CN210762570U - Track for extraction system - Google Patents

Track for extraction system Download PDF

Info

Publication number
CN210762570U
CN210762570U CN201921505422.9U CN201921505422U CN210762570U CN 210762570 U CN210762570 U CN 210762570U CN 201921505422 U CN201921505422 U CN 201921505422U CN 210762570 U CN210762570 U CN 210762570U
Authority
CN
China
Prior art keywords
track
strengthening rib
extraction system
grade
mounting panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921505422.9U
Other languages
Chinese (zh)
Inventor
范湘东
徐正伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongli Automation Technology Co ltd
Original Assignee
Jiangsu Zhongli Automation Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongli Automation Technology Co ltd filed Critical Jiangsu Zhongli Automation Technology Co ltd
Priority to CN201921505422.9U priority Critical patent/CN210762570U/en
Application granted granted Critical
Publication of CN210762570U publication Critical patent/CN210762570U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a track that extraction system used belongs to chemical industry equipment technical field, and its technical scheme main points are, including foundation ditch and track body, the track body is located in the foundation ditch, the track body includes that a plurality of installation axle and cover establish at the epaxial running roller of installation, and the track body still includes two mounting panels along running roller center pin mirror surface setting, is equipped with a plurality of incision on two mounting panels, and every installation axle both ends joint is in two incisions that two mounting panels are adjacent respectively. Dismantle the track when clean and more convenient, play the effect that improves cleaning personnel work efficiency, the utility model is suitable for a track.

Description

Track for extraction system
Technical Field
The utility model belongs to the technical field of the chemical industry equipment technique and specifically relates to a track that extraction system used is related to.
Background
With the rapid development of the mechanical industry, products such as various lubricating oils, compounds, daily cosmetics, soaps, detergents, paints, varnishes, coatings and the like are produced by mixing different ingredients so as to meet the requirements of the products on various functions.
In the production process of lubricating oil, finished products are formed through different procedures, and the finished products comprise an extraction system, wherein the extraction system comprises a track and an extractor, an oil drum filled with high-viscosity materials is generally transported to an extraction position through the track, and the materials are extracted and filled into a mixing container through the extractor by utilizing a pressure difference principle.
The above prior art solutions have the following drawbacks: in the in-service use process, the track passes through threaded connection on the mounting panel in the foundation ditch, and the track is in the transportation oil drum in-process, in debris and the oil on the oil drum outer wall drop the foundation ditch easily, need regularly clear up the foundation ditch. During staff's clearance process, unscrew fixed connection's screw through the instrument and take off to wholly take off the track and clear up the foundation ditch, it is more troublesome clean, cleanup crew's work efficiency is lower.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a track that extraction system used, installation axle and the direct joint of mounting panel dismantle the track when clean more convenient, play the effect that improves cleaning personnel work efficiency.
The above technical purpose of the present invention can be achieved by the following technical solutions:
the utility model provides a track that extraction system used, includes foundation ditch and track body, the track body is located in the foundation ditch, the track body includes that a plurality of installation axles and cover establish the epaxial running roller of installation, the track body still includes two mounting panels along running roller center pin mirror surface setting, two be equipped with a plurality of incision on the mounting panel, every install the axle both ends joint respectively two the mounting panel is adjacent two in the incision.
By adopting the technical scheme, the rail body is used for transporting the oil drum, a worker places the oil drum on the rail body and applies thrust to move the oil drum, and the roller is sleeved on the mounting shaft, so that the friction force between the oil drum and the rail body is reduced, and the worker can conveniently move the oil drum; when the installation axle adopted screw thread mode and foundation ditch fixed connection, need dismantle every running roller from the foundation ditch get off, work load is great, and work efficiency reduces, and long-term installation dismantles and causes track and the loose phenomenon of foundation ditch platform hookup location easily. The direct joint of installation axle is in the incision, when needing clean in the foundation ditch, and the direct installation axle that will overlap there is the running roller takes off from the incision position, and it is more convenient to operate, improves staff's work efficiency.
The utility model discloses further set up to, install the breach that the axle joint radially was provided with the symmetry along it at intraoral end in incision, the breach include with incision looks butt's vertical face and violently straight face, violently straight face with the mounting panel is close to the one side butt of running roller.
Through adopting above-mentioned technical scheme, for easy to assemble and dismantlement installation axle, directly set up the incision on the mounting panel and supply installation axle joint, need regularly clean in the foundation ditch, often dismantle the installation axle, cause easily that installation axle end is connected insecure with incision joint position, when the oil drum passes through the running roller, the installation axle rotates simultaneously, and running roller and installation axle are relatively motionless, cause the phenomenon that the track can't transport the oil drum.
The utility model discloses further set up to, the track body divide into weighing track and chin track, be equipped with the weigher in the foundation ditch, weighing track wholly is located the top of weigher, separate mutually between weighing track and the chin track.
Through adopting above-mentioned technical scheme, the weigher is used for measuring the weight of the interior material of oil drum on the track, when contacting each other between weighing track and the chin track, causes the unsafe condition of weigher reading easily, separates weighing track and chin track each other, improves the accuracy of weigher reading.
The utility model discloses further set up to, on the track body the mounting panel is whole to be "Z" type, the mounting panel is including the first grade board, the second grade board, the tertiary board that connect gradually, the incision is "L" type to be located first grade board and second grade board, every one side that the first grade board was kept away from to the third grade board is equipped with one-level strengthening rib, two be connected with the second grade strengthening rib between the one-level strengthening rib.
Through adopting above-mentioned technical scheme, material total weight is great in oil drum and the oil drum, and one-level strengthening rib and second grade strengthening rib play the intensity of reinforcing track body, have the material saving quantity simultaneously, weight reduction, reduce cost's effect.
The utility model discloses further set up to, tertiary board is connected with the supporting leg, supporting leg quantity is four, the supporting leg is located respectively pull-up orbital four corners position, the supporting leg is close to the one end and the ground fixed connection on ground.
Through adopting above-mentioned technical scheme, weighing track and pull up the effect that the track all has the conveying oil drum, and the supporting leg plays the effect of supporting pull up track and oil drum. The running roller is installed on independent mounting panel, it is fixed with other parts not, simultaneously, for making things convenient for the chin track can transmit the oil drum smoothly, the separation distance is less between weighing track and the chin track, weighing track and chin track are through long-term work back, weighing track and chin track are close to each other easily, cause the unsafe condition of weigher reading, fix the supporting leg subaerial, the realization is fixed the effect in the foundation ditch with the track body, reduce weighing track and chin track phenomenon of being close to each other.
The utility model discloses further set up to, the one-level strengthening rib with the third grade board passes through screw fixed connection, the one-level strengthening rib with the connection can be dismantled to the second grade strengthening rib, the one-level strengthening rib with the supporting leg is kept away from the one end on ground and can be dismantled the connection.
Through adopting above-mentioned technical scheme, connection can be dismantled to one-level strengthening rib and second grade strengthening rib, and the one end that ground was kept away from to one-level strengthening rib and supporting leg can be dismantled and be connected, and the staff of being convenient for overhauls the track body.
The utility model discloses further set up to, the supporting leg is close to the one end fixedly connected with backup pad on ground, the backup pad passes through screw fixed connection with ground.
Through adopting above-mentioned technical scheme, increase the area that track and ground are connected through the backup pad, play the effect that increases track body stability.
The utility model discloses further set up to, the running roller surface is equipped with the rubber sleeve, the thickness of rubber sleeve is 0.5 centimetre to 1 centimetre.
Through adopting above-mentioned technical scheme, the rubber sleeve reduces the injury of oil drum to orbital, increases orbital service life, simultaneously, plays the cushioning effect.
To sum up, the utility model discloses following beneficial effect has:
1. the installation shaft and the installation plate are directly clamped through the arrangement of the installation shaft and the installation plate, so that the effect of facilitating cleaning and maintenance of workers can be achieved;
2. through the arrangement of the metering scale, the weight of the raw materials in the oil drum before and after extraction is read through the metering scale, and the effect of accurately extracting the raw materials in the oil drum can be achieved;
3. through supporting leg and ground fixed connection's setting, with weighing track and chin track separation and fix on certain position, can play the condition that reduces weigher reading error.
Drawings
Fig. 1 is a schematic view of the overall structure of the track body of the present invention.
Fig. 2 is a schematic view of the rail body in the embodiment of the present invention.
Fig. 3 is a schematic view of the rail body in the embodiment of the present invention.
Fig. 4 is a schematic view of the roller sleeve of the present invention mounted on the shaft.
In the figure, 1, a foundation pit; 2. a track body; 21. weighing the rail; 22. a pull-up track; 23. a scale; 3. installing a shaft; 31. a roller; 32. a notch; 33. a vertical plane; 34. a transverse plane; 4. mounting a plate; 41. cutting; 42. a primary plate; 43. a secondary plate; 44. a tertiary plate; 45. a first-stage reinforcing rib; 46. a secondary reinforcing rib; 5. supporting legs; 51. and a support plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example (b): the utility model discloses a track that extraction system used, refer to fig. 2 or fig. 3, include foundation ditch 1 and be located foundation ditch 1 (see fig. 1) interior track body 2. The track body 2 comprises two parallel Z-shaped mounting plates 4, each mounting plate 4 comprises a primary plate 42, a secondary plate 43 and a tertiary plate 44 which are connected in sequence, a plurality of notches 41 which correspond to each other one by one are arranged on the two mounting plates 4, each notch 41 is of an inverted L shape, and each notch 41 comprises a transverse notch 41 positioned on the primary plate 42 and a vertical notch 41 positioned on the secondary plate 43. Track body 2 still includes that a plurality of installation axle 3 overlaps establishes the running roller 31 (see fig. 3) on installing axle 3, and the staff places the oil drum on track body 2 to when exerting thrust to the oil drum and removing the oil drum, running roller 31 reduces the output of staff's manpower. The both ends of installation axle 3 all are equipped with the breach 32 (see fig. 3) of mutual symmetry along its radial, and breach 32 includes horizontal plane 34 and vertical face 33 (see fig. 3), and the both ends of installation axle 3 are waist type along installation axle 3 circumference cross-section. Breach 32 is convenient for install axle 3 and 41 joints of incision, when reducing track body 2 transportation oil drum, running roller 31 and the condition of installing axle 3 relatively motionless. Installation axle 3 is in the mode of 4 joints of mounting panel, and the staff of being convenient for installs and dismantles running roller 31, reduces the clean foundation ditch 1's of cleanup crew time. The outer surface of the roller 31 is provided with a rubber sleeve (not marked in the figure), the rubber sleeve plays a role in protecting the roller 31, the service life of the roller 31 is prolonged, the wall thickness of the rubber sleeve is 0.5 cm to 1 cm, the wall thickness of the rubber sleeve is greater than 1 cm, and the speed of the oil drum moving on the rail is easily influenced.
Referring to fig. 2 or fig. 3, the one side that first grade board 42 was kept away from to two tertiary boards 44 is equipped with one-level strengthening rib 45, be connected with second grade strengthening rib 46 between two one-level strengthening ribs 45 simultaneously, material weight in the oil drum of track body 2 transportation and the oil drum is great, setting through one-level strengthening rib 45 and second grade strengthening rib 46 plays the intensity of reinforcing track body 2, and simultaneously, the strengthening rib is the hollow structure that the aluminum product preparation formed, play the effect that alleviates track body 2 weight and material, material cost saving's effect has. One-level strengthening rib 45 is the cuboid, the four sides of one-level strengthening rib 45 are equipped with scarce groove, lack the notch and be equipped with the "L" type limiting plate of symmetry of each other, the limiting plate includes the diaphragm with 45 side fixed connection of one-level strengthening rib and is located the riser of scarce inslot, tertiary board 44 and one-level strengthening rib 45 pass through screw (not mark in the picture) fixed connection, the fix with screw is close to the scarce inslot of tertiary board 44, two limiting plates press from both sides the screw tightly, play further set screw's effect, increase the steadiness that tertiary board 44 and one-level strengthening rib 45 are connected. The shape of second grade strengthening rib 46 is the same with the shape of one-level strengthening rib 45, and second grade strengthening rib 46 is close to the scarce inslot fixedly connected with connecting plate of one-level strengthening rib 45, and the connecting plate is pegged graft in the scarce inslot of one-level strengthening rib 45 near second grade strengthening rib 46. The one-level strengthening rib 45 and the second grade strengthening rib 46 can be dismantled and be connected, and the staff of being convenient for overhauls and clears up track body 2.
Referring to fig. 2 or 3, the track body 2 is divided into a weighing track 21 and a pull-up track 22, a weighing scale 23 is disposed under the weighing track 21, the weighing scale 23 is located in the foundation pit 1, a base of the weighing scale 23 is fixedly connected with the foundation pit 1, and the weighing track 21 is entirely located on the weighing scale 23 and fixedly connected with the weighing scale 23. For reducing the condition that error appears in weigher 23 reading, the mounting panel 4 of weighing track 21 and chin track 22 separates each other, chin track 22's four corners department all is equipped with supporting leg 5, supporting leg 5 is equipped with backup pad 51 near the one end on ground, backup pad 51 plays the effect that improves 2 stability of track body, because remove the oil drum and need exert partial external force, make weighing track 21 and chin track 22 be close to each other easily, thereby influence the accuracy of weigher 23 reading, backup pad 51 and foundation ditch 1 are through locking screw (not marked in the picture) fixed connection, fix chin track 22 in corresponding position, reduce the condition that chin track 22 influences the accuracy of weigher 23.
The specific implementation manner of the above embodiment is as follows: when the staff need remove the oil drum, place the oil drum on weighing track 21 to apply external force to the oil drum, when the oil drum removed weigher 23 position, the staff kept away from the oil drum, measured out the weight of material in the oil drum through weigher 23, removed the oil drum again and drawn body track 22, mixed container and other materials are mixed in drawing the material in with the oil drum through the extractor. After the track body 2 is used for a specified time, or when sundries fall in the foundation pit 1, the installation shaft 3 is directly detached from the notch 41, and the foundation pit 1 is cleaned in the region. When the track body 2 needs to be overhauled, the mounting shaft 3, the roller 31, the first-stage reinforcing ribs 45, the second-stage reinforcing ribs 46 and the supporting legs 5 are sequentially detached and repaired, and after finishing, all parts are sequentially installed into the track body 2.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. A track for an extraction system comprises a foundation pit (1) and a track body (2), and is characterized in that: track body (2) are located in foundation ditch (1), track body (2) include a plurality of installation axle (3) and overlap establish running roller (31) on installation axle (3), track body (2) still include along running roller (31) two mounting panel (4) that the center pin mirror surface set up, two be equipped with a plurality of incision (41) on mounting panel (4), every installation axle (3) both ends joint respectively two mounting panel (4) adjacent two in incision (41).
2. A track for an extraction system according to claim 1, wherein: the end of installation axle (3) joint in incision (41) is provided with symmetrical breach (32) along its radial, breach (32) include with incision (41) looks butt vertical face (33) and horizontal straight face (34), horizontal straight face (34) with mounting panel (4) are close to the one side butt of running roller (31).
3. A track for an extraction system according to claim 2, wherein: track body (2) divide into weighing track (21) and chin track (22), be equipped with weigher (23) in foundation ditch (1), weighing track (21) wholly is located the top of weigher (23), separate each other between weighing track (21) and the chin track (22).
4. A track for an extraction system according to claim 3, wherein: on track body (2) mounting panel (4) wholly are "Z" type, mounting panel (4) are including the first grade board (42), second grade board (43), tertiary board (44) that connect gradually, incision (41) are "L" type to be located first grade board (42) and second grade board (43), every one side that first grade board (42) were kept away from in third grade board (44) is equipped with one-level strengthening rib (45), two be connected with second grade strengthening rib (46) between one-level strengthening rib (45).
5. A track for an extraction system according to claim 4, wherein: the three-stage plate (44) is connected with supporting legs (5), the number of the supporting legs (5) is four, the supporting legs (5) are respectively located at the four corners of the pull-up track (22), and one ends, close to the ground, of the supporting legs (5) are fixedly connected with the ground.
6. A track for an extraction system according to claim 5, wherein: one-level strengthening rib (45) with three-level board (44) pass through screw fixed connection, one-level strengthening rib (45) with connection can be dismantled in second grade strengthening rib (46), one-level strengthening rib (45) with connection can be dismantled in supporting leg (5).
7. A track for an extraction system according to claim 6, wherein: one end of the supporting leg (5) close to the ground is fixedly connected with a supporting plate (51), and the supporting plate (51) is fixedly connected with the ground through a locking screw.
8. A track for an extraction system according to claim 7, wherein: the outer surface of the roller (31) is provided with a rubber sleeve, and the thickness of the rubber sleeve is 0.5 cm to 1 cm.
CN201921505422.9U 2019-09-10 2019-09-10 Track for extraction system Active CN210762570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921505422.9U CN210762570U (en) 2019-09-10 2019-09-10 Track for extraction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921505422.9U CN210762570U (en) 2019-09-10 2019-09-10 Track for extraction system

Publications (1)

Publication Number Publication Date
CN210762570U true CN210762570U (en) 2020-06-16

Family

ID=71052724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921505422.9U Active CN210762570U (en) 2019-09-10 2019-09-10 Track for extraction system

Country Status (1)

Country Link
CN (1) CN210762570U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114035530A (en) * 2022-01-12 2022-02-11 江苏中力自动化科技有限公司 Full-closed intelligent lubricating oil blending complete equipment
CN114537967A (en) * 2022-03-28 2022-05-27 江苏驭芯传感器科技有限公司 Roller assembly line with sensor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114035530A (en) * 2022-01-12 2022-02-11 江苏中力自动化科技有限公司 Full-closed intelligent lubricating oil blending complete equipment
CN114537967A (en) * 2022-03-28 2022-05-27 江苏驭芯传感器科技有限公司 Roller assembly line with sensor
CN114537967B (en) * 2022-03-28 2022-11-04 江苏驭芯传感器科技有限公司 Roller assembly line with sensor

Similar Documents

Publication Publication Date Title
CN210762570U (en) Track for extraction system
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN201348570Y (en) Self-balanced static-load testing device for building structure
CN103816983A (en) Installation construction method of large coal pulverizer
CN102114553A (en) Method for mounting steel plate crop shear
CN203818129U (en) Front axle maintenance tray for loader
CN108298477A (en) A kind of repair car of electric power
CN103410305A (en) Boiler maintenance gray supporting platform and building method thereof
CN204040438U (en) Wall-hanging adjustable inspection platform
CN103803422A (en) Hoisting device for nuclear power station, and installation method of hoisting device
CN208324760U (en) A kind of railway locomotive fluid pressure type is to wheel quick replacement device
CN204673801U (en) The box mixing plant of a kind of concrete
CN214117454U (en) Scaffold for building construction
CN203876050U (en) Foundation-free integrated concrete stirring station
CN208361840U (en) A kind of burner hearth inspection platform
CN206029301U (en) Numerical control longmen rail block's adjustment installation device
CN203559351U (en) Suspended bridge overhauling workbench
CN206001119U (en) Large Hydroelectric Set center blowdown pipe pipe collar type guiding trestle
CN207211679U (en) A kind of Shock-proof for building pin hand support frame
CN103111417B (en) Modularized drawer-type multilayer vibrating screen and manufacture method thereof
CN105735628B (en) Boiler maintenance ash mouth support platform and its building method
CN207525641U (en) A kind of movable type airport taxiway bridging toughening protective device
CN205777426U (en) One hangs overhanging scaffold
CN213597434U (en) Building scaffold convenient to installation
CN210965970U (en) Section bar sorting device is used in production of fire engine jar case

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant