CN210828384U - Civil engineering is with assembled steel construction platform of falling material - Google Patents
Civil engineering is with assembled steel construction platform of falling material Download PDFInfo
- Publication number
- CN210828384U CN210828384U CN201921694887.3U CN201921694887U CN210828384U CN 210828384 U CN210828384 U CN 210828384U CN 201921694887 U CN201921694887 U CN 201921694887U CN 210828384 U CN210828384 U CN 210828384U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- platform
- shaped
- civil engineering
- material pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a civil engineering is with assembled steel construction material pouring platform, including strip steel, the T shape of intercommunication about seting up on the lateral wall of strip steel leads to the groove, T shape leads to inslot sliding connection has two movable blocks, and rotates between two movable blocks and be connected with the same piece horizontally material pouring platform, fixedly connected with L shape connecting rod on the movable block lateral wall of material pouring platform downside, and two L shape connecting rods keep away from the same piece horizontally backup pad of one end fixedly connected with of movable block, two first U-shaped pieces of fixedly connected with on the lateral wall of backup pad, the notch internal rotation of first U-shaped piece is connected with electric putter, electric putter's flexible end rotates and is connected with second U-shaped piece. The utility model provides a material pouring platform can carry out corresponding regulation according to the needs of the height when using and angle, reduces workman's intensity of labour to improve device's suitability.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a civil engineering is with assembled steel construction material pouring platform.
Background
High and ultra-high floors have been widely used in public buildings and civil housing works as the mainstream of modern building products. At present, the building construction enterprise still adopts shaped steel welding preparation to fall the material platform, and its volume of falling the material platform is great to lead to when the transportation to be more troublesome, is not convenient for construct and uses for a long time.
Through the retrieval, chinese laid-open publication No. CN207597893U discloses "a building construction is with assembled steel construction material pouring platform, including two notch plates, connecting rod fixedly connected with go-between is passed through to one side of notch plate surface, and the joint has the backup pad between two notch plates, the both sides at backup pad top all are provided with the connecting piece, the both sides of connecting piece surface all are through the top threaded connection of first bolt with the backup pad, the other both sides of connecting piece surface all have first baffle through second bolt threaded connection, one side of backup pad surface is provided with the second baffle, the both sides of second baffle surface all have the mounting through third bolt threaded connection. This civil engineering is with assembled steel construction material pouring platform makes it can transport the construction site with the material pouring platform and assembles, has been convenient for the transportation of material pouring platform. "the material platform of falling in this publication is fixed structure, is not convenient for adjust the height and the angle of material platform of falling when using, and then needs to increase workman's working strength to the time of work has increased relatively, for this reason, we propose a civil engineering construction with assembled steel construction material platform of falling to solve the problem that the aforesaid was proposed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the assembled steel construction platform of falling material for civil engineering that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an assembled steel structure material pouring platform for civil engineering construction comprises a strip steel, wherein a T-shaped through groove which is communicated up and down is formed in the side wall of the strip steel, two movable blocks are connected in the T-shaped through groove in a sliding way, and a material pouring platform which is horizontal and is connected between the two movable blocks in a rotating way, an L-shaped connecting rod is fixedly connected on the side wall of the movable block at the lower side of the material pouring platform, and one end of each L-shaped connecting rod far away from the movable block is fixedly connected with the same horizontal supporting plate, the side wall of each supporting plate is fixedly connected with two first U-shaped parts, an electric push rod is rotationally connected in the notch of the first U-shaped piece, the telescopic end of the electric push rod is rotationally connected with a second U-shaped piece, the lower extreme of falling the material platform is provided with the stabilizing mean who is connected with the second U-shaped spare, the upper end fixedly connected with two blocks of curb plates of falling the material platform, and fixedly connected with protection network on the lateral wall of curb plate.
Preferably, all set up a plurality of mounting holes that lead to the groove intercommunication with the T shape on the lateral wall around the strip shaped steel, and threaded connection has the fastening bolt fixed with the movable block in the mounting hole.
Preferably, fixedly connected with lock nut on the lateral wall of movable block, and set up the spout with lock nut sliding connection on the inner wall of T shape logical groove, fastening bolt is connected with lock nut cooperation.
Preferably, the side wall of the L-shaped connecting rod opposite to the supporting plate is fixedly connected with a mounting plate, and the mounting plate is fixedly connected with the supporting plate through screws.
Preferably, stabilizing mean is including seting up in the dovetail groove of material platform lower extreme that falls, sliding connection has trapezoidal piece in the dovetail groove, second U-shaped spare fixed connection is at the lower extreme of trapezoidal piece.
Preferably, the upper end face of the material pouring platform between the two side plates is uniformly provided with anti-skid grains, and the upper ends of the side plates are fixedly connected with a plurality of lifting lugs.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the material platform of falling in the utility model when using, can carry out corresponding regulation to the position of movable block according to its needs of using the height to fix the movable block with fastening bolt, with the suitability that improves the material platform of falling, be applicable to the use of co-altitude.
2. The material platform of falling in the utility model when using, can carry out corresponding regulation to the length of electric push rod according to its use angle's needs, under stabilizing mean's supplementary action, can guarantee to fall the stability of material platform when turning to, avoid artificial manual regulation, be applicable to the use of different angles.
Drawings
Fig. 1 is a front structural sectional view of an assembled steel structure material pouring platform for civil engineering provided by the utility model;
fig. 2 is a schematic top view of the assembled steel structure material pouring platform for civil engineering of the present invention;
fig. 3 is the utility model provides a civil engineering is with assembled steel construction material pouring platform's side structure schematic diagram.
In the figure: 1 shaped steel, 2 movable blocks, 3 material pouring platforms, 4L-shaped connecting rods, 5 supporting plates, 6 first U-shaped parts, 7 electric push rods, 8 second U-shaped parts, 9 side plates, 10 protective nets, 11 mounting holes, 12 locking nuts, 13 trapezoidal blocks and 14 lifting lugs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a civil engineering is with assembled steel construction material pouring platform, including strip steel 1, the T that communicates from top to bottom is seted up on the lateral wall of strip steel 1 leads to the groove, T leads to groove sliding connection has two movable block 2, all set up a plurality of mounting holes 11 that lead to the groove intercommunication with T on the lateral wall around strip steel 1, and mounting hole 11 internal thread connection has fastening bolt fixed with movable block 2, more specifically, fixedly connected with lock nut 12 on the lateral wall of movable block 2, and set up the spout with lock nut 12 sliding connection on the inner wall that the groove was led to T, fastening bolt and lock nut 12 cooperate and be connected, can carry out corresponding regulation to the position of movable block 2 according to the needs of material pouring platform 3 use height, in order to improve the suitability of material pouring platform.
Wherein, a material pouring platform 3 which is the same horizontal is rotatably connected between the two movable blocks 2, the side wall of the movable block 2 at the lower side of the material pouring platform 3 is fixedly connected with an L-shaped connecting rod 4, one end of the two L-shaped connecting rods 4 far away from the movable block 2 is fixedly connected with a supporting plate 5 which is the same horizontal, the side wall of the L-shaped connecting rod 4 opposite to the supporting plate 5 is fixedly connected with a mounting plate, the mounting plate is fixedly connected with the supporting plate 5 by screws, the mounting and dismounting of the supporting plate 5 are convenient, two first U-shaped parts 6 are fixedly connected with the side wall of the supporting plate 5, an electric push rod 7 is rotatably connected in a notch of the first U-shaped part 6, the electric push rod 7 is a product in the prior art, the electric push rod 7 is connected with an external controller, the repeated description is omitted, a second U-shaped part 8 is rotatably connected at the telescopic end of the electric, stabilizing mean is including seting up at the dovetail groove of 3 lower extremes of material platform that fall, and sliding connection has trapezoidal piece 13 in the dovetail groove, and 8 fixed connection of second U-shaped piece can guarantee the stability of material platform 3 when turning to at the lower extreme of trapezoidal piece 13 under stabilizing mean's additional action, can adjust the angle of material platform 3 that falls according to the user demand when the construction, avoid artificial manual regulation.
Wherein, two blocks of curb plates 9 of the upper end fixedly connected with of material pouring platform 3, and fixedly connected with protection network 10 on the lateral wall of curb plate 9, the 3 up end equipartitions of material pouring platform between two blocks of curb plates 9 have anti-skidding line, and a plurality of lugs 14 of the upper end fixedly connected with of curb plate 9 are convenient for hoist and mount the processing to material pouring platform 3 to anti-skidding line on the material pouring platform 3 lateral wall can increase the friction of material when the transportation, reduces the condition that self flows to appear in the material.
The utility model provides a material platform 3 falls when using, can carry out corresponding regulation to the position of movable block 2 according to its needs of using the height, and fix movable block 2 with fastening bolt, with the suitability of improving material platform 3 falls, be applicable to the use of co-altitude not, in addition, material platform 3 falls when using, can carry out corresponding regulation according to its needs of using the angle, and length to electric putter 7, and under stabilizing mean's supplementary action, can guarantee the stability of material platform 3 when turning to, avoid artificial manual regulation, be applicable to the use of different angles.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The assembled steel structure material pouring platform for civil engineering construction comprises a strip steel (1) and is characterized in that a T-shaped through groove which is communicated up and down is formed in the side wall of the strip steel (1), two movable blocks (2) are connected in the T-shaped through groove in a sliding mode, a material pouring platform (3) which is horizontal to the same block is connected between the two movable blocks (2) in a rotating mode, L-shaped connecting rods (4) are fixedly connected to the side wall of the movable blocks (2) on the lower side of the material pouring platform (3), a supporting plate (5) which is horizontal to the same block is fixedly connected to one end, far away from the movable blocks (2), of the two L-shaped connecting rods (4), two first U-shaped pieces (6) are fixedly connected to the side wall of the supporting plate (5), an electric push rod (7) is connected to the notch of each first U-shaped piece (6) in a rotating mode, and a second, the lower extreme of falling material platform (3) is provided with the stabilizing mean who is connected with second U-shaped spare (8), two blocks of curb plates (9) of the upper end fixedly connected with of falling material platform (3), and fixedly connected with protection network (10) on the lateral wall of curb plate (9).
2. The assembled steel structure discharging platform for civil engineering according to claim 1, wherein the front and rear side walls of the bar steel (1) are provided with a plurality of mounting holes (11) communicated with the T-shaped through grooves, and the mounting holes (11) are internally threaded with fastening bolts fixed with the movable blocks (2).
3. The assembled steel structure discharging platform for civil engineering according to claim 2, wherein the side wall of the movable block (2) is fixedly connected with a locking nut (12), the inner wall of the T-shaped through groove is provided with a sliding groove in sliding connection with the locking nut (12), and the fastening bolt is connected with the locking nut (12) in a matching manner.
4. The assembled steel structure discharging platform for civil engineering according to claim 1, wherein the side wall of the L-shaped connecting rod (4) opposite to the supporting plate (5) is fixedly connected with a mounting plate, and the mounting plate is fixedly connected with the supporting plate (5) through screws.
5. The assembled steel structure material pouring platform for the civil engineering construction according to claim 1, wherein the stabilizing mechanism comprises a trapezoidal groove formed at the lower end of the material pouring platform (3), trapezoidal blocks (13) are connected in the trapezoidal groove in a sliding mode, and the second U-shaped part (8) is fixedly connected to the lower ends of the trapezoidal blocks (13).
6. The assembled steel structure pouring platform for the civil engineering construction according to claim 1, wherein anti-skid lines are uniformly distributed on the upper end surface of the pouring platform (3) between the two side plates (9), and a plurality of lifting lugs (14) are fixedly connected to the upper ends of the side plates (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921694887.3U CN210828384U (en) | 2019-10-11 | 2019-10-11 | Civil engineering is with assembled steel construction platform of falling material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921694887.3U CN210828384U (en) | 2019-10-11 | 2019-10-11 | Civil engineering is with assembled steel construction platform of falling material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210828384U true CN210828384U (en) | 2020-06-23 |
Family
ID=71264030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921694887.3U Expired - Fee Related CN210828384U (en) | 2019-10-11 | 2019-10-11 | Civil engineering is with assembled steel construction platform of falling material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210828384U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113006447A (en) * | 2021-02-22 | 2021-06-22 | 杨建勋 | Movable lifting auxiliary device for building wall and using method thereof |
-
2019
- 2019-10-11 CN CN201921694887.3U patent/CN210828384U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113006447A (en) * | 2021-02-22 | 2021-06-22 | 杨建勋 | Movable lifting auxiliary device for building wall and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210828384U (en) | Civil engineering is with assembled steel construction platform of falling material | |
CN208220164U (en) | Architecture construction security maintenance cantilevered structure | |
CN210067415U (en) | Scaffold connecting device | |
CN209261182U (en) | A kind of assembled architecture engineering construction scaffold | |
CN210848095U (en) | Steel bar plate correcting device convenient to use | |
CN201121406Y (en) | Novel full-movable operating platform | |
CN215717422U (en) | Floor concrete placement prevents trampling device | |
CN215252339U (en) | Hanging basket elevation adjusting device | |
CN210738051U (en) | Scaffold for building engineering | |
CN210976550U (en) | Adjustable fastening tool type externally-hung protection frame system | |
CN209760803U (en) | Toilet upturning beam formwork support | |
CN211472401U (en) | Dam panel pours with trolley-bus slipform structure | |
CN209760612U (en) | Constructional engineering reinforcing bar split heads | |
CN207332307U (en) | The horizontal connection structure and system of a kind of shuttering supporting | |
CN207330121U (en) | A kind of crane hook device for building | |
CN207419689U (en) | A kind of prefabricated balcony slab | |
CN205348720U (en) | Take hoisting device's removal scaffold | |
CN218714803U (en) | Assembled wallboard installation bearing structure | |
CN220868541U (en) | Curtain wall groove type embedded node | |
CN218090529U (en) | Cast-in-place box girder external mold rapid prototyping bearing structure | |
CN212027644U (en) | Hydraulic engineering is with inspection cat ladder | |
CN204492158U (en) | The formwork erection structure of superelevation shear wall | |
CN209990437U (en) | Peach picking support with high safety performance | |
CN218563093U (en) | Quick carloader of scaffold constructs | |
CN209742772U (en) | assistor for electric power maintenance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200623 Termination date: 20211011 |