CN210857094U - Hydraulic engineering is with flood prevention flood control wall body - Google Patents

Hydraulic engineering is with flood prevention flood control wall body Download PDF

Info

Publication number
CN210857094U
CN210857094U CN201921650259.5U CN201921650259U CN210857094U CN 210857094 U CN210857094 U CN 210857094U CN 201921650259 U CN201921650259 U CN 201921650259U CN 210857094 U CN210857094 U CN 210857094U
Authority
CN
China
Prior art keywords
wall
flood
main part
wall body
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201921650259.5U
Other languages
Chinese (zh)
Inventor
段磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Julong Bridge Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921650259.5U priority Critical patent/CN210857094U/en
Application granted granted Critical
Publication of CN210857094U publication Critical patent/CN210857094U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to the technical field of hydraulic engineering, and discloses a flood control wall body for hydraulic engineering, which comprises a wall main body, wherein the wall main body is a hollow cuboid structure with openings at two sides and the top, a base is welded and fixed at the bottom of the wall main body, the base and the wall main body jointly form an L-shaped structure, an extension wall is arranged inside the wall main body, and two sides of the extension wall are flush with two sides of the wall main body; in the in-process that uses, through the pressure of flood, can be with the firm fixing of base subaerial, and the flood can enter into the wall main part through a plurality of inlet openings, after the water level of flood rises, the gasbag that extends the wall bottom can float, thereby can be with extending the wall jack-up, after the decline of flood water level, the gasbag can follow the decline, extend the wall and also can descend thereupon, compare in current flood control wall body, this wall body is at the in-process that uses, the height of wall body can carry out nimble regulation along with the water level of flood.

Description

Hydraulic engineering is with flood prevention flood control wall body
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a hydraulic engineering is with flood prevention flood control wall body.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the natural world to achieve the purposes of removing harm and benefiting benefit, is also called water engineering, and flood disasters often occur in regions with abundant water resources, so that flood prevention wall bodies are often needed when the hydraulic engineering is carried out to avoid serious loss of properties of people caused by the flood disasters.
However, the conventional flood control wall body cannot be freely adjusted according to the water level of flood water in the using process, so that the conventional flood control wall body is not flexible enough in the using process, and the conventional flood control wall body is generally formed by pouring concrete in the using process, so that time and labor are wasted when the wall body needs to be detached, and the conventional flood control wall body cannot be recycled.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a hydraulic engineering is with flood prevention flood control wall body has solved the in-process that current flood prevention flood control wall body used now, can not carry out free regulation according to the water level of flood, lead to current flood prevention flood control wall body at the in-process that uses, it is not nimble enough, and current flood prevention flood control wall body generally forms through concrete placement, when the wall body need be dismantled, comparatively waste time and energy, and current flood prevention flood control wall body can not carry out cyclic utilization's problem.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hydraulic engineering is with flood prevention flood control wall body, includes the wall main part, the wall main part is both sides and open-top's cavity cuboid structure, just the bottom welded fastening of wall main part has the base, the base with the L type structure is constituteed jointly to the wall main part, the inside of wall main part is equipped with extends the wall, extend the both sides of wall with the both sides of wall main part flush, just the top of extending the wall is located the top of wall main part, the front surface of wall main part is close to a plurality of inlet openings have from left to right been seted up in proper order to the upper surface department of base, the bottom of extending the wall is located a plurality ofly the top of inlet opening is fixed with the gasbag, the inside packing of gasbag has gas.
Preferably, the base is steel material, just the lower surface of base is fixed with anti-skidding gasket through sealed glue, anti-skidding gasket is stand wear and tear and the surface passes through the rubber material of rough treatment.
Preferably, the base and the side of the anti-slip gasket, which is far away from the wall main body, are both wedge-shaped structures.
Preferably, the wall main body is provided with sliding grooves in the front surface and the rear surface, the front surface and the rear surface of the extension wall are fixedly welded with shaft levers, one ends of the two shaft levers, which are far away from the extension wall, are rotatably connected with pulleys, and the two pulleys are respectively located in the two sliding grooves and are respectively in sliding connection with the two sliding grooves.
Preferably, two connecting blocks are welded and fixed on one side of the extension wall from top to bottom, grooves are symmetrically formed in the outer surfaces of the connecting blocks, extension springs are fixed inside the grooves, clamping blocks are fixed at one ends of the extension springs and located outside the grooves, two connecting grooves are formed in the other side of the extension wall from top to bottom, and clamping grooves are symmetrically formed in the inner surfaces of the connecting grooves.
Preferably, the connecting block is matched with the connecting groove, the clamping block is of a hemispherical structure with the clamping groove, and the clamping block is elastically connected with the connecting block through the telescopic spring.
(III) advantageous effects
The utility model provides a hydraulic engineering is with flood prevention flood control wall body possesses following beneficial effect:
(1) the utility model discloses at the in-process that uses, through the pressure of flood, can be subaerial with the firm fixing of base, and the flood can enter into the wall main part through a plurality of inlet openings, after the water level of flood rises, the gasbag that extends the wall bottom can float, thereby can be with extending the wall jack-up, after the decline of flood water level, the gasbag can follow the decline, it also can descend along with it to extend the wall, compare in current flood prevention flood control wall body, this wall body is at the in-process that uses, the height of wall body can carry out nimble regulation along with the water level of flood.
(2) The utility model discloses at the in-process that uses, the connecting block that will extend wall one side inserts in another extension wall one side's spread groove to under the block effect between fixture block and draw-in groove, can accomplish the erection joint work of wall body, and make things convenient for the dismantlement work of wall body, and after dismantling the completion, can assemble the wall body once more and use, compare in current flood prevention flood control wall body, this wall body is convenient to be dismantled, and can recycle.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the internal structure of the present invention;
fig. 3 is a schematic view of the internal structure of the middle extension wall according to the present invention;
fig. 4 is an enlarged schematic structural diagram of a position a in the present invention.
In the figure: 1. a base; 2. connecting blocks; 3. a clamping block; 4. an extension wall; 5. a wall body; 6. a water inlet hole; 7. an anti-slip gasket; 8. a pulley; 9. a chute; 10. connecting grooves; 11. a shaft lever; 12. an air bag; 13. a card slot; 14. a groove; 15. a telescoping spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: a flood control wall body for hydraulic engineering comprises a wall main body 5, wherein the wall main body 5 is a hollow cuboid structure with two sides and an open top, a base 1 is fixedly welded at the bottom of the wall main body 5, the base 1 and the wall main body 5 jointly form an L-shaped structure, an extension wall 4 is arranged inside the wall main body 5, two sides of the extension wall 4 are flush with two sides of the wall main body 5, the top of the extension wall 4 is positioned above the wall main body 5, a plurality of water inlet holes 6 are sequentially formed in the front surface of the wall main body 5, close to the upper surface of the base 1, from left to right, an air bag 12 is fixed above the plurality of water inlet holes 6 at the bottom of the extension wall 4, air is filled in the air bag 12, when the flood control wall body is used, the base 1 can be firmly fixed on the ground through the pressure of flood, the flood can enter the wall main body 5 through the plurality of water inlet holes 6, and after the water level, the gasbag 12 of extension wall 4 bottom can float to can be with extension wall 4 jack-up, after the flood water level descends, gasbag 12 can follow the decline, and extension wall 4 also can descend thereupon, compares in current flood prevention wall body, and this wall body is at the in-process that uses, and the height of wall body can carry out nimble regulation along with the water level of flood.
Further, base 1 is the steel material, and base 1's lower surface is fixed with anti-skidding gasket 7 through sealed glue, and anti-skidding gasket 7 is stand wear and tear and the surface is through the rubber material of rough treatment, and at the in-process that uses, anti-skidding gasket 7 can increase the frictional force between base 1 and the ground to can make wall main part 5's stability better.
Further, one side that base 1 and skid resistant gasket 7 kept away from wall main part 5 is the wedge structure, avoids the flood to strike the region between base 1 and the ground to erode a gap, influence wall main part 5's stability.
Further, spout 9 has all been seted up to the inside front surface and the inside rear surface of wall main part 5, the front surface and the equal welded fastening of rear surface of extension wall 4 have axostylus axostyle 11, two axostylus axostyles 11 are kept away from the one end of extending wall 4 and are all rotated and be connected with pulley 8, two pulley 8 are located the inside of two spout 9 respectively, and respectively with two spout 9 sliding connection, avoid extending the motion of wall 4, and can avoid extending the condition that takes place to break away from each other between wall 4 and the wall main part 5.
Furthermore, two connecting blocks 2 are fixedly welded on one side of an extending wall 4 from top to bottom, grooves 14 are symmetrically formed in the outer surface of each connecting block 2, an extension spring 15 is fixed inside each groove 14, a clamping block 3 is fixed at one end of each extension spring 15, each clamping block 3 is located outside each groove 14, two connecting grooves 10 are formed in the other side of the extending wall 4 from top to bottom, clamping grooves 13 are symmetrically formed in the inner surfaces of the connecting grooves 10, when the connecting device is used, the two connecting blocks 2 on one side of one extending wall 4 can be inserted into the two connecting grooves 10 on one side of the other extending wall 4, the clamping effect between the clamping blocks 3 on the connecting blocks 2 and the clamping grooves 13 on the connecting grooves 10 is utilized, so that the installation between the two wall main bodies 5 can be completed, after the installation of the wall body is completed, the two wall main bodies 5 and the two extending walls 4 are tightly attached, and the mutually opposite sides of the two wall main bodies 5 at the two ends are provided with sealing structures, so that the moisture entering the wall body is prevented from overflowing from the wall main bodies 5 at the two ends, the height of the whole wall body cannot be freely adjusted along with the flood water level, the wall body is more convenient to disassemble compared with the existing flood prevention wall body, and after the disassembly is completed, the wall body can be assembled for use again, so that the wall body can be recycled.
Further, connecting block 2 and spread groove 10 looks adaptation, fixture block 3 is the half spherical structure with draw-in groove 13, and fixture block 3 passes through expanding spring 15 and connecting block 2 elastic connection, can be in the same place two wall main parts 5 installation again through connecting block 2 and spread groove 10 to can conveniently dismantle two wall main parts 5.
To sum up, the utility model discloses a work flow: when the flood prevention wall is used, the two connecting blocks 2 on one side of one extending wall 4 can be inserted into the two connecting grooves 10 on one side of the other extending wall 4, and the two connecting blocks 3 on the connecting blocks 2 and the clamping grooves 13 on the connecting grooves 10 are clamped, so that the two wall main bodies 5 can be installed, after the wall is installed, the two wall main bodies 5 and the two extending walls 4 are tightly attached to each other, flood is prevented from overflowing through gaps, the back sides of the two wall main bodies 5 at the two ends are sealed structures, moisture entering the wall is prevented from overflowing from the wall main bodies 5 at the two ends, the height of the whole wall cannot be freely adjusted along with the flood water level, the wall is more convenient to disassemble compared with the existing flood prevention wall, and after the wall is disassembled, the wall can be assembled again for use, so that the wall can be recycled, and at the in-process that uses, through the pressure of flood, can be with the firm fixing of base 1 subaerial, and the flood can enter into wall main part 5 through a plurality of inlet openings 6, after the water level of flood rises, the gasbag 12 of extension wall 4 bottom can float, thereby can be with extending 4 jack-ups of wall, after the flood water level descends, gasbag 12 can follow the decline, extension wall 4 also can descend thereupon, compare in current flood control wall body, this wall body is in the in-process that uses, the height of wall body can carry out nimble regulation along with the water level of flood.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a hydraulic engineering is with flood prevention flood control wall body, includes wall main part (5), its characterized in that: wall main part (5) are both sides and open-top's cavity cuboid structure, just the bottom welded fastening of wall main part (5) has base (1), base (1) with wall main part (5) constitute L type structure jointly, the inside of wall main part (5) is equipped with extends wall (4), extend the both sides of wall (4) with the both sides of wall main part (5) flush, just the top of extending wall (4) is located the top of wall main part (5), the front surface of wall main part (5) is close to the upper surface department of base (1) has from left to right seted up a plurality of inlet openings (6) in proper order, the bottom of extending wall (4) is located a plurality of the top of inlet opening (6) is fixed with gasbag (12), the inside packing of gasbag (12) has gas.
2. The flood prevention wall body for the hydraulic engineering according to claim 1, characterized in that: the base (1) is steel material, just the lower surface of base (1) is fixed with anti-skidding gasket (7) through sealed glue, anti-skidding gasket (7) are stand wear and tear and the surface is through the rubber material of crude processing.
3. The flood prevention wall body for the hydraulic engineering according to claim 2, characterized in that: the base (1) and one side, far away from the wall main body (5), of the anti-skid gasket (7) are both wedge-shaped structures.
4. The flood prevention wall body for the hydraulic engineering according to claim 1, characterized in that: the wall comprises a wall body (5) and is characterized in that sliding grooves (9) are formed in the front surface and the rear surface of the interior of the wall body (5), shaft levers (11) are welded and fixed to the front surface and the rear surface of the extension wall (4), one ends, far away from the extension wall (4), of the shaft levers (11) are rotatably connected with pulleys (8), and the pulleys (8) are located in the sliding grooves (9) and are connected with the sliding grooves (9) in a sliding mode.
5. The flood prevention wall body for the hydraulic engineering according to claim 1, characterized in that: extend one side from the top down welded fastening of wall (4) and have two connecting block (2), the surface symmetry of connecting block (2) is seted up flutedly (14), the inside of recess (14) is fixed with expanding spring (15), the one end of expanding spring (15) is fixed with fixture block (3), fixture block (3) are located the outside of recess (14), the opposite side from the top down of extending wall (4) is equipped with two spread groove (10), draw-in groove (13) have been seted up to the internal surface symmetry of spread groove (10).
6. The flood prevention wall body for the hydraulic engineering according to claim 5, characterized in that: the connecting block (2) is matched with the connecting groove (10), the clamping block (3) is of a hemispherical structure with the clamping groove (13), and the clamping block (3) is elastically connected with the connecting block (2) through the telescopic spring (15).
CN201921650259.5U 2019-09-30 2019-09-30 Hydraulic engineering is with flood prevention flood control wall body Withdrawn - After Issue CN210857094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921650259.5U CN210857094U (en) 2019-09-30 2019-09-30 Hydraulic engineering is with flood prevention flood control wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921650259.5U CN210857094U (en) 2019-09-30 2019-09-30 Hydraulic engineering is with flood prevention flood control wall body

Publications (1)

Publication Number Publication Date
CN210857094U true CN210857094U (en) 2020-06-26

Family

ID=71300350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921650259.5U Withdrawn - After Issue CN210857094U (en) 2019-09-30 2019-09-30 Hydraulic engineering is with flood prevention flood control wall body

Country Status (1)

Country Link
CN (1) CN210857094U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111979970A (en) * 2020-07-27 2020-11-24 中国港湾工程有限责任公司 Seashore wave-blocking protection structure
CN112227301A (en) * 2020-09-23 2021-01-15 李咸荣 Combined flood-fighting flood control plate based on hydraulic seal
CN112482305A (en) * 2020-12-04 2021-03-12 河南浦腾实业有限公司 Hydraulic engineering wall body flood fighting device
CN113152367A (en) * 2021-05-13 2021-07-23 冯冰 Hydraulic engineering vertical water stop structure and construction method
CN114541473A (en) * 2022-04-13 2022-05-27 常德捷成建筑工程有限公司 Hydraulic engineering retaining wall structure
CN115233615A (en) * 2022-09-03 2022-10-25 浙江钱塘江海塘物业管理有限公司 Sea pond wave wall structure and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111979970A (en) * 2020-07-27 2020-11-24 中国港湾工程有限责任公司 Seashore wave-blocking protection structure
CN111979970B (en) * 2020-07-27 2021-08-17 中国港湾工程有限责任公司 Seashore wave-blocking protection structure
CN112227301A (en) * 2020-09-23 2021-01-15 李咸荣 Combined flood-fighting flood control plate based on hydraulic seal
CN112482305A (en) * 2020-12-04 2021-03-12 河南浦腾实业有限公司 Hydraulic engineering wall body flood fighting device
CN113152367A (en) * 2021-05-13 2021-07-23 冯冰 Hydraulic engineering vertical water stop structure and construction method
CN114541473A (en) * 2022-04-13 2022-05-27 常德捷成建筑工程有限公司 Hydraulic engineering retaining wall structure
CN115233615A (en) * 2022-09-03 2022-10-25 浙江钱塘江海塘物业管理有限公司 Sea pond wave wall structure and construction method thereof
CN115233615B (en) * 2022-09-03 2024-03-29 浙江钱塘江海塘物业管理有限公司 Wave wall structure of sea pond and construction method thereof

Similar Documents

Publication Publication Date Title
CN210857094U (en) Hydraulic engineering is with flood prevention flood control wall body
CN206190318U (en) Tunnel drainage system
CN209384207U (en) A kind of efficient bevel-type waterpower stilling pool slab
CN103174140B (en) For pile driver and the supporting stake thereof of piling at dike breach
CN111926841A (en) Dewatering well water-carrying plugging structure and construction method thereof
CN212200475U (en) High water level area precipitation well shutoff structure
CN107700472A (en) The hydraulic ejection rubber water-proof joint case and its release method of construction of diaphragm wall
CN109797768B (en) Turbulent flow energy consumption anti-scouring open caisson and construction method
CN209603049U (en) A kind of prefabricated waterwall
CN102635109A (en) Diaphram wall clapboard type joint and method for preventing streaming around in concrete pouring
CN107975063B (en) Big cross section taking and discharging box culvert temporary plugging structure and construction method under operation state
CN209227543U (en) A kind of concrete floor constructing device
CN107938694A (en) Gravity type water jetting at high pressure percussion mechanism and its help heavy method
CN202927154U (en) Flap valve
CN207525735U (en) The hydraulic ejection rubber water-proof connector case of construction of diaphragm wall
CN207143746U (en) Support beam template system under concrete support trestle plate
CN206693293U (en) A kind of gutter standard section excavating device
CN104314047A (en) Water bag concrete engineering deformation joint water stop type cavity die and manufacturing and construction method thereof
CN209603050U (en) A kind of self-priming flood control plugging bag
CN105951890A (en) Application method of concrete engineering cavity mold airbag
CN210127481U (en) Bucket type structure drainage device
CN202673137U (en) Piston type nail drift
CN217840707U (en) Suspension floor with prevent off position mounting structure
CN210766883U (en) Template suitable for cascaded top-down construction seam subway station side wall is pour
CN211621887U (en) Waterproof sealing floor drain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240418

Address after: 230000 Industrial Park in Nihe Town, Lujiang County, Hefei City, Anhui Province

Patentee after: Anhui Julong Bridge Engineering Co.,Ltd.

Country or region after: China

Address before: 274000 No. 3443, Huanghe East Road, Mudan District, Heze City, Shandong Province

Patentee before: Duan Lei

Country or region before: China

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20200626

Effective date of abandoning: 20240514

AV01 Patent right actively abandoned

Granted publication date: 20200626

Effective date of abandoning: 20240514