CN210857105U - Flood control structure - Google Patents
Flood control structure Download PDFInfo
- Publication number
- CN210857105U CN210857105U CN201921705399.8U CN201921705399U CN210857105U CN 210857105 U CN210857105 U CN 210857105U CN 201921705399 U CN201921705399 U CN 201921705399U CN 210857105 U CN210857105 U CN 210857105U
- Authority
- CN
- China
- Prior art keywords
- flood
- bottom plate
- flood control
- control baffle
- barrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a flood control structure, including flood control baffle, bottom plate and bracing, the bottom plate is fixed in on the ground, flood control baffle articulate in the upper end of bottom plate, flood control baffle can rotate to being open mode or fold condition by relative bottom plate, the bracing is used for dismantling to connect between flood control baffle and bottom plate so that flood control baffle keeps in open mode. By means of the structure, the flood control baffle is folded in the non-flood season and can be used as a corridor walking along the river. When the flood season arrives, the flood control baffle plate is opened to be vertical or approximately vertical, and the inclined strut is installed, so that the flood control baffle plate, the steel bottom plate and the inclined strut form a stable triangular structure, and the rapid conversion from the riverside walking corridor to the flood control wall can be completed.
Description
Technical Field
The utility model relates to a water conservancy facility technical field especially relates to a flood control structure.
Background
In recent years, rainstorm flood disasters occur frequently in our country, and many cities in south suffer from flood disasters, so that very serious economic losses are caused, and even the urban development and the life safety of people are influenced. In order to ensure the safety and convenience of lives of residents, a large number of flood control projects are built in China. However, when encountering extra-heavy rainstorm, the river water level still exceeds the warning water level, and the current solution is to adopt an assembly type flood protection wall, so that flood can be quickly assembled on the existing flood protection engineering when the flood attacks, and the flood can be quickly disassembled and stored after the flood passes, thereby not affecting residents to enjoy river scenery.
Traditional assembled flood control wall comprises base, stand, baffle, strengthening rib, handle, lug and sealing device etc. though has good manger plate effect, when meetting urgent flood calamity, the efficiency of traditional assembled flood control wall transport, assembly is lower, needs to consume a large amount of manpowers and spend more time to go the assembly of carrying out the flood control wall, can't reach the requirement of urgent disaster prevention.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art not enough, but a rapid Assembly's flood control structure is provided.
In order to solve the technical problem, the utility model discloses a following technical scheme:
the utility model provides a flood control structure, includes flood control baffle, bottom plate and bracing, the bottom plate is fixed in on the ground, flood control baffle articulate in the upper end of bottom plate, flood control baffle can rotate to being open mode or fold condition by relative bottom plate, the bracing is used for dismantling to connect between flood control baffle and bottom plate so that flood control baffle keeps in open mode.
By means of the structure, the flood control baffle is folded in the non-flood season and can be used as a corridor walking along the river. When the flood season arrives, the flood control baffle plate is opened to be vertical or approximately vertical, and the inclined strut is installed, so that the flood control baffle plate, the steel bottom plate and the inclined strut form a stable triangular structure, and the rapid conversion from the riverside walking corridor to the flood control wall can be completed.
As a further improvement of the above technical solution:
when the flood control baffle is in an open state, the included angle between the flood control baffle and the bottom plate ranges from 80 degrees to 100 degrees.
In order to enhance the flood control effect of the flood control baffle, a reinforcing device is arranged on the surface of the flood control baffle facing the inclined strut.
The reinforcing device comprises a plurality of longitudinal stiffening ribs and a plurality of transverse stiffening ribs, and the longitudinal stiffening ribs and the transverse stiffening ribs are connected in a staggered mode.
The bracing is equipped with many, and many braces are followed the length direction interval arrangement of flood control baffle.
The flood control baffle is provided with a baffle support hinged to the upper end of the inclined strut, and the bottom plate is provided with a bottom plate support hinged to the lower end of the inclined strut.
The flood control baffle is hinged to the bottom plate through a plurality of hinges, and the plurality of hinges are arranged at intervals along the length direction of the flood control baffle.
The inclined strut is a telescopic rod. Can be conveniently stored after being disassembled.
The bottom plate is fixed on the foundation through a steel chisel.
The flood control baffle comprises a plurality of flood control baffle units, and the plurality of flood control baffle units are sequentially connected through fastening components.
Compared with the prior art, the utility model has the advantages of:
the utility model discloses during normal use, put down the flood control baffle and be fold condition, can regard as the use of river-following pavement, when the need carries out flood fighting and speedily carries out rescue work, open rapidly for the flood control wall state. Convert into flood control wall state by fold condition and only need lift to upright with flood control baffle, carry out the conversion that can accomplish function with each scalable bracing steel pipe and bracing support and articulate the installation, whole process is convenient fast, and easy operation is convenient, very is favorable to the success of flood fighting.
Drawings
Fig. 1 is an axial three-dimensional view of the flood control structure in an open state according to an embodiment of the present invention.
Fig. 2 is a side view of the flood protection structure according to the embodiment of the present invention in a folded state.
Fig. 3 is a side view of the flood protection structure according to the embodiment of the present invention in an approximately upright working state.
Fig. 4 is a side view of the flood protection structure according to the embodiment of the present invention in an upright working state.
Fig. 5 is a back side elevation view of a flood barrier according to an embodiment of the present invention.
Fig. 6 is a back surface elevation view of adjacent flood barrier units connected.
Fig. 7 is a cross-sectional view of the junction of adjacent flood barrier units.
Illustration of the drawings: 1. flood control baffles; 2. a base plate; 3. a longitudinal stiffener; 4. a transverse stiffener; 5. bracing; 6. a hinge; 7. a baffle plate support; 8. a base plate support; 9. steel chisel; 10. fastening a steel plate; 11. and fastening the bolt.
Detailed Description
The invention is further described below with reference to specific preferred embodiments, without thereby limiting the scope of protection of the invention.
Example 1:
as shown in fig. 1 and 2, the flood control structure of this embodiment includes flood control baffle 1, bottom plate 2 and bracing 5, and on bottom plate 2 was fixed in the ground through drill rod 9, flood control baffle 1 articulated in the upper end of bottom plate 2 through a plurality of hinges 6, and a plurality of hinges 6 were arranged along flood control baffle 1's length direction interval. Flood barrier 1 can rotate to be open mode or fold condition relative to bottom plate 2, and bracing 5 is used for dismantling to be connected between flood barrier 1 and bottom plate 2 so that flood barrier 1 keeps in open mode.
As shown in fig. 3 and 4, the flood barrier 1 is approximately vertical or perpendicular with respect to the floor 2 when the flood barrier 1 is in the open position.
As shown in fig. 1, 2 and 5, the flood barrier 1 is provided with reinforcing means on its face facing the diagonal braces 5. The reinforcing device comprises a plurality of longitudinal stiffening ribs 3 and a plurality of transverse stiffening ribs 4, and the longitudinal stiffening ribs 3 and the transverse stiffening ribs 4 are connected in a staggered mode.
In the embodiment, the inclined strut 5 is a telescopic rod, so that the collection in the non-flood season is convenient. The bracing 5 is equipped with many, and many bracing 5 are arranged along the length direction interval of flood protection baffle 1. The flood control baffle 1 is provided with a baffle support 7 at the upper end of the hinged inclined strut 5, and the bottom plate 2 is provided with a bottom plate support 8 at the lower end of the hinged inclined strut 5. Baffle support 7, bottom plate support 8 and bracing 5 one-to-one.
As shown in fig. 6 and 7, the flood barrier 1 comprises a plurality of flood barrier units, which are connected in sequence by fastening assemblies. Fastening assembly includes fastening steel sheet 10 and fastening bolt 11, passes through fastening bolt 11 by two front and back fastening steel sheet 10 between the adjacent flood control baffle and connects, and all is equipped with joint strip between fastening steel sheet 10 and the flood control baffle 1. The length of the fastening steel plate 10 is consistent with the height of the flood control baffle 1, the width of the fastening steel plate is 300-400 mm, and the thickness of the fastening steel plate is 4-6 mm. The sealant strip adopts the ethylene propylene diene monomer, has excellent oxidation resistance, erosion resistance, aging resistance and corrosion resistance, still has excellent elasticity and weather resistance at low temperature, can adapt to the requirement of long-term exposure, and has the service life of 10 years.
Specifically, the transverse stiffening ribs 4 are welded with the flood control baffle 1; the longitudinal stiffening ribs 3 are welded with the flood control baffle 1; the baffle support 7 is welded with the flood control baffle 1; the bottom plate support 8 is welded with the steel bottom plate 2; the upper end of the telescopic inclined strut 5 is hinged with the baffle plate support 7, and the lower end of the telescopic inclined strut is hinged with the bottom plate support 8; the leaves of the connecting hinge 6 are respectively welded with the flood control baffle 1 and the steel bottom plate 2.
The height of the flood control baffle plate unit is 1.2-1.5 m, the width is about 1.5-2 m, and the thickness is 6-8 mm; welding a through longitudinal stiffening rib 3 at one fourth and three quarters of the flood control baffle 1 in the transverse direction, wherein the width is 10-15 cm, and the thickness is 4-6 mm; horizontal stiffening rib 4 and flood control baffle 1 are the same width, and one link up horizontal stiffening rib 4 of welding respectively in the vertical one-third of flood control baffle 1 and three-thirds, and the width is 10 ~ 15cm, and thickness is 4 ~ 6 mm.
The inclined strut 5 is a telescopic steel pipe, the length of the steel pipe is 1.0-1.2 m, the diameter of the steel pipe is 45-55 mm, and the wall thickness of the steel pipe is 4-6 mm.
The inner shaft of the hinge 6 is 20-24 mm, the outer shaft is 35-38 mm, the length is 350-380 mm, the width is 260-300 mm, and the thickness is 6-8 mm.
The bottom reinforcing steel chisel 9 connects the steel bottom plate 2 and the foundation into a whole, if the foundation is a concrete foundation, the diameter can be an expansion bolt with the diameter not less than 12 mm; if the foundation is other foundation, the steel chisel with the diameter not less than 28mm and the length not less than 800mm can be poured.
Install bottom plate 2 and flood basic built-in fitting through fixing bolt fixedly, to the installation of flood control baffle unit concatenation in order to reach anticipated flood control effect according to the engineering needs. During normal use, the flood control baffle is put down to be in a folded state, can be used as a riverway, and can be quickly opened to be in a flood control wall state when flood fighting and emergency dealing are needed. Convert into flood control wall state by fold condition and only need lift to upright with flood control baffle, carry out the conversion that can accomplish function with each scalable bracing steel pipe and bracing support and articulate the installation, whole process is convenient fast, and easy operation is convenient, very is favorable to the success of flood fighting.
The above description is only for the preferred embodiment of the present application and should not be taken as limiting the present application in any way, and although the present application has been disclosed in the preferred embodiment, it is not intended to limit the present application, and those skilled in the art should understand that they can make various changes and modifications within the technical scope of the present application without departing from the scope of the present application, and therefore all the changes and modifications can be made within the technical scope of the present application.
Claims (10)
1. The utility model provides a flood control structure, its characterized in that, includes flood control baffle (1), bottom plate (2) and bracing (5), bottom plate (2) are fixed in on the ground, flood control baffle (1) articulate in the upper end of bottom plate (2), flood control baffle (1) can rotate to being open mode or fold condition relative bottom plate (2), bracing (5) are used for dismantling to be connected between flood control baffle (1) and bottom plate (2) so that flood control baffle (1) keep in open mode.
2. A flood protection structure according to claim 1, characterized in that the angle between the flood barrier (1) and the floor (2) is in the range of 80-100 ° when the flood barrier (1) is in the open position.
3. A flood protection structure according to claim 1, characterized in that the flood barrier (1) is provided with reinforcement means on its face facing the diagonal braces (5).
4. A flood protection structure according to claim 3, wherein said reinforcing means comprises a plurality of longitudinal stiffeners (3) and a plurality of transverse stiffeners (4), said longitudinal stiffeners (3) and said transverse stiffeners (4) being connected in a staggered manner.
5. The flood protection structure according to claim 1, characterized in that the braces (5) are provided with a plurality of braces (5) arranged at intervals along the length direction of the flood barrier (1).
6. A flood protection structure according to claim 1, characterized in that the flood protection barriers (1) are provided with barrier supports (7) for hinging the upper ends of the diagonal braces (5), and the bottom plate (2) is provided with bottom plate supports (8) for hinging the lower ends of the diagonal braces (5).
7. The flood protection structure according to claim 1, characterized in that the flood protection barrier (1) is hinged to the bottom plate (2) by a plurality of hinges (6), the plurality of hinges (6) being arranged at intervals along the length of the flood protection barrier (1).
8. A flood protection structure according to claim 1, characterized in that said diagonal braces (5) are telescopic braces.
9. A flood protection structure according to claim 1, characterized in that the bottom plate (2) is fixed to the foundation by means of steel studs (9).
10. A flood protection structure according to claim 1, characterized in that the flood barrier (1) comprises a plurality of flood barrier units, which are connected in series by fastening means.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921705399.8U CN210857105U (en) | 2019-10-12 | 2019-10-12 | Flood control structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921705399.8U CN210857105U (en) | 2019-10-12 | 2019-10-12 | Flood control structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210857105U true CN210857105U (en) | 2020-06-26 |
Family
ID=71308835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921705399.8U Active CN210857105U (en) | 2019-10-12 | 2019-10-12 | Flood control structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210857105U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115059015A (en) * | 2022-06-09 | 2022-09-16 | 华北水利水电大学 | Embedded combined urban waterlogging water retaining device |
-
2019
- 2019-10-12 CN CN201921705399.8U patent/CN210857105U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115059015A (en) * | 2022-06-09 | 2022-09-16 | 华北水利水电大学 | Embedded combined urban waterlogging water retaining device |
CN115059015B (en) * | 2022-06-09 | 2024-04-12 | 华北水利水电大学 | Embedded combined urban waterlogging water retaining device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202559571U (en) | Net rack roof with siphon rainwater pipeline | |
CN210857105U (en) | Flood control structure | |
CN209799546U (en) | non-Newtonian fluid temporary sealing enclosure | |
CN216551777U (en) | A multistage sediment trapping device for soil and water conservation | |
CN203788804U (en) | Design of wind-resistant and snow-resistant sunlight greenhouse framework | |
CN110438885B (en) | Bridge tunnel supporting member | |
CN217231860U (en) | Diagonal beam string system for foundation pit | |
CN116180602A (en) | Welding construction method for curved surface special-shaped inner concrete outer steel main tower decorative plate | |
CN213268892U (en) | Post-cast strip connection structure is supported to casing string | |
CN206090460U (en) | But fast assembly's flood control device | |
CN210031674U (en) | Long-span flood control baffle | |
CN114000460A (en) | A multistage sediment trapping device for soil and water conservation | |
CN209722861U (en) | A kind of collapsible flood protection device and collapsible anti-flood wall | |
CN207277373U (en) | A kind of riding track being used in foundation pit construction | |
CN216604174U (en) | Suspension type center drive mud scraper working bridge | |
CN215857486U (en) | Flood prevention water retaining device | |
CN114684624B (en) | Few-column sectional type chimney-penetrating coal conveying stack bridge system and method | |
CN221681651U (en) | Single-column pier anti-seismic reinforcing device | |
CN216341187U (en) | Assembled large steel pipe lattice column support frame | |
CN219908769U (en) | A rain-proof manger plate instrument in temporary place for unhardened ground | |
CN217378756U (en) | Garage access & exit flood prevention breakwater | |
CN113027228B (en) | A enclose and keep off reinforcing apparatus for wall body | |
CN218310607U (en) | Collapse-preventing energy-saving steel bar shed structure | |
CN219450809U (en) | Water conservancy soil blocking device capable of preventing soil loss | |
CN221767951U (en) | Road side double-sided photovoltaic power generation isolation grid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200828 Address after: 410014, 16 East camphor Road, Yuhua District, Hunan, Changsha Co-patentee after: Changsha public engineering construction center Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd. Address before: 410014, 16 East camphor Road, Yuhua District, Hunan, Changsha Patentee before: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd. |
|
TR01 | Transfer of patent right |