CN210946889U - Assembled utility tunnel mechanized construction equipment - Google Patents

Assembled utility tunnel mechanized construction equipment Download PDF

Info

Publication number
CN210946889U
CN210946889U CN201921681384.2U CN201921681384U CN210946889U CN 210946889 U CN210946889 U CN 210946889U CN 201921681384 U CN201921681384 U CN 201921681384U CN 210946889 U CN210946889 U CN 210946889U
Authority
CN
China
Prior art keywords
pipe gallery
prefabricated
conveying vehicle
construction equipment
prefabricated pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921681384.2U
Other languages
Chinese (zh)
Inventor
李铁虎
王东权
曹玉军
陈龙
王洋
祝理慎
卓筱超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Second Navigation Bureau Science And Engineering Wuhan Co ltd
Original Assignee
Cccc Shec Structural Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Shec Structural Engineering Co ltd filed Critical Cccc Shec Structural Engineering Co ltd
Priority to CN201921681384.2U priority Critical patent/CN210946889U/en
Application granted granted Critical
Publication of CN210946889U publication Critical patent/CN210946889U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model belongs to the technical field of the construction equipment, especially, relate to an assembled utility tunnel mechanized construction equipment. The sliding double rails are fixed on the left side and the right side of the pipe gallery installation groove; and the left side of the sliding double track is provided with a miniature hoisting crane; the right side of the sliding double track is connected with a prefabricated pipe gallery conveying vehicle through a limiting guide wheel, and the top end of the prefabricated pipe gallery conveying vehicle is provided with a horizontal transfer platform; an inclined plane pulley block is arranged on the left inclined plane of the prefabricated pipe gallery conveying vehicle, and the tail part of the inclined plane pulley block is connected with a buffer base plate through the matching of a bearing and a buffer spring; the prefabricated piping lane delivery wagon's lower extreme right side is provided with the athey wheel, and the upper end and the driving motor of athey wheel are connected, and the left side lower extreme of prefabricated piping lane delivery wagon is provided with driven compression roller. The prefabricated pipe gallery is quickly conveyed and installed by matching the prefabricated part conveying vehicle with the hoisting travelling crane, so that the prefabricated pipe gallery is installed and hoisted separately, and the installation efficiency is greatly improved; the trouble brought by the traditional hoisting by using a crane is avoided.

