CN210737423U - Entrance guard passing device and entrance guard board house convenient for integral hoisting - Google Patents

Entrance guard passing device and entrance guard board house convenient for integral hoisting Download PDF

Info

Publication number
CN210737423U
CN210737423U CN201920998735.6U CN201920998735U CN210737423U CN 210737423 U CN210737423 U CN 210737423U CN 201920998735 U CN201920998735 U CN 201920998735U CN 210737423 U CN210737423 U CN 210737423U
Authority
CN
China
Prior art keywords
entrance guard
floodgate machine
board house
house
square frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920998735.6U
Other languages
Chinese (zh)
Inventor
田庆喜
马三伟
张貌
田庆忠
祝晓红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Nuanshu Industrial Co ltd
Original Assignee
Zhengzhou Nuanshu Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Nuanshu Industrial Co ltd filed Critical Zhengzhou Nuanshu Industrial Co ltd
Priority to CN201920998735.6U priority Critical patent/CN210737423U/en
Application granted granted Critical
Publication of CN210737423U publication Critical patent/CN210737423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a current device of entrance guard and entrance guard board house of being convenient for integral hoisting. This current device of entrance guard is including being used for putting the support body in the entrance guard room, and the support body includes the floodgate machine installation frame that two at least intervals set up, and floodgate machine installation frame lower part is equipped with floodgate machine accommodation space, corresponds in the floodgate machine accommodation space and installs the floodgate machine. Because this current device of entrance guard installs the floodgate machine in floodgate machine installation frame lower part to need not fix the floodgate machine subaerial, make things convenient for laying of floodgate machine in entrance guard board house, prevent simultaneously to the destruction on entrance guard board house floor when fixing the floodgate machine subaerial. Additionally, the utility model provides a square frame of entrance guard board house is overall design, and the floodgate machine of the current device of entrance guard need not be fixed subaerial, when needs are changeed the board house, can carry away on this entrance guard board house lifts by crane the transport vechicle together with the current device of inside entrance guard wholly, need not dismantle, and also need not reassemble after reacing new place, reduction work load.

Description

Entrance guard passing device and entrance guard board house convenient for integral hoisting
Technical Field
The utility model relates to a building engineering equipment field, concretely relates to current device of entrance guard and entrance guard board house of being convenient for integral hoisting.
Background
The management of the personnel entering and exiting the construction site is mainly based on the following aspects: firstly, due to the danger of high-altitude personnel operation and high-altitude mechanical operation construction in a construction site, potential safety hazards are caused by the fact that irrelevant people and the like need to be prevented from randomly entering and exiting the construction site; recording the attendance of labor workers in and out of the construction site; and thirdly, the engineering building materials are prevented from being stolen.
The traditional personnel business turn over management mode is through the entrance guard personnel according to roster record or rely on memory discernment, and the data and the information of business turn over personnel can't accurate statistics, and need a plurality of entrance guard personnel to maintain the order on the spot simultaneously, extravagant human cost.
The gate machine can be a simple channel gate, and can also be an intelligent personnel management system passing in and out through card swiping, and the gate machine passing in and out through card swiping is equivalent to a gate guard, a safety supervisor and a statistics staff post standing on the gate of the building site, so that the management is efficient, and the personnel cost can be effectively reduced.
At present, be equipped with the passageway that supplies personnel to pass in and out in the guard's room of construction site, this passageway is as the gate on business turn over building site, and current guard's room has following not enough: on one hand, the prior concierge house can not be integrally transferred, and after the construction of the later construction site is finished, the concierge house needs to be disassembled, transferred and then assembled; on the other hand, the floodgate machine is inconvenient to be installed in the entrance guard room, and the floodgate machine installed in the existing entrance guard room is directly fixed on the ground where the channel is located, so that the floodgate machine needs to be detached and transferred together when the entrance guard room is transferred at the later stage. Therefore, the entrance guard room and the gate are inconvenient to transition in the later period.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a current device of entrance guard and be convenient for integral hoisting's entrance guard board house solves among the prior art inconvenient installation floodgate machine's in the entrance guard's room on the building site technical problem.
In order to solve the above technical problem, the first aspect of the present invention is:
the utility model provides a current device of entrance guard, is including being used for putting the support body in the entrance guard room, the support body includes the floodgate machine installation frame that two at least intervals set up, floodgate machine installation frame lower part is equipped with floodgate machine accommodation space, the floodgate machine is installed to the correspondence in the floodgate machine accommodation space, the top of floodgate machine installation frame is passed through first connecting rod and is connected.
Preferably, the gate installation frame includes four upright posts, the positional relationship of the four upright posts is arranged according to four vertical sides respectively adjacent to the gate, a plurality of second connecting rods are fixedly connected between the upright posts, and a gate accommodating space is formed between the lower parts of the upright posts.
Preferably, the gate is a triple-roller gate, and the railings of the gates face the same side.
The second aspect of the utility model is:
the design one kind is convenient for integral hoisting's entrance guard board house, including square frame, two relative sides of square frame are equipped with presss from both sides core wallboard the house roof is fixed to be laid at square frame's top, and the floor is fixed to be laid in the bottom, the floor with square frame is together fixed be equipped with in the entrance guard board house the utility model discloses the first aspect arbitrary entrance device of entrance guard.
Preferably, the square frame comprises upright frames on the left side and the right side, the upright frames comprise square steel columns on the front side and the rear side, a cross beam is connected between the upper end and the lower end of each square steel column, and a longitudinal beam is connected between the upright frames on the left side and the right side at four corners; the inner sides of the two cross beams and the two longitudinal beams at the top of the square frame are respectively provided with an L-shaped supporting plate for bearing a roof plate of the plate house; the inner sides of the two cross beams and the two longitudinal beams at the bottom of the square frame are respectively provided with a plurality of brackets for bearing the floor of the board room.
Preferably, the end parts of the longitudinal beam and the transverse beam are welded with the square steel upright columns, and waterproof glue is filled in gaps at the connecting parts of the square steel column, the transverse beam and the longitudinal beam.
Preferably, still be equipped with personnel identification statistical system in the entrance guard board house, personnel identification statistical system includes face identification device, host computer and display screen, face identification device installs on the current device of entrance guard, the display screen is installed on the wall in the entrance guard board house, face identification device discerns and records personnel information after transmit the host computer, the host computer statistics transmits and shows behind the whole personnel information on the display screen.
The utility model has the advantages of:
1. the utility model provides a current device of entrance guard sets up the support body that comprises the floodgate machine installation frame, can install the floodgate machine in floodgate machine installation frame lower part to need not fix the floodgate machine subaerial, make things convenient for laying of floodgate machine in entrance guard board house, prevent simultaneously to the destruction on entrance guard board house floor when fixing the floodgate machine subaerial.
2. The utility model provides a current device of entrance guard's support body and floodgate machine constitute the passageway of personnel business turn over jointly, and the upper portion space of this floodgate machine is sheltered from by the support body, prevents that personnel from crossing the floodgate machine, prevents simultaneously that the building materials of building site from being carried out by stealing in passageway department.
3. The gate machine and the frame body can be directly placed in the guard board room, the gate machine and the frame body can be directly moved out and transported away or the gate machine, the frame body and the guard board room can be transported away together during transition, the transition is convenient, and the installation is convenient after the transition.
4. The utility model provides a square frame of entrance guard board house is overall design, and the floor is the whole plate by each compoboard block group one-tenth, and the current device of entrance guard is directly placed on the floor, and the floodgate machine of the current device of entrance guard need not be fixed subaerial, when needs are changeed the board house, can carry away on this entrance guard board house lifts by crane the transport vechicle with the current device of entrance guard of inside wholly, need not dismantle, and also need not to assemble again after reacing new place, reduction work load.
Drawings
Fig. 1 is a perspective view of a entrance guard passage device according to embodiment 1 of the present invention;
fig. 2 is a perspective view of a gate installation frame in the entrance guard passage device according to embodiment 1 of the present invention;
fig. 3 is a perspective view of a gate in the entrance guard passage device according to embodiment 1 of the present invention;
fig. 4 is a perspective view of a square frame of a board house for entrance guards convenient for integral hoisting in embodiment 2 of the present invention;
fig. 5 is an installation schematic view of a floor in a board house of a guard convenient for integral hoisting in embodiment 2 of the present invention;
fig. 6 is the utility model discloses embodiment 2 guard board house's convenient to integral hoisting's inner structure schematic diagram.
In the drawings, each reference numeral means: the gate comprises a gate mounting frame 11, a first connecting rod 111, a vertical column 112, a gate accommodating space 113, a long rod 114, a short rod 115, a gate 12, a railing 121, vertical side edges 122, longitudinal beams 13, an L-shaped supporting plate 14, a bracket 15, square steel columns 16, a cross beam 17, a combined plate 18, a polyurethane layer 181, a cellular aluminum layer 182, a rabbet 183, a sandwich wall plate 21, a floor 22, a entrance guard passing device 23, a rolling gate 24, a face recognition device 31 and a display screen 32.
Detailed Description
The following embodiments are only intended to illustrate the present invention in detail, and do not limit the scope of the present invention in any way.
Example 1:
a gate guard passage device, please refer to fig. 1 to 3.
As shown in fig. 1, the embodiment of the utility model provides a current device of entrance guard includes the support body, and the support body includes the floodgate machine installation frame 11 that three interval set up, and the top of floodgate machine installation frame 11 is passed through first connecting rod 111 and is connected, and the support body that each floodgate machine installation frame 11 is constituteed can be whole firm place in the entrance guard room.
A gate accommodating space is formed at the lower part of each gate mounting frame 11, gates 12 are correspondingly mounted in the gate accommodating space, the gates 12 are triple-roller gates as shown in fig. 3, the railings 121 of the gates 12 face the same side so as to form separate pedestrian passageways, and each gate 12 corresponds to one pedestrian passageway so as to facilitate traffic management. In fig. 1, a pedestrian passageway is formed between adjacent gate installation frames 11, and a pedestrian passageway is formed between the outermost gate 12 and the wall surface of the entrance guard room.
Further, as shown in fig. 2, the gate mounting frame 11 includes four vertical columns 112, and the four vertical columns 112 are disposed adjacent to the four vertical sides 122 of the gate 12 in fig. 3, so that the gate accommodating space 113 formed between the lower portions of the vertical columns 112 can be just placed into the gate 12, and the gate 12 can be stably placed in the gate accommodating space 113. A plurality of second connecting rods are fixedly connected between the upright posts 112, and the second connecting rods comprise a transverse long rod 114 and a longitudinal short rod 115, wherein the short rod 115 is arranged to the lower part of the upright posts 112, and the upright posts 112 form a stable integral framework through the connection of the long rod 114 and the short rod 115.
Example 2:
a guard board house convenient for integral hoisting, please refer to fig. 4 to 6.
As shown in fig. 4, the embodiment of the utility model provides a be convenient for support structure of guard board room of integral hoisting is a square frame structure, this frame structure includes the grudging post of the left and right sides, the grudging post includes the square steel post 16 of both sides around, respectively be connected with a crossbeam 17 between the square steel post 16 upper and lower ends, respectively be connected with a longeron 13 in four corners whereabouts between the grudging post of the left and right sides, crossbeam 17 and longeron 13 in this embodiment also are the square steel, square steel post 16, crossbeam 17, longeron 13 junction welding each other, it has the waterproof glue to fill in the gap of the department that is connected at square steel post 16, crossbeam 17 and longeron 13.
Furthermore, the inner sides of the two cross beams 17 and the two longitudinal beams 13 at the top of the frame structure are respectively provided with an L-shaped supporting plate 14 for bearing a roof plate of a house, the back surface of the vertical plate part of the L-shaped supporting plate 14 is correspondingly welded on the inner side surface of the cross beam 17 or the longitudinal beam 13, and waterproof glue is filled between the back surface of the vertical plate part of the L-shaped supporting plate 14 and the inner side surface of the corresponding cross beam 17 or the longitudinal beam 13, so that the service life of the frame is shortened due to rusting caused by water leakage or gap water inflow.
When the board roof is installed, the board roof is laid on the L-shaped supporting board 14, and then waterproof glue is filled between the edge of the board roof and the inner side surface of the vertical board portion of the L-shaped supporting board 12.
Furthermore, a plurality of brackets 15 used for bearing the floor of the board room are respectively arranged on the inner sides of two cross beams 17 and two longitudinal beams 13 at the bottom of the frame structure, the brackets 15 are L-shaped short plate pieces welded on the inner side surfaces of the cross beams 17 or the longitudinal beams 13, and the floor of the board room is borne on the brackets 15, so that the installation is more convenient.
As shown in fig. 6, two opposite sides of the square frame are provided with sandwich wall panels 21, the other two opposite sides are reserved as personnel passages, the bottom of the square frame is fixedly paved with a floor 22, the top of the square frame is also fixedly paved with a house roof, and the house roof and the floor 22 are both fixed with the square frame. A shutter door 24 is provided on the front side of the square frame on the entrance guard passage device 23, and the shutter door 24 can be closed at night or during a work-site shutdown.
The two sides of the sandwich wallboard 21 of the board house are aluminum plates, the interior of the sandwich wallboard is provided with the modified polyurethane heat-insulation board, the surface of the aluminum plate is convenient for processing textures, and the modified polyurethane heat-insulation board has fireproof performance while preserving heat. The teflon coating is coated on the outside of the core wallboard 21, so that the surface of the core wallboard 21 has self-cleaning property. The house top plate fixedly laid on the top of the square frame is the same as the sandwich wall plate 21 in material. As shown in fig. 5, the floor 22 is assembled by a plurality of combined plates 18, each combined plate 18 comprises a polyurethane layer 181 at the lower part and a honeycomb aluminum layer 182 at the upper part, and has good bearing capacity and comfort, grooves and tongues 183 are correspondingly arranged between adjacent combined plates 18, so that the adjacent combined plates 18 are in tight lap joint, after the floor 22 is laid, waterproof glue is filled in gaps where the grooves and tongues 183 are located, and the top of the gaps are subjected to seam beautifying treatment.
Further, the entrance guard passing device 23 in embodiment 1 is provided in the entrance guard board house, and the entrance guard passing device 23 can be directly placed on the floor 22 without punching a hole in the floor 22 for installing the entrance guard passing device 23 or welding the entrance guard passing device 23 on the floor 22, thereby preventing damage to the floor 22.
Further, as shown in fig. 6, still be equipped with personnel identification statistical system in the entrance guard board house, personnel identification statistical system includes face identification device 31, host computer and display screen 32, and in this embodiment, face identification device 31 adopts the face identification ware that the model is YS-M5201, and the host computer is the computer, and display screen 32 is the LCD screen, and the host computer is placed in the entrance guard house, between face identification device 31 and the host computer to and all through communication line connection between host computer and the display screen 32. Face identification device 31 installs on current device 23 of entrance guard, display screen 32 installs on the wall in the entrance guard board house, face identification device 31 discerns business turn over personnel's information, and play the effect of checking the card, face identification device 31 transmits the personnel information of record to the host computer, the host computer statistics transmits and shows on display screen 32 behind the whole personnel information, the information that display screen 32 shows includes the quantity of each worker, for example, show how many carpenters have come in on the workplace, the clay worker, the water electrician, the welder, the management etc..
The utility model provides a square frame of entrance guard board house is overall design, and the floor is the whole that polylith compoboard block group becomes, and the current device of entrance guard is directly placed on the floor, and the floodgate machine of the current device of entrance guard need not be fixed subaerial, when needs are changeed the board house, can carry away on this entrance guard board house lifts by crane the transport vechicle with the current device of inside entrance guard wholly, need not dismantle, and also need not reassemble after reacing the new place, reduction work load.
The present invention has been described in detail with reference to the accompanying drawings and embodiments, but those skilled in the art will understand that various specific parameters in the above embodiments can be changed without departing from the spirit of the present invention to form a plurality of specific embodiments, which are the common variation ranges of the present invention and will not be described in detail herein.

Claims (7)

1. The utility model provides a current device of entrance guard, is including being used for putting the support body in the entrance guard room, a serial communication port, the support body includes the floodgate machine installation frame that two at least intervals set up, floodgate machine installation frame lower part is equipped with floodgate machine accommodation space, the floodgate machine is installed to the correspondence in the floodgate machine accommodation space, the top of floodgate machine installation frame is passed through first connecting rod and is connected.
2. The entrance guard passing device according to claim 1, wherein the gate installation frame comprises four columns, the four columns are arranged in a position relationship adjacent to four vertical sides of the gate respectively, a plurality of second connecting rods are fixedly connected between the columns, and a gate accommodating space is formed between the lower parts of the columns.
3. The concierge access device according to claim 1, wherein said gates are three-roller gates, the balustrade of each of said gates facing the same side.
4. A entrance guard board house convenient for integral hoisting, comprising a square frame, characterized in that two opposite sides of the square frame are provided with sandwich wall boards, a house top board is fixedly paved on the top of the square frame, a floor board is fixedly paved on the bottom of the square frame, the floor board is fixed with the square frame, and the entrance guard passing device of any one of claims 1-3 is arranged in the entrance guard board house.
5. The doorkeeper house convenient for integral hoisting according to claim 4, wherein the square frame comprises upright frames at left and right sides, the upright frames comprise square steel columns at front and rear sides, a cross beam is respectively connected between the upper and lower ends of the square steel columns, and a longitudinal beam is respectively connected between the upright frames at left and right sides at four corners; the inner sides of the two cross beams and the two longitudinal beams at the top of the square frame are respectively provided with an L-shaped supporting plate for bearing a roof plate of the plate house; the inner sides of the two cross beams and the two longitudinal beams at the bottom of the square frame are respectively provided with a plurality of brackets for bearing the floor of the board room.
6. The easy-to-integrally-hoist concierge board house according to claim 5, wherein the ends of the longitudinal beams and the transverse beams are welded to the square steel columns, and waterproof glue is filled in the gaps at the joints of the square steel columns, the transverse beams and the longitudinal beams.
7. The entrance guard board house convenient for integral hoisting according to claim 5, wherein a personnel identification statistical system is further arranged in the entrance guard board house, the personnel identification statistical system comprises a face identification device, an upper computer and a display screen, the face identification device is mounted on the entrance guard passage device, the display screen is mounted on a wall surface in the entrance guard board house, the face identification device identifies and records personnel information and then transmits the personnel information to the upper computer, and the upper computer counts the whole personnel information and then transmits and displays the personnel information on the display screen.
CN201920998735.6U 2019-06-29 2019-06-29 Entrance guard passing device and entrance guard board house convenient for integral hoisting Active CN210737423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920998735.6U CN210737423U (en) 2019-06-29 2019-06-29 Entrance guard passing device and entrance guard board house convenient for integral hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920998735.6U CN210737423U (en) 2019-06-29 2019-06-29 Entrance guard passing device and entrance guard board house convenient for integral hoisting

Publications (1)

Publication Number Publication Date
CN210737423U true CN210737423U (en) 2020-06-12

Family

ID=70984820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920998735.6U Active CN210737423U (en) 2019-06-29 2019-06-29 Entrance guard passing device and entrance guard board house convenient for integral hoisting

Country Status (1)

Country Link
CN (1) CN210737423U (en)

Similar Documents

Publication Publication Date Title
CN112329105B (en) Optimized construction method of aluminum mold and modular attached scaffold based on BIM technology
US11001187B1 (en) Mobile detention and detainment center
CN210737423U (en) Entrance guard passing device and entrance guard board house convenient for integral hoisting
CN209958508U (en) Fabricated concrete structure and subway ground access structure thereof
CN203531421U (en) Movable tower type ladder stand
CN115802670A (en) Multilayer expandable micromodule data center
CN105257034A (en) Method of building garage
CN215253788U (en) Novel window type curtain wall beam column position closing-in system
CN208235884U (en) A kind of elevator shaft frame structure
CN212957877U (en) Parking module and parking lot formed by combining same
CN210369035U (en) Subway station structure
CN210930485U (en) Assembled steel bed structure
JPH09302957A (en) Space-use structure
CN203440913U (en) Supporting structure for reinforced concrete corridor construction
CN206337867U (en) A kind of self-propelled stereoscopic garage
CN216038056U (en) Prefabricated formula elevator well convenient to transportation
CN105544730A (en) Prefabricated house easy to assemble
CN218970760U (en) Management cabin and toll station
JP2014094818A (en) Mezzanine-type rack and portal frame for assembling mezzanine-type rack
US20040128928A1 (en) Combination structure providing multiple covered parking and storage spaces
CN217172856U (en) Construction elevator stops layer platform
CN216007300U (en) Stadium with spliced box bodies
KR100447620B1 (en) Communication equipment shelter
CN217537329U (en) Stair splicing module of box structure building
CN117947937A (en) Tower crane passage and construction method