CN210890365U - Novel adjustable and detachable combined type oil and gas pipeline compression foundation pier - Google Patents
Novel adjustable and detachable combined type oil and gas pipeline compression foundation pier Download PDFInfo
- Publication number
- CN210890365U CN210890365U CN201821932067.9U CN201821932067U CN210890365U CN 210890365 U CN210890365 U CN 210890365U CN 201821932067 U CN201821932067 U CN 201821932067U CN 210890365 U CN210890365 U CN 210890365U
- Authority
- CN
- China
- Prior art keywords
- concrete module
- pressing
- pipeline
- gas pipeline
- novel adjustable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a novel adjustable and detachable combined type oil and gas pipeline compression foundation pier, which comprises a concrete module and a pipe clamp assembly; a preformed hole through which the compaction screw rod passes is reserved in the middle of the concrete module, and the concrete module is provided with a slideway of the pipe clamp assembly part; the lower surface of the concrete module is provided with a bottom plate assembly, the upper surface of the concrete module is provided with a top pressing bar, two ends of the upper surface of the top pressing bar are fixedly connected with pressing screw rods through nuts, and the pressing screw rods penetrate through the concrete module and are fixedly connected with thickening nuts of the bottom plate assembly; through the design of the concrete module, the bottom plate assembly, the top pressing bar, the adjusting screw rod and the pipe clamp assembly which can be installed in a splicing mode, pipelines can be fixed conveniently, and the problems that in the prior art, the pipelines are difficult to carry, limited in use height, limited in use site and incapable of being recycled, cost is too large, environment is protected and the like in the use process of pressing the foundation pier can be effectively solved.
Description
Technical Field
The utility model belongs to the technical field of the oil and gas pipeline compresses tightly the base mound, concretely relates to novel adjustable and but split combination formula oil and gas pipeline compresses tightly the base mound.
Background
In the petroleum and gas industry, due to the fact that in the field construction work process, various factors such as large medium pressure and uneven flow velocity inside various pipelines easily cause pipeline jumping to cause resonance, and great hidden danger is caused to the safety problem of a work site, the pipeline pressing device can be manufactured and installed at the corresponding position of the field work pipeline in the construction process of the existing petroleum and gas industry, and the pipeline pressing foundation pier can be manufactured by adopting concrete to guarantee safety of the pressing device. Since 2017, pipeline compaction foundation piers in the industry are generally divided into two types, the first type is field manufacturing and installation, namely all working pipelines are installed, on-site pit digging and formwork supporting are carried out at positions where pipelines need to be compacted, concrete is poured in, and the required pipeline compaction foundation piers are manufactured. The second is a concrete foundation pier which is manufactured before being used on site, the recyclable concrete foundation pier basically solves the problem of environmental pollution caused by a large amount of construction waste, but for the oil and gas industry of field construction operation, the natural contradiction between the complexity of the terrain and the manufactured fixed-size concrete foundation pier still cannot meet the use on site.
With the issuance of new standards in the oil and gas industry, the old pipeline pressing foundation pier can not meet the requirements of current development from aspects of appearance, size, field applicability, sustainable development, building environmental protection and the like, and on the basis, the invention of the currently applicable pipeline pressing foundation pier is very necessary.
The existing oil and gas pipeline pressing base pier can not be recycled if being convenient to install when in use, and can not be combined with each other if being unfavorable for installation and further increases the operation cost of enterprises and causes the problem of large quantities of construction waste or increased workload during installation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel but adjustable and split combination formula oil and gas pipeline compresses tightly the base mound to it compresses tightly the base mound if the installation of being convenient for is just unable recycle to provide current oil and gas pipeline in the above-mentioned background art when using to solve, just is unfavorable for the installation if recycle, and can't combine both mutually, thereby has increaseed the operation cost of enterprise, the problem of the work load increase when causing a large amount of building rubbish or installation.
In order to achieve the above object, the utility model provides a following technical scheme: novel adjustable and but split combination oil and gas pipeline compresses tightly base mound, including concrete module and pipe strap assembly, the lower surface of concrete module is provided with the bottom plate assembly, the upper surface of concrete module is provided with the top and presses the thick stick, the upper surface both ends that the thick stick was pressed at the top all compress tightly the lead screw through nut fixedly connected with, and compress tightly the lead screw run through the concrete module and with bottom plate assembly high strength thickening nut fixed connection, the upper surface that the thick stick was pressed at the top passes through nut fixedly connected with accommodate the lead screw, the inboard of concrete module is provided with the pipe strap assembly, and the pipe strap assembly carries out over-and-under type through accommodate the rotation of lead screw and slides in the slide of concrete module.
Preferably, the pipe strap assembly includes that the pipeline is fixed to be detained A and the pipeline is fixed to be detained B, and the pipeline is fixed to be detained A and the pipeline is fixed to be detained B outside and all weld the preparation and have circular arc strengthening rib, and the circular arc strengthening rib interval that the pipeline was fixed to be detained B outside is 42mm to effectual fixed M27 nut of being convenient for.
Preferably, the concrete module is provided with a pressing screw rod, holes for adjusting the screw rod and a slide way for the pipe clamp at the corresponding position in the middle, and the thickness of the single concrete module is 100 mm.
Preferably, the upper surface of the bottom plate assembly is welded with a high-strength thickened nut and a special counter bore machined part.
Preferably, the upper surface of the top pressing bar is provided with a through hole for pressing a screw rod and adjusting the screw rod.
Compared with the prior art, the beneficial effects of the utility model are that:
through the design of the concrete module, the bottom plate assembly, the top pressing bar, the adjusting screw rod, the pressing screw rod and the pipe clamp assembly which can be installed in a splicing mode, the pipeline can be fixed conveniently, and the problems that in the prior art, the pipeline pressing foundation pier is difficult to carry, limited in use height, limited in use place and incapable of being recycled, the cost is too large, the environment is protected and the like can be effectively solved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the assembly structure of the present invention;
FIG. 3 is a schematic sectional view of the present invention;
FIG. 4 is a schematic sectional view of the assembly of the present invention;
FIG. 5 is a schematic view of the structure of the part A of the pipeline fastener of the present invention;
in the figure: 1. pressing the bar at the top; 2. adjusting the screw rod; 3. pressing the screw rod; 4. a pipeline fixing buckle A; 5. a concrete module; 6. a floor assembly; 7. and a pipeline fixing buckle B.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: novel adjustable and but split combination oil and gas pipeline compresses tightly base mound, including concrete module 5 and pipe strap assembly, concrete module 5's lower surface is provided with bottom plate assembly 6, concrete module 5's upper surface is provided with the top and presses thick stick 1, the top is pressed thick stick 1's upper surface both ends and is all compressed tightly lead screw 3 through nut fixedly connected with, and compress tightly lead screw 3 run through concrete module 5 and be connected with the high strength thickening nut in bottom plate assembly 6, the upper surface that thick stick 1 was pressed at the top passes through nut fixedly connected with accommodate the lead screw 2, concrete module 5's inboard is provided with the pipe strap slide, and the pipe strap assembly carries out over-and-under type slip in concrete module 5's slide through accommodate the rotation of accommodate the lead screw 2.
In order to fix the pipeline conveniently, in this embodiment, preferably, the pipe clamp assembly includes a pipeline fixing buckle a4 and a pipeline fixing buckle B7, and the outer edge of the pipeline fixing buckle a4 is welded with an arc reinforcing rib; the outside welding of pipeline fixed knot B7 has the circular arc strengthening rib, and the strengthening rib headroom is 42mm, and the strengthening rib can block M27 nut, makes the nut can not the free rotation.
In order to ensure smooth passing of the pressing screw rod 3 and the adjusting screw rod 2 and manual operability, in this embodiment, preferably, the concrete module 5 is provided with a hole and a slide way of the pipe clamp at a corresponding position in the middle, and the thickness of the single concrete module 5 is 100 mm.
In order to facilitate connection with the pressing screw rod 3, in this embodiment, it is preferable that a high-strength thickened nut is welded to the upper surface of the bottom plate assembly 6.
In order to facilitate the penetration of the pressing screw rod 3, in the present embodiment, it is preferable that the upper surface of the top pressing bar 1 is provided with an opening.
The utility model discloses a theory of operation and use flow: after the device is installed, the concrete module 5 is placed on the upper surface of the bottom plate assembly 6, the compression screw rod 3 and the adjusting screw rod 2 are guaranteed to penetrate through the concrete module 5, the concrete module 5 is sequentially stacked until the required height is reached, the pipeline is placed between the pipeline fixing buckle A4 and the pipeline fixing buckle B7, then the concrete module 5 is stacked again until the proper height is reached, and then the compression screw rod 3 is locked by the nut.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. Novel adjustable and but split combination formula oil and gas pipeline compresses tightly base mound, including concrete module (5) and pipe strap assembly, its characterized in that: the lower surface of concrete module (5) is provided with bottom plate assembly (6), the upper surface of concrete module (5) is provided with the top and presses thick stick (1), the upper surface both ends that thick stick (1) were pressed at the top all compress tightly lead screw (3) through nut fixedly connected with, and compress tightly lead screw (3) run through concrete module (5) and with bottom plate assembly (6) fixed connection, the upper surface that thick stick (1) was pressed at the top passes through nut fixedly connected with accommodate the lead screw (2), the inboard of concrete module (5) is provided with the pipe strap assembly, and the pipe strap assembly carries out over-and-under type slip in the slide of concrete module (5) through the rotation of accommodate the lead screw (2).
2. The novel adjustable and detachable combined type oil and gas pipeline pressing foundation pier as claimed in claim 1, wherein: the pipe strap assembly includes that the pipeline is fixed to be detained A (4) and pipeline is fixed to be detained B (7), and the fixed A (4) outside border welding of detaining of pipeline has the circular arc strengthening rib, and the pipeline is fixed to be detained B (7) outside and also has the welding of circular arc strengthening rib, and strengthening rib headroom is 42mm, and the strengthening rib can block M27 nut, makes the nut can not the free rotation.
3. The novel adjustable and detachable combined type oil and gas pipeline pressing foundation pier as claimed in claim 1, wherein: the concrete modules (5) are provided with holes for pressing the screw rods and adjusting the screw rods and slideways for the pipe clamps at corresponding positions in the middle, and the thickness of each concrete module (5) is 100 mm.
4. The novel adjustable and detachable combined type oil and gas pipeline pressing foundation pier as claimed in claim 1, wherein: the upper surface of the bottom plate assembly (6) is welded with a high-strength thickened nut and a special counter bore machined part.
5. The novel adjustable and detachable combined type oil and gas pipeline pressing foundation pier as claimed in claim 1, wherein: and the corresponding position of the upper surface of the top pressing bar (1) is provided with a through hole for pressing the screw rod and the adjusting screw rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821932067.9U CN210890365U (en) | 2018-11-22 | 2018-11-22 | Novel adjustable and detachable combined type oil and gas pipeline compression foundation pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821932067.9U CN210890365U (en) | 2018-11-22 | 2018-11-22 | Novel adjustable and detachable combined type oil and gas pipeline compression foundation pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210890365U true CN210890365U (en) | 2020-06-30 |
Family
ID=71315618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821932067.9U Expired - Fee Related CN210890365U (en) | 2018-11-22 | 2018-11-22 | Novel adjustable and detachable combined type oil and gas pipeline compression foundation pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210890365U (en) |
-
2018
- 2018-11-22 CN CN201821932067.9U patent/CN210890365U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109339230A (en) | A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method | |
CN209875180U (en) | Inscription formula tunnel lining board with seal and slip casting function | |
CN208072706U (en) | A kind of connection structure of the prefabricated steel shear wall horizontal joint of slip installation | |
CN210890365U (en) | Novel adjustable and detachable combined type oil and gas pipeline compression foundation pier | |
CN208395694U (en) | A kind of pile foundation reinforcement structure | |
CN202831643U (en) | Combined type concrete chute | |
CN213539076U (en) | Steel-wood template system of advanced water stop belt of ultrahigh underground outer wall post-cast strip | |
CN211498530U (en) | Pier pile maintenance reinforcing template | |
CN206693265U (en) | A kind of installation node of piping lane | |
CN208884478U (en) | A kind of hidden rolling sealing of aqueduct expansion joints | |
CN209277533U (en) | Assembled integral Double-side laminated co-clip heart heat-preservation shear wall wall root reinforces tooling | |
CN216640642U (en) | Dull and stereotyped rotary gate formula precipitation well plugging device | |
CN215801631U (en) | Tool for injecting sealing paste into deformation joint of pipe gallery | |
CN206189694U (en) | Assembled room lid | |
CN210194678U (en) | Structure for fixing rubber waterstop by end template | |
WO2018227357A1 (en) | Packer allowing piling to be performed first | |
CN211622615U (en) | Aluminum template for preventing leakage of window part | |
CN209760610U (en) | Grouting sleeve | |
CN204491596U (en) | Pile for prestressed pipe end plate exempts from welding structure | |
CN208379644U (en) | A kind of post-cast strip built for basement | |
CN208473892U (en) | Two lining trolley plug mold device of buried water stop installation in tunnel-liner | |
CN217734077U (en) | Foundation ditch stagnant water curtain structure | |
CN218094790U (en) | Sealed interfacing apparatus of sewage treatment pipeline | |
CN201132956Y (en) | Prestressing force connecting apparatus for rods for reinforcing concrete static pressure piles | |
CN212104594U (en) | Assembled structure coincide floor end opening seam plugging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200630 Termination date: 20211122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |