CN210857521U - Structure is assembled in long-span building construction - Google Patents
Structure is assembled in long-span building construction Download PDFInfo
- Publication number
- CN210857521U CN210857521U CN201921175013.7U CN201921175013U CN210857521U CN 210857521 U CN210857521 U CN 210857521U CN 201921175013 U CN201921175013 U CN 201921175013U CN 210857521 U CN210857521 U CN 210857521U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- storage bin
- glue
- groove
- positioning block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a large-span building construction assembly structure, which belongs to the field of large-span assembly workpieces, and comprises a main assembly workpiece and an auxiliary assembly workpiece, wherein the auxiliary assembly workpiece is positioned on the right side of the main assembly workpiece, one end of the main assembly workpiece, which is close to the auxiliary assembly workpiece, is fixedly connected with a positioning block, a containing groove is drilled on the positioning block, one end of the auxiliary assembly workpiece, which is close to the main assembly workpiece, is provided with a positioning groove matched with the positioning block, a glue storage bin matched with the containing groove is fixedly connected on a slot bottom plate of the positioning groove, a partition plate is slidably connected in the glue storage bin, the embedded part of the glue storage bin is divided into a glue chamber and a movable chamber by the partition plate, the glue chamber is positioned on the left side of the movable chamber, a compression spring is fixedly connected between the partition plate and the inner wall of the glue storage bin, and the compression spring is positioned in the movable chamber, thereby facilitating the pre-connection, the operation difficulty of pre-connection is reduced.
Description
Technical Field
The utility model relates to a work piece field is assembled to the large-span, and more specifically says, relates to a structure is assembled in construction of long-span.
Background
The large-span building generally refers to a building (concrete) with a span of more than 30m, and the current steel structure specification in China stipulates that the structure with a span of more than 60m is a large-span structure, and is mainly used for movie theaters, stadiums, exhibition halls, large halls, airports and other large public buildings of civil buildings. The method is mainly used for aircraft assembly workshops, hangars and other large-span plants in industrial buildings. The large-span building structure comprises basic space structures such as a grid structure, a reticulated shell structure, a suspended cable structure, a truss structure, a membrane structure, a thin shell structure and the like, and various combined space structures.
In the construction of the existing large-span building, the connection between the workpieces is mostly connected by arc welding or rivet fixing, and before the connection by arc welding or rivet fixing, the two workpieces to be connected are usually pre-connected by glue, so that the subsequent operation is convenient.
Because large-span building span range is great, when utilizing glue to carry out the pre-connection to the work piece, need build scaffold frame and strutting arrangement in advance, the work of staff on the scaffold frame can be subject to the home range of scaffold frame, and the operation of pre-connection is comparatively difficult.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a structure is assembled in construction of striding greatly, it can realize making things convenient for the staff to carry out the work of connecting in advance to the work piece on the scaffold frame, reduces the operation degree of difficulty of connecting in advance.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A large-span building construction assembly structure comprises a main assembly workpiece and an auxiliary assembly workpiece, wherein the auxiliary assembly workpiece is positioned on the right side of the main assembly workpiece, one end of the main assembly workpiece, which is close to the auxiliary assembly workpiece, is fixedly connected with a positioning block, an accommodating groove is formed in the positioning block, one end of the auxiliary assembly workpiece, which is close to the main assembly workpiece, is provided with a positioning groove matched with the positioning block, a groove bottom plate of the positioning groove is fixedly connected with a glue storage bin matched with the accommodating groove, a partition plate is slidably connected in the glue storage bin and divides an embedded glue storage bin into a glue chamber and a movable chamber, the glue chamber is positioned on the left side of the movable chamber, a compression spring is fixedly connected between the partition plate and the inner wall of the glue storage bin and positioned in the movable chamber, a glue storage bin through hole is formed in the glue storage bin, and the glue chamber is communicated with the outside through the glue storage bin through hole, the glue storage bin is characterized in that a sealing rubber film is fixedly connected to the inner wall of the through hole of the glue storage bin, glue is filled in the glue material chamber, a hidden needle matched with the through hole of the glue storage bin is fixedly connected to a groove bottom plate of the containing groove, a through hole groove is formed in the side wall of the hidden needle, pre-connection work of a workpiece on a scaffold by a worker can be facilitated, and the pre-connection operation difficulty is reduced.
Further, fixedly connected with telescopic link between division board and the storage rubber storehouse inner wall, and compression spring cup joints in the outside of telescopic link, and compression spring can be protected to the telescopic link, is that compression spring is difficult for taking place the non-work under the effect of external force to deformation, is difficult for influencing subsequent sizing material and extrudes work.
Furthermore, the telescopic link divide into movable part and fixed part, and the telescopic link fixed part is pegged graft in vice work piece of assembling, reduces the space that the telescopic link took up in storing up gluey storehouse, increases the home range of telescopic link.
Furthermore, a silica gel gasket is connected between the positioning block and the inner wall of the positioning groove and fixedly connected with the inner wall of the positioning groove, and the silica gel gasket can increase the sealing property between the positioning block and the positioning groove, so that the rubber material is not easy to flow out from a gap between the positioning block and the positioning groove.
Further, be interference fit between silica gel packing ring and the locating piece, the equal fixedly connected with polishing layer of locating piece and silica gel packing ring's contact surface further increases the leakproofness between locating piece and the constant head tank, makes the sizing material be difficult for flowing out from the gap between locating piece and the constant head tank.
Furthermore, a sealing gasket is connected between the inner wall of the glue storage bin and the partition plate and fixedly connected with the partition plate, so that the sealing performance between the glue storage bin and the partition plate is improved, and the glue in the glue storage bin is not easy to permeate into the movable chamber from a gap between the glue storage bin and the partition plate.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) this scheme can realize making things convenient for the staff to carry out the work of connecting in advance to the work piece on the scaffold frame, reduces the operation degree of difficulty of connecting in advance.
(2) The telescopic rod is fixedly connected between the partition plate and the inner wall of the glue storage bin, the compression spring is sleeved outside the telescopic rod, the compression spring can be protected by the telescopic rod, the compression spring is not prone to non-working deformation under the action of external force, and subsequent glue material extrusion work is not prone to being influenced.
(3) The telescopic link divide into movable part and fixed part, and the telescopic link fixed part is pegged graft in vice work piece of assembling, reduces the space that the telescopic link took in storing up gluey storehouse, increases the home range of telescopic link.
(4) The positioning block is connected with the positioning groove through the positioning ring, the positioning groove is formed in the outer wall of the positioning block, the positioning block is connected with the inner wall of the positioning groove through the positioning ring, and the positioning block is fixedly connected with the inner wall of the positioning groove.
(5) For interference fit between silica gel packing ring and the locating piece, the equal fixedly connected with polishing layer of locating piece and silica gel packing ring's contact surface further increases the leakproofness between locating piece and the constant head tank, makes the sizing material be difficult for flowing out from the gap between locating piece and the constant head tank.
(6) A sealing gasket is connected between the inner wall of the glue storage bin and the partition plate, and the sealing gasket is fixedly connected with the partition plate, so that the sealing performance between the glue storage bin and the partition plate is improved, and the glue in the glue material chamber is not easy to permeate into the movable chamber from a gap between the glue storage bin and the partition plate.
Drawings
Fig. 1 is a front sectional view of two assembled workpieces of the present invention before assembly;
fig. 2 is a front sectional view of the two assembled workpieces of the present invention after assembly;
fig. 3 is a schematic structural diagram at a in fig. 2.
The reference numbers in the figures illustrate:
the device comprises a main assembly workpiece 1, an auxiliary assembly workpiece 2, a positioning block 3, a storage groove 4, a hiding needle 5, a positioning groove 6, a glue storage bin 7, a separation plate 8, a glue storage bin 9, a movable chamber 10, a telescopic rod 11, a compression spring 12, a glue storage bin through hole 13, a sealing rubber film 14 and a silica gel gasket 15.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1:
referring to fig. 2-3, a long-span construction assembly structure comprises a main assembly workpiece 1 and an auxiliary assembly workpiece 2, wherein the main assembly workpiece 1 and the auxiliary assembly workpiece 2 are long-span workpieces to be pre-connected, the auxiliary assembly workpiece 2 is positioned at the right side of the main assembly workpiece 1, one end of the main assembly workpiece 1 close to the auxiliary assembly workpiece 2 is fixedly connected with a positioning block 3, a containing groove 4 is chiseled on the positioning block 3, one end of the auxiliary assembly workpiece 2 close to the main assembly workpiece 1 is chiseled with a positioning groove 6 matched with the positioning block 3, a glue storage bin 7 matched with the containing groove 4 is fixedly connected on a groove bottom plate of the positioning groove 6, a partition plate 8 is slidably connected in the glue storage bin 7, the partition plate 8 divides an embedded glue storage bin 7 into a glue chamber 9 and a movable chamber 10, the glue chamber 9 is positioned at the left side of the movable chamber 10, a compression spring 12 is fixedly connected between the partition plate 8 and the inner wall of the glue storage, and compression spring 12 is located the activity room 10, and it has glue storage bin through-hole 13 to cut on glue storage bin 7, and glue material room 9 is linked together with the external world through glue storage bin through-hole 13, and glue storage bin through-hole 13 inner wall fixedly connected with sealing rubber membrane 14, and glue material room 9 intussuseption is filled with glue, and fixedly connected with hides needle 5 that glue storage bin through-hole 13 assorted on the groove bottom plate of holding groove 4, and it has the through-hole groove to cut on the lateral wall of hiding needle 5.
Referring to fig. 2-3, an expansion link 11 is fixedly connected between the partition plate 8 and the inner wall of the glue storage bin 7, and the compression spring 12 is sleeved outside the expansion link 11, the expansion link 11 can protect the compression spring 12, the compression spring 12 is not easy to deform in a non-working direction under the action of external force, and subsequent glue extrusion work is not easy to be affected, the expansion link 11 is divided into a movable part and a fixed part, and the fixed part of the expansion link 11 is inserted into the auxiliary assembly workpiece 2, so that the space occupied by the expansion link 11 in the glue storage bin 7 is reduced, the movable range of the expansion link 11 is enlarged, a silicone gasket 15 is connected between the positioning block 3 and the inner wall of the positioning slot 6, the silicone gasket 15 is fixedly connected with the inner wall of the positioning slot 6, the sealing performance between the positioning block 3 and the positioning slot 6 can be increased by the silicone gasket 15, so that glue is not easy, the equal fixedly connected with polishing layer of locating piece 3 and the contact surface of silica gel packing ring 15 further increases the leakproofness between locating piece 3 and the constant head tank 6, make the sizing material be difficult for flowing out from the gap between locating piece 3 and the constant head tank 6, store up and be connected with seal ring between 7 inner walls in the gluey storehouse and the division board 8, and seal ring and division board 8 fixed connection, increase the leakproofness between storing up gluey storehouse 7 and the division board 8, make the sizing material in the sizing material room 9 be difficult for permeating the studio 10 from the gap between storing up gluey storehouse 7 and the division board 8.
Before the main assembling workpiece 1 and the auxiliary assembling workpiece 2 are connected, please refer to fig. 1, the positioning block 3 and the positioning groove 6 are prefabricated positioning devices matched with each other, when the main assembling workpiece 1 and the auxiliary assembling workpiece 2 are required to be pre-connected, the positioning block 3 is inserted into the positioning groove 6 until the state shown in fig. 2 is reached, at this time, the main assembling workpiece 1 and the auxiliary assembling workpiece 2 are contacted with each other, the sealing rubber film 14 is pierced by the hidden needle 5 positioned in the accommodating groove 4, the rubber material filled in the rubber material chamber 9 flows to the accommodating groove 4 and the positioning groove 6 through the needle tube of the sealing rubber film 14 and the through hole groove of the sealing rubber film 14, and under the action of the compression spring 12 in the compression state, the rubber material in the rubber material chamber 9 is rapidly extruded from the rubber material chamber 9 by the partition plate 8 and is filled in the accommodating groove 4 and the positioning groove 6, because a small amount of air exists in the accommodating groove 4 and the positioning groove 6, the sizing material that has contacted the air can the fast curing, assembles work piece 1 with vice work piece 2 bonding of assembling with the owner, accomplishes the owner and assembles work piece 1 and vice pre-connection of assembling work piece 2, can realize making things convenient for the staff to carry out pre-connection work to the work piece on the scaffold frame, reduces the operation degree of difficulty of pre-connection.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.
Claims (6)
1. The utility model provides a structure is assembled in construction of striding greatly, includes that the owner assembles work piece (1) and vice work piece (2) of assembling, vice work piece (2) of assembling is located the main right side of assembling work piece (1), its characterized in that: the main splicing workpiece (1) is close to one end fixedly connected with positioning block (3) of the auxiliary splicing workpiece (2), a storage groove (4) is formed in the positioning block (3), one end, close to the main splicing workpiece (1), of the auxiliary splicing workpiece (2) is provided with a positioning groove (6) matched with the positioning block (3), a glue storage bin (7) matched with the storage groove (4) is fixedly connected onto a bottom plate of the positioning groove (6), a partition plate (8) is slidably connected into the glue storage bin (7), the partition plate (8) divides the embedding of the glue storage bin (7) into a glue material chamber (9) and a movable chamber (10), the glue material chamber (9) is positioned on the left side of the movable chamber (10), a compression spring (12) is fixedly connected between the partition plate (8) and the inner wall of the glue storage bin (7), and the compression spring (12) is positioned in the movable chamber (10), store up and cut on gluey storehouse (7) and have store up gluey storehouse through-hole (13), and glue material room (9) are linked together with the external world through storing up gluey storehouse through-hole (13), store up gluey storehouse through-hole (13) inner wall fixedly connected with sealing rubber membrane (14), glue material room (9) intussuseption is filled with glue, fixedly connected with stores up gluey storehouse through-hole (13) assorted hiding needle (5) on the groove bottom plate of holding groove (4), it has the through-hole groove to cut on the lateral wall of hiding needle (5).
2. The long-span building construction assembly structure of claim 1, wherein: the separation plate (8) and the inner wall of the glue storage bin (7) are fixedly connected with a telescopic rod (11), and the compression spring (12) is sleeved on the outer side of the telescopic rod (11).
3. The long-span building construction assembly structure of claim 2, wherein: the telescopic rod (11) is divided into a movable part and a fixed part, and the fixed part of the telescopic rod (11) is inserted into the auxiliary assembling workpiece (2).
4. The long-span building construction assembly structure of claim 1, wherein: and a silica gel gasket (15) is connected between the positioning block (3) and the inner wall of the positioning groove (6), and the silica gel gasket (15) is fixedly connected with the inner wall of the positioning groove (6).
5. The long-span building construction assembly structure of claim 4, wherein: the silica gel gasket (15) and the positioning block (3) are in interference fit, and the polishing layer is fixedly connected to the contact surface of the positioning block (3) and the silica gel gasket (15).
6. The long-span building construction assembly structure of claim 1, wherein: and a sealing gasket is connected between the inner wall of the glue storage bin (7) and the partition plate (8), and the sealing gasket is fixedly connected with the partition plate (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921175013.7U CN210857521U (en) | 2019-07-25 | 2019-07-25 | Structure is assembled in long-span building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921175013.7U CN210857521U (en) | 2019-07-25 | 2019-07-25 | Structure is assembled in long-span building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210857521U true CN210857521U (en) | 2020-06-26 |
Family
ID=71304801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921175013.7U Expired - Fee Related CN210857521U (en) | 2019-07-25 | 2019-07-25 | Structure is assembled in long-span building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210857521U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211337A (en) * | 2020-11-11 | 2021-01-12 | 安徽省浦菲尔建材有限公司 | Waterproof heat-preservation metal curtain wall plate |
CN112252569A (en) * | 2020-11-11 | 2021-01-22 | 安徽省浦菲尔建材有限公司 | High-strength metal ceiling |
CN112282070A (en) * | 2020-11-27 | 2021-01-29 | 福建江夏学院 | Concrete assembled structure with high supporting strength |
CN113047106A (en) * | 2021-03-29 | 2021-06-29 | 韶关市中群建设有限公司 | Assembled municipal road and construction method thereof |
CN113049772A (en) * | 2021-03-22 | 2021-06-29 | 南通市飞宇石油科技开发有限公司 | Continuous triaxial coal and gas outburst simulation experiment device |
CN113062460A (en) * | 2021-03-31 | 2021-07-02 | 潮峰钢构集团有限公司 | Ultra-large span cable bearing grid system and cable net tensioning construction method |
CN113137057A (en) * | 2021-05-07 | 2021-07-20 | 中国建筑第七工程局有限公司 | Prefabricated steel structure integrated assembly type green building component |
CN114941392A (en) * | 2022-06-28 | 2022-08-26 | 中国水利水电第三工程局有限公司 | Crack-resistant device with seamless structure |
CN115853867A (en) * | 2022-11-15 | 2023-03-28 | 张家港杰茂铝业有限公司 | Fastener for aluminum profile connection |
-
2019
- 2019-07-25 CN CN201921175013.7U patent/CN210857521U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211337A (en) * | 2020-11-11 | 2021-01-12 | 安徽省浦菲尔建材有限公司 | Waterproof heat-preservation metal curtain wall plate |
CN112252569A (en) * | 2020-11-11 | 2021-01-22 | 安徽省浦菲尔建材有限公司 | High-strength metal ceiling |
CN112282070A (en) * | 2020-11-27 | 2021-01-29 | 福建江夏学院 | Concrete assembled structure with high supporting strength |
CN113049772A (en) * | 2021-03-22 | 2021-06-29 | 南通市飞宇石油科技开发有限公司 | Continuous triaxial coal and gas outburst simulation experiment device |
CN113047106A (en) * | 2021-03-29 | 2021-06-29 | 韶关市中群建设有限公司 | Assembled municipal road and construction method thereof |
CN113062460A (en) * | 2021-03-31 | 2021-07-02 | 潮峰钢构集团有限公司 | Ultra-large span cable bearing grid system and cable net tensioning construction method |
CN113062460B (en) * | 2021-03-31 | 2022-05-10 | 潮峰钢构集团有限公司 | Ultra-large span cable bearing grid system and cable net tensioning construction method |
CN113137057A (en) * | 2021-05-07 | 2021-07-20 | 中国建筑第七工程局有限公司 | Prefabricated steel structure integrated assembly type green building component |
CN114941392A (en) * | 2022-06-28 | 2022-08-26 | 中国水利水电第三工程局有限公司 | Crack-resistant device with seamless structure |
CN114941392B (en) * | 2022-06-28 | 2023-05-02 | 中国水利水电第三工程局有限公司 | Crack resistance device with seamless structure |
CN115853867A (en) * | 2022-11-15 | 2023-03-28 | 张家港杰茂铝业有限公司 | Fastener for aluminum profile connection |
CN115853867B (en) * | 2022-11-15 | 2023-10-27 | 张家港杰茂铝业有限公司 | Fastener for aluminum profile connection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210857521U (en) | Structure is assembled in long-span building construction | |
KR101202214B1 (en) | Curtain wall with high insulation | |
CN206090956U (en) | Clean wallboard T type connection structure of medical treatment and keel connecting piece | |
CN212656439U (en) | Semi-hidden frame curtain wall joint | |
CN113073767A (en) | Top-mounted assembly type suspended ceiling structure and mounting method thereof | |
CN110905119B (en) | Keel composite wall structure with replaceable sealing rubber strip and sealing rubber strip replacing method | |
CN107620414B (en) | Vertical and horizontal hidden glass curtain wall | |
CN107605081B (en) | Horizontal bright vertical hidden glass curtain wall | |
CN207998973U (en) | Pendant and ceiling joist component | |
CN215106325U (en) | Embedded curtain wall | |
CN102912899A (en) | Self-sealing movable combined wall structure | |
CN210369368U (en) | Pre-buried bearing structure of waterproof board for construction | |
CN212478201U (en) | Housing construction is with effectual assembled baffle that gives sound insulation | |
CN113700179A (en) | Thickness-adjustable combined PVC (polyvinyl chloride) inner formwork partition wall | |
CN207453218U (en) | The node structure of frame concealed curtain wall bottom plate and frame concealed curtain wall | |
KR101943981B1 (en) | Conbination structures of unite curtain wall for on-site assembly and precision construction | |
CN207332054U (en) | Concealed curtain wall joint structure | |
CN210636650U (en) | Hidden curtain wall of steel structure building | |
CN219863476U (en) | Prefabricated interior wall partition structure of assembled | |
CN215166604U (en) | Building enclosure structure | |
CN218572821U (en) | Self-luminous three-arch building block structure | |
CN214273085U (en) | Recording room | |
CN205296464U (en) | Convex surface fossil fragments, concave surface fossil fragments and wall connection structure | |
CN215368032U (en) | Assembled partition wall | |
CN215253946U (en) | Wallboard provided with prefabricated wire grooves and used for light steel integrated house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200626 Termination date: 20210725 |
|
CF01 | Termination of patent right due to non-payment of annual fee |