CN210818198U - Work fixture for steel structure production - Google Patents
Work fixture for steel structure production Download PDFInfo
- Publication number
- CN210818198U CN210818198U CN201921893654.6U CN201921893654U CN210818198U CN 210818198 U CN210818198 U CN 210818198U CN 201921893654 U CN201921893654 U CN 201921893654U CN 210818198 U CN210818198 U CN 210818198U
- Authority
- CN
- China
- Prior art keywords
- mobile station
- track
- slot
- steel structure
- matchd
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a frock clamp of steel construction production, including the anchor clamps main part, the anchor clamps main part comprises mobile station and track, mobile station and track integrated into one piece, track accordant connection has four runners, the runner is connected with branch, branch is connected with the bench vice, the bench vice is equipped with three jack, the jack is matchd there is the inserted bar, the bench vice is equipped with the slot, the slot is matchd there is the power input shaft, the mobile station is equipped with three H type slot, H type slot is matchd with H type inserted bar, the universal wheel is installed to the mobile station.
Description
Technical Field
The utility model belongs to the anchor clamps field, concretely relates to frock clamp of steel construction production.
Background
The steel structure is one of the more common and most common structural forms in modern building engineering; the steel construction mainly comprises beam steel, steel column, steel truss etc. components such as the girder steel of making such as shaped steel and steel sheet, adopts welding seam, bolt or rivet to connect usually between each component or the part, when steel welding, needs to use anchor clamps to fix it, then welds, but the frock clamp of current steel construction production has following not enough:
1. when the existing steel structure welding tool clamp is used for welding H-shaped steel, the phenomena of welding deviation and insufficient firmness in welding can occur due to the fact that steel butt joint is not accurate enough;
2. when different surfaces of a steel structure are welded, an operator needs to frequently change the station moving position, so that the welding is very inconvenient and the welding efficiency is reduced;
3. when the steel structure is too long, the work fixture can only clamp the part, so that the part which is not clamped is suspended, and the phenomenon of downward movement or upward warping easily occurs under the influence of gravity.
In view of this, a tooling clamp for steel structure production is provided, which achieves the purposes of solving the problems and improving the practical value.
SUMMERY OF THE UTILITY MODEL
To the problem that the above-mentioned background art provided, the utility model aims at: aiming at providing a work fixture for steel structure production. In order to realize the technical purpose, the utility model discloses a technical scheme as follows:
the utility model provides a frock clamp of steel construction production, includes the anchor clamps main part, the anchor clamps main part comprises mobile station and track, mobile station and track integrated into one piece, track accordant connection has four runners, the runner is connected with branch, branch is connected with the bench vice, the bench vice is equipped with three jack, the jack matches there is the inserted bar, the bench vice is equipped with the slot, the slot matches there is the power input shaft, the mobile station is equipped with three H type slot, H type slot matches there is H type inserted bar, the universal wheel is installed to the mobile station.
Further inject, the universal wheel is the auto-lock universal wheel, and such design strengthens stable effect.
Further, the runner is coated with plastic, and the service life is prolonged due to the design.
Further restrict, the mobile station embeds there is heavy weight, and such design increases the dead weight, strengthens mobile station self stabilization effect.
Further, the track is intermittently matched with the rotating wheel, and due to the design, the rotation is more stable, and the positioning is more accurate.
Adopt the beneficial effects of the utility model:
1. the jacks are matched with the insertion rods, and the H-shaped slots are matched with the H-shaped insertion rods, so that the butt joint position consistency of the clamp main body is ensured, and welding deviation is prevented;
2. by adopting the structural design of the utility model, the effect of rotating the workpiece can be achieved by controlling the rotation of the power input shaft, so that the welding process can be completed without moving the position of an operator, and the efficiency is enhanced;
3. the setting of mobile station can reach through the quantity and the distance of adjusting the mobile station and place stable purpose with the steel construction, has guaranteed the welding effect.
Drawings
The present invention can be further illustrated by the non-limiting examples given in the accompanying drawings;
FIG. 1 is a first schematic structural view of an embodiment of a tooling fixture for steel structure production according to the present invention;
FIG. 2 is a schematic structural diagram II of an embodiment of a tooling fixture for steel structure production according to the present invention;
the main element symbols are as follows:
the clamp comprises a slot 2, a power input shaft 3, a bench vice 4, a clamp body 5, a jack 6, an insertion rod 7, a support rod 8, a rotating wheel 9, a rail 10, a moving platform 11, an H-shaped slot 12, an H-shaped insertion rod 13 and a universal wheel 14.
Detailed Description
In order to make the present invention better understood by those skilled in the art, the technical solutions of the present invention are further described below with reference to the accompanying drawings and examples.
As shown in fig. 1 and 2, the utility model discloses a frock clamp of steel construction production, including anchor clamps main part 5, anchor clamps main part 5 comprises mobile station 11 and track 10, mobile station 11 and track 10 integrated into one piece, track 10 accordant connection has four runners 9, runner 9 is connected with branch 8, branch 8 is connected with bench vice 4, bench vice 4 is equipped with three jack 6, jack 6 matches there is inserted bar 7, bench vice 4 is equipped with slot 2, slot 2 matches there is power input shaft 3, mobile station 11 is equipped with three H type slot 12, H type slot 12 matches has H type inserted bar 13, universal wheel 14 is installed to mobile station 11.
In this embodiment, when using a frock clamp of steel construction production, confirm the quantity of the anchor clamps main part 5 that need to use according to needs welded steel length, then cooperate through H type inserted bar 13 and H type slot 12, connect, rotate the connection cooperation that anvil vice 4 accomplished inserted bar 7 and jack 6 again, pass through anvil vice 4 with steel and fix, then just can start the welding, when needing the rotational position, insert slot 2 with power input shaft 3, control power input shaft 3 rotates and drives anvil vice 4 and rotate in track 10 and can conveniently accomplish the position rotation to steel.
Preferably, the universal wheel 14 is a self-locking universal wheel, so as to enhance the stability effect, and actually, the selection of the universal wheel can be considered according to specific conditions.
Preferably, the runner 9 is coated with plastic to prolong the service life, and in fact, the material of the plastic can be selected according to specific conditions.
It is preferable that the weight of the weight is built in the mobile station 11 to increase the self-weight and enhance the self-stabilization effect of the mobile station 11, and actually, the weight of the weight can be selected according to specific situations.
Preferably, the track 10 is intermittently engaged with the runner 9, so that the rotation is more stable and the positioning is more accurate, and in fact, the size of the clearance fit can be considered according to specific conditions.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not to be construed as limiting the invention. Modifications and variations can be made to the above-described embodiments by those skilled in the art without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which may be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.
Claims (5)
1. The utility model provides a frock clamp of steel construction production, includes anchor clamps main part (5), its characterized in that: anchor clamps main part (5) comprise mobile station (11) and track (10), mobile station (11) and track (10) integrated into one piece, track (10) accordant connection has four runners (9), runner (9) are connected with branch (8), branch (8) are connected with bench vice (4), bench vice (4) are equipped with three jack (6), jack (6) are matchd there are inserted bar (7), bench vice (4) are equipped with slot (2), slot (2) are matchd there is power input shaft (3), mobile station (11) are equipped with three H type slot (12), H type slot (12) are matchd with H type inserted bar (13), universal wheel (14) are installed in mobile station (11).
2. The tooling clamp for steel structure production according to claim 1, characterized in that: the universal wheel (14) is a self-locking universal wheel.
3. The tooling clamp for steel structure production according to claim 2, characterized in that: the rotating wheel (9) is coated with plastic.
4. The tool clamp for steel structure production according to claim 3, characterized in that: a weight is arranged in the mobile station (11).
5. The tooling clamp for steel structure production according to claim 4, characterized in that: the track (10) is intermittently matched with the rotating wheel (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921893654.6U CN210818198U (en) | 2019-11-05 | 2019-11-05 | Work fixture for steel structure production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921893654.6U CN210818198U (en) | 2019-11-05 | 2019-11-05 | Work fixture for steel structure production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210818198U true CN210818198U (en) | 2020-06-23 |
Family
ID=71281128
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921893654.6U Active CN210818198U (en) | 2019-11-05 | 2019-11-05 | Work fixture for steel structure production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210818198U (en) |
-
2019
- 2019-11-05 CN CN201921893654.6U patent/CN210818198U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203209912U (en) | Welding clamp for steering column connecting pipe | |
CN210818198U (en) | Work fixture for steel structure production | |
CN209353784U (en) | A kind of supporting frame with steel structure | |
CN203484859U (en) | Support tool for use during welding of barrel | |
CN203062161U (en) | Welding positioning device for tunnel steel arch truss and connecting steel plate | |
CN205464583U (en) | Horizontal cutting equipment | |
CN204850068U (en) | Connection structure of side column and crane beam tip in steel construction | |
CN212613749U (en) | Beam-penetrating sleeve for building pipeline | |
CN206795000U (en) | Curved beam submerged arc welding frock | |
CN113431606B (en) | Positioning device suitable for multi-specification tunnel steel arch connecting plate and construction method | |
CN205380383U (en) | Work platform of hoist welding end beam | |
CN204817559U (en) | Crane end beam correcting unit | |
CN205520204U (en) | Welding jig of butt -joint machine | |
CN204060000U (en) | Prefabricated cladding panel construction Special positioning tool | |
CN204817568U (en) | Workstation is rectified to fixed base crane end beam | |
CN205290267U (en) | Pipe welding strutting arrangement | |
CN209619777U (en) | Roadbed cushion construction falsework | |
CN103286467B (en) | A kind of welding method controlling frame assembly deformation | |
CN203347025U (en) | Novel conical head for bolt ball node net rack | |
CN209256199U (en) | The apparatus for welding and positioning of fixed column in support frame | |
CN210756160U (en) | Engine exhaust pipe welding device | |
CN211388407U (en) | Arch bar positioning device for arch center processing | |
CN201841342U (en) | Adjustable broaching support frame | |
CN212427559U (en) | Connecting device convenient to install in narrow space | |
CN203583473U (en) | Centering support for reinforced soil nail or anchor rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Xiaodong Inventor after: Yuan Yongli Inventor before: Liu Xiaodong Inventor before: Yuan Yongli |
|
CB03 | Change of inventor or designer information |