CN210918274U - Steel bar positioning frame for assembling integral building conversion layer - Google Patents

Steel bar positioning frame for assembling integral building conversion layer Download PDF

Info

Publication number
CN210918274U
CN210918274U CN201921310469.XU CN201921310469U CN210918274U CN 210918274 U CN210918274 U CN 210918274U CN 201921310469 U CN201921310469 U CN 201921310469U CN 210918274 U CN210918274 U CN 210918274U
Authority
CN
China
Prior art keywords
frame
conversion layer
steel bar
fixedly connected
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921310469.XU
Other languages
Chinese (zh)
Inventor
李国�
周亚亚
葛晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Sanjian Engineering Co Ltd
Original Assignee
Anhui Sanjian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Sanjian Engineering Co Ltd filed Critical Anhui Sanjian Engineering Co Ltd
Priority to CN201921310469.XU priority Critical patent/CN210918274U/en
Application granted granted Critical
Publication of CN210918274U publication Critical patent/CN210918274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assemble integral construction conversion layer steel bar positioning frame, including the sheet frame, the both sides of sheet frame are provided with first backup pad and second backup pad respectively, be provided with the spout on the sheet frame, sliding connection has the slider in the spout, be provided with the connecting rod on the slider, be provided with the steel bar cover on the connecting rod, this assemble integral construction conversion layer steel bar positioning frame, through the turning block at the rotation seat internal rotation, make the other end fixed part of sheet frame can adjust fixedly according to actual position, improve the flexibility of construction, and do not influence the stability after the installation, set up multiunit steel bar cover in the sheet frame can, cooperate the removal of slider in the spout simultaneously, make the interval of adjacent steel bar cover to adjust.

Description

Steel bar positioning frame for assembling integral building conversion layer
Technical Field
The utility model relates to a steel bar positioning frame technical field specifically is assembly integral building conversion layer steel bar positioning frame.
Background
The upper part and the lower part of a certain floor of the building have different using functions due to the plane, the upper part and the lower part of the floor adopt different structural types (floors with suddenly changed rigidity), and structural conversion is carried out through the floors, so the floors are called structural conversion layers.
When the reinforcing bar is laid to the conversion layer, need compensate the position of laying of reinforcing bar through location structure to guarantee the stability of conversion part, but current location structure majority selects both ends fixed, can't adjust according to actual conditions, leads to the mounted position that needs frequent change installation location structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assemble integral building conversion layer steel bar positioning frame to solve the problem of the inconvenient adjustment of location structure.
In order to achieve the above object, the utility model provides a following technical scheme: assembly integral architectural conversion layer steel bar positioning frame, including the sheet frame, the both sides of sheet frame are provided with first backup pad and second backup pad respectively, be provided with the spout on the sheet frame, sliding connection has the slider in the spout, be provided with the connecting rod on the slider, be provided with the steel bar cover on the connecting rod.
Preferably, the first supporting plate is fixedly connected with a connecting block through a bolt, the connecting block is fixedly connected with a rotating block through a support, and the rotating block is rotatably connected with a rotating seat.
Preferably, the lower end of the rotating seat is fixedly connected with a first connecting plate, and the lower end of the first connecting plate is fixedly connected with a first angle steel.
Preferably, fixedly connected with inserted bar in the second backup pad, the sliding sleeve is equipped with the rod cover on the inserted bar, and the rod cover passes through bolt fixed connection with the inserted bar.
Preferably, the lower end of the rod sleeve is fixedly connected with a second connecting plate, and the lower end of the second connecting plate is fixedly connected with a second angle steel.
Compared with the prior art, the beneficial effects of the utility model are that: this assemble integral building conversion layer reinforcing bar locating frame: 1. the rotating block rotates in the rotating seat, so that the other end fixing part of the plate frame can be adjusted and fixed according to the actual position, the construction flexibility is improved, and the stability after installation is not influenced;
2. set up multiunit reinforcing bar cover in the sheet frame can, cooperate the removal of slider in the spout simultaneously for the interval of adjacent connecting rod can be adjusted.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is the schematic diagram of the inner side structure of the plate frame of the present invention.
In the figure: 1 plate frame, 11 first backup pads, 12 second backup pads, 13 spouts, 14 sliders, 15 connecting rods, 16 steel bar sleeves, 2 link up the piece, 21 turning block, 22 turning seat, 3 first link up board, 31 first angle steel, 4 inserted bars, 41 rod sleeves, 5 second link up board, 51 second angle steel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 and fig. 2, the present invention provides a technical solution: assembly integral architectural conversion layer steel bar positioning frame, including sheet frame 1, the both sides of sheet frame 1 are provided with first backup pad 11 and second backup pad 12 respectively, first backup pad 11 and second backup pad 12 all pass through bolt fixed connection with sheet frame 1, be provided with spout 13 on the sheet frame 1, sliding connection has slider 14 in the spout 13, slider 14 passes through inflation screw fixed connection with spout 13, be provided with connecting rod 15 on the slider 14, connecting rod 15 and slider 14 fixed connection, be provided with steel bar cover 16 on the connecting rod 15, the fixed embedding of steel bar cover 16 is on connecting rod 15.
Referring to fig. 1, a first supporting plate 11 is provided with a connecting block 2 fixedly connected with bolts, the connecting block 2 is provided with a rotating block 21 fixedly connected with a support, the rotating block 21 is connected with a rotating seat 22 in a rotating manner, a lower end of the rotating seat 22 is fixedly connected with a first connecting plate 3, and a lower end of the first connecting plate 3 is fixedly connected with a first angle steel 31, so that one end of the plate frame 1 can be adjusted in a rotating manner, and the positioning position can be adjusted flexibly.
Referring to fig. 1, an inserting rod 4 is fixedly connected to the second supporting plate 12, a rod sleeve 41 is slidably sleeved on the inserting rod 4, the rod sleeve 41 is fixedly connected to the inserting rod 4 through a bolt, a second connecting plate 5 is fixedly connected to the lower end of the rod sleeve 41, and a second angle steel 51 is fixedly connected to the lower end of the second connecting plate 5, so that one end of the plate frame 1 can be fixed.
The utility model discloses when concrete implementation: when the steel bar needs to be positioned, the first angle steel 31 is pre-embedded in the lower wall, the first connecting plate 3 and the first angle steel 31 are welded and fixed, the rotating seat 22 with the rotating block 21 is fixed with the first connecting plate 3, the connecting block 2 on the rotating block 21 is fixed with the first supporting plate 11 on the plate frame 1, the rotating block 21 rotates on the inner side of the rotating seat 22, so that the installation position of the other end of the plate frame 1 can be adjusted in angle, the flexibility of the position of the plate frame 1 is improved, the second angle steel 51 can be fixed with the wall according to the actual position, the second connecting plate 5 is fixed with the second angle steel 51, the inserting rod 4 is connected with the rod sleeve 41, so that the second supporting rod 12 can be positioned with the second connecting plate 5, the whole position of the plate frame 1 is fixed, the steel bar passes through the steel bar sleeve 16 and slides in the sliding groove 13 through the sliding block 14, the distance between two adjacent connecting rods 15 can be adjusted, and finally, after the position is determined, the plate frame 1 and the sliding block 14 are fixed through expansion screws, so that the positioning of the steel bars is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Assembly integral building conversion layer reinforcing bar locating frame, including sheet frame (1), its characterized in that: the improved steel plate frame is characterized in that a first supporting plate (11) and a second supporting plate (12) are respectively arranged on two sides of the plate frame (1), a sliding groove (13) is formed in the plate frame (1), a sliding block (14) is connected in the sliding groove (13), a connecting rod (15) is arranged on the sliding block (14), and a steel bar sleeve (16) is arranged on the connecting rod (15).
2. The fabricated integral building conversion layer rebar positioning frame of claim 1, wherein: the first supporting plate (11) is fixedly connected with a connecting block (2) through a bolt, the connecting block (2) is fixedly connected with a rotating block (21) through a support, and the rotating block (21) is rotatably connected with a rotating seat (22).
3. The fabricated integral building conversion layer rebar positioning frame of claim 2, wherein: the lower end of the rotating seat (22) is fixedly connected with a first connecting plate (3), and the lower end of the first connecting plate (3) is fixedly connected with a first angle steel (31).
4. The fabricated integral building conversion layer rebar positioning frame of claim 1, wherein: fixedly connected with inserted bar (4) on second backup pad (12), sliding sleeve is equipped with rod cover (41) on inserted bar (4), and rod cover (41) pass through bolt fixed connection with inserted bar (4).
5. The fabricated integral building conversion layer rebar positioning frame of claim 4, wherein: the lower end of the rod sleeve (41) is fixedly connected with a second connecting plate (5), and the lower end of the second connecting plate (5) is fixedly connected with a second angle steel (51).
CN201921310469.XU 2019-08-14 2019-08-14 Steel bar positioning frame for assembling integral building conversion layer Expired - Fee Related CN210918274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921310469.XU CN210918274U (en) 2019-08-14 2019-08-14 Steel bar positioning frame for assembling integral building conversion layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921310469.XU CN210918274U (en) 2019-08-14 2019-08-14 Steel bar positioning frame for assembling integral building conversion layer

Publications (1)

Publication Number Publication Date
CN210918274U true CN210918274U (en) 2020-07-03

Family

ID=71351419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921310469.XU Expired - Fee Related CN210918274U (en) 2019-08-14 2019-08-14 Steel bar positioning frame for assembling integral building conversion layer

Country Status (1)

Country Link
CN (1) CN210918274U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006492A (en) * 2021-02-25 2021-06-22 吕铁男 Steel bar positioning device of concrete beam and construction method
CN113047527A (en) * 2021-05-17 2021-06-29 张登登 Method for manufacturing prefabricated wall steel reinforcement framework

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006492A (en) * 2021-02-25 2021-06-22 吕铁男 Steel bar positioning device of concrete beam and construction method
CN113047527A (en) * 2021-05-17 2021-06-29 张登登 Method for manufacturing prefabricated wall steel reinforcement framework

Similar Documents

Publication Publication Date Title
CN210918274U (en) Steel bar positioning frame for assembling integral building conversion layer
CN205369958U (en) A support frame for prefabricating wallboard installation
CN202360896U (en) Adjustable cable fixing bracket
CN207194268U (en) The repeatable steel bar truss floor support plate utilized of bed die
CN210421756U (en) Leveling connection structure and installation structure of assembled wallboard
CN112144651A (en) Combined type positioning device for assembly type building
CN106223604A (en) The shuttering supporting adjusting means of 45 ° of pitched roof concrete
CN207260192U (en) A kind of comprehensive pipe gallery structure
CN207739656U (en) A kind of hanging dry wall scene supporting apparatus in hole side
CN218194828U (en) Heating and ventilation pipe clamp for integrated building
CN107386593B (en) GRC component and installation method thereof
CN211901797U (en) Correcting mechanism for synchronously laying prefabricated pipe sections along waterproof edges of toilets
CN218176114U (en) Waterproof type composite prefabricated balcony slab
CN105258112A (en) Corner flue of CFB boiler and assembly process thereof
CN218406227U (en) Kitchen assembled ground basic unit leveling system
CN217151262U (en) Consolidate in template support bracket in split screw rod hole
CN214117527U (en) Wall location reinforcing apparatus is led to aluminum alloy template
CN205421661U (en) Put formula sky shed structure under radiant tube
CN212641512U (en) Prefabricated wallboard installation stop device
CN219773639U (en) Steel construction support piece convenient to dismantle
CN213013956U (en) Double-column pier shaft steel bar positioning device
CN209568737U (en) A kind of vestibule of assembling type steel structure elevator and the connection structure of hoistway
CN219909628U (en) Prefabricated wall body reinforcing bar positioner of high turnover assembled conversion layer
CN213452089U (en) Same-floor drainage and water supply buried pipeline supporting structure
CN219975660U (en) Electromechanical pipeline installing support under raised floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200703

Termination date: 20210814