
Compared with the prior art, the beneficial effects of the utility model are that: this quick installing the system of big board of pottery, through the bottom plate, the opening, the long slab, cooperation between protruding type pole and the protruding type hole, make the connection between a plurality of risers very inseparable, and then the compactness between the big board of pottery has been guaranteed, the problem of avoiding appearing the crack, and the installation is convenient, the dirty and disorderly problem of fitment site environment has been avoided, the user's of being convenient for later stage clearance, and this kind of mounting means, make the big board of pottery be convenient for change, when the maintenance after damaging, more labour saving and time saving, reduce the operation degree of difficulty, when using this quick installing the system of big board of pottery, the big board of pottery wholly receives the support, can not damage easily, consequently can be better satisfy people's user demand.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection structure of the base plate, the riser and the support in FIG. 1;
fig. 3 is a schematic view showing the connection relationship between the base, the support and the riser in fig. 2.
In the figure: 1. connecting component 101, convex rod 102, convex hole 103, pore 2, hanging mechanism 201, base plate 202, first opening 203, first screw 3, fixing mechanism 301, support 302, second opening 303, second screw 4, vertical plate 5, square groove 6, square hole 7, opening 8, long plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a quick installing the system of big board of pottery, including riser 4, it is together fixed with the big board of external pottery to glue the right side of riser 4 through the durable compound of powerful complex, riser 4 adopts plastic steel or PVC material to make all can, riser 4 and long slab 8 make as integrated into one piece, square groove 5 has all been seted up around riser 4's the right side, several square hole 6 has been seted up at riser 4's top, square hole 6 plays the effect of losing weight to riser 4, riser 4's top is equipped with three coupling assembling 1, opening 7 has been seted up in riser 4's front, riser 4's back rigid coupling has long slab 8, opening 7 and long slab 8 interference fit, can play fixed effect to two riser 4, riser 4's left side is equipped with hangs and puts mechanism 2, hang the left side swing joint who puts mechanism 2 and have fixed establishment 3.
Coupling assembling 1 includes convex pole 101 and convex hole 102, convex pole 101 passes through convex pole 101 and the cooperation of convex hole 102 through convex hole 102 and riser 4 interference fit, can be in the same place two riser 4 are fixed from top to bottom, convex hole 102 runs through riser 4, two pores 103 have all been seted up around convex hole 102's right side, pore 103 guarantees that convex pole 101 inserts convex hole 102 when, riser 4 produces little deformation, and then be convenient for insert convex pole 101 the inside in convex hole 102, pore 103 runs through riser 4, and the right-hand member of first screw 203 links to each other with convex pole 101 screw thread, three convex pole 101 equidistance between two liang distributes.
The hanging mechanism 2 comprises a base plate 201, first openings 202 are formed in the upper portion and the lower portion of the right side of the base plate 201, first screws 203 are in clearance fit with the inner portions of the first openings 202, the base plate 201 and a vertical plate 4 are fixed together through the first screws 203, the right end of each first screw 203 is connected with the left side of the corresponding vertical plate 4 in a threaded mode, and the two first openings 202 are in central symmetry with respect to the base plate 201.
The fixing mechanism 3 comprises a support 301, a second opening 302 is formed in the upper portion of the side face of the support 301, a second screw 303 is in clearance fit with the inside of the second opening 302, and the support 301 and an external wall are fixed together through the second screw 303.
When using this quick installing the system of big board of pottery, at first, it is together fixed with the big board of external pottery to glue the right side of riser 4 through powerful compound durable complex, it is together fixed with external wall body with support 301 through second screw 303, in order to guarantee the stability of connecting, can change second screw 303 into the expansion screw, it is together fixed with protruding type pole 101 and protruding type hole 102 to pass through two risers 4 from top to bottom, it is together fixed with riser 4 to pass through first screw 203 with base plate 201, it is together fixed with long board 8 to pass through opening 7 with two risers 4 around with, simultaneously first screw 203 realizes fixing protruding type pole 101 and riser 4, later hang base 201 and support 301 together, the realization is fixed riser 4 with external wall body, accomplish the installation of big board of pottery this moment.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A quick mounting system of big board of pottery, includes riser (4), its characterized in that: all seted up square groove (5) around the right side of riser (4), several square hole (6) have been seted up at the top of riser (4), the top of riser (4) is equipped with three coupling assembling (1), opening (7) have been seted up in the front of riser (4), the back rigid coupling of riser (4) has rectangular plate (8), the left side of riser (4) is equipped with to hang puts mechanism (2), hang the left side swing joint who puts mechanism (2) and have fixed establishment (3).
2. The ceramic large panel quick mount system of claim 1, wherein: coupling assembling (1) is including protruding type pole (101) and protruding type hole (102), protruding type pole (101) are through protruding type hole (102) and riser (4) interference fit, riser (4) are run through in protruding type hole (102), two pore (103) have all been seted up around the right side in protruding type hole (102), pore (103) run through riser (4).
3. The ceramic large panel quick mount system of claim 2, wherein: the three convex rods (101) are distributed at equal intervals in pairs.
4. The ceramic large panel quick mount system of claim 1, wherein: hang and put mechanism (2) including base plate (201), first opening (202) have all been seted up from top to bottom on the right side of base plate (201), the inside clearance fit of first opening (202) has first screw (203), the right-hand member of first screw (203) links to each other with the left side screw thread of riser (4), and the right-hand member of first screw (203) links to each other with convex pole (101) screw thread.
5. The ceramic large panel quick mount system of claim 4, wherein: the two first openings (202) are centrosymmetric relative to the substrate (201).
6. The ceramic large panel quick mount system of claim 1, wherein: the fixing mechanism (3) comprises a support (301), a second opening (302) is formed in the upper portion of the side face of the support (301), and a second screw (303) is in clearance fit with the inner portion of the second opening (302).
CN201921569013.5U 2019-09-20 2019-09-20 Quick mounting system of big board of pottery Active CN210947529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921569013.5U CN210947529U (en) 2019-09-20 2019-09-20 Quick mounting system of big board of pottery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921569013.5U CN210947529U (en) 2019-09-20 2019-09-20 Quick mounting system of big board of pottery

Publications (1)

Publication Number Publication Date
CN210947529U true CN210947529U (en) 2020-07-07

Family

ID=71386405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921569013.5U Active CN210947529U (en) 2019-09-20 2019-09-20 Quick mounting system of big board of pottery

Country Status (1)

Country Link
CN (1) CN210947529U (en)

Similar Documents

Publication Publication Date Title
CN210947529U (en) Quick mounting system of big board of pottery
CN205314449U (en) Building decorative board dogging formula connecting device
CN214531684U (en) Stone dry-hanging installation device
CN113356454A (en) Hanging component of ceiling, ceiling structure and mounting method of ceiling structure
CN211447393U (en) Connecting mechanism for building curtain wall
WO2019137127A1 (en) Modular curtain wall system
CN205712911U (en) A kind of Stone-ceramic brick dry hanging article
CN214117139U (en) Architectural decoration curtain quick connecting device
CN213508989U (en) Assembled heat preservation sandwich wallboard
CN203284922U (en) Hanging-buckle type pendant for curtain walls
CN211736174U (en) Special pendant of building outer wall insulation material
CN210713465U (en) Hoisting system for ceiling decorative glass
CN210685134U (en) Edge sealing fixing component for ceiling decorative glass
CN201546405U (en) Wallboard mounting and fixing device
CN213741854U (en) Ceiling structure convenient to installation
CN209114677U (en) A kind of dry-fasten stone curtain wall structure
CN216920951U (en) Mounting structure of fossil fragments and worker's word piece
CN220100344U (en) T-shaped hanging structure of detachable bottom plate of steel bar truss building support plate
CN217027615U (en) Green building energy-saving wall
CN204983510U (en) Seat is hung to convenient to use's stone material
CN217897121U (en) Assembled kitchen wall structure
CN219732572U (en) Building externally hung decoration prefabricated member
CN219281141U (en) Assembled interior wall partition wall skeleton connection structure
CN217299625U (en) Assembled connecting piece, connecting piece structure and assembled bathroom, kitchen
CN220133186U (en) Assembled office separates structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant