CN210917033U - Pier top surface construction protection device - Google Patents

Pier top surface construction protection device Download PDF

Info

Publication number
CN210917033U
CN210917033U CN201921398096.6U CN201921398096U CN210917033U CN 210917033 U CN210917033 U CN 210917033U CN 201921398096 U CN201921398096 U CN 201921398096U CN 210917033 U CN210917033 U CN 210917033U
Authority
CN
China
Prior art keywords
top surface
rail
pier
pier body
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921398096.6U
Other languages
Chinese (zh)
Inventor
胡德
徐宝平
刘亚娟
李巧如
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scegc No10 Construction Engineering Group Co ltd
Original Assignee
Scegc No10 Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scegc No10 Construction Engineering Group Co ltd filed Critical Scegc No10 Construction Engineering Group Co ltd
Priority to CN201921398096.6U priority Critical patent/CN210917033U/en
Application granted granted Critical
Publication of CN210917033U publication Critical patent/CN210917033U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pier top surface construction protection device, including a plurality of basins, the both sides of a plurality of basins all are equipped with same T type slide rail. The utility model discloses a first threaded rod, the fixed block, the setting of sleeve and inserted bar, make two splint effectual step up the pier body, and the first nut at the slide rail both ends on two splint sets up down, both can play the injecing of the slide rail position between two splint, can effectually play fixedly to two splint again, make two splint more effectual step up the pier body, and the rail can realize gliding on two slide rails, in pier body top surface construction like this, can effectually play the guard action to the staff of pier body top surface construction, when one side of pier body carries out the bridge connection installation, can slide the opposite side of one side, avoid the rail to influence the bridge construction between two pier bodies, and the device is connected conveniently, effectual reduction operating time rail, and make things convenient for reuse.

Description

Pier top surface construction protection device
Technical Field
The utility model relates to a building technical field, concretely relates to pier top surface construction protection device.
Background
At present, more and more bridge piers are built for viaducts, highway bridges and railway bridges in cities of China, the bridge piers are fixed and erected on the ground through hoisting equipment, then workers perform fixing and welding operations at high altitude, the danger is high, a stable operation platform needs to be arranged to guarantee the safety of the operators, the existing operation platform is inconvenient to use, low in utilization rate, small in bearing quantity, inconvenient to adjust and move, puzzlement is caused to work, and the operation platform is inconvenient to recycle. And current pier construction generally sets up double scaffold frame according to actual conditions at the pier job site and forms operation platform, all needs fixed connection between the steel pipe of this operation platform scaffold frame, and the joint of connecting is many, and it is slow to set up demolish the cycle, and is inefficient, and the cost of labor is high.
Disclosure of Invention
In order to solve the problems existing in the prior art, the utility model provides a pier top surface construction protection device.
The utility model discloses a realize through following technical scheme:
a pier top surface construction protection device comprises a pier body, wherein two ends of the top surface of the pier body are symmetrically provided with insertion rods, one end of each insertion rod is sleeved with a sleeve, the two sleeves are symmetrically arranged and are in fit connection with the top surface of the pier body, two slide rails are arranged between the two sleeves, the bottom surfaces of the slide rails are in fit connection with the top surface of the pier body, the top surfaces of the slide rails are provided with T-shaped slide grooves, two T-shaped slide blocks matched with the T-shaped slide grooves in the T-shaped slide grooves are arranged in the T-shaped slide grooves and are in sliding connection with the T-shaped slide blocks, the two T-shaped slide blocks arranged in the T-shaped slide grooves penetrate through the top surfaces of the T-shaped slide grooves and are fixedly connected with second threaded rods, two ends of the two slide rails are sleeved with clamping plates, one side of each clamping plate is in fit connection with the side surface of the pier, one side of the top surface of the inserted rod is fixedly connected with a fixed plate, the fixed plate is rotationally connected with a first threaded rod, the first threaded rods on the two sides of the fixed plate are sleeved with check rings and fixedly connected with the check rings, the two check rings are respectively attached to the two sides of the fixed plate, one end of the first threaded rod is fixedly connected with a handle, the other end of the first threaded rod is sleeved with a fixed block and is in threaded connection with the fixed block, the bottom surface of the fixed block is fixedly connected with the top surface of a sleeve right below the fixed block, the other end of the first threaded rod on the side end of the fixed block is fixedly connected with a check block, two fences are arranged between the two slide rails and are respectively arranged on the two sides of the top surface of the pier body, the two ends of each fence are respectively sleeved on two different second threaded rods, the two ends of the bottom surface of each fence are respectively attached, the top of the opposite side of two rails all is equipped with a plurality of light, fixed mounting has the battery on the rail of light one side.
Preferably, the battery is in communication with the hydraulic station via a conduit.
Preferably, the outer sections of the sliding rail, the inserted link and the sleeve are square.
Compared with the prior art, the beneficial effects of the utility model are that: through the arrangement of the first threaded rod, the fixing plate, the fixing block, the sleeve and the inserting rod, the two clamping plates can effectively clamp the pier body, and under the arrangement of the first nuts at two ends of the sliding rails on the two clamping plates, the limiting of the position of the sliding rail between the two clamping plates can be realized, and the fixing of the two clamping plates can also be effectively realized, so that the pier body can be more effectively clamped by the two clamping plates, and the fence can slide on the two sliding rails, thus when the top surface of the pier body is constructed, a worker on the top surface of the pier body can be effectively protected, when one side of the pier body is connected and installed by a bridge, the fence on one side can slide to the other side, the bridge construction between the two pier bodies is prevented from being influenced by the fence, the worker on the top surface of the pier body can be effectively protected by the fence, and the worker can be prevented from fixing and welding at high altitude, the danger is increased, and the device is convenient to connect, effectively reduces the working time and is convenient to recycle.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
fig. 2 is a top view of the structure of the present invention;
in the figure: pier body 1, splint 2, slide rail 3, first nut 4, hand (hold) 5, first threaded rod 6, fixed plate 7, rail 8, second threaded rod 9, light 10, fixed block 11, dog 12, inserted bar 13, sleeve 14, T type spout 15, second nut 16, battery 17, retaining ring 18.
Detailed Description
The invention will be described in further detail with reference to the following detailed description and accompanying drawings:
as shown in fig. 1 and 2, a pier top surface construction protection device comprises a pier body 1, wherein two ends of the top surface of the pier body 1 are symmetrically provided with an insert rod 13, one end of the insert rod 13 is sleeved with a sleeve 14, the two sleeves 14 are symmetrically arranged and are in fit connection with the top surface of the pier body 1, two slide rails 3 are arranged between the two sleeves 14, the bottom surfaces of the slide rails 3 are in fit connection with the top surface of the pier body 1, the top surfaces of the slide rails 3 are provided with T-shaped slide grooves 15, the T-shaped slide grooves 15 are internally provided with two T-shaped slide blocks matched with the T-shaped slide blocks in a sliding manner and are in slide connection with the T-shaped slide grooves, the two T-shaped slide blocks arranged in the T-shaped slide grooves 15 penetrate through the top surfaces of the T-shaped slide grooves 15 and are fixedly connected with second threaded rods 9, two ends of the two slide rails 3 are sleeved with clamp plates 2, one side of, the opposite sides of two clamping plates 2 on the same slide rail 3 are respectively fixedly connected with an inserted bar 13 and a sleeve 14 which are close to the inserted bar 13, one side of the top surface of the inserted bar 13 is fixedly connected with a fixed plate 7, a first threaded rod 6 is rotationally connected on the fixed plate 7, check rings 18 are respectively sleeved on the first threaded rods 6 at the two sides of the fixed plate 7 and fixedly connected with the first threaded rod, the two check rings 18 are respectively attached to the two sides of the fixed plate 7, one end of the first threaded rod 6 is fixedly connected with a handle 5, the other end of the first threaded rod 6 is sleeved with a fixed block 11 and is in threaded connection with the fixed block, the bottom surface of the fixed block 11 is fixedly connected with the top surface of the sleeve 14 right below the fixed block, the other end of the first threaded rod 6 at the side end of the fixed block 11 is fixedly connected with a check block, the both ends of rail 8 overlap respectively on two different second threaded rod 9, the bottom surface both ends of rail 8 are connected with the laminating of 3 top surfaces of two slide rails respectively, the top surface of second threaded rod 9 passes 8 top surface covers of rail and has second nut 16 and rather than threaded connection, and the top of two relative one sides of rail 8 all is equipped with a plurality of light 10, fixed mounting has battery 17 on the rail 8 of light 10 one side.
The battery 17 is in communication with the hydraulic station via a line.
The outer sections of the sliding rail 3, the inserted link 13 and the sleeve 14 are all square.
The working principle is as follows: when the utility model is used, a corresponding group of inserted bar 13 and sleeve 14 are firstly placed at one end of the top surface of the pier, the clamp plates 2 fixedly connected with the inserted bar 13 and one end of the sleeve 14 are respectively arranged at two sides of the pier body 1, then a worker holds the fixing plate 7 with one hand and rotates the handle 5 with the other hand, and then drives the first threaded rod 6 to rotate, so that the fixing block 11 in threaded connection on the first threaded rod 6 drives the sleeve 14 to slide towards one side close to the inserted bar 13, and then the two clamp plates 2 effectively tighten the pier body 1, and then the slide rail 3 passes through the two clamp plates 2, and the first nuts 4 in threaded connection are sleeved at two ends of the slide rail 3 at the side ends of the two clamp plates 2, and the first nuts 4 are screwed and are attached to the clamp plates 2, thereby not only firmly limiting the position of the slide rail 3 between the two clamp plates 2, but also effectively fixing the two clamp plates 2, so that the two clamp plates 2 can more effectively clamp the pier body 1, then the other end of the top surface of the pier body 1 is fixed by the two clamp plates 2, the fixing principle is the same as that described above, after the inserted bar 13, the sleeve 14 and the slide rail 3 are installed at the two ends of the pier body 1, the connection and the fixation of the fence 8 are carried out, and the fence 8 can slide on the two slide rails 3, so that when the top surface of the pier body 1 is constructed, the two fences 8 can respectively slide to the two sides of the top surface of the pier body 1, thus effectively protecting the workers in the top surface construction of the pier body 1, when one side of the pier body 1 is connected and installed by a bridge, the fence 8 at one side can slide to the other side, avoiding the fence 8 from influencing the bridge construction between the two pier bodies 1, and effectively protecting the workers in the top surface construction of the pier body 1 through the arrangement of the fence, the device has the advantages that the worker is prevented from fixing and welding at high altitude, the danger is increased, the device is convenient to connect, the working time is effectively reduced, and the device is convenient to recycle.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (3)

1. The utility model provides a pier top surface construction protection device, includes pier body (1), its characterized in that: the steel bridge pier is characterized in that inserting rods (13) are symmetrically arranged at two ends of the top surface of the pier body (1), one end of each inserting rod (13) is sleeved with a sleeve (14), the two sleeves (14) are symmetrically arranged and are attached to the top surface of the pier body (1), two sliding rails (3) are arranged between the two sleeves (14), the bottom surfaces of the sliding rails (3) are attached to the top surface of the pier body (1), T-shaped sliding grooves (15) are arranged on the top surfaces of the sliding rails (3), two T-shaped sliding blocks matched with the T-shaped sliding grooves are arranged in the T-shaped sliding grooves (15) and are in sliding connection with the T-shaped sliding grooves, the two T-shaped sliding blocks arranged in the T-shaped sliding grooves (15) penetrate through the top surfaces of the T-shaped sliding grooves (15) and are fixedly connected with second threaded rods (9), clamping plates (2) are sleeved at two ends of the two sliding rails (3), one side of each clamping plate (2) is attached to the side surface of the pier body, two splint (2) relative one side on same slide rail (3) respectively rather than close inserted bar (13) and sleeve (14) fixed connection, top surface one side fixedly connected with fixed plate (7) of inserted bar (13), swivelling joint has first threaded rod (6) on fixed plate (7), all overlap on first threaded rod (6) of fixed plate (7) both sides has retaining ring (18) and rather than fixed connection, and two retaining rings (18) are connected with the both sides laminating of fixed plate (7) respectively, the one end fixedly connected with hand (hold) 5 of first threaded rod (6), the cover has fixed block (11) and rather than threaded connection on the other end of first threaded rod (6), the bottom surface of fixed block (11) and sleeve (14) top surface fixed connection under it, the other end fixedly connected with dog (12) of first threaded rod (6) of fixed block (11) side, be equipped with two rails (8) between two slide rail (3), two rails (8) set up respectively in pier body (1) top surface both sides, the both ends of rail (8) overlap respectively on second threaded rod (9) of two differences, the bottom surface both ends of rail (8) are connected with two slide rail (3) top surface laminating respectively, the top surface of second threaded rod (9) is passed rail (8) top surface cover and is had second nut (16) and rather than threaded connection, and the top of two relative one sides of rail (8) all is equipped with a plurality of light (10), fixed mounting has battery (17) on rail (8) of light (10) one side.
2. The pier coping construction protecting device according to claim 1, wherein: the battery (17) is communicated with the hydraulic station through a pipeline.
3. The pier coping construction protecting device according to claim 1, wherein: the outer sections of the sliding rail (3), the inserted rod (13) and the sleeve (14) are square.
CN201921398096.6U 2019-08-27 2019-08-27 Pier top surface construction protection device Expired - Fee Related CN210917033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921398096.6U CN210917033U (en) 2019-08-27 2019-08-27 Pier top surface construction protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921398096.6U CN210917033U (en) 2019-08-27 2019-08-27 Pier top surface construction protection device

Publications (1)

Publication Number Publication Date
CN210917033U true CN210917033U (en) 2020-07-03

Family

ID=71365776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921398096.6U Expired - Fee Related CN210917033U (en) 2019-08-27 2019-08-27 Pier top surface construction protection device

Country Status (1)

Country Link
CN (1) CN210917033U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794511A (en) * 2020-07-17 2020-10-20 中国十九冶集团有限公司 Protective device for construction of single-beam hanging beam working face

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794511A (en) * 2020-07-17 2020-10-20 中国十九冶集团有限公司 Protective device for construction of single-beam hanging beam working face

Similar Documents

Publication Publication Date Title
CN210917033U (en) Pier top surface construction protection device
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN211088924U (en) High-voltage isolating switch overhauling operation platform
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN213418456U (en) Building scaffold wall connecting piece
US4201275A (en) Means for the renovating and refurbishing of overhead structures
CN208266685U (en) A kind of safe work platform of beam bridge steel web coating
CN111058611A (en) High-altitude steel structure construction method and self-climbing operation platform for construction
CN108643039A (en) A kind of safe work platform of beam bridge steel web application
CN209816679U (en) Wiring device for road and bridge construction
CN217557626U (en) Bottom fixing device for upright rod of cantilever type steel pipe scaffold
CN215167218U (en) Induction type concrete prestressed anchorage utensil with anti-drop end
CN211646019U (en) Quick-disassembly life line protection device and device set for steel box girder
CN213418543U (en) Building engineering construction protector
CN207944783U (en) A kind of construction fixture type protective fence
CN215441502U (en) Bridge side-span cast-in-place section short cantilever construction device
CN213925856U (en) Bridge detects uses safety device
CN204139640U (en) A kind of overhanging type protection canopy
CN213953064U (en) Roof safety protection fence device
CN216914331U (en) Precast beam jack adjustment and stretch-draw protector
CN213538706U (en) Movable protection device for dismantling and recovering existing bridge guardrail
CN203499277U (en) Tool type section steel hard isolation protective shed
CN220080313U (en) Tool type guard rail embedded part fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200703

Termination date: 20210827

CF01 Termination of patent right due to non-payment of annual fee