CN210828250U - Bearing frame for building construction - Google Patents

Bearing frame for building construction Download PDF

Info

Publication number
CN210828250U
CN210828250U CN201920909784.8U CN201920909784U CN210828250U CN 210828250 U CN210828250 U CN 210828250U CN 201920909784 U CN201920909784 U CN 201920909784U CN 210828250 U CN210828250 U CN 210828250U
Authority
CN
China
Prior art keywords
sleeve
supporting
fixed
sleeves
protective cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920909784.8U
Other languages
Chinese (zh)
Inventor
邓育文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jingting Construction Development Co ltd
Original Assignee
Anhui Jingting Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jingting Construction Development Co ltd filed Critical Anhui Jingting Construction Development Co ltd
Priority to CN201920909784.8U priority Critical patent/CN210828250U/en
Application granted granted Critical
Publication of CN210828250U publication Critical patent/CN210828250U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction bears frame, which comprises a supporting pedestal and is characterized by further comprising, it has four support columns, and four to lie in avris department welding on the top surface of support base first sleeve and second sleeve are installed in the cooperation on the support column, just first sleeve with the second sleeve all is equipped with four, two the welding has first backup pad between the first sleeve, the bottom of first backup pad is connected with the hydraulic stem among the hydraulic cylinder, just hydraulic cylinder's bottom fixed mounting is on the top surface of supporting the base, two the welding has the fixed limit on the telescopic inside and outside wall of second. The utility model discloses an equal joint has the locating piece on first sleeve and telescopic one side outer wall of second, has passed the locating lever in the through-hole on the locating piece, and the locating lever makes first backup pad and second backup pad move from top to bottom more stable, improves the security that bears the frame.

Description

Bearing frame for building construction
Technical Field
The utility model relates to a construction field, in particular to construction bears frame.
Background
The bearing frame is a working platform which is erected for ensuring each construction process to be carried out smoothly. The device is divided into an outer bearing frame and an inner bearing frame according to the erected positions; the material can be divided into a wood bearing frame, a bamboo bearing frame and a steel pipe bearing frame; according to the structural form, the device is divided into a vertical rod type bearing frame, a bridge type bearing frame, a door type bearing frame, a suspension type bearing frame, a hanging type bearing frame, a picking type bearing frame and a climbing type bearing frame; the worker does not have protection device at worker's head when bearing the during operation on bearing the frame for the worker does not have the security at the during operation, and the security performance is not enough, and the backup pad that bears on the frame is not enough at the in-process stability that rises moreover, and the practicality is lower.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a bearing frame for building construction, which can effectively solve the problems of the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building construction bearing frame comprises a supporting base, wherein four supporting columns are welded at the position of an edge side on the surface of the top of the supporting base, a first sleeve and a second sleeve are installed on the four supporting columns in a matched mode, the number of the first sleeves and the number of the second sleeves are four, a first supporting plate is welded between the two first sleeves, the bottom of the first supporting plate is connected with a hydraulic rod in a lifting hydraulic cylinder, the bottom of the lifting hydraulic cylinder is fixedly installed on the surface of the top of the supporting base, fixing edges are welded on the inner wall and the outer wall of the two second sleeves, first screw holes are formed in the fixing edges, the first screw holes and second screw holes formed in the second supporting plate are overlapped, in addition, the bolt fixing is adopted, a third sleeve is also installed in a matched mode at the extending sections of the two supporting columns, and four second fixing holes which are distributed at equal intervals are further formed at the extending sections of the supporting columns, and the third sleeve is provided with a first fixing hole, and the lifting hydraulic cylinder is connected with a power supply through a wire.
Furthermore, the locating piece is clamped to one side of the first sleeve and one side of the second sleeve, a through hole is formed in the locating piece, the locating rod penetrates through the through hole, and one end of the locating rod is connected with the top surface of the supporting base.
Further, the top surface of the first supporting plate is connected with the bottom of the first fixing block through a bolt, the first fixing block is fixedly connected with a supporting rod, one end of the supporting rod is fixedly connected with the second fixing block, and the top of the second fixing block is fixedly installed with the bottom surface of the second supporting plate through a bolt.
Further, the welding has the supporting shoe on the telescopic one side outer wall of third, just the top fixed mounting of supporting shoe has the safety cover to accomodate the shell.
Further, the inside of safety cover storage shell is equipped with accomodates the chamber, just accomodate and to accomodate the safety cover in the chamber, the bottom joint of safety cover has the handle.
Further, the protective cover storage shell and the protective cover are both arc-shaped, a first positioning hole is formed in the protective cover storage shell, a second positioning hole is formed in the protective cover, and the first positioning hole and the second positioning hole are overlapped and fixed through the inserted rod.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the positioning blocks are clamped on the outer walls of one sides of the first sleeve and the second sleeve, the positioning rods pass through the through holes on the positioning blocks, and the positioning rods enable the first supporting plate and the second supporting plate to be more stable when the first supporting plate and the second supporting plate run up and down, so that the safety of the bearing frame is improved;
2. the utility model has the advantages that the fixing edge is welded on the outer wall of one side of the second sleeve, the first screw holes arranged on the fixing edge are coincided with the second screw holes on the second support plate, and the fixing is carried out by adopting bolts, so that the second support plate is more convenient to install, and the practical effect is improved;
3. the third sleeve is arranged at the extending section on the supporting column in a matching way, and the third sleeve can move up and down on the supporting column, so that the height of the protective cover can be adjusted, and the operation is more convenient;
4. the utility model discloses an install the safety cover storage case to the safety cover is installed in the cooperation of safety cover storage case, the safety cover can cover in worker's head top, can carry out the guard action to the worker during the construction, and can accomodate when not using the safety cover in the safety cover storage case, has fine safe effect.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the protective cover storage case of the present invention;
fig. 3 is a schematic view of a partial structure of the second supporting plate of the present invention.
In the figure: 1. a support base; 2. a support pillar; 3. a lifting hydraulic cylinder; 4. a first support plate; 5. a first sleeve; 6. positioning blocks; 7. positioning a rod; 8. a first fixed block; 9. a support bar; 10. a second fixed block; 11. a second sleeve; 12. a third sleeve; 13. a first fixing hole; 14. a second fixing hole; 15. a support block; 16. a protective cover housing case; 17. a protective cover; 18. a handle; 19. a first positioning hole; 20. a second positioning hole; 21. a second support plate; 22. a receiving cavity; 23. fixing the edge; 24. a first screw hole; 25. and a second screw hole.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-3, a bearing frame for building construction comprises a supporting base 1, four supporting columns 2 are welded on the top surface of the supporting base 1 at the edge side, a first sleeve 5 and a second sleeve 11 are installed on the four supporting columns 2 in a matching manner, four first sleeves 5 and four second sleeves 11 are arranged on the first sleeve 5 and the second sleeve 11, a first supporting plate 4 is welded between the two first sleeves 5, the bottom of the first supporting plate 4 is connected with a hydraulic rod in a lifting hydraulic cylinder 3, the bottom of the lifting hydraulic cylinder 3 is fixedly installed on the top surface of the supporting base 1, fixing edges 23 are welded on the inner and outer walls of the two second sleeves 11, first screw holes 24 are formed in the fixing edges 23, the first screw holes 24 are coincided with second screw holes 25 formed in the second supporting plate 21 and fixed by bolts, wherein, the extension section of two support columns 2 also cooperates and installs third sleeve 12, and the extension section of support column 2 still offers four equidistant second fixed orificess 14 that distribute, a first fixed orifices 13 has been seted up on the third sleeve 12, hydraulic cylinder 3 is connected with the power through the wire.
Specifically, as shown in fig. 1, a positioning block 6 is clamped on one side of each of the first sleeve 5 and the second sleeve 11, a through hole is formed in the positioning block 6, a positioning rod 7 penetrates through the through hole, and one end of the positioning rod 7 is connected with the top surface of the support base 1.
Through adopting above-mentioned scheme, seted up the through-hole in the locating piece 6, and passed locating lever 7 in the through-hole, the one end of locating lever 7 is connected with the top surface that supports base 1, and locating lever 7 has fine guidance quality when making the backup pad up-and-down motion.
Specifically, as shown in fig. 1, the top surface of the first supporting plate 4 is connected to the bottom of the first fixing block 8 through a bolt, the first fixing block 8 is fixedly connected to a supporting rod 9, one end of the supporting rod 9 is fixedly connected to the second fixing block 10, and the top of the second fixing block 10 is fixedly mounted to the bottom surface of the second supporting plate 21 through a bolt.
Through adopting above-mentioned scheme, the top of first backup pad 4 is connected through the bottom of bolt with first fixed block 8 on the surface, fixedly connected with bracing piece 9 on the first fixed block 8, fixed connection between the one end of bracing piece 9 and the second fixed block 10, and the top of second fixed block 10 is passed through bolt and the fixed surface installation in second backup pad 21 bottom, carries out better fixed action between first backup pad 4 and the second backup pad 21.
Specifically, as shown in fig. 1, a supporting block 15 is welded on an outer wall of one side of the third sleeve 12, and a protective cover accommodating shell 16 is fixedly mounted on the top of the supporting block 15.
Through adopting above-mentioned scheme, the welding has supporting shoe 15 on one side outer wall of third sleeve 12, and the top fixed mounting of supporting shoe 15 has the safety cover to accomodate shell 16, and third sleeve 12 can be adjusted according to going up and down to the position that drives safety cover and accomodate shell 16, and it is more convenient to operate.
Specifically, as shown in fig. 2, a receiving cavity 22 is formed inside the protective cover receiving shell 16, the protective cover 17 can be received in the receiving cavity 22, and a handle 18 is clamped at the bottom of the protective cover 17.
By adopting the above scheme, the protective cover housing 16 is internally provided with the housing cavity 22, the protective cover 17 can be housed in the housing cavity 22, and the protective cover 17 can be housed in the housing cavity 22.
Specifically, as shown in fig. 1, the protective cover accommodating shell 16 and the protective cover 17 are both arc-shaped, a first positioning hole 19 is formed in the protective cover accommodating shell 16, a second positioning hole 20 is formed in the protective cover 17, and the overlapping position of the first positioning hole 19 and the second positioning hole 20 is fixed by an insertion rod.
Through adopting above-mentioned scheme, the safety cover is accomodate shell 16 and safety cover 17 and is the arc form, has seted up first locating hole 19 on the safety cover is accomodate shell 16, has seted up second locating hole 20 on the safety cover 17, and the coincidence department of first locating hole 19 and second locating hole 20 adopts the inserted bar fixed, carries out the fixed action to safety cover 17.
It should be noted that the utility model is a construction bearing frame, the worker stands on the second supporting plate 21, when the height of the bearing frame needs to be adjusted, the switch of the lifting hydraulic cylinder 3 is pressed, so that the lifting hydraulic cylinder 3 drives the hydraulic rod to move, the first supporting plate 4 moves upwards, thereby driving the second supporting plate 21 to move upwards, and the positioning rod 7 has good positioning function while the first supporting plate 4 and the second supporting plate 21 move upwards, so that the first support plate 4 and the second support plate 21 are more stably moved up and down, the protective cover 17 is moved to one side, so that the protective cover 17 is moved in the protective cover receiving case 16, when the protection cover 17 moves to the position right above the worker, the inserted rod penetrates through the overlapped position of the first positioning hole 19 and the second positioning hole 20 to fix the protection cover 17, and the working safety of the worker is improved.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a construction bears frame, includes support base (1), its characterized in that: the top of the supporting base (1) is located at the edge side on the surface and welded with four supporting columns (2), the supporting columns (2) are provided with four supporting sleeves (5) and four second sleeves (11) in a matched mode, the first sleeves (5) and the second sleeves (11) are provided with four supporting columns, two supporting plates (4) are welded between the first sleeves (5), the bottom of each supporting plate (4) is connected with a hydraulic rod in each lifting hydraulic cylinder (3), the bottoms of the lifting hydraulic cylinders (3) are fixedly installed on the top surface of the supporting base (1), fixed edges (23) are welded on the inner wall and the outer wall of the second sleeves (11), first screw holes (24) are formed in the fixed edges (23), and the first screw holes (24) and the second screw holes (25) formed in the second supporting plates (21) coincide with each other, and the lifting hydraulic cylinder is fixed by bolts, wherein a third sleeve (12) is also installed at the extension section of the two support columns (2) in a matching manner, four second fixing holes (14) which are distributed at equal intervals are also formed in the extension section of the support columns (2), a first fixing hole (13) is formed in the third sleeve (12), and the lifting hydraulic cylinder (3) is connected with a power supply through a wire.
2. The construction carrier of claim 1, wherein: the locating piece (6) is clamped to one side of the first sleeve (5) and one side of the second sleeve (11), a through hole is formed in the locating piece (6), the locating rod (7) penetrates through the through hole, and one end of the locating rod (7) is connected with the top surface of the supporting base (1).
3. The construction carrier of claim 1, wherein: the top of first backup pad (4) is connected through the bottom of bolt with first fixed block (8) on the surface, just fixedly connected with bracing piece (9) on first fixed block (8), fixed connection between the one end of bracing piece (9) and second fixed block (10), just the top of second fixed block (10) is through bolt and second backup pad (21) bottom fixed surface mounting.
4. The construction carrier of claim 1, wherein: the supporting block (15) is welded on the outer wall of one side of the third sleeve (12), and the protective cover accommodating shell (16) is fixedly mounted at the top of the supporting block (15).
5. The construction carrier of claim 4, wherein: the inside of protective cover storage shell (16) is equipped with accomodates chamber (22), just accomodate in chamber (22) and can accomodate protective cover (17), the bottom joint of protective cover (17) has handle (18).
6. The construction carrier of claim 5, wherein: the safety cover storage shell (16) and the safety cover (17) are both arc-shaped, a first positioning hole (19) is formed in the safety cover storage shell (16), a second positioning hole (20) is formed in the safety cover (17), and the first positioning hole (19) and the superposition position of the second positioning hole (20) are fixed through an inserted rod.
CN201920909784.8U 2019-06-18 2019-06-18 Bearing frame for building construction Expired - Fee Related CN210828250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920909784.8U CN210828250U (en) 2019-06-18 2019-06-18 Bearing frame for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920909784.8U CN210828250U (en) 2019-06-18 2019-06-18 Bearing frame for building construction

Publications (1)

Publication Number Publication Date
CN210828250U true CN210828250U (en) 2020-06-23

Family

ID=71253237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920909784.8U Expired - Fee Related CN210828250U (en) 2019-06-18 2019-06-18 Bearing frame for building construction

Country Status (1)

Country Link
CN (1) CN210828250U (en)

Similar Documents

Publication Publication Date Title
CN210828250U (en) Bearing frame for building construction
CN210134633U (en) A climbing scaffold frame for communication
CN102862649B (en) Adjustable support device for reverse installation of lifting lugs in building process of ship
CN210818161U (en) Bed-jig that steel construction was used
CN212371490U (en) Welding device for hydraulic oil cylinder
CN213175687U (en) Bolt connection type support frame with annular structure
CN211871178U (en) Hoisting machinery strutting arrangement convenient to installation
CN209890071U (en) Steel construction light pipe fitting hoisting accessory
CN2925670Y (en) Calibrator of electrolytic bath side
CN202896850U (en) Adjustable bracket device for inverse installation of lifting lug in shipbuilding process
CN217027989U (en) Concrete parapet outside template construction operation platform device based on steel construction
CN211114702U (en) Mobile construction platform for building construction
CN215691167U (en) Adjustable assembled safety rope hanging column
CN215165558U (en) Conduit type pile driver with safety protection structure
CN211707169U (en) Environment-friendly tipping arrangement is used in processing of building wallboard
CN217000768U (en) Retractable removes operation platform that encorbelments
CN216892844U (en) Detachable steel truss bed-jig device
CN220618362U (en) Mast type aerial work platform for electric power overhaul
CN211899947U (en) Electric power iron tower with climbing mechanism
CN211780011U (en) Industrial robot is with installation base convenient to adjust
CN211376461U (en) Special maintenance of circuit breaker, equipment support
CN213916893U (en) Angle iron bracket preparation mould
CN212671160U (en) Combined building scaffold
CN213535981U (en) Storage device for formaldehyde convenient to installation is dismantled
CN215905760U (en) Hoisting device for disassembling climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200623

Termination date: 20210618

CF01 Termination of patent right due to non-payment of annual fee