CN206782622U - One kind building brick clamp - Google Patents
One kind building brick clamp Download PDFInfo
- Publication number
- CN206782622U CN206782622U CN201720189949.XU CN201720189949U CN206782622U CN 206782622 U CN206782622 U CN 206782622U CN 201720189949 U CN201720189949 U CN 201720189949U CN 206782622 U CN206782622 U CN 206782622U
- Authority
- CN
- China
- Prior art keywords
- plate
- clamping plate
- sleeve pipe
- bar
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011469 building brick Substances 0.000 title claims abstract description 13
- 239000011449 brick Substances 0.000 claims abstract description 37
- 208000006558 Dental Calculus Diseases 0.000 claims description 6
- 239000012634 fragment Substances 0.000 abstract description 23
- 230000000694 effects Effects 0.000 description 12
- 238000000034 method Methods 0.000 description 6
- 230000005484 gravity Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
Abstract
The utility model discloses a kind of building brick clamp, including first clamping plate, second clamping plate and sleeve pipe, the first clamping plate are arranged on its lower end with second clamping plate, and the first clamping plate is arranged on second clamping plate right-hand member, it is characterised in that:Described sleeve pipe right-hand member is provided with cross bar, the cross bar is arranged in sleeve pipe close to one end of sleeve pipe, the cross bar is connected with cannula slide, described sleeve pipe right-hand member is provided with clamping screw, the cross bar is provided with two with sleeve pipe, first connecting rod is provided between two cross bar, second connecting rod is provided between two sleeve pipe, the cross bar lower end is fixedly installed the first pole, described sleeve pipe lower end is fixedly installed the second pole, the first clamping plate right-hand member is fixedly installed the first motion bar, the second clamping plate left end is fixedly installed the second motion bar, first motion bar and the first pole are rotatablely connected, the building brick, which is clipped in carrying fragment of brick, need not hold pull bar, the fragment of brick of different-thickness can be clamped, operating efficiency is high.
Description
Technical field
It the utility model is related to a kind of building brick clamp.
Background technology
In construction, it is often necessary to fragment of brick is carried, it is necessary to wear gloves if directly with the hands removing, to the demand of gloves
Amount is big, and hand is also easily injured, and when both hands are removed, can't see the situation of underfooting, it is possible that it is unexpected, therefore the appearance of brick clamp
It is popular, but in general brick clamp needs to be held with a firm grip always pull bar with hand, arm easily produces fatigue, potential safety hazard be present.This
Outer existing brick clamp can not can only clamp, operating efficiency bottom in fixed fixture operated within range to the fragment of brick of different-thickness
Utility model content
In view of this, the utility model purpose is to provide one kind need not hold pull bar in carrying fragment of brick, can be to different thickness
The fragment of brick of degree is clamped, the high building brick clamp of operating efficiency.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is:One kind building brick clamp, including the first folder
Plate, second clamping plate and sleeve pipe, the first clamping plate are arranged on its lower end with second clamping plate, and the first clamping plate is arranged on second
Clamping plate right-hand member, described sleeve pipe right-hand member are provided with cross bar, and the cross bar is arranged in sleeve pipe close to one end of sleeve pipe, the cross bar with
Cannula slide connects, and described sleeve pipe right-hand member is provided with clamping screw, and the cross bar and sleeve pipe are provided with two, between two cross bar
First connecting rod is provided with, second connecting rod is provided between two sleeve pipe, the cross bar lower end is fixedly installed the first pole, institute
State its lower end and be fixedly installed the second pole, the first clamping plate right-hand member is fixedly installed the first motion bar, second folder
Plate left end is fixedly installed the second motion bar, and first motion bar and the first pole are rotatablely connected, second motion bar with
Second pole is rotatablely connected, and the described one end of first motion bar away from first clamping plate is provided with the first connecting plate, and described second lives
The one end of lever away from second clamping plate is provided with the second connecting plate, the first connecting plate and the first motion bar rotation connection, institute
To state the second connecting plate and the second motion bar is rotatablely connected, first connecting plate and the second connecting plate upper end are provided with fixed plate,
The fixed plate is rotatablely connected with the first connecting plate, the second connecting plate, and the dead plate upper end is fixedly installed pull bar.
Further, the first motion bar lower end is provided with the first antiskid plate, first antiskid plate and first clamping plate
Bolt is fixed, and the second motion bar lower end is provided with the second antiskid plate, and second antiskid plate is fixed with second clamping plate bolt,
One end fixed setting spinosity of first antiskid plate one end and the second antiskid plate away from first clamping plate away from second clamping plate
Head, the stability of clamping is improved, avoid fragment of brick in clamping process from dropping.
Further, the first clamping plate upper end is fixedly installed the first spring, the second clamping plate upper end fixed setting
There is second spring, the one end of first spring away from first clamping plate is fixedly connected with the first pole, and the second spring is remote
One end of second clamping plate is fixedly connected with the second pole, and first clamping plate keeps opening shape with second clamping plate after the completion of convenient use
State.
Further, described clamping screw one end is arranged in sleeve pipe, and the clamping screw other end is arranged on outside sleeve pipe,
The clamping screw is connected with casing threads, and clamping screw is screwed in sleeve pipe and carries out clamping to cross bar by convenient use person.
Further, stopping means is provided between the first connecting rod and second connecting rod, the stopping means includes limit
Position plate and slide bar, the limiting plate are fixedly installed on second connecting rod right-hand member, and the slide bar is fixedly installed on first connecting rod left end, institute
State limiting plate and be provided with square groove, the slide bar left end is arranged in square groove and is slidably connected with square groove, and the pull bar passes through spacing
Plate is simultaneously slidably connected with limiting plate, and pull bar is limited, and pull bar is offset during avoiding lifting.
Further, the slide bar is provided with two, and two slide bar is separately positioned on limiting plate rear and front end so that spacing
Device stress balance.
Further, the first clamping plate is welded with baffle plate with second clamping plate lower end, avoids fragment of brick in clamping process from dropping.
The utility model has the technical effect that following aspect:The pull bar of setting, fixed plate, the first connecting plate,
Two connecting plates, the first pole, the second pole, the first motion bar and the second motion bar coordinate, and during use, utilize brick
Gravity closes up pull bar, it is only necessary to it is portable live pull bar just, without worrying to cause because of arm Fatigue brick to fall down hair
Outside business;Cross bar, sleeve pipe and the clamping screw of setting, convenient use person adjust first clamping plate and second clamping plate according to actual conditions
The distance between, convenient use person clamps to the fragment of brick of different-thickness;The baffle plate of setting and tartar, can be in clamping fragment of brick
When to fragment of brick carry out clamping, avoid fragment of brick from dropping.
Brief description of the drawings
Fig. 1 is a kind of overall structure figure for building brick clamp of the application utility model.
Fig. 2 is a kind of left view for building brick clamp of the application utility model.
Fig. 3 is a kind of top view for building brick clamp of the application utility model.
Fig. 4 is a kind of right view for building brick clamp stopping means of the application utility model.
Embodiment
Below in conjunction with accompanying drawing, specific embodiment of the present utility model is described in further detail, so that the utility model skill
Art scheme is more readily understood and grasped.
As Figure 1-4, a kind of building brick clamp, including first clamping plate 1, second clamping plate 2 and sleeve pipe 3, the first clamping plate 1
The lower end of sleeve pipe 3 is arranged on second clamping plate 2, the first clamping plate 1 is arranged on the right-hand member of second clamping plate 2, and first clamping plate 1 and second is pressed from both sides
The effect of plate 2 is that fragment of brick is clamped.The right-hand member of described sleeve pipe 3 is provided with cross bar 4, and the cross bar 4 is set close to one end of sleeve pipe 3
Put in sleeve pipe 3, the cross bar 4 is slidably connected with sleeve pipe 3, facilitates cross bar 4 to carry out transverse shifting in sleeve pipe 3.Described sleeve pipe 3
Right-hand member is provided with clamping screw 5, and described one end of clamping screw 5 is arranged in sleeve pipe 3, and the other end of clamping screw 5 is arranged on
Outside sleeve pipe 3, the clamping screw 5 is threadedly coupled with sleeve pipe 3, and clamping screw 5 is screwed in sleeve pipe to enter cross bar 4 by convenient use person
Row clamping.The cross bar 4 is provided with two with sleeve pipe 3, and first connecting rod 6, the first connecting rod 6 are provided between two cross bar 4
It is welded and fixed with cross bar 4, facilitates first connecting rod 6 to carry out two cross bars 4 and be attached, the second company is provided between two sleeve pipe 3
Bar 7, the second connecting rod 7 are welded and fixed with sleeve pipe 3, facilitate second connecting rod 7 to be attached two sleeve pipes 3.The work of first connecting rod 6
With being to be attached two cross bars 4, the effect of second connecting rod 7 is to be attached two sleeve pipes 3.
The lower end of cross bar 4 is fixedly installed the first pole 8, and the lower end of described sleeve pipe 3 is fixedly installed the second pole 9, Gu
Mode is determined to be welded and fixed, and the effect of cross bar 4 is to be used to fix the first pole 8, and the effect of sleeve pipe 3 is to be used to fix the second pole
9, the upper end of first clamping plate 1 is fixedly installed the first spring 10, and the upper end of second clamping plate 2 is fixedly installed second spring
11, fixed form is is welded and fixed, and the one end of first spring 10 away from first clamping plate 1 is fixedly connected with the first pole 8, institute
State the one end of second spring 11 away from second clamping plate 2 to be fixedly connected with the second pole 9, fixed form conveniently makes to be welded and fixed
First clamping plate 1 keeps open configuration with second clamping plate 2 after the completion of.The right-hand member of first clamping plate 1 is fixedly installed the first activity
Bar 12, the left end of second clamping plate 2 are fixedly installed the second motion bar 13, and fixed form is is welded and fixed, Stability Analysis of Structures.It is described
First motion bar 12 is rotatablely connected with the first pole 8, and rotation connection mode is by being arranged on the rotating shaft at the middle part of the first motion bar 12
It is connected with the first pole 8, second motion bar 13 is rotatablely connected with the second pole 9, and rotation connection mode is by being arranged on
The rotating shaft at the middle part of two motion bar 13 is rotatablely connected with the second pole 9, facilitates the first motion bar 12 to be rotated relative to the first pole 8
And facilitating the second motion bar 13 to be rotated relative to the first pole 8, the effect of the first pole 8 and the second pole 9 is for first
The motion bar 13 of motion bar 12 and second provides support, and the effect of the first motion bar 12 and the second motion bar 13 is to drive first clamping plate
1 is rotated with second clamping plate 2.The lower end of first motion bar 12 is provided with the first antiskid plate 14, first antiskid plate 14
Fixed with the bolt of first clamping plate 1, the lower end of the second motion bar 13 is provided with the second antiskid plate 15, second antiskid plate 15 with
The bolt of second clamping plate 2 is fixed, and first antiskid plate 14 one end and the second antiskid plate 15 away from first clamping plate 1 are away from second
One end of clamping plate 2 is fixedly installed tartar 16, and fixed form improves the stability of clamping, avoid clamping process to be welded and fixed
Middle fragment of brick drops.Tartar 16 can in clamping process with fragment of brick clamping.The effect of first antiskid plate 14 and the second antiskid plate 15
It is to be used to fix tartar 16.The first clamping plate 1 is welded with baffle plate 17 with the lower end of second clamping plate 2, avoids fragment of brick in clamping process
Drop.Baffle plate 17 can prop up fragment of brick in clamping process, avoid fragment of brick from moving down.First motion bar 12 is away from first clamping plate
1 one end is provided with the first connecting plate 18, and the described one end of second motion bar 13 away from second clamping plate 2 is provided with the second connecting plate
19, first connecting plate 18 is rotatablely connected with the first motion bar 12, and second connecting plate 13 rotates with the second motion bar 19
Connection, rotation connection mode are completed by rotating shaft.The upper end of first connecting plate, 18 and second connecting plate 19 is provided with fixed plate
20, the fixed plate 20 is rotatablely connected with the first connecting plate 18, the second connecting plate 19, and rotation connection mode is completed by rotating shaft.
The effect of first connecting plate 18 and the second connecting plate 19 is to connect the first motion bar 12 and the second motion bar 13 with fixed plate 20
Connect.The upper end of fixed plate 20 is fixedly installed pull bar 21.The effect of fixed plate 20 is to be used for steady brace 21.Described first connects
Stopping means 22 is provided between bar 6 and second connecting rod 7, the stopping means 22 includes limiting plate 23 and slide bar 24, the cunning
Bar 24 is provided with two, and two slide bar 24 is separately positioned on the rear and front end of limiting plate 23 so that the stress balance of stopping means 22.Institute
State limiting plate 23 and be fixedly installed on the right-hand member of second connecting rod 6, the slide bar 24 is fixedly installed on the left end of first connecting rod 7, fixed form
To be welded and fixed, the limiting plate 23 is provided with square groove, and the left end of slide bar 24 is arranged in square groove and is slidably connected with square groove,
The pull bar 21 is slidably connected through limiting plate 23 and with limiting plate 23, facilitates stopping means 22 to limit pull bar 21, keeps away
Pull bar 21 is offset during hands-free drawing.
Operation principle:In use, promoting cross bar 4 as needed, the distance between first clamping plate 1 and second clamping plate 2 are adjusted,
After the completion of regulation, cross bar is fixed using clamping screw 5, fragment of brick is placed between first clamping plate 1 and second clamping plate 2, is lifted
Pull bar 21, pull bar 21 drive fixed plate 20 to move up, and fixed plate 20 drives the first connecting plate 18 and second being rotatablely connected with it to connect
Fishplate bar 19 moves up, and the first connecting plate 18 drives the left end end of the first motion bar 12 to move up, and the second connecting plate 19 drives
The right-hand member of second motion bar 13 moves up, and first clamping plate 1 and the move toward one another of second clamping plate 2 are to the brick between being placed on two clamping plates
Block is clamped.
The utility model has the technical effect that following aspect:The pull bar of setting, fixed plate, the first connecting plate,
Two connecting plates, the first pole, the second pole, the first motion bar and the second motion bar coordinate, and during use, utilize brick
Gravity closes up pull bar, it is only necessary to it is portable live pull bar just, without worrying to cause because of arm Fatigue brick to fall down hair
Outside business;Cross bar, sleeve pipe and the clamping screw of setting, convenient use person adjust first clamping plate and second clamping plate according to actual conditions
The distance between, convenient use person clamps to the fragment of brick of different-thickness;The baffle plate of setting and tartar, can be in clamping fragment of brick
When to fragment of brick carry out clamping, avoid fragment of brick from dropping.
Certainly, it is representative instance of the present utility model above, in addition, the utility model can also have other a variety of
Embodiment, all technical schemes formed using equivalent substitution or equivalent transformation, all falls within the requires of the utility model protection
Within the scope of.
Claims (7)
1. one kind building brick clamp, including first clamping plate, second clamping plate and sleeve pipe, the first clamping plate are arranged on set with second clamping plate
Pipe lower end, the first clamping plate are arranged on second clamping plate right-hand member, it is characterised in that:Described sleeve pipe right-hand member is provided with cross bar, described
Cross bar is arranged in sleeve pipe close to one end of sleeve pipe, and the cross bar is connected with cannula slide, and described sleeve pipe right-hand member is provided with locking
Bolt, the cross bar are provided with two with sleeve pipe, are provided with first connecting rod between two cross bar, are provided between two sleeve pipe
Second connecting rod, the cross bar lower end are fixedly installed the first pole, and described sleeve pipe lower end is fixedly installed the second pole, and described
One clamping plate right-hand member is fixedly installed the first motion bar, and the second clamping plate left end is fixedly installed the second motion bar, and described first
Motion bar and the first pole are rotatablely connected, and second motion bar and the second pole are rotatablely connected, and first motion bar is remote
One end of first clamping plate is provided with the first connecting plate, and the described one end of second motion bar away from second clamping plate is provided with the second connection
Plate, the first connecting plate and the first motion bar rotation connection, the second connecting plate and the second motion bar rotation connection are described
First connecting plate and the second connecting plate upper end are provided with fixed plate, and the fixed plate rotates with the first connecting plate, the second connecting plate
Connection, the dead plate upper end are fixedly installed pull bar.
2. brick clamp is built according to claim 1, it is characterised in that:It is anti-skidding that the first motion bar lower end is provided with first
Plate, first antiskid plate are fixed with first clamping plate bolt, and the second motion bar lower end is provided with the second antiskid plate, and described
Two antiskid plates are fixed with second clamping plate bolt, and one end and the second antiskid plate away from first clamping plate of first antiskid plate are remote
One end of second clamping plate is fixedly installed tartar.
3. brick clamp is built according to claim 2, it is characterised in that:The first clamping plate upper end is fixedly installed the first bullet
Spring, the second clamping plate upper end are fixedly installed second spring, the one end of first spring away from first clamping plate with first
Bar is fixedly connected, and the one end of the second spring away from second clamping plate is fixedly connected with the second pole.
4. brick clamp is built according to claim 3, it is characterised in that:Described clamping screw one end is arranged in sleeve pipe, described
The clamping screw other end is arranged on outside sleeve pipe, and the clamping screw is connected with casing threads.
5. brick clamp is built according to claim 4, it is characterised in that:Set between the first connecting rod and second connecting rod limited
Position device, the stopping means include limiting plate and slide bar, and the limiting plate is fixedly installed on second connecting rod right-hand member, the slide bar
First connecting rod left end is fixedly installed on, the limiting plate is provided with square groove, and the slide bar left end is arranged in square groove and and square groove
It is slidably connected, the pull bar is slidably connected through limiting plate and with limiting plate.
6. brick clamp is built according to claim 5, it is characterised in that:The slide bar is provided with two, and two slide bar is set respectively
Put in limiting plate rear and front end.
7. brick clamp is built according to claim 6, it is characterised in that:The first clamping plate is welded with gear with second clamping plate lower end
Plate.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720189949.XU CN206782622U (en) | 2017-03-01 | 2017-03-01 | One kind building brick clamp |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720189949.XU CN206782622U (en) | 2017-03-01 | 2017-03-01 | One kind building brick clamp |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206782622U true CN206782622U (en) | 2017-12-22 |
Family
ID=60703674
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720189949.XU Expired - Fee Related CN206782622U (en) | 2017-03-01 | 2017-03-01 | One kind building brick clamp |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206782622U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108001932A (en) * | 2017-12-21 | 2018-05-08 | 郑州格瑞塔电子信息技术有限公司 | A kind of construction carpenter grabs set with anti-wood thorn |
| CN109878969A (en) * | 2019-03-04 | 2019-06-14 | 浙江杰特工贸股份有限公司 | One kind holding lifting device |
| CN110817232A (en) * | 2019-11-17 | 2020-02-21 | 黄为英 | Large-scale fragment of brick clamping device for building wall |
| CN111997386A (en) * | 2018-07-02 | 2020-11-27 | 杭州富阳鼎杰石材有限公司 | Laborsaving brick that building engineering used clamps puts |
| CN112942855A (en) * | 2021-02-22 | 2021-06-11 | 秦超 | Large brick clamping device for building wall and using method thereof |
| CN113001499A (en) * | 2021-04-19 | 2021-06-22 | 中国电建集团重庆工程有限公司 | Cable trench cover plate opening clamp |
-
2017
- 2017-03-01 CN CN201720189949.XU patent/CN206782622U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108001932A (en) * | 2017-12-21 | 2018-05-08 | 郑州格瑞塔电子信息技术有限公司 | A kind of construction carpenter grabs set with anti-wood thorn |
| CN111997386A (en) * | 2018-07-02 | 2020-11-27 | 杭州富阳鼎杰石材有限公司 | Laborsaving brick that building engineering used clamps puts |
| CN109878969A (en) * | 2019-03-04 | 2019-06-14 | 浙江杰特工贸股份有限公司 | One kind holding lifting device |
| CN110817232A (en) * | 2019-11-17 | 2020-02-21 | 黄为英 | Large-scale fragment of brick clamping device for building wall |
| CN112942855A (en) * | 2021-02-22 | 2021-06-11 | 秦超 | Large brick clamping device for building wall and using method thereof |
| CN113001499A (en) * | 2021-04-19 | 2021-06-22 | 中国电建集团重庆工程有限公司 | Cable trench cover plate opening clamp |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207027531U (en) | A kind of compressor clamping lifting switching mechanism | |
| CN105397798B (en) | Capture clamping device | |
| CN204920149U (en) | A intelligent robot for construction | |
| CN206328956U (en) | A kind of straight screw sleeve connection device | |
| CN204819484U (en) | Pickup attachment of high stability | |
| CN108295562A (en) | A kind of waste gas dust-removal device rack | |
| CN110668165A (en) | Material grabbing hand device | |
| CN203887807U (en) | Automotive suspension stand column assembly disassembling mechanism | |
| CN202943587U (en) | Portable type universal pin puller for locating pin | |
| CN201440587U (en) | a pay-off tackle | |
| CN204152417U (en) | A kind of removable hanging ladder | |
| CN209239124U (en) | Simple tool for drilling high places | |
| CN205330578U (en) | Unload pole ware subassembly | |
| CN213504871U (en) | Stacking equipment for brick processing | |
| CN205238002U (en) | Multipurpose plier is good at workstation | |
| CN108149934A (en) | Road brick gripper and method of use thereof | |
| CN208681485U (en) | A kind of rotation of back card and fixed structure | |
| CN207971415U (en) | A kind of suspension type aluminium packet beam rotary power unit | |
| CN204546380U (en) | A kind of multifunctional wrench | |
| CN106493684A (en) | A kind of torque mechanism for crankshaft-link rod production | |
| CN221252600U (en) | Brick arranging and clamping mechanism | |
| CN206811833U (en) | A kind of portable elevator reparing combination rope clamp | |
| CN221542858U (en) | Hand-held brick carrying tool | |
| CN218862019U (en) | Warm up ground wire net mounting tool | |
| CN218746074U (en) | Screw installation mechanism |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 Termination date: 20190301 |