CN210918248U - Anchor pulling and fixing device of building template - Google Patents

Anchor pulling and fixing device of building template Download PDF

Info

Publication number
CN210918248U
CN210918248U CN201921481555.7U CN201921481555U CN210918248U CN 210918248 U CN210918248 U CN 210918248U CN 201921481555 U CN201921481555 U CN 201921481555U CN 210918248 U CN210918248 U CN 210918248U
Authority
CN
China
Prior art keywords
hinge rod
rod
backup pad
fixed knot
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921481555.7U
Other languages
Chinese (zh)
Inventor
梁培培
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University Of Business And Technology
Original Assignee
Guangdong University Of Business And Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University Of Business And Technology filed Critical Guangdong University Of Business And Technology
Priority to CN201921481555.7U priority Critical patent/CN210918248U/en
Application granted granted Critical
Publication of CN210918248U publication Critical patent/CN210918248U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a building templates's anchor fixing device that draws, including fixed knot structure, last backup pad, first hinge rod and bottom suspension fagging, the top of going up the backup pad is provided with fixed knot structure, the bottom of going up the backup pad has set gradually second hinge rod, third hinge rod and fourth hinge rod, the other end of second hinge rod, third hinge rod and fourth hinge rod articulates there is the bottom suspension fagging, the intermediate position department of second hinge rod and third hinge rod articulates there is first hinge rod, the intermediate position department of bottom suspension fagging bottom is provided with the fixed slot, the welding of intermediate position department of third hinge rod one side has the second dead lever. The utility model discloses a be provided with fixed knot at the top of last backup pad and construct, carry out the block through the mounting groove of locating piece and building templates bottom, through rotating fastening bolt, detain the activity and impel forward, let fixed knot and activity buckle to fasten the template fixedly, reach the fixed purpose of installation of being convenient for.

Description

Anchor pulling and fixing device of building template
Technical Field
The utility model relates to a building material technical field specifically is a building templates draws anchor fixing device.
Background
With the development of the building industry, the building templates are widely used in the construction site, and the building templates need to be fixed during pouring, so that a pull anchor fixing device of the building templates is needed to fix the building templates.
The existing anchor fixing device of the building template has the defects that:
1. the traditional fixing device is inconvenient to fix, and is complex to install in the using process, so that the working efficiency of workers is influenced;
2. the size of the traditional fixing device cannot be adjusted, and the height of the supporting device is insufficient, so that the supporting device can be supplemented only by adding a plug filler, and the safety is low;
3. traditional fixing device supports intensity inadequately, can influence work safety because of the intensity of self is not enough in the in-process of using.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building templates's anchor fixing device that draws to solve the inconvenient fixed of traditional fixing device that proposes in the above-mentioned background art, it is more loaded down with trivial details at the in-process installation that uses, influence staff's work efficiency, size can not adjust and support intensity problem inadequately.
In order to achieve the above object, the utility model provides a following technical scheme: a pull anchor fixing device of a building template comprises a fixing structure, an upper supporting plate, a first hinge rod and a lower supporting plate, wherein the top of the upper supporting plate is provided with the fixing structure, the bottom of the upper supporting plate is sequentially provided with a second hinge rod, a third hinge rod and a fourth hinge rod, the other ends of the second hinge rod, the third hinge rod and the fourth hinge rod are hinged with the lower supporting plate, the middle position of the second hinge rod and the middle position of the third hinge rod are hinged with the first hinge rod, the middle position of the bottom of the lower supporting plate is provided with a fixing groove, the middle position of one side of the third hinge rod is welded with a second fixing rod, the middle position of the second fixing rod is provided with a first thread sleeve, the middle position of one side of the fourth hinge rod is welded with a first fixing rod, the middle position of the first fixing rod is provided with a second thread sleeve, one side of the second thread sleeve is provided with an adjusting bolt, and the top of the adjusting bolt simultaneously penetrates through the interiors of the first threaded sleeve and the second threaded sleeve.
Preferably, fixed knot, locating piece, activity are detained, fixed block and fastening bolt have set gradually to fixed knot in fixed knot structure's inside, and fixed knot welds in the one side at last backup pad top, and the fixed block welds in the opposite side at last backup pad top, and the top of fixed block is provided with fastening bolt, and one side of fastening bolt is provided with the activity and detains, and the locating piece has all been welded at the top of fixed knot and activity knot one side.
Preferably, the middle position department of fixed block is provided with the internal thread, and fastening bolt's the outside is provided with the external screw thread that mutually supports with the external screw thread, and fixed block and fastening bolt constitute threaded connection.
Preferably, the top of going up the backup pad is provided with the slide rail, and fixed knot constructs the bottom and is provided with the slider, and slide rail and slider constitute sliding structure.
Preferably, the first hinge rod is fixedly connected with the second hinge rod and the third hinge rod, the top of the adjusting bolt is provided with a limiting block, and the adjusting bolt and the first thread sleeve form a limiting structure.
Preferably, the inside of lower supporting plate has set gradually aluminum alloy, strengthening rib and skid resistant course, and the aluminum alloy sets up in the bottom of third hinge pole, and the bottom of aluminum alloy is provided with the strengthening rib, and the bottom of strengthening rib is provided with the skid resistant course.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a be provided with fixed knot at the top of last backup pad and construct, carry out the block through the mounting groove of locating piece and building templates bottom, through rotating fastening bolt, detain the activity and impel forward, let fixed knot and activity buckle to fasten the template fixedly, reach the fixed purpose of installation of being convenient for.
2. The utility model discloses a the welding of the intermediate position department of third hinge pole one side has the second dead lever, and the intermediate position department of second dead lever is provided with first thread bush, the welding of the intermediate position department of fourth hinge pole one side has first dead lever, and the intermediate position department of first dead lever is provided with the second thread bush, one side of second thread bush is provided with adjusting bolt, through adjusting bolt, makes second thread bush and first thread bush be close to each other, makes the distance increase between backup pad and the bottom suspension fagging, eliminates the space between support frame and the bottom suspension fagging through the distance increase between last backup pad and the bottom suspension fagging, reaches the purpose of the improvement stability of being convenient for adjust.
3. The utility model discloses an it has the lower support plate to articulate in the one end of second hinge bar, third hinge bar and fourth hinge bar, through set up the inner structure that the lower support plate was strengthened to the strengthening rib between the aluminum alloy, the skid resistant course can prevent to take place relative displacement between lower support plate and the support frame when colliding the support frame simultaneously, influences safety, reaches the purpose that improves safe in utilization.
Drawings
FIG. 1 is a front sectional view of the present invention;
fig. 2 is a schematic top view of the first fixing rod and the second fixing rod of the present invention;
FIG. 3 is a schematic side view of the slide rail and the movable buckle of the present invention;
fig. 4 is a schematic view of the side view of the lower support plate of the present invention.
In the figure: 1. a fixed structure; 101. a fixing buckle; 102. positioning blocks; 103. a movable buckle; 104. a fixed block; 105. fastening a bolt; 2. a slide rail; 3. an upper support plate; 4. a first hinge lever; 5. a second hinge lever; 6. a lower support plate; 601. an aluminum alloy; 602. reinforcing ribs; 603. an anti-slip layer; 7. fixing grooves; 8. a first threaded sleeve; 9. a third hinge rod; 10. a fourth hinge lever; 11. a second threaded sleeve; 12. adjusting the bolt; 13. a first fixing lever; 14. a second fixing bar; 15. a slide block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides an embodiment: a pulling anchor fixing device of a building template comprises a fixing structure 1, an upper supporting plate 3, a first hinged rod 4 and a lower supporting plate 6, wherein the top of the upper supporting plate 3 is provided with the fixing structure 1, the bottom of the upper supporting plate 3 is sequentially provided with a second hinged rod 5, a third hinged rod 9 and a fourth hinged rod 10, the other ends of the second hinged rod 5, the third hinged rod 9 and the fourth hinged rod 10 are hinged with the lower supporting plate 6, the middle position of the second hinged rod 5 and the middle position of the third hinged rod 9 are hinged with the first hinged rod 4, the middle position of the bottom of the lower supporting plate 6 is provided with a fixing groove 7, the middle position of one side of the third hinged rod 9 is welded with a second fixing rod 14, the middle position of the second fixing rod 14 is provided with a first thread sleeve 8, the middle position of one side of the fourth hinged rod 10 is welded with a first fixing rod 13, and the middle position of the first fixing rod 13 is provided with a second thread sleeve 11, one side of second thread bush 11 is provided with adjusting bolt 12, and adjusting bolt 12's top runs through in the inside of first thread bush 8 and second thread bush 11 simultaneously, through adjusting bolt 12, make second thread bush 11 and first thread bush 8 be close to each other, make the increase of distance between backup pad 3 and the bottom suspension fagging 6, eliminate the space between support frame and the bottom suspension fagging 6 through the increase of distance between backup pad 3 and the bottom suspension fagging 6, reach the purpose of the improvement stability of being convenient for adjust.
Further, fixed knot 101 has been set gradually to fixed knot structure 1's inside, locating piece 102, the activity is detained 103, fixed block 104 and fastening bolt 105, fixed knot 101 welds in the one side at last backup pad 3 top, fixed block 104 welds the opposite side at last backup pad 3 top, the top of fixed block 104 is provided with fastening bolt 105, one side of fastening bolt 105 is provided with the activity and detains 103, fixed knot 101 and the top of activity knot 103 one side all weld locating piece 102, when this device carries out the during operation, carry out the block through the mounting groove of locating piece 102 with the building templates bottom, through rotating fastening bolt 105, detain 103 forward propulsion with the activity, let fixed knot 101 and activity detain 103 fasten fixedly to the template, reach the fixed purpose of being convenient for to install.
Further, the middle position department of fixed block 104 is provided with the internal thread, and fastening bolt 105's the outside is provided with the external screw thread that mutually supports with the external screw thread, and fixed block 104 and fastening bolt 105 constitute threaded connection, when this device goes on working, are convenient for fasten the activity and detain 103.
Further, the top of going up backup pad 3 is provided with slide rail 2, and the bottom of fixed knot structure 1 is provided with slider 15, and slide rail 2 and slider 15 constitute sliding construction, when this device carries out the during operation, leads and fixes a position activity knot 103.
Further, first articulated rod 4 and the solid third articulated pole 9 fixed connection of second articulated rod 5, adjusting bolt 12's top is provided with the stopper, and adjusting bolt 12 and first thread bush 8 constitute limit structure, when this device carries out work, carries out the block location through the mounting groove of locating piece 102 and building templates bottom.
Further, the inside of bottom suspension fagging 6 has set gradually aluminum alloy 601, strengthening rib 602 and skid resistant course 603, aluminum alloy 601 sets up in the bottom of third hinge pole 9, aluminum alloy 601's bottom is provided with strengthening rib 602, the bottom of strengthening rib 602 is provided with skid resistant course 603, when this device carries out the during operation, through set up strengthening rib 602 and strengthen the inner structure of bottom suspension fagging 6 between aluminum alloy 601, skid resistant course 603 can prevent to take place relative displacement between bottom suspension fagging 6 and the support frame when colliding the support frame simultaneously, influence safety, reach the purpose that improves safe in utilization.
The working principle is as follows: before the device is used, a user firstly detects the device, after no problem is confirmed, when the device is used, the device is installed at the bottom of a building template, the building template is fixed through a fixed structure 1, a positioning block 102 is clamped with a mounting groove at the bottom of the building template, a movable buckle 103 is pushed forwards by rotating a fastening bolt 105, a fixed buckle 101 and the movable buckle 103 are used for fastening and fixing the template, the purpose of facilitating installation and fixation is achieved, after the template is fixed, because a support of the support and a lower support plate 6 have a certain distance gap, the second threaded sleeve 11 and a first threaded sleeve 8 are close to each other by adjusting an adjusting bolt 12, the distance between the upper support plate 3 and the lower support plate 6 is increased, and the gap between the support and the lower support plate 6 is eliminated by increasing the distance between the upper support plate 3 and the lower support plate 6, reach the purpose of the improvement stability of being convenient for adjust, because bottom suspension fagging 6 and support frame direct contact, so bottom suspension fagging 6 need have certain rigidity intensity, strengthens the inner structure of bottom suspension fagging 6 through set up strengthening rib 602 between aluminum alloy 601, and while skid resistant course 603 can prevent to take place relative displacement between bottom suspension fagging 6 and the support frame when colliding with the support frame, influences safety, reaches the purpose that improves safety in utilization.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a building templates's anchor fixing device that draws, includes fixed knot structure (1), goes up backup pad (3), first articulated rod (4) and bottom suspension fagging (6), its characterized in that: the top of the upper supporting plate (3) is provided with a fixing structure (1), the bottom of the upper supporting plate (3) is sequentially provided with a second hinge rod (5), a third hinge rod (9) and a fourth hinge rod (10), the other ends of the second hinge rod (5), the third hinge rod (9) and the fourth hinge rod (10) are hinged with a lower supporting plate (6), the middle positions of the second hinge rod (5) and the third hinge rod (9) are hinged with a first hinge rod (4), the middle position of the bottom of the lower supporting plate (6) is provided with a fixing groove (7), the middle position of one side of the third hinge rod (9) is welded with a second fixing rod (14), the middle position of the second fixing rod (14) is provided with a first thread sleeve (8), the middle position of one side of the fourth hinge rod (10) is welded with a first fixing rod (13), and a second threaded sleeve (11) is arranged in the middle of the first fixing rod (13), an adjusting bolt (12) is arranged on one side of the second threaded sleeve (11), and the top of the adjusting bolt (12) penetrates through the first threaded sleeve (8) and the second threaded sleeve (11) simultaneously.
2. A tie anchor attachment for a building panel as claimed in claim 1, wherein: the inside of fixed knot (1) has set gradually fixed knot (101), locating piece (102), the activity is detained (103), fixed block (104) and fastening bolt (105), fixed knot (101) weld in the one side at last backup pad (3) top, fixed block (104) weld in the opposite side at last backup pad (3) top, the top of fixed block (104) is provided with fastening bolt (105), one side of fastening bolt (105) is provided with the activity and detains (103), locating piece (102) have all been welded at the top of fixed knot (101) and activity knot (103) one side.
3. A tie anchor attachment for a building panel as claimed in claim 2, wherein: the middle position department of fixed block (104) is provided with the internal thread, and the outside of fastening bolt (105) is provided with the external screw thread that mutually supports with the external screw thread, and fixed block (104) and fastening bolt (105) constitute threaded connection.
4. A tie anchor attachment for a building panel as claimed in claim 1, wherein: the top of going up backup pad (3) is provided with slide rail (2), and the bottom of fixed knot constructs (1) is provided with slider (15), and slide rail (2) and slider (15) constitute sliding construction.
5. A tie anchor attachment for a building panel as claimed in claim 1, wherein: the first hinge rod (4) is fixedly connected with the second hinge rod (5) and the third hinge rod (9), the top of the adjusting bolt (12) is provided with a limiting block, and the adjusting bolt (12) and the first threaded sleeve (8) form a limiting structure.
6. A tie anchor attachment for a building panel as claimed in claim 1, wherein: the aluminum alloy hinge is characterized in that an aluminum alloy (601), a reinforcing rib (602) and an anti-slip layer (603) are sequentially arranged in the lower supporting plate (6), the aluminum alloy (601) is arranged at the bottom of the third hinge rod (9), the reinforcing rib (602) is arranged at the bottom of the aluminum alloy (601), and the anti-slip layer (603) is arranged at the bottom of the reinforcing rib (602).
CN201921481555.7U 2019-09-06 2019-09-06 Anchor pulling and fixing device of building template Active CN210918248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921481555.7U CN210918248U (en) 2019-09-06 2019-09-06 Anchor pulling and fixing device of building template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921481555.7U CN210918248U (en) 2019-09-06 2019-09-06 Anchor pulling and fixing device of building template

Publications (1)

Publication Number Publication Date
CN210918248U true CN210918248U (en) 2020-07-03

Family

ID=71365915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921481555.7U Active CN210918248U (en) 2019-09-06 2019-09-06 Anchor pulling and fixing device of building template

Country Status (1)

Country Link
CN (1) CN210918248U (en)

Similar Documents

Publication Publication Date Title
CN105864610A (en) Retractable suspension bracket for television
CN205713169U (en) A kind of support means connecting wallboard
CN210918248U (en) Anchor pulling and fixing device of building template
CN211313726U (en) Tool box locking bar linkage structure
CN207296360U (en) A kind of climbing frame falling proof mechanism and the climbing frame falling proof seat in the plane lock based on the mechanism
CN210178370U (en) Pre-buried channel of high-speed railway tunnel contact net
CN201121406Y (en) Novel full-movable operating platform
CN214302445U (en) Aluminum alloy expansion net with strong corrosion resistance for curtain wall outer vertical surface
CN210947138U (en) Constructional engineering frame roof beam reinforcing apparatus
CN209780212U (en) Reinforced assembly structure of building construction combined scaffold
CN210316535U (en) Construction hydraulic pressure template climbing device
CN206171633U (en) Novel bicycle frame of after -poppet tool to lock integral type
CN217602053U (en) Device for fixing support of lifting scaffold
CN201714064U (en) Scaffold corner pedal
CN213742267U (en) Concrete construction operation panel
CN210175639U (en) Simple and easy spout rail support section bar structure
CN212249143U (en) Hydraulic jacking protection platform attaches wall seat
CN215331390U (en) Integral type collet for hanging flower basket
CN221295946U (en) Tower crane cab guardrail with anti-drop structure
CN210421916U (en) A template subassembly for secondary structure pouring construction
CN219081473U (en) Folding hard ladder for overhauling draft tube
CN209837879U (en) A security fence for hydraulic and hydroelectric engineering
CN214786122U (en) Material platform structure of climbing frame
CN210037910U (en) Electromagnetic shielding box
CN214939424U (en) Template support frame is used in public road bridge roof beam construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant