CN210713747U - Adjustable combined construction hanging basket frame body - Google Patents

Adjustable combined construction hanging basket frame body Download PDF

Info

Publication number
CN210713747U
CN210713747U CN201921188979.4U CN201921188979U CN210713747U CN 210713747 U CN210713747 U CN 210713747U CN 201921188979 U CN201921188979 U CN 201921188979U CN 210713747 U CN210713747 U CN 210713747U
Authority
CN
China
Prior art keywords
piece
horizontal rod
rod piece
height adjusting
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921188979.4U
Other languages
Chinese (zh)
Inventor
蒋海东
周洪涛
李海臣
冯小明
陈仁君
潘航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201921188979.4U priority Critical patent/CN210713747U/en
Application granted granted Critical
Publication of CN210713747U publication Critical patent/CN210713747U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses an adjustable combined construction hanging basket support body, which comprises a single vertical rod support body (1), a double vertical rod support body (2), a first horizontal rod piece (3), a second horizontal rod piece (4) and a third horizontal rod piece (5); the single vertical rod supporting frame body comprises a first single vertical rod (11), a single vertical rod base (12) and a first height adjusting piece (13), the double vertical rod supporting frame body comprises two second single vertical rods (21), a double vertical rod base (22), a second height adjusting piece (23) and a fixing assembly (24), one end of a first horizontal rod piece is connected with the first single vertical rod through the first height adjusting piece, and the other end of the first horizontal rod piece is connected with one end of a second horizontal rod piece; the other end of the second horizontal rod piece is connected with a third horizontal rod piece, and the third horizontal rod piece is connected with a second height adjusting piece through a fixing assembly. The utility model discloses can height-adjusting and horizontal length to can effectively avoid structural component's hindrance in the certain limit, make things convenient for artifical transport and dismouting simultaneously.

Description

Adjustable combined construction hanging basket frame body
Technical Field
The utility model relates to a construction equipment especially relates to an adjustable combination formula construction hanging flower basket support body.
Background
The hanging basket is one of important construction machines for high-altitude operation in construction engineering, can replace traditional scaffold to assist operations such as curtain installation, outer wall cleaning, and is a novel high-altitude operation device capable of being repeatedly used. At present, promote through the hanging flower basket support body when the hanging flower basket uses, because the position of building operation face is different, the kind of required operation is also different, and the hanging flower basket need frequently move in horizontal, vertical equidirectional orientation, but along with building structure's complexity is higher and higher, and the hanging flower basket often collides with building structure component at the removal in-process, leads to the construction accident, influences the construction progress. The hanging basket support in the prior art has certain limitations in convenience of adjustment, disassembly and assembly, carrying and the like, and cannot meet the operation requirements of a construction site.
Disclosure of Invention
An object of the utility model is to provide an adjustable combination formula construction hanging flower basket support body can height-adjusting and horizontal length to can effectively avoid building structure component's hindrance in the certain limit, make things convenient for artifical transport and dismouting simultaneously.
The utility model discloses a realize like this:
an adjustable combined construction hanging basket frame body comprises a single vertical rod support frame body, a double vertical rod support frame body, a first horizontal rod piece, a second horizontal rod piece and a third horizontal rod piece; the single upright rod supporting frame body comprises a first single upright rod, a single upright rod base and a first height adjusting piece, the lower end of the first single upright rod is fixedly connected with the single upright rod base to form an inverted T-shaped structure, and the first height adjusting piece is sleeved on the first single upright rod and can move up and down along the axial direction of the first single upright rod; the double-upright-rod support frame body comprises two second single upright rods, a double upright rod base, a second height adjusting piece and a fixing assembly, the lower ends of the second single upright rods are fixedly connected with the double upright rod base to form an inverted T-shaped structure, and the two second single upright rods are arranged in parallel at intervals; the second height adjusting piece is of an H-shaped structure, and two ends of the second height adjusting piece are sleeved on the two second single vertical rods, so that the second height adjusting piece can move up and down along the axial direction of the second single vertical rods; one end of the first horizontal rod piece is vertically and fixedly connected with the first single vertical rod through the first height adjusting piece and moves synchronously with the first height adjusting piece, the other end of the first horizontal rod piece is provided with a perforated connecting plate, the two ends of the second horizontal rod piece are provided with perforated connecting plates, and the other end of the first horizontal rod piece is fixedly connected with one end of the second horizontal rod piece through the perforated connecting plate; one end of the third horizontal rod piece is provided with a connecting plate with a hole, the other end of the second horizontal rod piece is connected with one end of the third horizontal rod piece through the connecting plate with the hole, and the other end of the third horizontal rod piece is provided with a hanging ring; and the third horizontal rod piece is vertically and fixedly connected to the middle part of the second height adjusting piece through the fixing assembly and moves synchronously with the second height adjusting piece.
A first reinforcing rib is arranged at the joint of the lower end of the first single vertical rod and the single vertical rod base, and a second reinforcing rib is arranged between the first reinforcing rib and the first single vertical rod; the lower extreme of the single pole setting of second and the junction of two pole setting bases are equipped with first strengthening rib, are equipped with the second strengthening rib between first strengthening rib and the single pole setting of second.
The single upright rod base is provided with a pair of weight parts, and the pair of weight parts are positioned on two sides of the bottom of the first single upright rod.
A plurality of adjusting screw holes are formed in the first single vertical rod at intervals, and the first height adjusting piece is fixed on the first single vertical rod through the adjusting screw holes through bolts; a plurality of adjusting screw holes are formed in the two second single vertical rods at intervals, and the second height adjusting piece is fixed to the two second single vertical rods through the adjusting screw holes through bolts.
The second horizontal rod piece comprises one or more unit rod pieces, two ends of each unit rod piece are respectively provided with a perforated connecting plate, and the plurality of unit rod pieces are sequentially connected through the perforated connecting plates through bolts.
And third reinforcing ribs are arranged at the joints of the connecting plate with the holes and the first horizontal rod piece, the second horizontal rod piece and the third horizontal rod piece.
The first horizontal rod piece and the second horizontal rod piece are I-shaped steel.
The third horizontal rod piece is I-shaped steel, the lower edge of the end part of the other end of the third horizontal rod piece is cut off to form a T-shaped structure, and the hanging ring is arranged at the T-shaped structure at the other end of the third horizontal rod piece.
Ribbed plates are arranged in the first horizontal rod piece, the second horizontal rod piece and the third horizontal rod piece.
The fixing assembly comprises a fixing plate and a pair of fixing bolts, the third horizontal rod piece is inserted between the fixing plate and the second height adjusting piece, and two ends of the pair of fixing bolts penetrate through the fixing plate and the second height adjusting piece respectively and are locked through nuts.
The utility model discloses can height-adjusting and horizontal length to can effectively avoid the hindrance of building structure component in the certain limit, adopt high strength bolted connection, make things convenient for the dismouting again when guaranteeing supporting strength, make things convenient for artifical transport simultaneously, can adapt to the construction requirement of the changeable operating mode at scene.
Drawings
FIG. 1 is a front view of the adjustable combined construction hanging basket frame body of the utility model;
FIG. 2 is a side view of a single vertical rod support frame body in the adjustable combined construction hanging basket frame body of the utility model;
FIG. 3 is a side view of a double vertical rod support frame body in the adjustable combined construction hanging basket frame body of the present invention;
FIG. 4 is a front view of a first single vertical rod in the adjustable modular construction basket body of the present invention;
FIG. 5 is a front view of a first horizontal bar in the adjustable modular construction basket of the present invention;
FIG. 6 is a front view of a second horizontal bar in the adjustable modular construction basket of the present invention;
FIG. 7 is a front view of a third horizontal bar in the adjustable modular construction basket of the present invention;
FIG. 8 is a front view of the fixing assembly in the adjustable combined construction basket body of the present invention;
FIG. 9 is a front view of the counterweight basket in the adjustable modular construction basket body of the present invention;
fig. 10 is a front view of the weight plate in the adjustable combined construction hanging basket frame body of the present invention.
In the figure, 1 single vertical rod supports the support body, 11 first single vertical rods, 12 single vertical rod bases, 13 first height adjusting parts, 14 counterweight parts, 2 double vertical rod supports the support body, 21 second single vertical rods, 22 double vertical rod bases, 23 second height adjusting parts, 24 fixing components, 241 fixing plates, 242 fixing bolts, 3 first horizontal rod pieces, 4 second horizontal rod pieces, 5 third horizontal rod pieces, 51 hanging rings, 6 perforated connecting plates, 61 third reinforcing ribs, 71 first reinforcing ribs, 72 second reinforcing ribs, 8 adjusting screw holes, 9 high-strength bolts and 10 ribbed plates.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to fig. 1, an adjustable combined construction hanging basket frame includes a single vertical rod support frame 1, a double vertical rod support frame 2, a first horizontal rod 3, a second horizontal rod 4 and a third horizontal rod 5; referring to fig. 2, the single upright support frame 1 includes a first single upright 11, a single upright base 12 and a first height adjusting member 13, the lower end of the first single upright 11 is fixedly connected to the single upright base 12 through a high-strength bolt to form an inverted T-shaped structure, and the first height adjusting member 13 is sleeved on the first single upright 11 and can move up and down along the axial direction of the first single upright 11; referring to fig. 3, the double vertical rod support frame 2 includes two second single vertical rods 21, a double vertical rod base 22, a second height adjusting member 23 and a fixing assembly 24, the lower ends of the second single vertical rods 21 are fixedly connected with the double vertical rod base 22 through high-strength bolts to form an inverted T-shaped structure, and the two second single vertical rods 21 are arranged in parallel at intervals; the second height adjusting piece 23 is of an H-shaped structure, and two ends of the second height adjusting piece 23 are sleeved on the two second single vertical rods 21, so that the second height adjusting piece 23 can move up and down along the axial direction of the second single vertical rods 21; referring to fig. 5, one end of the first horizontal rod 3 is vertically and fixedly connected with the first single vertical rod 11 through the first height adjusting member 13 via the high-strength bolt and moves synchronously with the first height adjusting member 13, the other end of the first horizontal rod 3 is provided with the perforated connecting plate 6, referring to fig. 6, both ends of the second horizontal rod 4 are provided with the perforated connecting plates 6, and the other end of the first horizontal rod 3 is fixedly connected with one end of the second horizontal rod 4 through the perforated connecting plate 6 via the high-strength bolt; referring to fig. 7, one end of the third horizontal rod 5 is provided with a perforated connecting plate 6, the other end of the second horizontal rod 4 is connected with one end of the third horizontal rod 5 through the perforated connecting plate 6 via a high-strength bolt, and the other end of the third horizontal rod 5 is provided with a hanging ring 51; the third horizontal rod 5 is vertically and fixedly connected to the middle of the second height adjusting member 23 through a fixing assembly 24 and moves synchronously with the second height adjusting member 23. Preferably, the second height adjusting member 23 may be formed by connecting a square tube of 72 × 5mm at both ends thereof and a square tube of 60 × 5mm at the middle thereof to form an H-shaped structure.
The lower extreme of first single pole setting 11 and the junction of single pole setting base 12 be equipped with first strengthening rib 71, be equipped with one or polylith second strengthening rib 72 between first strengthening rib 71 and the first single pole setting 11, the lower extreme of the single pole setting 21 of second and the junction of two pole setting bases 22 are equipped with first strengthening rib 71, be equipped with one or polylith second strengthening rib 72 between first strengthening rib 71 and the single pole setting 21 of second, can improve the reliability of being connected between single pole setting and the base to improve the stability of bearing to the hanging flower basket. Preferably, can set up 8 apertures and be 12.8 mm's screw on single pole setting base 12, set up first strengthening rib 71 and set up through screw laminating single pole setting base 12 through high strength bolt 9 in the bottom of first single pole setting 11, 8 screw symmetric distributions are in the both sides of first single pole setting 11, and be 25mm with the interval of the long limit edge of single pole setting base 12, the interval that is located 4 screws of first single pole setting 11 one side along the length direction of single pole setting base 12 is 80mm, the interval along the width direction of single pole setting base 12 is 40 mm. Four second reinforcing ribs 72 are uniformly arranged around the bottom of the first single vertical rod 11, the second reinforcing ribs 72 are made of steel plates which are 90mm in side length and 5mm in thickness and are in an isosceles right triangle shape, the high-strength bolts 9 are M12 bolts, and the strength grade is 8.8. The reinforced connection between the second single upright 21 and the double upright base 22 is the same as the connection between the first single upright 11 and the single upright base 12.
Preferably, the height of the first single upright 11 and the second single upright 21 is 2095mm, the first single upright 11 and the second single upright 21 are made of square tubes 60 × 5mm, the size of the single upright base 12 is 100 × 5mm, and the size of the double upright base 22 is 100 × 360 × 5 mm.
Referring to fig. 4, a plurality of adjusting screw holes 8 are formed at intervals on the first single vertical rod 11, and the first height adjusting member 13 is fixed on the first single vertical rod 11 through the adjusting screw holes 8 by high-strength bolts, so that the height adjusting precision can be adjusted according to the arrangement density of the adjusting screw holes 8. Preferably, the aperture of the adjusting screw hole 8 is 12.8mm, the distance between the adjusting screw holes 8 is 150mm, and the distance between the adjusting screw hole 8 at the lowest end and the single vertical rod base 12 is 370 mm; the first height adjuster 13 may be made of a square tube of 72 x 5 mm.
Two single pole pieces 21 of second on all the interval be equipped with a plurality of regulation screw holes 8, second altitude mixture control spare 23 passes through high strength bolt and fixes between two single pole pieces 21 of second through adjusting screw hole 8, can be according to the precision of adjusting the arrangement density adjustment altitude mixture control of screw 8, regulation screw hole 8 on first single pole piece 11 and the single pole piece 21 of second can the equidistant setting, ensure that first horizontal rod piece 3, second horizontal rod piece 4 and third horizontal rod piece 5 can go up and down in step and the range of lift is equivalent. Preferably, the aperture of the adjusting screw hole 8 is 12.8mm, the distance between the adjusting screw holes 8 is 150mm, and the distance between the adjusting screw hole 8 at the lowest end and the double-upright-rod base 22 is 370 mm.
Referring to fig. 2, the single upright rod base 12 is provided with a pair of weight members 14, and the pair of weight members 14 are located at two sides of the bottom of the first single upright rod 11, so as to improve the supporting stability of one end of the whole horizontal rod. Preferably, referring to fig. 9 and 10, the weight member 14 may be a weight basket with a weight of 10kg and a size of 250 × 20 or a weight plate with a size of 960 × 100 × 50mm and a wall thickness of 5mm, the weight basket may be welded to the single upright base 12, the weight plate may be fixedly connected to the single upright base 12 by a high strength bolt M12, the high strength bolt may have a strength rating of 8.8, and the weight plate may be a steel box.
The second horizontal rod piece 4 comprises one or more unit rod pieces, the two ends of each unit rod piece are respectively provided with a porous connecting plate 6, the plurality of unit rod pieces are sequentially connected through the porous connecting plates 6 through high-strength bolts, and the integral length of the horizontal rod piece can be adjusted according to construction requirements. Preferably, the perforated web 6 may be formed from 200 x 120 x 5mm steel plate.
The connection parts of the connecting plate 6 with the holes and the first horizontal rod piece 3, the second horizontal rod piece 4 and the third horizontal rod piece 5 are provided with one or more third reinforcing ribs 61, so that the connection reliability between the horizontal rod pieces can be further improved. The third reinforcing rib 61 may be made of a 20 x 20mm isosceles right triangle steel plate having a thickness of 5 mm.
The first horizontal rod piece 3 and the second horizontal rod piece 4 are made of I-shaped steel, and preferably, the I-shaped steel is No. 10I-shaped steel.
The third horizontal rod 5 is an i-steel, preferably, the i-steel is a number 10 i-steel, a T-shaped structure is cut off from the lower edge of the end part of the other end of the third horizontal rod 5, and the hanging ring 51 is arranged at the T-shaped structure of the third horizontal rod 5, so that the hanging ring 51 is convenient to mount.
Ribbed plates 10 are arranged in the first horizontal rod piece 3, the second horizontal rod piece 4 and the third horizontal rod piece 5, and one or more ribbed plates 10 can be arranged according to the length of the horizontal rod pieces and are used for improving the strength of the I-shaped steel. Preferably, the rib 10 has a thickness of 4.5 mm.
Referring to fig. 8, the fixing assembly 24 includes a fixing plate 241 and a pair of fixing bolts 242, the third horizontal rod 5 is inserted between the fixing plate 241 and the second height adjusting member 23, and both ends of the pair of fixing bolts 242 respectively penetrate through the fixing plate 241 and the second height adjusting member 23 and are locked by nuts, so that the third horizontal rod 5 is clamped between the fixing plate 241 and the second height adjusting member 23, and the supporting stability of the other end of the whole horizontal rod is ensured. Preferably, the fixing plate 241 may be a 400 × 100 × 5mm steel plate, and the fixing bolt 242 may be an M12 bolt with a strength rating of 8.8.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the scope of the present invention, therefore, any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention should be included in the scope of the present invention.

Claims (10)

1. The utility model provides an adjustable combination formula construction hanging flower basket support body, characterized by: comprises a single vertical rod support frame body (1), a double vertical rod support frame body (2), a first horizontal rod piece (3), a second horizontal rod piece (4) and a third horizontal rod piece (5); the single upright support frame body (1) comprises a first single upright (11), a single upright base (12) and a first height adjusting piece (13), the lower end of the first single upright (11) is fixedly connected with the single upright base (12) to form an inverted T-shaped structure, and the first height adjusting piece (13) is sleeved on the first single upright (11) and can move up and down along the axial direction of the first single upright (11); the double-upright-rod supporting frame body (2) comprises two second single upright rods (21), a double-upright-rod base (22), a second height adjusting piece (23) and a fixing component (24), the lower ends of the second single upright rods (21) are fixedly connected with the double-upright-rod base (22) to form an inverted T-shaped structure, and the two second single upright rods (21) are arranged in parallel at intervals; the second height adjusting piece (23) is of an H-shaped structure, and two ends of the second height adjusting piece (23) are sleeved on the two second single vertical rods (21), so that the second height adjusting piece (23) can move up and down along the axial direction of the second single vertical rods (21); one end of the first horizontal rod piece (3) is vertically and fixedly connected with the first single vertical rod (11) through a first height adjusting piece (13) and moves synchronously with the first height adjusting piece (13), a perforated connecting plate (6) is arranged at the other end of the first horizontal rod piece (3), perforated connecting plates (6) are arranged at two ends of the second horizontal rod piece (4), and the other end of the first horizontal rod piece (3) is fixedly connected with one end of the second horizontal rod piece (4) through the perforated connecting plate (6); one end of the third horizontal rod piece (5) is provided with a perforated connecting plate (6), the other end of the second horizontal rod piece (4) is connected with one end of the third horizontal rod piece (5) through the perforated connecting plate (6), and the other end of the third horizontal rod piece (5) is provided with a hanging ring (51); the third horizontal rod piece (5) is vertically and fixedly connected to the middle part of the second height adjusting piece (23) through a fixing component (24) and moves synchronously with the second height adjusting piece (23).
2. The adjustable modular construction basket body of claim 1, wherein: a first reinforcing rib (71) is arranged at the joint of the lower end of the first single vertical rod (11) and the single vertical rod base (12), and a second reinforcing rib (72) is arranged between the first reinforcing rib (71) and the first single vertical rod (11); a first reinforcing rib (71) is arranged at the joint of the lower end of the second single vertical rod (21) and the double vertical rod base (22), and a second reinforcing rib (72) is arranged between the first reinforcing rib (71) and the second single vertical rod (21).
3. An adjustable modular construction basket body according to claim 1 or 2, wherein: the single upright rod base (12) is provided with a pair of weight parts (14), and the pair of weight parts (14) are positioned on two sides of the bottom of the first single upright rod (11).
4. An adjustable modular construction basket body according to claim 1 or 2, wherein: a plurality of adjusting screw holes (8) are formed in the first single vertical rod (11) at intervals, and the first height adjusting piece (13) is fixed on the first single vertical rod (11) through the adjusting screw holes (8) through bolts; a plurality of adjusting screw holes (8) are formed in the two second single vertical rods (21) at intervals, and the second height adjusting piece (23) is fixed to the two second single vertical rods (21) through the adjusting screw holes (8) through bolts.
5. The adjustable modular construction basket body of claim 1, wherein: the second horizontal rod piece (4) comprises one or more unit rod pieces, two ends of each unit rod piece are respectively provided with a perforated connecting plate (6), and the plurality of unit rod pieces are sequentially connected through the perforated connecting plates (6) through bolts.
6. The adjustable modular construction basket body of claim 5, wherein: the junction of foraminiferous connecting plate (6) and first horizontal rod piece (3), second horizontal rod piece (4) and third horizontal rod piece (5) all be equipped with third strengthening rib (61).
7. An adjustable modular construction basket body according to claim 1 or 6, wherein: the first horizontal rod piece (3) and the second horizontal rod piece (4) are I-shaped steel.
8. An adjustable modular construction basket body according to claim 1 or 6, wherein: the third horizontal rod piece (5) is I-shaped steel, the lower edge of the end part of the other end of the third horizontal rod piece (5) is cut off to form a T-shaped structure, and the hanging ring (51) is arranged at the T-shaped structure at the other end of the third horizontal rod piece (5).
9. An adjustable modular construction basket body according to claim 1 or 6, wherein: ribbed plates (10) are arranged in the first horizontal rod piece (3), the second horizontal rod piece (4) and the third horizontal rod piece (5).
10. The adjustable modular construction basket body of claim 1, wherein: the fixing assembly (24) comprises a fixing plate (241) and a pair of fixing bolts (242), the third horizontal rod piece (5) is inserted between the fixing plate (241) and the second height adjusting piece (23), and two ends of the pair of fixing bolts (242) respectively penetrate through the fixing plate (241) and the second height adjusting piece (23) and are locked through nuts.
CN201921188979.4U 2019-07-26 2019-07-26 Adjustable combined construction hanging basket frame body Active CN210713747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921188979.4U CN210713747U (en) 2019-07-26 2019-07-26 Adjustable combined construction hanging basket frame body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921188979.4U CN210713747U (en) 2019-07-26 2019-07-26 Adjustable combined construction hanging basket frame body

Publications (1)

Publication Number Publication Date
CN210713747U true CN210713747U (en) 2020-06-09

Family

ID=70935228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921188979.4U Active CN210713747U (en) 2019-07-26 2019-07-26 Adjustable combined construction hanging basket frame body

Country Status (1)

Country Link
CN (1) CN210713747U (en)

Similar Documents

Publication Publication Date Title
CN206319609U (en) A kind of adjustable molding bed for making steel reinforcement cage
CN208396714U (en) Supporting construction is adjusted in a kind of hollow concrete well unilateral side inner wall form
CN210713747U (en) Adjustable combined construction hanging basket frame body
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN209780042U (en) Roof beam reinforcement support frame
CN210858025U (en) Adjustable support bed-jig of space pipe truss
CN208885048U (en) A kind of assembled composite beam integral support device
CN217776061U (en) Welding device for reinforcing hoop of steel reinforcement cage
CN208202602U (en) Beam string construction temporary support structure
CN206842874U (en) A kind of adjustable for height double guide rail Multifunctional hoisting transport supports
CN212775916U (en) Adjustable combined support and hanger for lower end of steel beam
CN211776014U (en) Novel building reinforcement type beam structure
CN212477442U (en) Steel box girder mounting bracket
CN211221311U (en) Segment prefabricated variable cross-section concrete box girder steel bar binding jig frame
CN203640313U (en) Floor beam installing support
CN211286560U (en) Spherical node suspension adjustable operation platform
CN214303033U (en) Assembled construction auxiliary stair
CN219887511U (en) Elevator shaft steel platform
CN220226207U (en) Anti-falling device for steel structure engineering construction
CN217079763U (en) Steel construction rag bolt group wholly assembles construction system
CN219298938U (en) Temporary prefabricated protection component and device
CN216196535U (en) Support diagonal rod convenient to disassemble and assemble and used for inner and outer vertical rods of climbing frame
CN219060856U (en) Adjustable buckle disc type scaffold
CN220434176U (en) Assembly shaping scaffold for construction
CN216641531U (en) Support structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant