CN210883844U - Apron board conveyor for building foundation ditch - Google Patents

Apron board conveyor for building foundation ditch Download PDF

Info

Publication number
CN210883844U
CN210883844U CN201921112120.5U CN201921112120U CN210883844U CN 210883844 U CN210883844 U CN 210883844U CN 201921112120 U CN201921112120 U CN 201921112120U CN 210883844 U CN210883844 U CN 210883844U
Authority
CN
China
Prior art keywords
side plate
baffle
assembly
plate strips
building foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921112120.5U
Other languages
Chinese (zh)
Inventor
金鹏飞
金鹏慧
马小波
王松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201921112120.5U priority Critical patent/CN210883844U/en
Application granted granted Critical
Publication of CN210883844U publication Critical patent/CN210883844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a skirtboard conveying device for building foundation pits, which comprises a support frame, pulleys, a conveyor belt and side plate strips, wherein the support frame is fixedly arranged at the two end sides of the pulleys, and the height of the support frame is greater than the height of the conveyor belt below the distance from the center of the pulleys; the side plate strips are symmetrically arranged in the width direction of the conveyor belt; the conveying belt is provided with a through hole assembly and a baffle assembly, the through hole assembly and the baffle assembly are positioned between side plate strips, the side plate strips and the baffle assembly jointly enclose a plurality of independently arranged partition compartments, and the through hole assembly is arranged in the partition compartments; the through hole assembly and the baffle assembly are arranged in a staggered mode, two ends of the baffle assembly are connected with the side plate strips respectively, the height of the baffle assembly is not larger than that of the side plate strips, and the baffle assembly is arranged along the moving direction of the conveyor belt and forms an angle of 60-90 degrees with the conveyor belt. The utility model discloses skirtboard conveyor, simple structure, convenient to use and easily maintenance can be fast, carry the earth in the building foundation ditch safely, and the commonality is good, the practicality is strong, and earth conveying effect is good, and the efficiency of construction is high.

Description

Apron board conveyor for building foundation ditch
Technical Field
The utility model belongs to the technical field of the foundation ditch of construction falls native construction equipment, especially, relate to a skirtboard conveyor for building foundation ditch.
Background
To the earthwork excavation engineering project place in the construction of various building deep basal pits, especially in narrow space, receive area and construction condition operating mode condition difference, earth bulk density, granularity and water content are different, and in carrying native formula and falling native device, earth easily slides on conveyor, leads to easy reworking in the earth transportation process, and the foundation ditch falls native inefficiency and has the potential safety hazard, seriously influences construction quality and construction progress.
Disclosure of Invention
The utility model aims at the problem that exists among the above-mentioned prior art, the purpose provides a skirtboard conveyor for building foundation ditch, and it is not good to lead to the foundation ditch to fall native effect because of structural design is unreasonable among the solution prior art, leads to earth easily to slide on conveyor, and earth carries and rework easily, and the foundation ditch falls native inefficiency and has the potential safety hazard, technical problem that construction cost is high.
The above technical purpose of the utility model is realized through following technical scheme:
the apron board conveying device for the building foundation pit comprises a supporting frame, pulleys, a conveying belt and side plate strips, wherein the supporting frame is fixedly arranged on two end sides of the pulleys, and the height of the supporting frame is greater than that of the conveying belt below the distance from the center of the pulleys; the pulley is matched with the conveying belt; the side plate strips are symmetrically arranged in the width direction of the conveyor belt; the conveying belt is provided with a through hole assembly and a baffle assembly, the through hole assembly and the baffle assembly are positioned between the side laths, the side laths and the baffle assembly jointly enclose a plurality of independently arranged partition compartments, and the through hole assembly is arranged in the partition compartments; the through hole assembly and the baffle assembly are arranged in a staggered mode, two ends of the baffle assembly are connected with the side plate strips respectively, the height of the baffle assembly is not larger than that of the side plate strips, and the baffle assembly is arranged along the moving direction of the conveyor belt and forms an angle of 60-90 degrees with the conveyor belt.
Furthermore, the through-hole subassembly includes the through-hole of a plurality of groups syntropy settings, the through-hole runs through the conveyer belt setting.
Furthermore, the central connecting line of each group of through holes and the side plate strips are obliquely arranged.
Furthermore, the central connecting line of each group of through holes is perpendicular to the side plate strips.
Furthermore, the adjacent through holes are arranged side by side or in a staggered manner.
Furthermore, at least one group of through holes are formed in each partition.
Further, the through hole is of a circular structure.
Furthermore, the baffle plate assembly comprises a plurality of baffle plates, and the baffle plates and the through holes are arranged in a staggered mode.
Furthermore, the baffle plate is connected with the side plate strips in an inclined mode.
Furthermore, the baffle plate is vertically connected with the side plate strips.
This technical scheme has following advantage and beneficial effect: compared with the prior art, the utility model discloses a skirtboard conveyor, simple structure, convenient to use and easily maintenance can be fast, carry the earth of taking water in the foundation ditch safely, and earth transports effectually, and the efficiency of construction is high.
Drawings
Fig. 1 is a perspective view of a skirt conveying device for a building foundation pit according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a skirt conveying device for a building foundation pit according to an embodiment of the present invention;
FIG. 3 is a side view of a baffle assembly and conveyor belt according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a through-hole assembly and a baffle assembly according to an embodiment of the present invention.
In the figure:
10. support frame 20, pulley 30, conveyer belt
40. Side panel 50, through hole assembly 51, through hole
52. Through hole 53, through hole 60 and baffle plate assembly
61. Baffle 62, baffle 63, baffle
70. Partition compartment
Detailed Description
The invention will be further explained with reference to the following examples and drawings:
the utility model provides a building skirtboard conveyor for foundation ditch, as shown in fig. 1-2, including support frame 10, pulley 20, conveyer belt 30 and side lath 40, support frame 10 is steel bar welded support body, support frame 10 fixed mounting is in the both ends side of pulley 20 and support frame 10 perpendicular to pulley shaft axis direction on and be close to skirtboard conveyor's lower extreme surface direction setting, support frame 10 highly be greater than pulley 20 center and send out the height apart from conveyer belt 30 of below, accessible support frame 10 steadily places skirtboard conveyor on the inclined surface of foundation ditch, the purpose makes skirtboard conveyor unsettled setting, be favorable to supporting the rotatory transmission of conveyer belt among the skirtboard conveyor, make the earth of placing on conveyer belt 30 remove along with conveyer belt 30 oblique ascending removal. The pulleys 20 are respectively arranged at the upper end and the lower end of the conveyor belt 30, and the pulleys 20 are arranged in a matching way with the inner surface of the conveyor belt 30. The side plate strips 40 are symmetrically arranged in the width direction of the conveyor belt 30, the side plate strips 40 are wound on two sides in the width direction of the conveyor belt 30, and the side plate strips 40 are vertically welded on the outer surface of the conveyor belt 30.
Be equipped with through-hole subassembly 50 and baffle subassembly 60 on conveyer belt 30, through-hole subassembly 50 and baffle subassembly 60 are located between the curb plate strip 40, through-hole subassembly 50 is arranged in leaking the thick liquid in the earth, the purpose is in order to prevent that thick liquid is too much to make earth paste on conveyer belt 30 in the removal data send process, because of muddy water is too much can lead to earth can't be conveyed out the foundation ditch completely, need rework the foundation ditch again many times, make earth convey away, increase when the capital construction, influence the construction progress. Meanwhile, excessive muddy water can be deposited in the foundation pit, so that potential safety hazards exist to constructors, and collapse is easy to happen. Side lath 40 encloses into a plurality of independent settings with baffle subassembly 60 jointly and separates fender room 70, separates fender room 70 and is used for preventing earth to slide, prevents to appear sliding in earth slope transmission course, if do not set up and separates the room, earth can be thrown away even and separate fender room 70, leads to the unable clean up of earth in the foundation ditch, needs the clearance repeatedly many times just can accomplish, wastes time and energy. The through hole assembly 50 is arranged in the baffle space 70, the through hole assembly 50 and the baffle assembly 60 are arranged in a staggered mode, two ends of the baffle assembly 60 are respectively connected with the side plate strips 40, the height of the baffle assembly 60 is not larger than that of the side plate strips 40, the baffle assembly 60 is arranged along the moving direction of the conveyor belt 30, and an angle theta formed by the baffle assembly 60 and the conveyor belt 30 is 60-90 degrees, as shown in fig. 3. This arrangement facilitates the transport of the soil over the apron conveyor and prevents the soil from sliding down as it moves up the incline of the conveyor belt 30.
Further, through-hole subassembly 50 includes the through-hole of a plurality of groups syntropy settings, and the through-hole runs through the setting of conveyer belt 30, and the through-hole can be for if circular, oval, square, rhombus or other structure, and in this embodiment, the through-hole is circular structure, and every group through-hole all sets up side by side, and the size of through-hole sets up according to operating condition's earth water content, corresponds the great soil property of water content, and the size that can densely set up the through-hole just makes the size of through-hole can leak the thick liquid in the earth completely, does not do not specifically limit here.
As shown in fig. 4, the center connecting line of the through hole 53 and the through hole 52 is obliquely connected to the side panel 40, or the center connecting line of the through hole 51 is vertically arranged to the side panel 40. Furthermore, the adjacent through holes 52 are arranged side by side, and the adjacent through holes 53 are arranged in a staggered manner, so that the purpose of leaking muddy water can be achieved. At least one set of said through holes is provided in the compartment 70, e.g. one set of through holes 51 is provided in the compartment 70, or two sets of through holes 52 or two sets of through holes 53 are provided in the compartment 70. In the transmission process, no matter how many sets of through holes are arranged, the leakage of the slurry can be completed, and the leakage is not particularly limited.
Further, the baffle plate assembly 60 comprises a plurality of baffle plates, the baffle plates and the through holes are arranged in a staggered mode, and the purpose is to prevent the through holes leaking muddy water from being blocked by the baffle plates, and the muddy water cannot be leaked out, as shown in fig. 4, the baffle plates 61 are vertically arranged and connected with the side plate strips 40, and the baffle plates 62 and the baffle plates 63 are respectively connected with the side plate strips 40 in an inclined mode.
The utility model discloses a working process: soil is placed on the conveyor belt 30, the conveyor belt 30 moves upwards along with the inclination of the apron board conveying device, muddy water in the soil drips and leaks downwards along with the through hole assemblies 50, and other soil is separated and blocked by the baffle plate assemblies 60 and the side plate strips 40 and gradually moves upwards for conveying until the soil is conveyed out.
This technical scheme has following advantage and beneficial effect: the utility model discloses a skirtboard conveyor, simple structure, convenient to use and easily maintenance can be fast, the earth of taking water in the safety transport foundation ditch, and the commonality is good, the practicality is strong, and earth transports effectually, and the efficiency of construction is high.
The embodiments of the present invention have been described in detail, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (10)

1. The apron board conveying device for the building foundation pit is characterized by comprising a supporting frame, pulleys, a conveying belt and side plate strips, wherein the supporting frame is fixedly arranged on two end sides of the pulleys, and the height of the supporting frame is greater than that of the conveying belt below the distance from the center of the pulleys; the pulley is matched with the conveying belt; the side plate strips are symmetrically arranged in the width direction of the conveyor belt; the conveying belt is provided with a through hole assembly and a baffle assembly, the through hole assembly and the baffle assembly are positioned between the side laths, the side laths and the baffle assembly jointly enclose a plurality of independently arranged partition compartments, and the through hole assembly is arranged in the partition compartments; the through hole assembly and the baffle assembly are arranged in a staggered mode, two ends of the baffle assembly are connected with the side plate strips respectively, the height of the baffle assembly is not larger than that of the side plate strips, and the baffle assembly is arranged along the moving direction of the conveyor belt and forms an angle of 60-90 degrees with the conveyor belt.
2. The apron board conveying device for the building foundation pit as claimed in claim 1, wherein the through hole assembly comprises a plurality of sets of through holes arranged in the same direction, and the through holes are arranged through the conveyor belt.
3. The skirt board conveying device for a building foundation pit according to claim 2, wherein a center connecting line of each group of the through holes is obliquely arranged with the side plate strips.
4. The skirt board conveying device for the building foundation pit according to claim 2, wherein a center connecting line of each group of the through holes is arranged perpendicular to the side plate strips.
5. The apron board conveying device for the building foundation pit according to any one of claims 2 to 4, wherein adjacent through holes are arranged side by side or staggered.
6. The skirt conveying device for a building foundation pit according to claim 5, wherein at least one set of the through holes is provided in each of the partitions.
7. The apron board conveying device for the building foundation pit as claimed in claim 6, wherein the through hole is of a circular structure.
8. The apron board conveying device for the building foundation pit as claimed in any one of claims 1-4 and 6-7, wherein the baffle plate assembly comprises a plurality of baffle plates, and two ends of each baffle plate are fixedly connected with the side plate strips respectively.
9. The apron board conveying device for the building foundation pit as claimed in claim 8, wherein the baffle plate is connected with the side plate strips in an inclined manner.
10. The skirt conveying device for the building foundation pit according to claim 9, wherein the baffle is vertically connected with the side plate strips.
CN201921112120.5U 2019-07-16 2019-07-16 Apron board conveyor for building foundation ditch Active CN210883844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921112120.5U CN210883844U (en) 2019-07-16 2019-07-16 Apron board conveyor for building foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921112120.5U CN210883844U (en) 2019-07-16 2019-07-16 Apron board conveyor for building foundation ditch

Publications (1)

Publication Number Publication Date
CN210883844U true CN210883844U (en) 2020-06-30

Family

ID=71339317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921112120.5U Active CN210883844U (en) 2019-07-16 2019-07-16 Apron board conveyor for building foundation ditch

Country Status (1)

Country Link
CN (1) CN210883844U (en)

Similar Documents

Publication Publication Date Title
CN210883844U (en) Apron board conveyor for building foundation ditch
CN210437969U (en) Narrow space soil lifting type building foundation pit soil lowering device
CN106430876A (en) Adjustable hopper of sludge stirring machine
CN203899935U (en) Device for solving problem of material accumulation of vibrating screen surface
CN202481674U (en) Flash recovery scraper
CN109396603A (en) Part automatic collecting device in plasma flame cutting platform sink
CN210145753U (en) Ground waste rock discharge equipment
CN211436877U (en) Upper and lower layer material moving device for wood in oven
CN208309321U (en) A kind of composite light-weight steel board for engineering
CN207879384U (en) A kind of coal mine underground sump coal mud clearing and conveying apparatus
CN110406926A (en) A kind of narrow space mentions native formula building foundation pit and drops native device and its application method
CN111282711A (en) Building rubbish flotation equipment
CN206089385U (en) Mud recovery system
CN220830996U (en) Earthing machine feedway in sprout cultivation system
CN210635222U (en) Novel scraper conveyor
CN215158193U (en) Chain slat conveyor
CN212711090U (en) Return tubular adhesive tape machine and equipment rack
CN217492128U (en) Soil remediation improves device
CN215026261U (en) Mine sump deposit cleaning device in pit
CN219636454U (en) Material conveying system
CN217075989U (en) Belt conveyor with self-cleaning device for mine
CN218023663U (en) Novel sealing cover for two sides of blanking point of belt conveyor
CN217779766U (en) Novel sealed baffle box device
CN221297800U (en) Engineering equipment for channel repair engineering
CN210305447U (en) Tray type bridge punches a hole and uses garbage collection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant