CN210798362U - Full water test reinforced structure of water treatment structure - Google Patents

Full water test reinforced structure of water treatment structure Download PDF

Info

Publication number
CN210798362U
CN210798362U CN201921393387.6U CN201921393387U CN210798362U CN 210798362 U CN210798362 U CN 210798362U CN 201921393387 U CN201921393387 U CN 201921393387U CN 210798362 U CN210798362 U CN 210798362U
Authority
CN
China
Prior art keywords
reserved hole
prefabricated steel
blocking plate
water treatment
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921393387.6U
Other languages
Chinese (zh)
Inventor
岳仁峰
仇立发
史军军
张永军
于娇娇
孙明臣
尹福鑫
信博岩
马骏东
王乐
刘云明
赵超越
于洋
田磊
冯卫志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201921393387.6U priority Critical patent/CN210798362U/en
Application granted granted Critical
Publication of CN210798362U publication Critical patent/CN210798362U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model relates to a reinforced structure, in particular to a reinforced structure for a water treatment structure full water test, which comprises a concrete tank structure with a reserved hole, wherein a prefabricated steel blocking plate with the size larger than that of the reserved hole is fixedly arranged at the inner side of the reserved hole, and a split bolt is fully welded at the outer side of the prefabricated steel blocking plate and extends out of the outer end of the reserved hole; the outside of reserving the entrance to a cave corresponds the split bolt and is provided with a plurality of steel pipes to, and just a plurality of steel pipes pass through the checkpost and correspond to the split bolt to be connected fixedly. The utility model can effectively and firmly fix the prefabricated steel closure plate and the concrete tank structure, and ensure that the periphery of the prefabricated steel closure plate is not seeped or leaked; the mode is convenient and quick to operate, and can be used repeatedly.

Description

Full water test reinforced structure of water treatment structure
Technical Field
The utility model relates to a reinforced structure specifically is a water treatment structures full water test reinforced structure.
Background
After the construction of the water treatment structure is completed, according to the specification and design requirements, a functional test, namely a full water test, must be carried out on the structure before the foundation pit is backfilled. The reserved hole opening must be tightly plugged before water is injected into the structure in the full water test of the structure, most of the conventional plugging modes of the hole opening adopt internal and external mortar plastering in masonry, if the masonry quality is not guaranteed, water leakage at the position of the hole opening is easy to occur, and the full water test fails.
Therefore, in order to effectively perform hole plugging, normally perform a full water test, and combine with actual conditions on site, it is urgently needed to develop a water treatment structure full water test reinforced structure to overcome the defects in the current practical application.
SUMMERY OF THE UTILITY MODEL
An object of the embodiment of the utility model is to provide a water treatment structures full water test reinforced structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions:
a water treatment structure full water test reinforcing structure comprises a concrete tank body structure provided with a reserved hole, wherein a prefabricated steel blocking plate with the size larger than that of the reserved hole is fixedly arranged on the inner side of the reserved hole, split bolts are fully welded on the outer side of the prefabricated steel blocking plate, and the split bolts extend out of the outer end of the reserved hole; the outer side of the reserved hole is provided with a plurality of pairs of steel pipes corresponding to the split bolts, and the steel pipes are correspondingly connected and fixed with the split bolts through clips.
As a further aspect of the present invention: and an annular water swelling and stopping adhesive tape which swells when encountering water is arranged between the prefabricated steel plugging plate and the wall of the concrete tank structure.
As a further aspect of the present invention: reserved entrance to a cave and prefabricated steel closure plate are square shape, and the length of side of prefabricated steel closure plate is grown up 200mm than the limit of reserving the entrance to a cave.
As a further aspect of the present invention: the length of split bolt is 600mm, and split bolt is equipped with nine altogether.
As a further aspect of the present invention: the steel pipes are arranged in three pairs, the three pairs of steel pipes are arranged in parallel, and each pair of steel pipes is fixedly connected with the three split bolts.
Compared with the prior art, the utility model discloses the beneficial effect of embodiment is:
the water-full test reinforcing structure of the water treatment structure can effectively and firmly fix the prefabricated steel blocking plate and the concrete tank structure, and ensure that the periphery of the prefabricated steel blocking plate is not leaked; the mode is convenient and quick to operate, and can be used repeatedly.
Drawings
Fig. 1 is a schematic view of a hole plugging structure according to an embodiment of the present invention.
Fig. 2 is a schematic sectional view taken along line a-a in fig. 1.
In the figure: 1-concrete tank body structure, 2-reserved hole, 3-split bolt, 4-prefabricated steel closure plate, 5-water swelling water stop adhesive tape and 6-steel pipe.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Please refer to fig. 1-2, in the embodiment of the utility model, a water treatment structures full water test reinforced structure, including setting up the concrete cell body structure 1 of reserving entrance to a cave 2, the inboard of reserving entrance to a cave 2 is fixed to be provided with the prefabricated steel closure plate 4 that the size is greater than reservation entrance to a cave 2, the outside full-weld of prefabricated steel closure plate 4 is to stay bolt 3, and stretches out from reserving 2 outer ends in entrance to a cave to stay bolt 3, be provided with cyclic annular chance water inflation stagnant water adhesive tape 5 between the pool wall of prefabricated steel closure plate 4 and concrete cell body structure 1.
The outside of reserving entrance to a cave 2 corresponds split bolt 3 and is provided with many to steel pipe 6, and is many right steel pipe 6 passes through the checkpost and corresponds with split bolt three and be connected fixedly, makes effectively fixed firm between prefabricated steel closure plate 4 and the concrete tank structure 1, ensures that prefabricated steel closure plate 4 periphery does not leak, and this mode simple operation, quick, and can have enough to meet the need the use many times.
Example 2
Referring to fig. 1-2, the present embodiment is different from embodiment 1 in that:
furthermore, the reserved hole 2 and the prefabricated steel blocking plate 4 are both square in front view (figure 1), and the side length of the prefabricated steel blocking plate 4 is 200mm longer than that of the reserved hole 2.
Furthermore, the length of the split bolts 3 is 600mm, and nine split bolts 3 are arranged; the steel pipes 6 are provided with three pairs, the three pairs of steel pipes 6 are arranged in parallel, and each pair of steel pipes 6 is fixedly connected with the three split bolts 3.
The water-full test reinforcing structure of the water treatment structure can effectively and firmly fix the prefabricated steel blocking plate 4 and the concrete tank body structure 1 in actual application, and ensure that the periphery of the prefabricated steel blocking plate 4 is not leaked; the mode is convenient and quick to operate, and can be used repeatedly.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.

Claims (5)

1. A water treatment structure full water test reinforcing structure comprises a concrete tank body structure (1) provided with a reserved hole (2), and is characterized in that a prefabricated steel blocking plate (4) with the size larger than that of the reserved hole (2) is fixedly arranged on the inner side of the reserved hole (2), split bolts (3) are fully welded on the outer side of the prefabricated steel blocking plate (4), and the split bolts (3) extend out of the outer end of the reserved hole (2); the outer side of the reserved hole (2) is provided with a plurality of pairs of steel pipes (6) corresponding to the split bolts (3), and the steel pipes (6) are correspondingly connected and fixed with the split bolts (3) through clamps.
2. The water treatment structure full water test reinforcement structure of claim 1, characterized in that an annular water-swelling and water-stopping rubber strip (5) is arranged between the prefabricated steel blocking plate (4) and the wall of the concrete tank structure (1).
3. The water treatment structure full water test reinforcing structure of claim 1 or 2, wherein the reserved hole (2) and the prefabricated steel blocking plate (4) are both square, and the side length of the prefabricated steel blocking plate (4) is 200mm larger than that of the reserved hole (2).
4. A water treatment structure full water test reinforcement structure according to claim 3, characterized in that the length of the split bolt (3) is 600mm, and nine split bolts (3) are provided.
5. The water treatment structure full water test reinforcing structure as claimed in claim 4, wherein the steel pipes (6) are arranged in three pairs, the three pairs of steel pipes (6) are arranged in parallel, and each pair of steel pipes (6) is fixedly connected with three split bolts (3).
CN201921393387.6U 2019-08-26 2019-08-26 Full water test reinforced structure of water treatment structure Active CN210798362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921393387.6U CN210798362U (en) 2019-08-26 2019-08-26 Full water test reinforced structure of water treatment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921393387.6U CN210798362U (en) 2019-08-26 2019-08-26 Full water test reinforced structure of water treatment structure

Publications (1)

Publication Number Publication Date
CN210798362U true CN210798362U (en) 2020-06-19

Family

ID=71229605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921393387.6U Active CN210798362U (en) 2019-08-26 2019-08-26 Full water test reinforced structure of water treatment structure

Country Status (1)

Country Link
CN (1) CN210798362U (en)

Similar Documents

Publication Publication Date Title
CN106836241A (en) A kind of support replacement construction of pattern foundation pit supporting structure horizontal support structure
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN210798362U (en) Full water test reinforced structure of water treatment structure
CN215483429U (en) Drainage structures of vestibule and major structure handing-over department
CN213953143U (en) A outer encapsulation is put for concrete mixing plant
CN219992416U (en) Self-sealing joint for underground diaphragm wall
CN104964121B (en) A kind of sleeve water leakage plugging method
CN115748780A (en) Dewatering well pipe well plugging device and method
CN212251495U (en) Concrete pond underwater equipment installation device
CN214940305U (en) Waterproof sleeve pipe of well is dredged to combination foundation ditch dewatering
CN210341975U (en) Major diameter single pile steel-pipe pile interpolation changeover portion grouting construction system
CN219773014U (en) Sleeve structure for protecting dewatering well
CN220226253U (en) Supporting structure suitable for single-side formwork of outer wall
JP5898915B2 (en) Temporary deadline structure of dam body
CN206352337U (en) A kind of basement wall and basement for preventing and treating seepage
CN214005396U (en) Cast-in-situ beam drainage hole supporting anti-blocking device
CN220848921U (en) Reinforcing structure of wall hole
CN220814589U (en) Waterproof building engineering structure
CN216194779U (en) Self-jacking soil retaining and water stopping device for missing part of support pile
CN214997720U (en) Edge water stop reinforcing structure for subway tunnel
CN213572010U (en) Deep basal pit supporting waterproof curtain structure
CN215518720U (en) Mud device is prevented pressing from both sides by underground continuous wall I-shaped steel joint
CN220080107U (en) Basement outer wall screw thread enlarges body steel pile sealing device
CN215520901U (en) High-strength reinforced concrete segment with grooves
CN214656940U (en) Be used for diaphragm wall defect seam seepage to stop drainage structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant