CN210893095U - Settlement monitoring device for engineering construction - Google Patents

Settlement monitoring device for engineering construction Download PDF

Info

Publication number
CN210893095U
CN210893095U CN201922317715.0U CN201922317715U CN210893095U CN 210893095 U CN210893095 U CN 210893095U CN 201922317715 U CN201922317715 U CN 201922317715U CN 210893095 U CN210893095 U CN 210893095U
Authority
CN
China
Prior art keywords
post
settlement
hexagonal prism
monitoring device
screw thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922317715.0U
Other languages
Chinese (zh)
Inventor
李红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922317715.0U priority Critical patent/CN210893095U/en
Application granted granted Critical
Publication of CN210893095U publication Critical patent/CN210893095U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)

Abstract

The utility model discloses a settlement monitoring device for engineering construction, including monitoring devices, monitoring devices includes lift post, indicator bar, monitoring board, detection scale mark, hexagonal prism and settlement piece, the lift post slides and pegs graft at the middle part of hexagonal prism, the indicator bar is circular distribution fixed connection in the upper end of lift post, the monitoring board is the circular even fixed mounting in the up end of hexagonal prism, settlement piece fixed connection is in the bottom of lift post, detect the scale mark and evenly set up the interior terminal surface at the monitoring board, the equal fixedly connected with strutting arrangement of each terminal surface of hexagonal prism, strutting arrangement includes peg graft post, telescopic link, first screw thread regulation post, bracing piece, second screw thread regulation post, support column and support base, the telescopic link is pegged graft in the inside of peg graft post. The utility model discloses can be fast accurate detect out the settlement volume in the use to it is convenient to use the detection.

Description

Settlement monitoring device for engineering construction
Technical Field
The utility model relates to an engineering construction technical field specifically is a settlement monitoring device is used in engineering construction.
Background
Need monitor the settlement volume on the place of construction and the construction platform among the engineering work progress to whether understanding that can be quick and judgement construction place and construction platform can be under construction, thereby make the in-process of construction can not take place dangerously, current monitoring devices testing result is accurate inadequately in the in-process that detects, and inconvenient detection in the use, the testing result is difficult for observing.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a settlement monitoring device is used in engineering construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a settlement monitoring device for engineering construction comprises a monitoring device, wherein the monitoring device comprises a lifting column, an indicating rod, a monitoring plate, detection scale marks, a hexagonal prism and a settlement block, the lifting column is inserted in the middle of the hexagonal prism in a sliding manner, the indicating rod is fixedly connected to the upper end of the lifting column in a circular distribution manner, the monitoring plate is uniformly and fixedly mounted on the upper end face of the hexagonal prism in a circular manner, the settlement block is fixedly connected to the bottom end of the lifting column, the detection scale marks are uniformly arranged on the inner end face of the monitoring plate, each end face of the hexagonal prism is fixedly connected with a supporting device, the supporting device comprises an insertion column, a telescopic rod, a first thread adjusting column, a supporting rod, a second thread adjusting column, a supporting column and a supporting base, the telescopic rod is inserted in the insertion column, the supporting rod is inserted in the telescopic rod, the first thread adjusting column is rotatably inserted in the middle of the insertion column and the front end of the telescopic rod, the bottom of bracing piece is pegged graft in the inside of support column, second screw thread is adjusted the post screw thread and is rotated and peg graft in the upper end of support column, support base fixed mounting is in the bottom of support column.
Preferably, the number of the supporting devices is six, and the tail ends of the plug columns in the supporting devices are fixedly connected with the side end faces of the hexagonal prisms.
Preferably, the settling block is made of metal.
Preferably, the foremost ends of the indicating rods are all indicated on the monitoring plate.
Preferably, the bottom end of the supporting base is provided with anti-skid threads.
Preferably, the bottom end surface of the settling block is horizontally smooth.
Compared with the prior art, the beneficial effects of the utility model are that:
the monitoring device of the utility model is supported by the supporting device and placed on the construction site to be detected, the side end faces of the hexagonal prism in the monitoring device are connected with the supporting device, the telescopic rod and the supporting rod are stretched according to the site to be detected, so that the hexagonal prism, the sedimentation block and the lifting column in the monitoring device are positioned at the upper end of the construction site, the supporting column and the supporting base in the supporting device are positioned on the non-construction site without sedimentation, the telescopic rod and the supporting rod can respectively stretch in the splicing column and the telescopic rod, so that the device is suitable for more sites to be used by screwing, the splicing amount of the front end of the supporting rod in the supporting column can be controlled by the second thread adjusting column, thereby the heights of the hexagonal prism and the monitoring plate are controlled by the supporting rod, the front end of the indicating rod installed at the upper end of the lifting column after the sedimentation block is contacted with the construction site to be detected indicates on the 0 scale mark in the detection scale mark, therefore, when the detection site is settled, the settlement block drives the lifting column and the indicating rod to move downwards due to self weight, and the settlement amount of the detected site can be quickly and accurately detected by observing the indication number indicated by the indicating rod in the specified time.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is a schematic structural view of the monitoring device of the present invention;
fig. 3 is a schematic structural view of the supporting device of the present invention.
In the figure: 1-a monitoring device; 2-a support device; 3-a lifting column; 4-an indicator stem; 5-a monitoring plate; 6-detecting scale marks; 7-hexagonal prism; 8-settling blocks; 9-inserting columns; 10-a telescopic rod; 11-a first threaded adjustment post; 12-a support bar; 13-a second threaded adjustment post; 14-a support column; 15-supporting the base.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a settlement monitoring device for engineering construction comprises a monitoring device 1, wherein the monitoring device 1 comprises a lifting column 3, an indicating rod 4, a monitoring plate 5, a detection scale mark 6, a hexagonal prism 7 and a settlement block 8, the lifting column 3 is inserted in the middle of the hexagonal prism 7 in a sliding mode, the indicating rod 4 is fixedly connected to the upper end of the lifting column 3 in a circular distribution mode, the monitoring plate 5 is uniformly and fixedly installed on the upper end face of the hexagonal prism 7 in a circular mode, the settlement block 8 is fixedly connected to the bottom end of the lifting column 3, the detection scale mark 6 is uniformly arranged on the inner end face of the monitoring plate 5, each end face of the hexagonal prism 7 is fixedly connected with a supporting device 2, each supporting device 2 comprises an inserting column 9, a telescopic rod 10, a first thread adjusting column 11, a supporting rod 12, a second thread adjusting column 13, a supporting rod 14 and a supporting base 15, the telescopic rod 10 is inserted in the inserting column 9, the supporting rod 12 is inserted, first screw thread regulation post 11 screw thread rotates and pegs graft in the front end middle part of grafting post 9 and telescopic link 10, and the bottom of bracing piece 12 pegs graft in the inside of support column 14, and second screw thread regulation post 13 screw thread rotates and pegs graft in the upper end of support column 14, supports base 15 fixed mounting in the bottom of support column 14.
Strutting arrangement 2 is equipped with six, 9 terminal and the side end face looks fixed connection of hexagonal prism 7 of plug column among strutting arrangement 2, and subside piece 8's material is the metal, and the foremost end of indicator lever 4 all indicates on monitoring board 5, and anti-skidding screw thread has all been seted up to the bottom of support base 15, and the bottom face of subsideing piece 8 sets up to level and level smoothness form.
The working principle is as follows: the monitoring device 1 is supported by the supporting device 2 and placed on a construction site needing to be detected, the supporting device 2 is connected and installed on the side end face of a hexagonal prism 7 in the monitoring device 1, a telescopic rod 10 and a supporting rod 12 are stretched according to the requirement of the detection site, so that the hexagonal prism 7, a settlement block 8 and a lifting column 3 in the monitoring device 1 are located at the upper end of the construction site, a supporting column 14 and a supporting base 15 in the supporting device 2 are located on a non-construction site where settlement is hard and cannot occur, the telescopic rod 10 and the supporting rod 12 can respectively stretch inside a splicing column 9 and the telescopic rod 10, so that the device is suitable for more sites to use, the splicing amount of the front end of the supporting rod 12 inside the supporting column 14 can be controlled by screwing a second thread adjusting column 13, so that the heights of the hexagonal prism 7 and the monitoring plate 5 are controlled by the supporting rod 12, make subside 4 front ends of the indicator arm of 3 upper ends installations of post that go up and down after the construction site contact of piece 8 and detection instruct in monitoring board 5 "0" scale mark to subside piece 8 when detecting that the place takes place to subside because the dead weight drives lift post 3 and indicator arm 4 displacement downwards, thereby observe the registration that indicator arm 4 instructed and can be fast accurate detect out the settlement volume that is detected the place in the time of stipulating, the utility model discloses can be fast accurate in the use detect out the settlement volume to it is convenient to use the detection.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a settlement monitoring device for engineering construction, includes monitoring devices (1), its characterized in that: monitoring devices (1) including lifting column (3), indicator lever (4), monitoring board (5), detection scale mark (6), hexagonal prism (7) and subside piece (8), lifting column (3) slip grafting is in the middle part of hexagonal prism (7), indicator lever (4) are circular distribution fixed connection in the upper end of lifting column (3), monitoring board (5) are circular even fixed mounting in the up end of hexagonal prism (7), subside piece (8) fixed connection in the bottom of lifting column (3), detect that scale mark (6) evenly set up at the interior terminal surface of monitoring board (5), each terminal surface of hexagonal prism (7) all fixedly connected with strutting arrangement (2), strutting arrangement (2) are including grafting post (9), telescopic link (10), first screw thread regulation post (11), bracing piece (12), second screw thread regulation post (13), Support column (14) and support base (15), telescopic link (10) are pegged graft in the inside of grafting post (9), bracing piece (12) are pegged graft in the inside of telescopic link (10), first screw thread regulation post (11) screw thread rotates and pegs graft in the front end middle part of grafting post (9) and telescopic link (10), the bottom of bracing piece (12) is pegged graft in the inside of support column (14), second screw thread regulation post (13) screw thread rotates and pegs graft in the upper end of support column (14), support base (15) fixed mounting is in the bottom of support column (14).
2. The settlement monitoring device for engineering construction according to claim 1, wherein: six supporting devices (2) are arranged, and the tail ends of the inserting columns (9) in the supporting devices (2) are fixedly connected with the side end faces of the hexagonal prisms (7).
3. The settlement monitoring device for engineering construction according to claim 1, wherein: the settling block (8) is made of metal.
4. The settlement monitoring device for engineering construction according to claim 1, wherein: the foremost ends of the indicating rods (4) are all indicated on the monitoring plate (5).
5. The settlement monitoring device for engineering construction according to claim 1, wherein: the bottom of the supporting base (15) is provided with anti-skid threads.
6. The settlement monitoring device for engineering construction according to claim 1, wherein: the bottom end face of the settling block (8) is horizontally smooth.
CN201922317715.0U 2019-12-22 2019-12-22 Settlement monitoring device for engineering construction Expired - Fee Related CN210893095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922317715.0U CN210893095U (en) 2019-12-22 2019-12-22 Settlement monitoring device for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922317715.0U CN210893095U (en) 2019-12-22 2019-12-22 Settlement monitoring device for engineering construction

Publications (1)

Publication Number Publication Date
CN210893095U true CN210893095U (en) 2020-06-30

Family

ID=71317368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922317715.0U Expired - Fee Related CN210893095U (en) 2019-12-22 2019-12-22 Settlement monitoring device for engineering construction

Country Status (1)

Country Link
CN (1) CN210893095U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112268539A (en) * 2020-11-24 2021-01-26 江苏房城建设工程质量检测有限公司 Building engineering detects with subsiding detection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112268539A (en) * 2020-11-24 2021-01-26 江苏房城建设工程质量检测有限公司 Building engineering detects with subsiding detection device

Similar Documents

Publication Publication Date Title
CN105547838A (en) Aluminum alloy interlocked armored cable tightness test device
CN210893095U (en) Settlement monitoring device for engineering construction
CN209198106U (en) A kind of well lid loading test instrument
CN217541896U (en) Ground settlement measuring device for engineering design investigation
CN107356308B (en) A kind of real time water level monitoring device for drainage system
CN107034930A (en) A kind of Portable Standards beam and its erection method
CN212843466U (en) Bearing ring size detection equipment
CN210036588U (en) Movable fixing frame for high-speed static strain gauge
CN207557302U (en) A kind of electronic equipment mainboard test fixture
CN115112484A (en) Bridge jib tensile strength testing arrangement
CN115573538A (en) Floor with leveling structure and leveling installation method thereof
CN212431987U (en) Thickness detection equipment for highway engineering suitable for different ground
CN211122499U (en) Outward appearance detection device of coil
CN219799061U (en) Building guardrail performance detection device
CN211651561U (en) Braking gliding amount tester for crane
CN206931906U (en) Electricity box install power assisting device
CN111664831A (en) Special measuring device of architectural design
CN211821450U (en) Measuring instrument support for water conservancy construction
CN217953488U (en) Level measuring device for engineering survey and drawing
CN220523751U (en) Theodolite rack
CN208721056U (en) For ceiling joist Mechanics Performance Testing rack
CN220184115U (en) Pile foundation detection static load instrument
CN216283542U (en) Building is managed with wall straightness detection device that hangs down
CN118066963B (en) Construction dimension measuring device for construction cost of building engineering
CN221326729U (en) Adjustable leakage current testing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200630

Termination date: 20201222

CF01 Termination of patent right due to non-payment of annual fee