CN210719135U - Settlement observation device for constructional engineering - Google Patents

Settlement observation device for constructional engineering Download PDF

Info

Publication number
CN210719135U
CN210719135U CN201922184109.6U CN201922184109U CN210719135U CN 210719135 U CN210719135 U CN 210719135U CN 201922184109 U CN201922184109 U CN 201922184109U CN 210719135 U CN210719135 U CN 210719135U
Authority
CN
China
Prior art keywords
sleeve
limiting plate
housing
observation device
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922184109.6U
Other languages
Chinese (zh)
Inventor
陶媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922184109.6U priority Critical patent/CN210719135U/en
Application granted granted Critical
Publication of CN210719135U publication Critical patent/CN210719135U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a settlement observation device used in constructional engineering, which comprises a cross beam and an inserted link, wherein the two ends of the cross beam are both fixedly connected with the inserted link, and the inserted link is inserted at the top of a detection mechanism; the detection mechanism comprises a sleeve, a housing, a first door body, a base, a limiting plate, a spring and an infrared distance meter, wherein the inserted bar is inserted into the inner cavity of the sleeve and connected with the limiting plate, the housing is sleeved on the outer wall of the sleeve, the side wall of the housing is hinged to the first door body, the base is fixedly connected to the bottom of the housing, the infrared distance meter is connected to the bottom of the limiting plate, and the spring is sleeved on the outer wall of the inserted bar. The utility model discloses an infrared distance meter measures the distance, then contrasts the distance numerical value around subsiding, then obtains the data that subside to can effectual assurance measuring precision.

Description

Settlement observation device for constructional engineering
Technical Field
The utility model relates to a building engineering technical field specifically is a subside observation device for among the building engineering.
Background
At present, settlement observation usually plays a role of identifying an observation point by inserting a metal rod at the observation point, however, due to the limitation of the structure of the metal rod, besides the identification function of the metal rod is not obvious, in the construction process, the metal rod often falls off or is damaged due to various external factors, if workers do not find and repair the metal rod in time, the continuity and the correctness of observation data of settlement observation in the future are greatly affected, and the safety of the structure in the construction process cannot be guaranteed.
According to patent CN201820146244.4, a subside observation device for among building engineering, including subsiding the board, it all is connected with the connecting block to subside the board both ends, the connecting block lower extreme is connected with the box body, be equipped with first cavity and second cavity in the box body, the connecting block runs through the box body and is connected with the movable block, be equipped with the spring between the lower extreme of movable block and the first cavity bottom, box body bottom is equipped with first pulley and second pulley outward, the upper end of box body is equipped with third pulley and support frame, be equipped with the motor on the support frame, the output of motor is equipped with the output pole, the cover is equipped with the reel on the output pole, the movable block bottom is equipped with the steel rope, first pulley, second cavity and third pulley are walked around in proper order to the steel rope and are connected with the reel, fixedly connected with. The settlement observation device is not easy to damage, has accurate observation data, and can effectively monitor the structural change in the building engineering.
Currently, the existing settlement observation devices used in construction engineering have some disadvantages, for example; the device is at the in-process that uses, and the motor is when tightening up the steel cable, and the rate of tension can't accurate control to easy tensioning is excessive or the rate of tension is not enough, thereby can influence the measuring precision. For this reason, new technical solutions need to be designed to solve the problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a subside observation device for among the building engineering, solved the problem that proposes among the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a settlement observation device for building engineering comprises a cross beam and insertion rods, wherein the insertion rods are fixedly connected to two ends of the cross beam and inserted into the top of a detection mechanism;
the detection mechanism comprises a sleeve, a housing, a first door body, a base, a limiting plate, a spring and an infrared distance measuring instrument, wherein the inserted bar is inserted into the inner cavity of the sleeve and connected with the limiting plate, the housing is sleeved on the outer wall of the sleeve, the side wall of the housing is hinged to the first door body, the base is fixedly connected to the bottom of the housing, the infrared distance measuring instrument is connected to the bottom of the limiting plate, the spring is sleeved on the outer wall of the inserted bar, and the two ends of the spring are respectively fixedly connected with the top of the inner cavity of the sleeve and the top of the.
As an optimal implementation mode of the utility model, spacing spout has all been seted up to telescopic inner chamber both sides wall, the inner chamber of spacing spout is pegged graft and is had spacing slider, and is two sets of spacing slider respectively with the both ends fixed connection of limiting plate.
As an optimal implementation mode of the utility model, the slot has been seted up to the bottom of limiting plate, the inner chamber of slot is pegged graft and is had the inserted block, the bottom and the infrared distance meter top fixed connection of inserted block.
As a preferred embodiment of the present invention, the outer wall of the sleeve is hinged to a second door body.
As a preferred embodiment of the utility model, the bolt has all been pegged graft to the top both sides of base, the bolt runs through the base and is connected with the stabilizer blade, the spirit level is installed to the preceding lateral wall of base.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses an infrared distance meter measures the distance, then contrasts the distance numerical value around subsiding, then obtains the data that subside to can effectual assurance measuring precision.
2. The utility model discloses utilize the bolt to adjust, contrast according to the spirit level, the adjustment levelness to further assurance measuring precision.
3. The utility model discloses a housing can be opened, and the sleeve lateral wall is opened simultaneously, and infrared distance meter and limiting plate utilize inserted block and slot to connect moreover to make convenient the dismantlement, and then make conveniently get to take infrared distance meter to observe data.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic view of the overall structure of a settlement observation device used in construction engineering of the present invention;
fig. 2 is a schematic structural view of an inner cavity of a sleeve of a settlement observation device used in constructional engineering of the utility model;
fig. 3 is the utility model relates to a sleeve structure sketch map for settlement observation device among the building engineering.
In the figure: the device comprises a beam 1, an inserted bar 2, a sleeve 3, a housing 4, a first door body 5, a base 6, a level gauge 7, a bolt 8, a support leg 9, a limiting plate 10, a spring 11, an infrared distance measuring instrument 12, a limiting sliding groove 13, a limiting sliding block 14, a slot 15, an inserted block 16 and a second door body 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may for example be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. To the ordinary technical personnel in this field, can understand the specific meaning in the utility model of above-mentioned term with the concrete condition, the utility model provides an electrical apparatus's model is the reference only, can be through changing different models electrical apparatus that the function is the same according to the actual use condition.
Referring to fig. 1-3, the present invention provides a technical solution: a settlement observation device for building engineering comprises a cross beam 1 and insertion rods 2, wherein the insertion rods 2 are fixedly connected to two ends of the cross beam 1, and the insertion rods 2 are inserted into the top of a detection mechanism;
detection mechanism includes sleeve 3, housing 4, the first door body 5, base 6, limiting plate 10, spring 11 and infrared distance meter 12, inserted bar 2 is pegged graft in sleeve 3's inner chamber and is connected with limiting plate 10, sleeve 3's outer wall cover is equipped with housing 4, housing 4's lateral wall articulates there is the first door body 5, housing 4's bottom fixedly connected with base 6, limiting plate 10's bottom is connected with infrared distance meter 12, inserted bar 2's outer wall cover is equipped with spring 11, spring 11's both ends respectively with sleeve 3's inner chamber top and limiting plate 10's top fixed connection, as shown in fig. 1, fig. 2 in this embodiment, utilize infrared distance meter 12 (the model is H92) to measure a distance and make the data precision higher, more accurate.
Referring to fig. 2 in this embodiment, two side walls of an inner cavity of the sleeve 3 are both provided with a limiting sliding groove 13, a limiting sliding block 14 is inserted into the inner cavity of the limiting sliding groove 13, and two sets of limiting sliding blocks 14 are respectively fixedly connected to two ends of the limiting plate 10, so that the limiting plate 10 slides stably in the sleeve 3.
In this embodiment, referring to fig. 2, a slot 15 is formed at the bottom of the limiting plate 10, an insertion block 16 is inserted into an inner cavity of the slot 15, and the bottom of the insertion block 16 is fixedly connected with the top of the infrared distance meter 12, so that the infrared distance meter 12 is convenient to disassemble.
In this embodiment, referring to fig. 3, the outer wall of the sleeve 3 is hinged to a second door 17, and the second door 17 is opened to facilitate taking the infrared distance measuring instrument 12.
In the embodiment, referring to fig. 1, bolts 8 are inserted into both sides of the top of the base 6, the bolts 8 penetrate through the base 6 and are connected with support legs 9, a level 7 is installed on the front side wall of the base 6, the bolts 8 are connected with the base 6 through nuts, and the bolts 8 can drive the base 6 to be adjusted.
It should be noted that, the settlement observation device used in the construction engineering of the present invention includes all the components known by the general standard components or the technicians in the field, the structure and principle of the settlement observation device are all known by the technical manual or the conventional experimental method, at the idle position of the device, all the electric devices, which refer to the power components, the electric devices and the adaptive monitoring computer, are connected with the power supply through the wires, the specific connection means should refer to the following working principle, the electric connection between the electric devices is completed in sequence, the detailed connection means is the known technology in the field, the following main introduces the working principle and process, without describing the electric control, when the settlement observation device used in the construction engineering is used, firstly the beam 1 is buried in the pre-supporting wall body, and then the base 6 is supported on the ground, adjust the stabilizer blade 9 through the bolt 8, observe the levelness according to the spirit level 7, make the device adjust the horizontal position, then record the distance numerical value that infrared distance measuring instrument 12 detected, then when the wall body takes place to subside, drive the inserted bar 2 and descend, from promoting limiting plate 10 extension spring 11, thereby drive infrared distance measuring instrument 12 and descend, again according to infrared distance measuring instrument 12 show numerical value and the initial numerical value of showing contrast can obtain the distance of subsiding, when reading numerical value, through opening the first door body 5 of housing 4 outer wall, then reopen sleeve 3 outer wall second door body 17, infrared distance measuring instrument 12 utilizes inserted block 16 and slot 15 to connect simultaneously, make can directly take out infrared distance measuring instrument 12, conveniently read data, when limiting plate 10 slides in sleeve 3, slide in spacing spout 13 through limiting slide block 14, make the slip stable, the device simple structure, the operation of being convenient for, the practicality is strong.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a settlement observation device for among building engineering, includes crossbeam (1) and inserted bar (2), its characterized in that: the two ends of the cross beam (1) are fixedly connected with inserting rods (2), and the inserting rods (2) are inserted into the top of the detection mechanism;
detection mechanism includes sleeve (3), housing (4), the first door body (5), base (6), limiting plate (10), spring (11) and infrared distance meter (12), inserted bar (2) are pegged graft in the inner chamber of sleeve (3) and are connected with limiting plate (10), the outer wall cover of sleeve (3) is equipped with housing (4), the lateral wall of housing (4) articulates there is the first door body (5), the bottom fixedly connected with base (6) of housing (4), the bottom of limiting plate (10) is connected with infrared distance meter (12), the outer wall cover of inserted bar (2) is equipped with spring (11), the both ends of spring (11) respectively with the inner chamber top of sleeve (3) and the top fixed connection of limiting plate (10).
2. A settlement observation device used in construction works according to claim 1, wherein: limiting sliding grooves (13) are formed in two side walls of an inner cavity of the sleeve (3), limiting sliding blocks (14) are inserted into the inner cavity of the limiting sliding grooves (13), and the two groups of limiting sliding blocks (14) are fixedly connected with two ends of the limiting plate (10) respectively.
3. A settlement observation device used in construction works according to claim 1, wherein: the bottom of the limiting plate (10) is provided with a slot (15), an insertion block (16) is inserted into an inner cavity of the slot (15), and the bottom of the insertion block (16) is fixedly connected with the top of the infrared distance meter (12).
4. A settlement observation device used in construction works according to claim 1, wherein: the outer wall of the sleeve (3) is hinged with a second door body (17).
5. A settlement observation device used in construction works according to claim 1, wherein: bolts (8) are inserted into two sides of the top of the base (6), the bolts (8) penetrate through the base (6) and are connected with support legs (9), and a level gauge (7) is installed on the front side wall of the base (6).
CN201922184109.6U 2019-12-09 2019-12-09 Settlement observation device for constructional engineering Expired - Fee Related CN210719135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922184109.6U CN210719135U (en) 2019-12-09 2019-12-09 Settlement observation device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922184109.6U CN210719135U (en) 2019-12-09 2019-12-09 Settlement observation device for constructional engineering

Publications (1)

Publication Number Publication Date
CN210719135U true CN210719135U (en) 2020-06-09

Family

ID=70967783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922184109.6U Expired - Fee Related CN210719135U (en) 2019-12-09 2019-12-09 Settlement observation device for constructional engineering

Country Status (1)

Country Link
CN (1) CN210719135U (en)

Similar Documents

Publication Publication Date Title
CN204988276U (en) Laser is perpendicular / horizontal measuring device
CN216645248U (en) Reinforcing bar interval detection device
CN210719135U (en) Settlement observation device for constructional engineering
CN202938729U (en) Ranging rod for length and distance measurement by using angle
CN211601790U (en) Measuring tool for building engineering management
CN105862940B (en) Immersed tube tunnel basis fills sandpipe bottom pressure and monitors system and method
CN208721070U (en) A kind of horizontal vertical measuring device of high level armored concrete wall
CN2888410Y (en) Simple height measurer
CN214225140U (en) Soil moisture content automatic monitoring device
CN210243519U (en) Multi-angle crack detection device for water conservancy detection
CN212134553U (en) Acidimeter with be equipped with regulation arm lock for chemometry detects
CN208902053U (en) A kind of coal mine roadway deformation monitoring device
CN209783537U (en) Bridge deflection distribution test system based on laser ranging
CN207231546U (en) A kind of construction engineering quality in-situs tester
CN209432062U (en) A kind of quick mapping system of house type
CN203241096U (en) Full-automatic triangular weir current measurement board
CN214842990U (en) Steel construction auxiliary monitoring device
CN217032469U (en) Measuring device for quality supervision of building engineering
CN210719190U (en) Wall perpendicularity detection device for real estate assessment
CN210664498U (en) Building slope warning equipment for building monitoring
CN215810811U (en) Building settlement and deviation analysis and detection device
CN220438545U (en) Transponder measuring tool based on laser technology
CN219391037U (en) Water level monitor with early warning function
CN214223896U (en) Measuring tool for building engineering management
CN2442228Y (en) Balance hammer type slope measurer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609

Termination date: 20201209