CN210635603U - Building materials hoist and mount net for building site - Google Patents

Building materials hoist and mount net for building site Download PDF

Info

Publication number
CN210635603U
CN210635603U CN201921708202.6U CN201921708202U CN210635603U CN 210635603 U CN210635603 U CN 210635603U CN 201921708202 U CN201921708202 U CN 201921708202U CN 210635603 U CN210635603 U CN 210635603U
Authority
CN
China
Prior art keywords
net
ropes
hoisting
tray
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921708202.6U
Other languages
Chinese (zh)
Inventor
周英杰
刘吉英
周忠梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Binzhou Hexin Fiber Net Co Ltd
Original Assignee
Shandong Binzhou Hexin Fiber Net Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Binzhou Hexin Fiber Net Co Ltd filed Critical Shandong Binzhou Hexin Fiber Net Co Ltd
Priority to CN201921708202.6U priority Critical patent/CN210635603U/en
Application granted granted Critical
Publication of CN210635603U publication Critical patent/CN210635603U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building material hoisting net for construction sites, which comprises four reinforcing ropes and a tray, wherein the reinforcing ropes are arranged on the outer wall of the four corners of the upper end of the tray, and the four reinforcing ropes are provided with lifting rings at the ends, the utility model discloses a building material hoisting net for construction sites is improved and innovated on the basis of the existing hoisting net, when the building material to be hoisted is large in size, at the moment, the four reinforcing ropes which are newly added can well keep the stability of the hoisting net during hoisting, so that the object is stable, moreover, when the hoisting net hoists the object, the gravity is concentrated on the newly added tray, the structure of the hoisting net is protected, when the object in the hoisting net is transferred, the object and the grid can not contact and rub with the ground under the action of a base, and the object and the grid can not be damaged, the safety factor is high, and the service life of the hoisting net is greatly prolonged.

Description

Building materials hoist and mount net for building site
Technical Field
The utility model belongs to the technical field of the hoist and mount apparatus is relevant, concretely relates to building materials hoist and mount net for building site.
Background
The device for hoisting and taking building materials in hoisting, transporting and hoisting operations is characterized in that the most common hoisting tool is a lifting hook, and other tools such as a hoisting ring, a hoisting sucker, a clamp and a hoisting net are also arranged, wherein the hoisting net is used as a flexible tool, so that articles in different shapes can be conveniently hoisted, moved and transported, and materials can be well supplied.
The existing hoisting net technology has the following problems: the existing hoisting net is applied to an actual building site, certain defects exist, the building material size needed to be hoisted is high, at the moment, the existing hoisting net is utilized for hoisting, the object is unstable and prone to collapse, certain potential safety hazards exist, the existing hoisting net is hoisted to the object, gravity is concentrated at the bottom of the net, the bottom of the hoisting net is prone to being cut off, and when the object in the hoisting net is placed, the object and the bottom of the hoisting net are both in contact with the ground, and damage to the object and the hoisting net is prone to being caused.
Disclosure of Invention
An object of the utility model is to provide a building materials hoist and mount net is used in building site to solve the current hoist and mount net that proposes in the above-mentioned background art when the building materials size of required hoist and mount is comparatively big, object hoist and mount unstability, and easily cause the problem of damage to object and hoist and mount net.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building materials hoist and mount net for building site, is including strengthening rope and tray, strengthen the rope and install on the outer wall of tray upper end four corners department, it is provided with four, four to strengthen the end of rope and be provided with rings, four it is connected with horizontal rope to strengthen between two adjacent enhancement ropes of rope, horizontal rope and enhancement rope are through indulging rope fixed connection, horizontal rope and indulge and be provided with the net between the rope, be provided with the base on the tray, be provided with the baffle on the upper end outer wall of base, the baffle is provided with four altogether, four the inside connecting hole, four that is provided with of circumference of baffle the baffle with indulge the rope and pass through connecting hole fixed connection, four be provided with the fixed orifices between two adjacent baffles of baffle, it passes through fixed orifices.
Preferably, the baffle and the base together define a supporting slot with an upward opening.
Preferably, the number of the fixing holes is four, and the four fixing holes are all round hole-shaped structures.
Preferably, the tray and the baffle are fixedly connected through welding.
Preferably, the connecting hole is of a circular hole-shaped structure, and the inner wall of the circumference of the connecting hole is smooth and flat.
Preferably, the reinforcing ropes are arranged in four, and the lengths of the four reinforcing ropes are equal.
Compared with the prior hoisting net technology, the utility model provides a building materials hoisting net for building site possesses following beneficial effect:
the utility model relates to a building material hoisting net for construction site is improved and innovated on the basis of the existing hoisting net, so that the hoisting net has good practical function, safety and reliability in the actual working process, the utility model discloses a structure of a tray, a reinforcing rope, a hanging ring and the like is additionally arranged on the existing hoisting net for construction site, wherein, the tray mainly comprises a base, a baffle plate, a bearing groove, a fixing hole, a connecting hole and the like, when the building material to be hoisted is in a large size, at the moment, the stability of the hoisting net during hoisting can be well kept by utilizing four reinforcing ropes which are additionally arranged, so that an object is more stable, and when the hoisting net hoists the object, the gravity is concentrated on the tray which is additionally arranged, the structure of the hoisting net is protected, when the object in the hoisting net is placed down, the object and the net can not contact and rub with the ground through the action of the base, the damage to objects and grids can not be caused, the safety factor is high, and the service life of the hoisting net is greatly prolonged;
the utility model relates to a building material hoisting net for construction site is improved and innovated on the basis of the existing hoisting net, a tray, a reinforcing rope, a hanging ring and other structures are additionally arranged on the existing hoisting net, wherein, the tray mainly comprises a base, a baffle, a bearing groove, a fixed hole, a connecting hole and other structures, when the building material hoisting net for construction site is utilized for hoisting, an object to be hoisted is placed on the tray, then, four reinforcing ropes are sequentially picked up upwards, so that a grid consisting of the longitudinal ropes and the transverse ropes is slowly lifted, the object to be hoisted is gradually surrounded, the four hanging rings are connected by a hook of a hoisting machine to start hoisting, the stable balance of the whole hoisting net is maintained through the common action of the four reinforcing ropes, the bearing groove can effectively prevent parts from falling down, after the hoisting is finished, the object is slowly descended, the tray is slowly landed by the base firstly, protecting the object and the grid.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description, do not constitute a limitation of the invention, in which:
fig. 1 is a schematic view of a three-dimensional structure of a building material hoisting net for a construction site according to the present invention;
fig. 2 is a schematic structural view of the tray provided by the present invention;
fig. 3 is a schematic view of the structure of the hanging ring provided by the present invention;
in the figure: 1. a tray; 2. a reinforcing cord; 3. a hoisting ring; 4. a transverse rope; 5. a longitudinal rope; 6. a grid; 7. a base; 8. a baffle plate; 9. a bearing groove; 10. a fixing hole; 11. and connecting the holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a building material hoisting net for a construction site comprises four reinforcing ropes 2 and a tray 1, wherein the reinforcing ropes 2 are arranged on the outer wall of the four corners of the upper end of the tray 1, the four reinforcing ropes 2 are equal in length, objects can be conveniently hoisted and transferred under the combined action of the four reinforcing ropes 2 with equal length, the four reinforcing ropes 2 can enable the objects to be stable and safe when moving, the tray 1 and a baffle 8 are fixedly connected through welding, so that the firmness between the tray 1 and the baffle 8 is ensured, the safety factor in the hoisting process is greatly increased, the four reinforcing ropes 2 are arranged, a hoisting ring 3 is arranged at the tail end of each reinforcing rope 2, a transverse rope 4 is connected between every two adjacent reinforcing ropes 2 of the four reinforcing ropes 2, the transverse rope 4 and the reinforcing ropes 2 are fixedly connected through a longitudinal rope 5, a grid 6 is arranged between the transverse rope 4 and the longitudinal rope 5, the tray 1 is provided with a base 7.
A building material hoisting net for a construction site is disclosed, wherein baffle plates 8 are arranged on the outer wall of the upper end of a base 7, the baffle plates 8 and the base 7 are enclosed into a bearing groove 9 with an upward opening, the bearing groove 9 can effectively prevent fine components from falling off from a grid 6 in the hoisting net, the baffle plates 8 are totally four, connecting holes 11 are arranged inside the circumference of the four baffle plates 8, the connecting holes 11 are of circular hole-shaped structures, the inner wall of the circumference of each connecting hole 11 is smooth and flat, the baffle plates 8 and parts of longitudinal ropes 5 can be fastened and connected through the combined action of the connecting holes 11, the inner wall of the circumference of each connecting hole 11 is smooth and flat, so that the abrasion to the longitudinal ropes 5 is reduced to the minimum, the four baffle plates 8 and the longitudinal ropes 5 are fixedly connected through the connecting holes 11, fixing holes 10 are arranged between two adjacent baffle plates 8 of the four baffle plates 8, and the four fixing, four fixed orificess 10 are round hole column structure, through the combined action of four fixed orificess 10, can be so that baffle 8 and enhancement rope 2 carry out the fastening connection, ensure the safety of hoist and mount work and go on, strengthen rope 2 and baffle 8 and pass through fixed orifices 10 fixed connection.
The utility model discloses a theory of operation and use flow: the utility model relates to a building materials hoist and mount net for building site utilizes tray 1, the combined action of strengthening rope 2 and rings 3 isotructure, make hoist and mount net safety and stability in the course of the work, building materials size when required hoist and mount is comparatively big, at this moment, utilize four enhancement ropes of new increase 2 can be fine the steady when keeping hoist and mount net hoist and mount, make the object comparatively stable, and, hoist and mount net when hoisting the object, utilize tray 1 to bear the main gravity of object, protect the net 6 structure of hoist and mount net, when transferring the object in hoist and mount net, through the effect of base 7, object and net 6 can not contact friction between with the ground, can not cause object and net 6 to damage, high, greatly increased the life of hoist and mount net, the utility model discloses after installing, the utility model relates to a building materials hoist and mount net for building site mainly by tray 1, factor of safety, The structure of the reinforcing ropes 2, the longitudinal ropes 5, the transverse ropes 4, the grid 6, the lifting rings 3 and the like, wherein, the tray 1 mainly comprises the structures of a base 7, a baffle 8, a bearing groove 9, a fixed hole 10, a connecting hole 11 and the like, when the building material hoisting net for a construction site is utilized for hoisting, an object to be hoisted is placed on the tray 1, then, four reinforcing ropes 2 are sequentially and upwards picked up, so that the grid 6 consisting of the longitudinal ropes 5 and the transverse ropes 4 slowly rises to gradually surround the object to be hoisted, four lifting rings 3 are connected through a hook of a hoisting machine to start hoisting, through the common action of the four reinforcing ropes 2, the stable balance of the whole hoisting net is maintained, the bearing groove 9 can effectively prevent parts from falling, after the hoisting is finished, the object slowly falls down, the base 7 of the tray 1 slowly lands firstly, the object and the grid 6 are protected, the utility model relates to a building materials hoist and mount net for building site has very high use value.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building materials hoist and mount net for building site, is including strengthening rope (2) and tray (1), its characterized in that: the reinforcing ropes (2) are arranged on the outer wall of the four corners of the upper end of the tray (1), the number of the reinforcing ropes (2) is four, the tail ends of the four reinforcing ropes (2) are provided with hanging rings (3), transverse ropes (4) are connected between two adjacent reinforcing ropes (2) of the four reinforcing ropes (2), the transverse ropes (4) are fixedly connected with the reinforcing ropes (2) through longitudinal ropes (5), grids (6) are arranged between the transverse ropes (4) and the longitudinal ropes (5), a base (7) is arranged on the tray (1), baffles (8) are arranged on the outer wall of the upper end of the base (7), the number of the baffles (8) is four, connecting holes (11) are formed in the periphery of the four baffles (8), the four baffles (8) are fixedly connected with the longitudinal ropes (5) through the connecting holes (11), and fixing holes (10) are formed between two adjacent baffles (8) of the four baffles (8), the reinforcing rope (2) is fixedly connected with the baffle (8) through a fixing hole (10).
2. A building material lifting net for a construction site according to claim 1, wherein: the baffle plate (8) and the base (7) jointly enclose a supporting groove (9) with an upward opening.
3. A building material lifting net for a construction site according to claim 1, wherein: the number of the fixing holes (10) is four, and the four fixing holes (10) are all in a circular hole-shaped structure.
4. A building material lifting net for a construction site according to claim 1, wherein: the tray (1) and the baffle (8) are fixedly connected through welding.
5. A building material lifting net for a construction site according to claim 1, wherein: the connecting hole (11) is of a circular hole-shaped structure, and the inner wall of the circumference of the connecting hole (11) is smooth and flat.
6. A building material lifting net for a construction site according to claim 1, wherein: the four reinforcing ropes (2) are arranged, and the lengths of the four reinforcing ropes (2) are equal.
CN201921708202.6U 2019-10-13 2019-10-13 Building materials hoist and mount net for building site Active CN210635603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921708202.6U CN210635603U (en) 2019-10-13 2019-10-13 Building materials hoist and mount net for building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921708202.6U CN210635603U (en) 2019-10-13 2019-10-13 Building materials hoist and mount net for building site

Publications (1)

Publication Number Publication Date
CN210635603U true CN210635603U (en) 2020-05-29

Family

ID=70795554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921708202.6U Active CN210635603U (en) 2019-10-13 2019-10-13 Building materials hoist and mount net for building site

Country Status (1)

Country Link
CN (1) CN210635603U (en)

Similar Documents

Publication Publication Date Title
CN203568604U (en) Cable hoist special for tool car
CN210635603U (en) Building materials hoist and mount net for building site
CN203820331U (en) Material hoist with built-in steel wire rope
CN211141282U (en) Steel reinforcement cage installation hoist device
CN218642255U (en) Assembled construction hoist device
CN204529090U (en) Electric precipitation anode plate hanging apparatus
CN210853369U (en) Protection device for vertical transportation building blocks of tower crane
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN104743437A (en) Electric precipitation anode plate hoisting device
CN213265442U (en) Movable assembled gantry crane
CN211056518U (en) Wheel hub hoist
CN203781713U (en) High slope support material transport device
CN207108239U (en) A kind of Novel steel profile hoisting device
CN214326873U (en) Heavy object hoisting equipment for construction
CN206266182U (en) Stone Vertical transport hanging basket in exterior wall scaffold
CN206309001U (en) Stone Vertical transportation system in exterior wall scaffold
CN220313074U (en) Gear shot blasting tool
CN217230122U (en) High-efficient stable novel valve lift
CN217323021U (en) Building block brick hoisting device for construction
CN212269333U (en) Reverse chain return pushing jacking device
CN214935340U (en) Lifting device for constructional engineering
CN213569108U (en) Precast beam template hoist and mount system
CN218538950U (en) Safe hoisting and conveying device for air-entraining block for building construction
CN210976516U (en) Assembled building safety construction platform
CN210558849U (en) Double-deck formula hanging flower basket carrier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shandong Huimin Meiao ribbon Co.,Ltd.

Assignor: Shandong Binzhou Hexin fiber net Co.,Ltd.

Contract record no.: X2021980011503

Denomination of utility model: A building material hoisting net for construction site

Granted publication date: 20200529

License type: Common License

Record date: 20211028