Description

Assembled utility tunnel mechanized construction equipment
Technical Field
The utility model belongs to the technical field of the construction equipment, especially, relate to an assembled utility tunnel mechanized construction equipment.
Background
With the acceleration of the urbanization construction pace of China, many cities are continuously expanded and rebuilt. Among them, the utility tunnel is a very important part in urban construction as a municipal utility for laying municipal utility lines. But current utility tunnel excavation equipment laggard behind, and degree of mechanization is low, and the process is more complicated, needs a plurality of operation teams cooperation construction, and the period is long, and the manpower and materials that consume are many. In the prior art, the installation period of the prefabricated comprehensive pipe gallery is long, the prefabricated comprehensive pipe gallery needs to be hoisted to a designated position in a pit slot through a crane and installed in a manner of being matched with manpower, then secondary hoisting can be carried out, and the hoisting and installation efficiency is low; therefore, a comprehensive pipe gallery construction device capable of improving the degree of mechanization, shortening the construction period and reducing the construction complexity is developed.
SUMMERY OF THE UTILITY MODEL
Aiming at solving the problems of the defects and the shortcomings of the prior art; the utility model aims at providing an assembly type comprehensive pipe gallery mechanized construction equipment with simple structure, reasonable design and convenient use, which adopts the matching of a prefabricated part conveying vehicle and a hoisting travelling crane to realize the rapid conveying and installation of a prefabricated pipe gallery, so that the installation and the hoisting of the prefabricated pipe gallery are separated, and the installation efficiency is greatly improved; the trouble brought by the traditional hoisting by using a crane is avoided.
In order to achieve the above object, the utility model adopts the following technical scheme: the device comprises a sliding double rail, a miniature hoisting travelling crane, a prefabricated pipe gallery conveying vehicle, a horizontal transfer platform, a limiting guide wheel, a crawler wheel, a driving motor, a driven compression roller, an inclined pulley block, a buffer base plate and a buffer spring; the sliding double rails are fixed on the left side and the right side of the pipe gallery installation groove; and the left side of the sliding double track is provided with a miniature hoisting crane; the right side of the sliding double track is connected with a prefabricated pipe gallery conveying vehicle through a limiting guide wheel, and the top end of the prefabricated pipe gallery conveying vehicle is provided with a horizontal transfer platform; an inclined plane pulley block is arranged on the left inclined plane of the prefabricated pipe gallery conveying vehicle, and the tail part of the inclined plane pulley block is connected with a buffer base plate through the matching of a bearing and a buffer spring; prefabricated piping lane delivery wagon's lower extreme right side be provided with the athey wheel, the upper end and the driving motor of athey wheel are connected, prefabricated piping lane delivery wagon's left side lower extreme be provided with driven compression roller.
Preferably, the upper surface of the horizontal transfer platform is provided with a rotating disc, and the rotating disc is provided with a horizontal roller.
Preferably, the included angle between the inclined plane of the inclined plane pulley block and the horizontal plane is 30-45 degrees.
Preferably, the driven press roller is flush with the lower surface of the crawler wheel.
Preferably, the left and right driving components of the crawler wheel are driven synchronously.
After the structure is adopted, the utility model discloses beneficial effect does: the mechanized construction equipment for the fabricated comprehensive pipe gallery adopts the matching of a prefabricated part conveying vehicle and a hoisting travelling crane to realize the rapid conveying and installation of the prefabricated pipe gallery, so that the installation and the hoisting of the prefabricated pipe gallery are separated, and the installation efficiency is greatly improved; the trouble brought by the traditional hoisting by using a crane is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the present invention is described in detail by the following specific embodiments and the accompanying drawings.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention.
Description of reference numerals: the device comprises a sliding double rail 1, a miniature hoisting travelling crane 2, a prefabricated pipe gallery conveying vehicle 3, a horizontal transfer platform 4, a limiting guide wheel 5, crawler wheels 6, a driving motor 7, a driven pressing roller 8, an inclined pulley block 9, a buffer base plate 10, a buffer spring 11, a rotating disc 12 and a horizontal roller 13.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described below with reference to specific embodiments shown in the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
It should also be noted that, in order to avoid obscuring the invention with unnecessary details, only the structures and/or process steps that are closely related to the solution according to the invention are shown in the drawings, while other details that are not relevant to the invention are omitted.
Referring to fig. 1 and 2, the following technical solutions are adopted in the present embodiment: the device comprises a sliding double rail 1, a miniature hoisting travelling crane 2, a prefabricated pipe gallery conveying vehicle 3, a horizontal transfer platform 4, a limiting guide wheel 5, a crawler wheel 6, a driving motor 7, a driven compression roller 8, an inclined pulley block 9, a buffer base plate 10 and a buffer spring 11; the sliding double rails 1 are fixed on the left side and the right side of the pipe gallery installation groove; and the left side of the sliding double track 1 is provided with a miniature hoisting travelling crane 2; the right side of the sliding double track 1 is connected with a prefabricated pipe gallery conveying vehicle 3 through a limiting guide wheel 5, and a horizontal transfer platform 4 is arranged at the top end of the prefabricated pipe gallery conveying vehicle 3; an inclined pulley block 9 is arranged on the left inclined surface of the prefabricated pipe gallery conveying vehicle 3, and the tail part of the inclined pulley block 9 is connected with a buffer base plate 10 through the matching of a bearing and a buffer spring 11; prefabricated piping lane delivery wagon 3's lower extreme right side be provided with athey wheel 6, athey wheel 6's upper end is connected with driving motor 7, prefabricated piping lane delivery wagon 3's left side lower extreme be provided with driven compression roller 8.
Wherein, the upper surface of the horizontal transfer platform 4 is provided with a rotating disc 12, and a horizontal roller 13 is arranged on the rotating disc 12; the included angle between the inclined plane of the inclined plane pulley block 9 and the horizontal plane is 30-45 degrees; the driven press roller 8 is flush with the lower surface of the crawler wheel 6; the left and right driving components of the crawler wheel 6 keep synchronous driving.
The working principle of the specific embodiment is as follows: at first place the upper end of horizontal transportation platform 4 with prefabricated piping lane level through fork truck, and inwards promote to the upper surface of rotary disk 12, adjust the orientation of prefabricated piping lane and promote prefabricated piping lane is whole along bevel pulley assembly 9 downwards, and cushion backing plate 10 through the bottom and buffer spring 11's cooperation, make prefabricated piping lane from last to go up to the bottom, the cooperation of rethread miniature hoist and mount driving 2 at last is hoisted the assembly, prefabricated piping lane delivery wagon 3 is at the removal in-process, the driven compression roller 8 of accessible rolls the floor and paves, lay the piping lane as preparing for follow-up.
After the structure is adopted, the utility model discloses beneficial effect does: the prefabricated pipe gallery is quickly conveyed and installed by matching the prefabricated part conveying vehicle with the hoisting travelling crane, so that the prefabricated pipe gallery is installed and hoisted separately, and the installation efficiency is greatly improved; the trouble brought by the traditional hoisting by using a crane is avoided.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides an assembled utility tunnel mechanized construction equipment which characterized in that: the device comprises a sliding double rail (1), a micro hoisting travelling crane (2), a prefabricated pipe gallery conveying vehicle (3), a horizontal transfer platform (4), a limiting guide wheel (5), a crawler wheel (6), a driving motor (7), a driven press roller (8), an inclined pulley block (9), a buffer base plate (10) and a buffer spring (11); the sliding double rails (1) are fixed on the left side and the right side of the pipe gallery installation groove; and the left side of the sliding double track (1) is provided with a micro hoisting travelling crane (2); the right side of the sliding double rail (1) is connected with a prefabricated pipe gallery conveying vehicle (3) through a limiting guide wheel (5), and the top end of the prefabricated pipe gallery conveying vehicle (3) is provided with a horizontal transfer platform (4); an inclined pulley block (9) is arranged on the left inclined surface of the prefabricated pipe gallery conveying vehicle (3), and the tail part of the inclined pulley block (9) is connected with a buffer base plate (10) through the matching of a bearing and a buffer spring (11); prefabricated piping lane delivery wagon (3) lower extreme right side be provided with athey wheel (6), the upper end and the driving motor (7) of athey wheel (6) are connected, prefabricated piping lane delivery wagon (3) left side lower extreme be provided with driven compression roller (8).
2. The mechanized construction equipment of assembled utility tunnel of claim 1, characterized in that: the upper surface of the horizontal transfer platform (4) is provided with a rotating disc (12), and a horizontal rolling shaft (13) is arranged on the rotating disc (12).
3. The mechanized construction equipment of assembled utility tunnel of claim 1, characterized in that: the inclined plane of the inclined plane pulley block (9) forms an included angle of 30-45 degrees with the horizontal plane.
4. The mechanized construction equipment of assembled utility tunnel of claim 1, characterized in that: the driven press roller (8) is flush with the lower surface of the crawler wheel (6).
5. The mechanized construction equipment of assembled utility tunnel of claim 1, characterized in that: the left driving component and the right driving component of the crawler wheel (6) keep synchronous driving.
CN201921681384.2U 2019-10-09 2019-10-09 Assembled utility tunnel mechanized construction equipment Active CN210946889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921681384.2U CN210946889U (en) 2019-10-09 2019-10-09 Assembled utility tunnel mechanized construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921681384.2U CN210946889U (en) 2019-10-09 2019-10-09 Assembled utility tunnel mechanized construction equipment

Publications (1)

Publication Number Publication Date
CN210946889U true CN210946889U (en) 2020-07-07

Family

ID=71374136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921681384.2U Active CN210946889U (en) 2019-10-09 2019-10-09 Assembled utility tunnel mechanized construction equipment

Country Status (1)

Country Link
CN (1) CN210946889U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115193764A (en) * 2021-04-08 2022-10-18 江苏新伟动力科技有限公司 Motor stator comprehensive test system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115193764A (en) * 2021-04-08 2022-10-18 江苏新伟动力科技有限公司 Motor stator comprehensive test system

Similar Documents

Publication Publication Date Title
CN207552994U (en) A kind of express highway intelligence inspection vehicle
CN203716009U (en) Ballast raking and lifting machine
CN203623675U (en) Penstock transportation trolley in hole
CN104775825A (en) Shield machine single well overall originating construction method
CN101786539A (en) Conveying chain for tubular pile production
CN210946889U (en) Assembled utility tunnel mechanized construction equipment
CN105383884B (en) A kind of rack-and-pinion draw-gear
CN203996146U (en) A kind of carriage lateral movement car of motor train unit bogie maintenance
CN203865579U (en) Stacker crane used in concrete member production system
CN202968018U (en) Folding type installation forklift
CN208341593U (en) A kind of auxiliary construction device of electric railway construction
CN207919266U (en) A kind of beam type track-laying machine
CN207420580U (en) A kind of urban subway tunnel exploits dregs conveying device
CN204160616U (en) A kind of steaming maintaining vehicle apparatus for feeding
CN204262219U (en) Bottom Automatic Charging Device
CN201901161U (en) Support stepping type bearing device for moving equipment train
CN205466703U (en) Mould platform and mould platform subassembly
CN204608519U (en) Three row horizontal transport tracks in tunnel
CN204691340U (en) Streamline stereo-parking system
CN210887594U (en) Motorized modular building structure
CN204020444U (en) A kind of railroad track sleeper conventional flat-panel car
CN210948674U (en) Auxiliary system for shield air-assisted pushing forming underground excavation tunnel in pipe gallery construction
CN203702187U (en) Tunnel waterproof plate laying trolley
CN202130917U (en) Cable moving device for mine shaft
CN207278296U (en) A kind of multi-functional transporting device for coal tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 430000 Xuelin Road, Shuangliu street, Xinzhou District, Wuhan City, Hubei Province

Patentee after: China Communications Second Navigation Bureau Science and Engineering (Wuhan) Co.,Ltd.

Country or region after: China

Address before: 430000 Xuelin Road, Shuangliu street, Xinzhou District, Wuhan City, Hubei Province

Patentee before: CCCC SHEC STRUCTURAL ENGINEERING CO.,LTD.

Country or region before: China

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 430000, No. 158 Xinggu Avenue, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province

Patentee after: China Communications Second Navigation Bureau Science and Engineering (Wuhan) Co.,Ltd.

Country or region after: China

Address before: 430000 Xuelin Road, Shuangliu street, Xinzhou District, Wuhan City, Hubei Province

Patentee before: China Communications Second Navigation Bureau Science and Engineering (Wuhan) Co.,Ltd.

Country or region before: China