CN210777746U - Progress show board for construction management - Google Patents
Progress show board for construction management Download PDFInfo
- Publication number
- CN210777746U CN210777746U CN201922190665.4U CN201922190665U CN210777746U CN 210777746 U CN210777746 U CN 210777746U CN 201922190665 U CN201922190665 U CN 201922190665U CN 210777746 U CN210777746 U CN 210777746U
- Authority
- CN
- China
- Prior art keywords
- display board
- board main
- construction management
- show board
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009430 construction management Methods 0.000 title abstract description 8
- 239000011521 glass Substances 0.000 claims abstract description 13
- 241000238631 Hexapoda Species 0.000 claims abstract description 11
- 230000007246 mechanism Effects 0.000 claims abstract description 11
- 230000000149 penetrating effect Effects 0.000 claims description 14
- 238000009435 building construction Methods 0.000 claims description 12
- 230000000694 effects Effects 0.000 abstract description 5
- 239000000428 dust Substances 0.000 abstract description 4
- 230000003628 erosive effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 3
- 108010085603 SFLLRNPND Proteins 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
Images
Landscapes
- Illuminated Signs And Luminous Advertising (AREA)
Abstract
The utility model discloses a progress show board for construction management, including the show board main part. In the utility model, the designed electric telescopic rod can adjust the height of the display board, so that people with different heights can conveniently use the display board, the supporting mechanisms are arranged on both sides of the electric telescopic rod, when the electric telescopic rod is fixed on the ground, the supporting mechanisms on both sides can be fixed with the ground, and further the stability of the display board can be improved, so that the display board cannot be easily knocked down by collision; the designed glass cover can protect the panel, so that the erosion of rainwater and external dust to characters on the display board can be effectively prevented, and the use efficiency of the display board is improved; the insect trap of design can catch some small insects of activity near the show board, avoids these small insects to enter into the inside of show board, influences the life of show board.
Description
Technical Field
The utility model belongs to the technical field of the device is used in the construction management, particularly, relate to a progress show board is used in construction management.
Background
With the development of economy, the pace of urban construction is gradually accelerated, the demand for building construction is continuously increased, and further the demand for equipment for construction management is more and more. In the building construction process, often need utilize the show board with the construction progress and demonstrate to in time trail the task progress for the project person in charge, also can utilize the show board to write by hand the task target of this day or this season simultaneously, realize audio-visual bandwagon effect.
However, the progress display board for the existing building construction management still has the following defects:
1. the schedule display board is generally installed outdoors so that more people can have detailed knowledge of the progress of the project, and the schedule display board placed outdoors is easy to topple over due to poor stability when a worker carries materials or is hit by articles such as vehicles, pedestrians and tool cars.
2. The existing display board can not be adjusted in height, so that people with different heights can not conveniently use the display board.
3. The outdoor display board is windy and sunned in the day, so that data on the display board is easily covered by rainwater or raised dust, and workers cannot conveniently view the contents.
Consequently in order to solve above problem, the utility model provides a progress show board is used in construction management.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a progress show board for construction management to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a progress display board for building construction management comprises a display board main body, wherein electric telescopic rods are fixedly mounted on two sides of the bottom end of the display board main body, supporting mechanisms are mounted on two sides of the bottom end of each electric telescopic rod, each supporting mechanism is provided with a third fixing seat, the third fixing seats are fixedly connected with the electric telescopic rods, a third rotating shaft is mounted on each third fixing seat in a penetrating manner, a telescopic supporting rod is mounted on one side of each third rotating shaft in a penetrating manner, a fixer is mounted on one side of each telescopic supporting rod, a conical head is fixedly mounted at one end of each telescopic supporting rod, a glass cover is mounted on one side of the display board main body, an infrared range finder is mounted on one side of the display board main body, an alarm is arranged at the bottom end of the infrared range finder, one end of the alarm is fixedly connected with the outer wall of the display, and the infrared distance measuring instrument is connected with the alarm through a signal line, the other side of the display board main body is fixedly provided with an insect trap, and the top end of the display board main body is provided with a solar photovoltaic panel.
Further, the inside top of show board main part is fixed mounting respectively has first spill fixing base and second spill fixing base, first spill fixing base through connection installs first pivot, second spill fixing base through connection installs the second pivot.
Furthermore, the top of glass cover fixed mounting respectively has first connecting block and second connecting block, first connecting block with first pivot through connection, the second connecting block with second pivot through connection.
Further, the equal fixed mounting in bottom of electric telescopic handle has the mounting panel, be equipped with a plurality of mounting holes on the mounting panel, and pass through mounting hole and ground fixed connection.
Further, the bottom fixed mounting of solar photovoltaic board has the support, the bottom fixed mounting of support is in the top of show board main part.
Furthermore, a panel is installed in the display board main body, and a containing groove and an eraser are arranged at the bottom end of the panel.
Furthermore, the model of the infrared distance measuring instrument is LDM-65.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses in, the electric telescopic handle of design can adjust the height of show board to the people of being convenient for different heights uses it, all installs supporting mechanism in electric telescopic handle's both sides, fixes electric telescopic handle subaerial the time, can also be fixed mutually with ground with the supporting mechanism of both sides, and then can improve the stability of show board, makes the show board can not be easily knocked down by the collision.
2. The utility model discloses in, infrared distance meter can carry out the distance to vehicle, tool bogie etc. that are close the show board and detect, when these are likely to cause the article that the striking influences show board stability to the show board near apart from the show board, the alarm will indicate these objects, signals it and keeps away from the show board, and then the security of further improvement show board.
3. The glass cover of design can protect the panel to can effectually prevent the erosion of rainwater and external dust to characters on the show board, improve the availability factor of show board.
4. The insect trap of design can catch some small insects of activity near the show board, avoids these small insects to enter into the inside of show board, influences the life of show board.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic plan view of the present invention.
Reference numerals:
1. a display board main body; 101. a first concave fixing seat; 102. a first rotating shaft; 103. a second concave fixing seat; 104. a second rotating shaft; 2. an electric telescopic rod; 201. mounting a plate; 202. mounting holes; 3. a support mechanism; 301. a third fixed seat; 302. a third rotating shaft; 303. a holder; 304. a telescopic strut; 305. a conical head; 4. a glass cover; 401. a first connection block; 402. a second connecting block; 5. a panel; 501. a receiving groove; 502. erasing the blackboard; 6. a solar photovoltaic panel; 601. a support; 7. an infrared range finder; 8. an alarm; 9. an insect trap.
Detailed Description
The following, with reference to the drawings and the detailed description, further description of the present invention is made:
referring to fig. 1-2, a progress display board for building construction management according to an embodiment of the present invention includes a display board main body 1, wherein an electric telescopic rod 2 is fixedly installed on both sides of the bottom end of the display board main body 1, a supporting mechanism 3 is installed on both sides of the bottom end of the electric telescopic rod 2, the supporting mechanism 3 is provided with a third fixing seat 301, the third fixing seat 301 is fixedly connected with the electric telescopic rod 2, a third rotating shaft 302 is installed on the third fixing seat 301 in a penetrating manner, a telescopic strut 304 is installed on one side of the third rotating shaft 302 in a penetrating manner, a fixer 303 is installed on one side of the telescopic strut 304, a conical head 305 is fixedly installed on one end of the telescopic strut 304, a glass cover 4 is installed on one side of the display board main body 1, and an infrared distance meter 7 is installed on one side of the display board main body 1, the bottom of infrared ray distancer 7 is equipped with siren 8, the one end of siren 8 with the outer wall fixed connection of show board main part 1, just infrared ray distancer 7 with siren 8 passes through the signal line and connects, the opposite side fixed mounting of show board main part 1 has insect trap 9, solar photovoltaic board 6 is installed on the top of show board main part 1.
Through the above scheme of the present invention, the inside top end of the display board main body 1 is respectively and fixedly provided with the first concave fixing seat 101 and the second concave fixing seat 103, the first concave fixing seat 101 is installed with the first rotating shaft 102 in a penetrating way, and the second concave fixing seat 103 is installed with the second rotating shaft 104 in a penetrating way; a first connecting block 401 and a second connecting block 402 are fixedly mounted at the top end of the glass cover 4 respectively, the first connecting block 401 is connected with the first rotating shaft 102 in a penetrating manner, and the second connecting block 402 is connected with the second rotating shaft 104 in a penetrating manner; the bottom ends of the electric telescopic rods 2 are fixedly provided with mounting plates 201, the mounting plates 201 are provided with a plurality of mounting holes 202, and the mounting plates are fixedly connected with the ground through the mounting holes 202; the bottom end of the solar photovoltaic panel 6 is fixedly provided with a support 601, and the bottom end of the support 601 is fixedly arranged at the top end of the display board main body 1; a panel 5 is arranged in the display board main body 1, and a containing groove 501 and an eraser 502 are arranged at the bottom end of the panel 5; the model of the infrared distance measuring instrument 7 is LDM-65.
In specific application, the display board is firstly moved to a designated place for installation, the display board is fixed with the ground through the installation hole 202 by using a bolt, the telescopic strut 304 can rotate around the third rotating shaft 302 by a certain angle, after the telescopic strut is rotated to a proper position, the conical head 305 is inserted into the ground, the telescopic amount (length) of the telescopic strut 304 is fixed by using the fixer 303, the glass cover 4 can rotate around the first rotating shaft 102 and the second rotating shaft 104 by a certain angle through the first connecting block 401 and the second connecting block 402, when a worker needs to write a construction schedule on the panel 5, the glass cover 4 is lifted upwards, after writing is finished, the glass cover 4 is moved back to the original position, the glass cover 4 can prevent external rainwater, dust and the like from corroding characters on the panel 5, and the infrared range finder 7 can be used for a vehicle close to the display board, Objects such as tool bogie carry out the distance and detect, when detecting that the distance is too near can collide the show board, it gives siren 8 with signal transmission, siren 8 can give out the warning to these objects, and insect trap 9 can catch the activity and build the nearly little worm of show board, avoids influencing the availability factor of show board because the activity of these little worms, and solar photovoltaic board 6 can utilize solar energy to generate electricity, provides energy for the operation of the mechanical structure in the show board.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The progress display board for building construction management is characterized by comprising a display board main body (1), wherein electric telescopic rods (2) are fixedly mounted on two sides of the bottom of the display board main body (1), supporting mechanisms (3) are mounted on two sides of the bottom of each electric telescopic rod (2), each supporting mechanism (3) is provided with a third fixing seat (301), the third fixing seats (301) are fixedly connected with the electric telescopic rods (2), third rotating shafts (302) are mounted on the third fixing seats (301) in a penetrating manner, telescopic supporting rods (304) are mounted on one sides of the third rotating shafts (302) in a penetrating manner, a fixer (303) is mounted on one sides of the telescopic supporting rods (304), a conical head (305) is fixedly mounted at one end of each telescopic supporting rod (304), and a glass cover (4) is mounted on one side of the display board main body (1), just infrared ray distancer (7) are installed to one side of show board main part (1), the bottom of infrared ray distancer (7) is equipped with siren (8), the one end of siren (8) with the outer wall fixed connection of show board main part (1), just infrared ray distancer (7) with siren (8) pass through the signal line connection, the opposite side fixed mounting of show board main part (1) has insect trap (9), solar photovoltaic board (6) are installed on the top of show board main part (1).
2. The progress display board for building construction management according to claim 1, wherein a first concave fixing seat (101) and a second concave fixing seat (103) are fixedly installed at the top end of the interior of the display board main body (1), the first concave fixing seat (101) is provided with a first rotating shaft (102) in a penetrating manner, and the second concave fixing seat (103) is provided with a second rotating shaft (104) in a penetrating manner.
3. The progress display board for building construction management according to claim 2, wherein a first connecting block (401) and a second connecting block (402) are fixedly mounted at the top end of the glass cover (4), the first connecting block (401) is connected with the first rotating shaft (102) in a penetrating manner, and the second connecting block (402) is connected with the second rotating shaft (104) in a penetrating manner.
4. The progress display board for building construction management according to claim 1, wherein a mounting plate (201) is fixedly mounted at each bottom end of the electric telescopic rod (2), a plurality of mounting holes (202) are formed in the mounting plate (201), and the mounting plate is fixedly connected with the ground through the mounting holes (202).
5. The progress display board for building construction management according to claim 1, wherein a support (601) is fixedly installed at a bottom end of the solar photovoltaic panel (6), and a bottom end of the support (601) is fixedly installed at a top end of the display board main body (1).
6. The progress display board for building construction management according to claim 1, wherein a panel (5) is installed in the display board main body (1), and a receiving groove (501) and an eraser (502) are provided at a bottom end of the panel (5).
7. The progress display board for building construction management according to claim 1, wherein the infrared distance meter (7) has a model of LDM-65.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922190665.4U CN210777746U (en) | 2019-12-10 | 2019-12-10 | Progress show board for construction management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922190665.4U CN210777746U (en) | 2019-12-10 | 2019-12-10 | Progress show board for construction management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210777746U true CN210777746U (en) | 2020-06-16 |
Family
ID=71064665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922190665.4U Expired - Fee Related CN210777746U (en) | 2019-12-10 | 2019-12-10 | Progress show board for construction management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210777746U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112967627A (en) * | 2021-02-19 | 2021-06-15 | 苏洁 | Forest pest living body science popularization bulletin board and use method thereof |
-
2019
- 2019-12-10 CN CN201922190665.4U patent/CN210777746U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112967627A (en) * | 2021-02-19 | 2021-06-15 | 苏洁 | Forest pest living body science popularization bulletin board and use method thereof |
CN112967627B (en) * | 2021-02-19 | 2022-05-10 | 苏洁 | Forest pest living body science popularization bulletin board and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210777746U (en) | Progress show board for construction management | |
JP4712141B2 (en) | Solar cell module and installation structure of solar cell module | |
CN205531652U (en) | Municipal works rail | |
CN209874660U (en) | Enclose fender suitable for construction is built with degradable dirt in room | |
CN214831911U (en) | Anti-collision protection fence for road and bridge | |
CN207335723U (en) | A kind of total powerstation for detecting tower crane verticality | |
CN211446683U (en) | Warning device for building site | |
CN214375348U (en) | Solid-state snow depth monitoring equipment that snows | |
CN213178088U (en) | Integrated control and environmental monitoring function in wisdom street lamp of an organic whole | |
CN209265896U (en) | A kind of traffic guiding apparatus of smart city | |
CN213234539U (en) | Building construction safety device | |
CN210154607U (en) | Engineering detection fixing device | |
CN210689690U (en) | Outdoor environment monitoring prevent wind mount | |
CN210852482U (en) | Dynamic railway signal detection system | |
CN209446177U (en) | A kind of Novel air is as temperature thermometer screen | |
CN209162678U (en) | A kind of roadblock sign with sound and light of alarm | |
CN213114372U (en) | Municipal administration is with energy-concerving and environment-protective road sign warning sign | |
CN205172073U (en) | Garage parking curtain room | |
CN215104914U (en) | Hydraulic engineering construction is with warning device at night | |
CN215495295U (en) | Warning device is used in city planning construction based on thing networking | |
CN219453443U (en) | Carbon monitoring device for monitoring carbon emissions | |
CN215867177U (en) | Solar energy monitoring device | |
CN212103729U (en) | Highway engineering is with construction sign | |
CN220889790U (en) | Building engineering security fence | |
CN220815158U (en) | Traffic protection enclosure frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200616 |