CN210917431U - Seepage-proofing water collecting well - Google Patents

Seepage-proofing water collecting well Download PDF

Info

Publication number
CN210917431U
CN210917431U CN201921770440.XU CN201921770440U CN210917431U CN 210917431 U CN210917431 U CN 210917431U CN 201921770440 U CN201921770440 U CN 201921770440U CN 210917431 U CN210917431 U CN 210917431U
Authority
CN
China
Prior art keywords
pit
well
plate
seepage
water collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921770440.XU
Other languages
Chinese (zh)
Inventor
马培中
吕振华
朱利新
朱晓文
文远粦
邓若非
陈彦辉
邓永全
罗国华
卢仙桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou First Construction Engineering Co ltd
Original Assignee
Huizhou First Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou First Construction Engineering Co ltd filed Critical Huizhou First Construction Engineering Co ltd
Priority to CN201921770440.XU priority Critical patent/CN210917431U/en
Application granted granted Critical
Publication of CN210917431U publication Critical patent/CN210917431U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a prevention of seepage sump pit, including setting up the well hole in the foundation ditch, the bottom surface of well hole is equipped with the bottom plate, and the lateral wall of well hole is equipped with and curb plate, the opening part roof of well hole, it has the water inlet to open on the roof, the inspection opening has still been opened on the roof, the edge of inspection opening is equipped with annular sink groove, be equipped with bearing structure on the sink groove, the last well lid of installing of bearing structure, be equipped with the protection wall between well hole and the curb plate, be equipped with the reinforcement basement between the bottom surface of well hole and the bottom plate, be equipped with waterproof construction between well hole and the protection wall, the utility model discloses a set up the effect of the prevention of seepage of multilayer waterproof seepage, the collection water of reinforcing sump pit.

Description

Seepage-proofing water collecting well
Technical Field
The utility model relates to a sump pit technical field especially relates to an prevention of seepage sump pit.
Background
The water collecting well is used for collecting rainwater, sewage and the like, is convenient to collect and discharge, and is a foundation ditch or foundation pit drainage facility. The water collecting well is generally built on the ground floor level or the position with lower topography, so that water is gathered in the water collecting well to form local water concentration, and then the water is discharged into a drainage ditch outside the building by a water suction pump, so that the aim of no water accumulation on the ground floor level of the building is fulfilled.
In the existing construction of the water collecting well, particularly in the water collecting well of a fire elevator pit and an underground garage, the consideration of the waterproof and seepage-proofing performance of the water collecting well is deficient, the well pit is generally constructed by integrally pouring concrete, and a fine cement layer is coated or waterproof paint is coated inside the well pit to reduce the construction cost of the water collecting well.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide an prevention of seepage sump pit strengthens the waterproof prevention of seepage effect of sump pit.
The above object of the present invention can be achieved by the following technical solutions:
the utility model provides a prevention of seepage sump pit, sets up the well pit at the foundation ditch, the bottom surface of well pit is equipped with the bottom plate, and the lateral wall of well pit is equipped with and reaches the curb plate, the opening part roof of well pit, it has the water inlet to open on the roof, still open the inspection opening on the roof, the edge of inspection opening is equipped with annular sink groove, be equipped with bearing structure on the sink groove, the last well lid of installing of bearing structure, be equipped with the protection wall between well pit and the curb plate, be equipped with the reinforcement basement between the bottom surface of well pit and the bottom plate, be equipped with waterproof construction between well pit and the protection wall.
Through adopting above-mentioned technical scheme, the sink groove that sets up is used for the holding well lid, and the bearing structure who sets up on the sink groove can avoid the well lid to close or the edge of the sink groove of collision when opening the well lid, play the effect of supporting the well lid, and the protection wall and the reinforcement basement that set up can protect the well hole, play and support reinforced effect, avoid the well hole to receive external force and warp and collapse, the waterproof construction that sets up between well hole and the protection wall can strengthen the seepage prevention effect of well hole, waterproof construction is owing to there is the support of protection wall, can keep the integrality of its structure, further increase waterproof performance.
The utility model discloses further set up, bearing structure includes: the bottom of the base plate is connected with a fixing hook which is embedded in the top plate.
Through adopting above-mentioned technical scheme, the backing plate is used for bearing the well lid, avoids the well lid to collide the edge of sinking the groove when closed or open, and the fixed hook that the bottom of backing plate is connected can strengthen the compactness of laminating between backing plate and the sinking groove.
The utility model discloses further set up, it has the viewing aperture to open on the well lid, be equipped with the bellying on the well lid, it turns over the board to articulate on the bellying, it has ventilative bleeder vent to turn over to open on the board, it is equipped with the handle on the board to turn over.
Through adopting above-mentioned technical scheme, the observation hole that sets up is convenient for observe the inside condition of catchmenting of pit, and the bleeder vent has balanced atmospheric pressure and carminative effect to the pit, and the handle that sets up is convenient for open flip.
The utility model discloses further set up, the protection wall is built by the brick body.
By adopting the technical scheme, the protection wall built by the brick body can reduce the construction cost and also plays a role in protecting the pit.
The utility model discloses further set up, consolidate the basement and include: and a concrete cushion layer is paved at the bottom of the pit, and waterproof coiled materials are arranged on the concrete cushion layer.
Through adopting above-mentioned technical scheme, the concrete cushion can strengthen the fastness of the ground of well pit, plays the effect of bearing well pit simultaneously, makes the well pit installation more stable firm, and the waterproofing membrane of setting can strengthen the prevention of seepage effect of well pit bottom.
The utility model discloses further set up, waterproof construction includes: waterproof coiled material arranged between the well pit and the protection wall.
Through adopting above-mentioned technical scheme, strengthened the prevention of seepage effect of well pit side, avoided water to go out from the seepage of well pit curb plate.
The utility model discloses further set up, the curb plate be equipped with transparent siphunculus on the surface, the inside floater that is equipped with of transparent siphunculus, transparent siphunculus be equipped with high sign on the surface.
Through adopting above-mentioned technical scheme, the staff of being convenient for through the high sign on floater and the transparent siphunculus knows the degree of depth condition of the inside catchment of pit.
The utility model discloses further set up, the diameter of inspection socket is less than the width of pit, the inspection socket sets up on the side of pit.
Through adopting above-mentioned technical scheme, can reduce the cost that the inspection socket set up, the inspection socket sets up on the side of well pit, can reduce the degree of difficulty of inspection socket preparation.
The utility model discloses further set up, it has the drain pipe to alternate on the up end of pit, the drain pipe is located the inside one end of pit and is connected with the immersible pump.
Through adopting above-mentioned technical scheme, avoid the drain pipe to penetrate from the well lid, and influence opening of well lid, also reduce the trouble of installation simultaneously, and the immersible pump that sets up can pass through the drain pipe with the water that the pit was collected and carry outside the building to reach the mesh that building base plane does not have ponding.
The utility model discloses further set up, the inside in pit is applied paint waterproof paint layer with a brush.
By adopting the technical scheme, the effect of water collection and seepage prevention of the well pit is further enhanced.
To sum up, the utility model discloses a beneficial technological effect does:
1. the waterproof and seepage-proof effects of the well pit can be improved through the arranged waterproof layer, and water collected by the well pit can be prevented from permeating the well pit;
2. the backing plate that sets up on the sink tank, the protection wall that sets up in the pit side and the concrete cushion of bedding in the pit bottom can play the effect of supporting and protection pit, avoid the pit to receive the extrusion of external force and take place deformation or damage, can prolong the life of pit.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
FIG. 2 is a cross-sectional view of section A-A of FIG. 1;
fig. 3 is an enlarged view of fig. 2 at B.
Reference numerals: 1. a well pit; 11. a foundation pit; 12. a base plate; 13. a side plate; 131. a water inlet; 14. a top plate; 15. a viewing port; 2. an inspection opening; 21. a well cover; 211. a boss portion; 212. turning over a plate; 213. a handle; 22. air holes are formed; 3. sinking the tank; 4. a base plate; 41. a fixed hook; 5. a protection wall; 6. reinforcing the substrate; 61. a concrete cushion; 62. waterproof coiled materials; 63. a transparent through pipe; 64. a floating ball; 7. a drain pipe; 71. a submersible pump; 8. and a waterproof layer.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses an prevention of seepage sump pit, including seting up in pit 1 of foundation ditch 11, pit 1 holds the chamber for a cube, and the size of pit 1's inside is established to 2000MM, and the inner wall of pit 1 coats on the surface and has brushed waterproof layer 8, and waterproof layer 8 is aliphatic polyurethane finish paint, has strengthened the prevention of seepage effect of pit 1, and then promotes the water collection effect of pit 1. The bottom surface of the pit 1 is provided with a bottom plate 12, four side walls of the pit 1 are provided with side plates 13, and an opening of the pit 1 is provided with a top plate 14. The roof 14 is opened on and is had a diameter to be 100 MM's water inlet 131, has seted up the inspection socket 2 of one on the roof 14, and the size of inspection socket 2 is 1000MM x 1000 MM's quad slit to establish in the corner of roof 14, the adjacent limit in both sides of inspection socket 2 and the adjacent limit laminating in both sides of well pit 1, well pit 1 has pour 240MMC15 concrete.
Referring to fig. 2 and 3, in the present embodiment, a sink groove 3 is formed on the peripheral edge of the inspection opening 2, the cross section of the sink groove 3 is L-shaped, the sink depth of the sink groove 3 is set to 120MM, the sink width is set to 70MM, and the sink groove 3 carries the manhole cover 21.
Referring to fig. 3, in the present embodiment, the sinking groove 3 is provided with a backing plate 4 having an L-shaped ring-shaped cross section, the backing plate 4 covers the surface of the sinking groove 3, the backing plate 4 is made of angle iron L50 × 50 × 5, the backing plate 4 is welded with a fixing hook 41, the fixing hook 41 is embedded at the bottom of the sinking groove 3 when the top plate 14 is poured, and the backing plate 4 plays a role of supporting the manhole cover 21, so as to prevent the manhole cover 21 from directly contacting with the concrete around the sinking groove. Referring to fig. 1 and 2, in the present embodiment, the manhole cover 21 is formed by pouring reinforced concrete and C15 concrete, and the size of the manhole cover 21 is 1050MM 120MM, and the manhole cover 21 is provided with an observation port 15 with a size of 200MM, one side of the observation port 15 is located in the middle of the side where the manhole cover 21 and the side plate 13 are attached, a protruding portion 211 is provided on the manhole cover 21 at a position close to one side of the observation port 15, the protruding portion 211 is hinged with a turning plate 212, the turning plate 212 is made of cast iron, and the turning plate 212 is 250MM, so that the turning plate 212 can be closed on the observation port 15, the turning plate 212 is further provided with a plurality of ventilation holes, and a handle 213 is provided on a side of the surface of the turning plate 212, which is far away from the hinged side, so as to facilitate opening and closing.
Referring to fig. 2, in this embodiment, curb plate 13 of well pit 1 is equipped with transparent siphunculus 63 on the surface, the material of transparent siphunculus 63 is the stereoplasm plastic, transparent siphunculus 63 is inside to be equipped with floater 64, floater 64 is fluorescence floater 64, transparent siphunculus 63 is equipped with the high sign that has fluorescence on the surface, and transparent siphunculus 63 bottom is inside to be equipped with the stopper, prevent floater 64 from following transparent siphunculus 63 bottom roll-off, make the staff see through the viewing aperture and look over the position of floater 64 and the high sign that corresponds, be convenient for know the degree of depth of the inside.
Referring to fig. 2, in this embodiment, the bottom of the foundation pit 11 is paved with a reinforcing substrate 6, the reinforcing substrate 6 is a 100MMC15 concrete cushion 61, and a layer of waterproof coiled material 62 is laid on the upper surface of the reinforcing substrate 6, so as to improve the anti-seepage effect of the bottom of the pit 1 and prevent water collected in the pit 1 from permeating out from the bottom wall.
Referring to fig. 2, in the present embodiment, a brick protection wall 5 with a thickness of 120MM is laid on the peripheral edge of the reinforcing base 6 by using M5 cement mortar, the protection wall 5 is moved inward by 60MM on the four sides of the reinforcing base 6 to improve the stability of the construction of the protection wall 5, and a layer of waterproof roll 62 is laid on the joint surface between the protection wall 5 and the side wall of the pit 1 to improve the anti-seepage effect of the pit 1.
Referring to fig. 2, in this embodiment, a drain pipe 7 is inserted through the upper end surface of the well pit 1, one end of the drain pipe 7 extending into the well pit 1 is connected with a submersible pump 71, the installation height of the submersible pump 71 is 300MM away from the bottom wall of the well pit 1, the installation height of the submersible pump 71 is set at a height 300MM away from the bottom wall of the well pit 1, and the submersible pump 71 is prevented from being damaged by sand entering the well pit 1 along with water flow, so that the sand has a settling space inside the well pit 1.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment as required without contribution after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (10)

1. The utility model provides an anti-seepage sump pit, is including setting up pit (1) in foundation ditch (11), its characterized in that, the bottom surface of pit (1) is equipped with bottom plate (12), and the lateral wall of pit (1) is equipped with and curb plate (13), opening part roof (14) of pit (1), it has water inlet (131) to open on roof (14), inspection opening (2) have still been opened on roof (14), the edge of inspection opening (2) is equipped with annular heavy groove (3) down, be equipped with bearing structure on heavy groove (3) down, last well lid (21) of installing of bearing structure, be equipped with between pit (1) and curb plate (13) protection wall (5), be equipped with between the bottom surface of pit (1) and bottom plate (12) and consolidate base (6), be equipped with waterproof construction between pit (1) and protection wall (5).
2. The seepage-proofing water collecting well is characterized in that the bearing structure comprises a backing plate (4) attached to the surface of the sunken groove (3), a fixing hook (41) is connected to the bottom of the backing plate (4), and the fixing hook (41) is embedded in the top plate (14).
3. The seepage-proofing water collecting well according to claim 1, wherein a viewing port (15) is formed in the well cover (21), a protruding portion (211) is arranged on the well cover (21), a turning plate (212) is hinged to the protruding portion (211), a vent hole (22) is formed in the turning plate (212), and a handle (213) is arranged on the turning plate (212).
4. An impermeable collector well according to claim 1, characterised in that the protective wall (5) is built from brick.
5. An impermeable collector well according to claim 1, characterized in that the reinforcement substrate (6) comprises: the concrete cushion (61) is paved at the bottom of the foundation pit (11), and waterproof rolls (62) are arranged on the concrete cushion (61).
6. An impermeable water collecting well according to claim 1, characterized in that the waterproofing structure comprises: and the waterproof roll (62) is arranged between the well pit (1) and the protection wall (5).
7. The seepage-proofing water collecting well is characterized in that a transparent through pipe (63) is arranged on the surface of the side plate (13), a floating ball (64) is arranged inside the transparent through pipe (63), and a height mark is arranged on the surface of the transparent through pipe (63).
8. An impermeable catchment pit according to claim 1, characterised in that the diameter of the inspection opening (2) is smaller than the width of the pit (1), the inspection opening (2) being provided at the corner of two adjacent sides of the roof (14).
9. An impermeable water collecting well according to the claim 1, characterized in that the top plate (14) is inserted with a drain pipe (7), and the end of the drain pipe (7) inside the well pit (1) is connected with a submersible pump (71).
10. An impermeable catchment well according to claim 1, characterised in that the inside of the well pit (1) is coated with a waterproof layer (8).
CN201921770440.XU 2019-10-21 2019-10-21 Seepage-proofing water collecting well Expired - Fee Related CN210917431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921770440.XU CN210917431U (en) 2019-10-21 2019-10-21 Seepage-proofing water collecting well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921770440.XU CN210917431U (en) 2019-10-21 2019-10-21 Seepage-proofing water collecting well

Publications (1)

Publication Number Publication Date
CN210917431U true CN210917431U (en) 2020-07-03

Family

ID=71346061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921770440.XU Expired - Fee Related CN210917431U (en) 2019-10-21 2019-10-21 Seepage-proofing water collecting well

Country Status (1)

Country Link
CN (1) CN210917431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991290A (en) * 2022-07-22 2022-09-02 福建永福电力设计股份有限公司 Infiltration-preventing water collecting well and manufacturing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991290A (en) * 2022-07-22 2022-09-02 福建永福电力设计股份有限公司 Infiltration-preventing water collecting well and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN203947484U (en) A kind of drainage of foundation pit and circulating water utilization system
CN207436078U (en) A kind of water drainage of deep foundation pit structure
CN108677644B (en) Drainage type municipal road and construction method thereof
JP3802027B2 (en) Combined rainwater temporary storage tank
CN110886303A (en) Prevent arranging integration underground drainage system
CN210917431U (en) Seepage-proofing water collecting well
CN206844171U (en) A kind of water proof structure of basement bottom board
CN113373963A (en) Drainage structure for water collection pit and elevator foundation pit and construction method
CN112962646B (en) Sump and construction method thereof
CN215888504U (en) Anti-clogging inverted siphon sewage pipeline system
CN211113431U (en) Well type water measuring building
CN109518787B (en) Surface runoff initial rain control structure
KR200426719Y1 (en) A Tunnel Type Rainwater Infitration and Detention System
CN212294882U (en) Drainage structure
KR102451462B1 (en) Free section type rainwater storage tank and its construction method
CN219080427U (en) Waterproof drainage system for basement bottom plate
CN220377488U (en) Anti-cracking and water-seepage foundation pit slope roof drainage ditch
JP2008308974A (en) Dust-removal managing pit for water storage tank
CN218713847U (en) Intelligent drainage system of building site
CN212896367U (en) Can effectively prevent building foundation ditch of rainwater infiltration
CN210421104U (en) Water collecting device for ultra-deep foundation pit
CN212026367U (en) Water stop structure with basement anti-floating design
CN211113920U (en) Bottom layer structure of toilet
CN215977585U (en) Novel drainage structures in garage ground
CN217924006U (en) District greenbelt percolating water is repaired and precipitation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200703