CN210704631U - Bulb mounting tool - Google Patents
Bulb mounting tool Download PDFInfo
- Publication number
- CN210704631U CN210704631U CN201921259620.1U CN201921259620U CN210704631U CN 210704631 U CN210704631 U CN 210704631U CN 201921259620 U CN201921259620 U CN 201921259620U CN 210704631 U CN210704631 U CN 210704631U
- Authority
- CN
- China
- Prior art keywords
- bulb
- locking
- pipe
- rod
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
The utility model relates to a bulb mounting tool, include: a main rod; one end of each grabbing rod is hinged to the top of the main rod and is oppositely arranged; the lamp bulb fixing device comprises a main rod, a plurality of grabbing rods, a sleeve pipe and a clamping device, wherein the main rod is sleeved with the sleeve pipe in a movable mode, the sleeve pipe is partially sleeved with the grabbing rods, the grabbing rods are attached to the surface of a lamp bulb to be installed, the sleeve pipe moves from the main rod to the grabbing rod direction, and the part of the sleeve pipe is sleeved with the grabbing rods, so that the sleeve pipe extrudes the grabbing rods to fix the lamp bulb to be installed in a clamping mode.
Description
Technical Field
The utility model relates to a construction field indicates a bulb mounting tool especially.
Background
After the beginning of the building decoration project, a large number of bulbs need to be installed. For bulbs arranged at high positions, the bulbs are generally required to be installed by means of a herringbone ladder in the traditional method, time and labor are wasted, and the installation efficiency of the bulbs in decoration engineering is low. In the prior art, an operating rod and a hand grip are adopted for fixing, and the hand grip is used for gripping a bulb and rotating the operating rod so as to screw the bulb. But the grip clamping space is fixed and unchanged, and the grip can only be suitable for bulbs of one specification, so that the application range is small.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, provide a bulb mounting tool, it is fixed unchangeable to solve tongs centre gripping space among the prior art, can only be applicable to the bulb of a specification, problem that application scope is little.
The technical scheme for realizing the purpose is as follows:
the utility model provides a bulb mounting tool, include:
a main rod;
one end of each grabbing rod is hinged to the top of the main rod and is oppositely arranged; and
the lamp bulb fixing device comprises a main rod, a plurality of grabbing rods, a sleeve pipe and a clamping device, wherein the main rod is sleeved with the sleeve pipe in a movable mode, the sleeve pipe is partially sleeved with the grabbing rods, the grabbing rods are attached to the surface of a lamp bulb to be installed, the sleeve pipe moves from the main rod to the grabbing rod direction, and the part of the sleeve pipe is sleeved with the grabbing rods, so that the sleeve pipe extrudes the grabbing rods to fix the lamp bulb to be installed in a clamping mode.
The utility model discloses bulb mounting tool's beneficial effect:
the utility model discloses bulb mounting tool articulates in the mobile jib through a plurality of poles of grabbing to grab the pole and can rotate round articulated department, the adaptation is wide in a plurality of different specification and dimension's bulb, application scope. Through will grab the pole subsides and locate the relative both sides of the bulb of treating the installation and move the sleeve pipe from the mobile jib to grabbing the pole direction and locate a plurality of poles of grabbing to some cover for thereby the sleeve pipe extrudees a plurality of poles of grabbing and reduce the clamping distance and fix the bulb of treating the installation with a pair of pole centre gripping of grabbing, guarantees to stabilize the centre gripping bulb. The rotating bulb of the main rod is fixed and installed, and the operation is convenient.
The utility model discloses bulb mounting tool's further improvement lies in, still locate including the cover the mobile jib and can with the fixed locking pipe of mobile jib locking, through will locking pipe top prop in the sheathed tube bottom just the locking pipe the mobile jib locking is fixed, thereby is fixed sheathed tube position.
The utility model discloses a further improvement of the bulb mounting tool,
at least one cutting is vertically fixed on the main rod,
the inner wall vertical fixation of locking pipe has a plurality of annular plates that set up along the length direction interval, the one end of annular plate is fixed in the inner wall of locking pipe, the other end of annular plate support lean on in the outer wall of mobile jib, it is a plurality of the confession has all been seted up to the annular plate the cutting is through and being located same sharp bar breach, be equipped with between two adjacent annular plates with the interval of the thickness adaptation of cutting, through relative rotation the locking pipe with the mobile jib makes the cutting of mobile jib is inserted and is located adjacent two in the interval between the annular plate, realize the locking pipe with the locking of mobile jib is fixed.
The utility model discloses a further improvement of the bulb mounting tool,
the bottom end of the locking pipe is fixed with a telescopic rod with adjustable length.
The utility model discloses bulb mounting tool's further improvement lies in, the telescopic link includes:
a screw fixed to the bottom end of the locking pipe; and
the adjusting pipe is fixed with a nut, and the adjusting pipe is sleeved on the screw rod and is connected with the screw rod in a screwing mode through the nut.
The utility model discloses bulb mounting tool's further improvement lies in, the medial surface of grabbing the pole is fixed with elastic buffer layer.
The utility model discloses bulb mounting tool's further improvement lies in, it is the arc pole to grab the pole.
The utility model discloses bulb mounting tool's further improvement lies in, two relatively grab the pull tie of the articulated position department of being close to of pole and be connected with the spring.
Drawings
Fig. 1 is a sectional view of the bulb installation tool of the present invention.
Fig. 2 is a sectional view a-a in fig. 1.
Fig. 3 is a schematic view of the connection between the main rod and the grab rod of the bulb installation tool of the present invention.
Fig. 4 is a sectional view of B-B in fig. 3.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to fig. 1, a cross-sectional view of the bulb installation tool of the present invention is shown. As shown in fig. 1, the utility model discloses a bulb mounting tool includes:
a main rod 10;
a plurality of gripping bars 20 having one end hinged to the top of the main bar 10 and disposed opposite to each other; and
the sleeve 30 is movably sleeved on the main rod 10 and partially sleeved on the plurality of the grabbing bars 20, and the plurality of the grabbing bars 20 are attached to the surface of the bulb to be installed and the sleeve 30 is moved from the main rod 10 to the grabbing bar 20 to be partially sleeved on the grabbing bar 20, so that the sleeve 30 presses the plurality of the grabbing bars 20 to clamp and fix the bulb to be installed.
As a preferred embodiment of the utility model discloses bulb mounting tool, the utility model discloses bulb mounting tool is still located including the cover the mobile jib 10 and can with the fixed locking pipe 40 of mobile jib 10 locking, through inciting somebody to action locking pipe 40 props the bottom of sleeve pipe 30 just locking pipe 40 the mobile jib 10 locking is fixed, thereby is fixed sleeve pipe 30's position.
As a preferred embodiment of the bulb installation tool of the present invention, fig. 2 is a sectional view of a-a in fig. 1. Fig. 3 is a schematic view of the connection between the main rod and the grab rod of the bulb installation tool of the present invention. Fig. 4 is a sectional view of B-B in fig. 3. Combine fig. 1 to 4 to show, mobile jib 10 vertical fixation has at least one cutting 11, the inner wall vertical fixation of locking pipe 40 has a plurality of annular plates 41 that set up along the length direction interval, the one end of annular plate 41 is fixed in the inner wall of locking pipe 40, the other end of annular plate 41 support lean on in the outer wall of mobile jib 10 is a plurality of annular plate 41 all has seted up the confession the cutting passes through and is located the bar breach 410 of collinear, be equipped with between two adjacent annular plates 41 with the interval of the thickness adaptation of cutting 11, through relative rotation locking pipe 40 with mobile jib 10 makes the cutting 11 of mobile jib 10 inserts and locates two adjacent in the interval between the annular plate 41, realize locking pipe 40 with mobile jib 10 locking is fixed.
In the present embodiment, a comb tube is employed as the lock tube 40. The insert 11 may be an annular plate that is fitted over and fixed to the main rod 10. The annular plate can be provided with a plurality of annular plates to strengthen the limiting function.
As a preferred embodiment of the bulb installation tool of the present invention, the bottom end of the locking tube 40 is fixed with a telescopic rod 50 with adjustable length.
As a preferred embodiment of the bulb installation tool of the present invention, the telescopic rod 50 includes: a screw 51 fixed to a bottom end of the locking pipe 40; and an adjusting pipe 53 to which a nut 52 is fixed, the adjusting pipe 53 being fitted to the screw 51 and threadedly coupled to the screw 51 via the nut 52.
In this embodiment, the one end trompil of grabbing pole 20, the convenience is gone on the round pin axle with mobile jib 10 and is articulated to the one end of grabbing pole 20 can rotate round the articulated position of mobile jib 10, thereby changes the contained angle between a plurality of grabbing pole 20. It is ensured that the distance between the plurality of grab bars 20 can be adjusted when fixing the bulb.
As a preferred embodiment of the bulb installation tool of the present invention, the elastic buffer layer 60 is fixed to the inner side surface of the grasping rod 20. The bulb is protected by the buffer layer 60 against damage. In this embodiment, the grab bar 20 is an arc-shaped bar. To fit the shape of the bulb.
As a preferred embodiment of the bulb installation tool of the present invention, two opposite grabbing bars 20 are connected to a spring 21 near the hinge position. The two opposite gripping rods 20 are elastically pulled by the spring 21, so that the gripping rods 20 are prevented from being excessively spaced.
The following explains the use method of the bulb installation tool of the utility model:
when the bulb is required to be installed on the top plate, the bulb is firstly placed between the plurality of grabbing rods 20 in a mode that the screw head faces upwards and the glass shell faces downwards, and the plurality of grabbing rods 2 are attached to the outer surface of the bulb. Then, the sleeve 30 is moved from the position of the main rod 10 toward the grasping rods 20 to be partially sleeved on the plurality of grasping rods 20, so that the sleeve 30 presses the plurality of grasping rods 20, then the locking tube 40 is butt-supported at the bottom end of the sleeve 30, and the locking tube 40 is rotated so that the insert 11 of the main rod 10 is inserted between two adjacent annular plates 41 at the corresponding position of the locking tube 40 to realize the locking of the locking tube 40 and the main rod 10, so as to fix the position of the sleeve 30 and prevent the sleeve 30 from sliding downwards. A pair of said gripping bars 20 is realized to grip and fix the bulb to be mounted.
The handheld main rod 10 aligns the bulb with the mounting position and rotates and screws the bulb, so that the bulb is mounted at the mounting position of the top plate. Then, the locking tube 40 is rotated to rotate the insert 11 away from the strip-shaped gap 410 between two adjacent annular plates 41 and corresponding to the annular plates 41, so that the locking tube 40 is conveniently moved downwards along the main rod 10, the sleeve 30 can move downwards by means of the gravity of the sleeve 30, the sleeve 30 releases the grabbing rod 20, the grabbing rod 20 releases the bulb, and the installation is finished.
In addition, the buffer layer 60 is provided with a glue layer, the glue layer is attached to the surface of the bulb, and the friction force between the buffer layer 60 and the bulb is increased for screwing the bulb.
The utility model discloses bulb mounting tool's beneficial effect does:
the utility model discloses bulb mounting tool articulates in the mobile jib through a plurality of poles of grabbing to grab the pole and can rotate round articulated department, the adaptation is wide in a plurality of different specification and dimension's bulb, application scope. Through pasting a plurality of grab the pole and locate the relative both sides of the bulb of treating the installation and move the sleeve pipe from the mobile jib to grabbing the pole direction and locate a plurality of poles of grabbing to some cover for thereby the sleeve pipe extrudees a plurality of poles of grabbing and reduce the clamping distance and fix the bulb of treating the installation with a pair of pole centre gripping of grabbing, adopts the fixed sheathed tube position of locking pipe again to prevent that the sleeve pipe from gliding, prevents to grab the pole and takes place not hard up at the in-process of installation, guarantees to stabilize the centre gripping bulb. The rotating bulb of the main rod is fixed and installed, and the operation is convenient.
The present invention has been described in detail with reference to the embodiments shown in the drawings, and those skilled in the art can make various modifications to the present invention based on the above description. Therefore, certain details of the embodiments should not be construed as limitations of the invention, which are intended to be covered by the following claims.
Claims (8)
1. A bulb installation tool, comprising:
a main rod;
one end of each grabbing rod is hinged to the top of the main rod and is oppositely arranged; and
the lamp bulb fixing device comprises a main rod, a plurality of grabbing rods, a sleeve pipe and a clamping device, wherein the main rod is sleeved with the sleeve pipe in a movable mode, the sleeve pipe is partially sleeved with the grabbing rods, the grabbing rods are attached to the surface of a lamp bulb to be installed, the sleeve pipe moves from the main rod to the grabbing rod direction, and the part of the sleeve pipe is sleeved with the grabbing rods, so that the sleeve pipe extrudes the grabbing rods to fix the lamp bulb to be installed in a clamping mode.
2. The bulb installation tool of claim 1,
still locate including the cover the mobile jib and can with the fixed locking pipe of mobile jib locking, through with locking pipe shore in sheathed tube bottom just the locking pipe the mobile jib locking is fixed, thereby fixed sheathed tube position.
3. The bulb installation tool of claim 2,
at least one cutting is vertically fixed on the main rod,
the inner wall vertical fixation of locking pipe has a plurality of annular plates that set up along the length direction interval, the one end of annular plate is fixed in the inner wall of locking pipe, the other end of annular plate support lean on in the outer wall of mobile jib, it is a plurality of the confession has all been seted up to the annular plate the cutting is through and being located same sharp bar breach, be equipped with between two adjacent annular plates with the interval of the thickness adaptation of cutting, through relative rotation the locking pipe with the mobile jib makes the cutting of mobile jib is inserted and is located adjacent two in the interval between the annular plate, realize the locking pipe with the locking of mobile jib is fixed.
4. The bulb installation tool of claim 2,
the bottom end of the locking pipe is fixed with a telescopic rod with adjustable length.
5. The light bulb installation tool of claim 4, wherein the telescoping rod comprises:
a screw fixed to the bottom end of the locking pipe; and
the adjusting pipe is fixed with a nut, and the adjusting pipe is sleeved on the screw rod and is connected with the screw rod in a screwing mode through the nut.
6. The lamp installation tool of claim 1, wherein the gripping rod has an elastic buffer layer secured to an inner side thereof.
7. The bulb installation tool of claim 1, wherein the catch bar is an arcuate bar.
8. The light bulb installation tool of claim 1, wherein a spring is attached to opposing grab bars near the hinge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921259620.1U CN210704631U (en) | 2019-08-06 | 2019-08-06 | Bulb mounting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921259620.1U CN210704631U (en) | 2019-08-06 | 2019-08-06 | Bulb mounting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210704631U true CN210704631U (en) | 2020-06-09 |
Family
ID=70938896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921259620.1U Active CN210704631U (en) | 2019-08-06 | 2019-08-06 | Bulb mounting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210704631U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111958548A (en) * | 2020-08-17 | 2020-11-20 | 安徽美拓照明有限公司 | Portable energy-saving bulb production test is with erection equipment of screwing |
-
2019
- 2019-08-06 CN CN201921259620.1U patent/CN210704631U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111958548A (en) * | 2020-08-17 | 2020-11-20 | 安徽美拓照明有限公司 | Portable energy-saving bulb production test is with erection equipment of screwing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206360363U (en) | A kind of aluminum alloy pattern plate bracing device | |
CN210704631U (en) | Bulb mounting tool | |
CN206782622U (en) | One kind building brick clamp | |
CN212063260U (en) | Cable laying is with fixed clamping device | |
CN209859913U (en) | Novel bulb dismouting device | |
CN217874520U (en) | C-shaped steel combined type support hanger | |
CN215592371U (en) | Reinforced concrete is effective equipment of demolising | |
CN105405740A (en) | Bulb replace tool | |
CN206768631U (en) | A kind of road and bridge crack is connected mechanism | |
CN211967223U (en) | Locating pin telescopic machanism on sheet metal anchor clamps | |
CN205184590U (en) | Curb ann step anchor clamps | |
CN208605467U (en) | A kind of helix nailing that band is auxiliarily fixed | |
CN211916711U (en) | Multifunctional wrench for mounting automobile bulb | |
CN210141381U (en) | Auxiliary assembly convenient to pipeline inserts preformed hole | |
CN208486743U (en) | A kind of door closer rocker arm carrying out length adjustment | |
CN219426600U (en) | Be applied to special fixture of various steel tile of arc | |
CN105113800A (en) | Assembling tool for connecting reinforcing steel bar and swivel nut | |
CN211341873U (en) | Building safety protection steel pipe guardrail mounting | |
CN204493365U (en) | A kind of novel hydraulic filter end cap | |
CN204960341U (en) | A erecting tool for connecting reinforcement and swivel nut | |
CN213512961U (en) | Support for fixing industrial camera | |
CN212804575U (en) | High-strength pipe staple bolt | |
CN218927087U (en) | Turning device is used in aluminium alloy processing | |
CN221119056U (en) | Aluminum alloy door and window installation strutting arrangement | |
CN213770063U (en) | Manual brick moving device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201225 Address after: No. 14701, 47 / F, unit 1, green space center, block a, northeast corner of cross between Jinye road and zhangbaer Road, Zhangba Street office, high tech Zone, Xi'an City, Shaanxi Province, 710076 Patentee after: Northwest Construction Co.,Ltd. of China Construction Eighth Engineering Bureau Address before: 200122 Pudong New Area, Shanghai, China (Shanghai) free trade trial area 1568 Century Avenue 27 Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd. |