CN210618126U - Prefabricated wall body production is with fortune material dolly - Google Patents

Prefabricated wall body production is with fortune material dolly Download PDF

Info

Publication number
CN210618126U
CN210618126U CN201920940920.XU CN201920940920U CN210618126U CN 210618126 U CN210618126 U CN 210618126U CN 201920940920 U CN201920940920 U CN 201920940920U CN 210618126 U CN210618126 U CN 210618126U
Authority
CN
China
Prior art keywords
conveying trolley
material conveying
wall body
prefabricated wall
discharging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920940920.XU
Other languages
Chinese (zh)
Inventor
顾志成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Jiquan Building Technology Co ltd
Original Assignee
Nantong Jiquan Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Jiquan Building Technology Co ltd filed Critical Nantong Jiquan Building Technology Co ltd
Priority to CN201920940920.XU priority Critical patent/CN210618126U/en
Application granted granted Critical
Publication of CN210618126U publication Critical patent/CN210618126U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a prefabricated wall body production is with fortune material dolly, fortune material dolly is whole to be leaks hopper-shaped, leaks hopper-shaped be provided with on the fortune material dolly: the feeding door is positioned at the top end of the material conveying trolley and is a split door capable of being automatically opened and closed; the discharge port is positioned at the bottom end of the material conveying trolley, and an automatic discharging device is arranged at the discharge port; the vibration motor is fixedly arranged on the outer wall of the material conveying trolley; and the automatic discharging device and the vibrating motor are respectively connected with the automatic controller.

Description

Prefabricated wall body production is with fortune material dolly
Technical Field
The utility model relates to a prefabricated wall body production field, concretely relates to prefabricated wall body production is with fortune material dolly.
Background
The prefabricated wall is more and more popular in modern buildings due to the advantages of short preparation period, simple splicing process and firm prepared finished product, the production of the prefabricated wall is separated from a construction site and transferred to a production line in a workshop, the production process of the prefabricated wall is convenient, the concrete after being stirred is only required to be inverted into a wall mould and then dried, in the existing prefabricated wall production process, the site required by concrete stirring is large, so that the concrete stirring process is carried out outdoors, then the concrete is transported indoors for mould filling, the transportation process of the concrete also adopts a manual transportation mode with low efficiency and high labor intensity, the company adopts a rail transportation mode through rails and trolleys, compared with the traditional manual transportation mode, the prefabricated wall has the advantages of high efficiency and low labor intensity, however, the rail transportation is higher due to the arrangement of the rails, therefore, the requirement on the automation degree of the trolley is high, and the traditional trolley is difficult to meet the requirement.
SUMMERY OF THE UTILITY MODEL
For solving the problem that above-mentioned traditional dolly can't satisfy rail transport's requirement, the utility model provides a prefabricated wall body production is with fortune material dolly, degree of automation is higher, can satisfy rail transport's requirement completely.
The utility model adopts the technical proposal that:
the utility model provides a prefabricated wall body production is with fortune material dolly, fortune material dolly wholly is hourglass hopper-shaped, leaks hopper-shaped be provided with on the fortune material dolly:
the feeding door is positioned at the top end of the material conveying trolley and is a split door capable of being automatically opened and closed;
the discharge port is positioned at the bottom end of the material conveying trolley, and an automatic discharging device is arranged at the discharge port;
the vibration motor is fixedly arranged on the outer wall of the material conveying trolley, and the vibration motor is arranged to assist concrete to shake off from the material conveying trolley due to poor flowability of the concrete; and
and the automatic discharging device and the vibrating motor are respectively connected with the automatic controller.
Furthermore, two control cylinders are arranged below the feeding door, the two control cylinders are respectively fixed on the inner side wall of the material conveying trolley, cylinder shafts of the two control cylinders are respectively fixed with the two opposite-opening doors, and the two opposite-opening doors are automatically opened and closed through the two control cylinders.
Furthermore, the two control cylinders are synchronous cylinders, so that synchronous opening and closing of the split door can be realized, and the switches of the two control cylinders are connected with the automatic controller.
Further, automatic blowing device includes blowing pipeline and blowing valve, the blowing pipeline is installed in discharge gate department, blowing valve fixed mounting is on the blowing pipeline, the blowing valve is connected with automated controller.
Furthermore, still be provided with the window on the lateral wall of fortune material dolly, install glass on the window, be provided with the scale on the glass, when having clear and definite requirement to the quantity of concrete in the prefabricated wall body workshop, the volume of transporting of ability accurate control fortune material dolly saves the trouble that the clout was handled.
Further, the both sides of fortune material dolly still are provided with an end ear respectively, the end ear all is the right angle form, the end ear inboard all is provided with the pad that rubs that hinders that increases wear resistance, during the use, will fortune material dolly two end ears erect respectively to two tracks on can, for the security that increases in the use, reduce the risk that the end ear drops, best with end ear and fortune material dolly manufacturing become one piece formula.
The utility model has the advantages that: 1. the feeding door is set into a split door capable of automatically opening and closing, the discharging opening is provided with an automatic discharging device, and the outer wall of the conveying trolley is also provided with a vibrating motor, so that the feeding, discharging and discharging processes of the conveying trolley are automated, the requirements of concrete rail transportation are met, and the conveying efficiency of the conveying trolley is greatly improved; 2. the feeding door is arranged on the conveying trolley, the opening and closing of the feeding door can be controlled by the control cylinder during feeding, and the feeding door is closed in the concrete material transportation process to prevent dust, sundries and the like from falling into the conveying trolley to influence the concrete material.
Drawings
Fig. 1 is a schematic sectional view of the present invention.
Fig. 2 is a top view of the usage state of the present invention.
Fig. 3 is a front view of the usage state of the present invention.
Wherein: 1. the device comprises a feeding door, 2, a discharging hole, 3, a vibration motor, 4, an automatic controller, 5, a control cylinder, 6, an automatic discharging device, 61, a discharging pipeline, 62, a discharging valve, 7, a window, 8, an end lug, 9, a friction-resisting gasket, 10 and a track.
Detailed Description
In order to deepen the understanding of the present invention, the present invention will be further described in detail with reference to the following embodiments and the attached drawings, and the embodiments are only used for explaining the present invention, and do not constitute the limitation to the protection scope of the present invention.
As shown in fig. 1, the whole material conveying trolley for producing the prefabricated wall body is funnel-shaped, and a feeding door 1, a discharging hole 2, a vibration motor 3 and an automatic controller 4 are arranged on the funnel-shaped material conveying trolley;
the feeding door 1 is positioned at the top end of the material conveying trolley, the feeding door 1 is a split door capable of being automatically opened and closed, the specific embodiment is that two control cylinders 5 are arranged below the feeding door 1, the two control cylinders 5 are respectively fixed on the inner side wall of the material conveying trolley, cylinder shafts of the two control cylinders 5 are respectively fixed with the two split doors, the two split doors are automatically opened and closed through the two control cylinders 5, the two control cylinders 5 are synchronous cylinders, so that the split doors can be synchronously opened and closed, switches of the two control cylinders 5 are both connected with the automatic controller 4, and the automatic controller 4 controls the control cylinders 5 to be opened and closed;
the discharge port 2 is positioned at the bottom end of the material conveying trolley, the automatic discharging device 6 is arranged at the discharge port 2, the automatic discharging device 6 comprises a discharging pipeline 61 and a discharging valve 62, the discharging pipeline 61 is arranged at the discharge port 2, the discharging valve 62 is fixedly arranged on the discharging pipeline 61, the discharging valve 62 is connected with the automatic controller 4, and the automatic controller 4 controls the discharging valve 62 to be opened and closed;
the vibrating motor 3 is fixedly installed on the outer wall of the material conveying trolley, the flowability of concrete is poor, the concrete flows out of the material conveying trolley under the action of gravity, the consumed time is long, a lot of concrete can be remained on the inner wall of the material conveying trolley, the trolley can be inverted in the manual transportation process, and the concrete retention problem in the trolley is solved by knocking or scraping with a shovel, the utility model discloses a problem is solved by installing the vibrating motor 3, the vibrating motor 3 can assist the concrete to shake off from the material conveying trolley, the vibrating motor 3 is connected with the automatic controller 4, and the automatic controller 4 controls the on-off and vibration performance of the vibrating motor 3;
the control of the automatic controller 4 on the control cylinder 5, the emptying valve 62 and the vibrating motor 3 can be realized by human key operation, or can be realized by setting data parameters on the automatic controller 4 after calculating the travel speed distance and the like of the material conveying trolley, and the like, and the control is not limited in the steps;
the side wall of the material conveying trolley is also provided with a window 7, the window 7 is provided with glass, the glass is provided with scales, when the prefabricated wall production workshop has a definite requirement on the concrete consumption, the conveying amount of the material conveying trolley can be accurately controlled, the trouble of excess material treatment is avoided, particularly when the last prefabricated wall is poured, the concrete in the material conveying trolley is too little to fill the mould, the material is required to be fed into the material conveying trolley again, when the concrete in the material conveying trolley is too much to be added, the last prefabricated wall is manufactured, then the material conveying trolley still has a lot of concrete residues, if the concrete is placed in the material conveying trolley, the concrete can be solidified after a long time, if the concrete is discharged from the material conveying trolley, the material conveying trolley needs to be slid to the end position of the track, the concrete is controlled to flow into the holding container after the discharge port 2 is opened, is troublesome;
both sides of fortune material dolly still are provided with an end ear 8 respectively, and end ear 8 all is the right angle form, and end ear 8 inboard all is provided with the pad 9 that rubs that hinders that increases wear resistance, during the use, will transport two end ears 8 of material dolly erect respectively to two tracks on can, for the security that increases in the use, reduce the risk that end ear 8 drops, will hold ear 8 and transport material dolly at best and make into one piece formula.
As shown in fig. 2 and fig. 3, in the above-mentioned material transporting trolley, when in use, two end lugs 8 are respectively erected on two tracks 10, friction-resisting gaskets 9 on the inner sides of the end lugs 8 are in contact with the pulleys on the tracks 10, when the material transporting trolley is fed at the starting point position of the tracks 10, the automatic controller 4 starts the control cylinder 5 to operate, the control cylinder 5 controls the feeding door 1 to open, then the material transporting trolley is fed through a pump and a short-distance pipeline, the feeding amount of concrete can be observed at the window 7 during the feeding process, the feeding amount of concrete is controlled according to production requirements, after the feeding is finished, the automatic controller 4 controls the control cylinder 5 to reset, the control cylinder 5 controls the feeding door 1 to close during the resetting process, then the material transporting trolley slides on the tracks 10 and slides to the upper part of the production line, the automatic controller 4 jointly opens the feeding valve 62 and the vibrating motor 3, concrete in the conveying trolley flows out of the discharging pipeline 61 and flows into the mould, the vibrating motor 3 continuously drives the conveying trolley to vibrate, the concrete flows out of the conveying trolley more quickly and thoroughly under the vibration effect, and discharging is finished.

Claims (6)

1. The utility model provides a prefabricated wall body production is with fortune material dolly, its characterized in that, fortune material dolly is whole to be leaks hopper-shaped, leaks hopper-shaped be provided with on the fortune material dolly:
the feeding door is positioned at the top end of the material conveying trolley and is a split door capable of being automatically opened and closed;
the discharge port is positioned at the bottom end of the material conveying trolley, and an automatic discharging device is arranged at the discharge port;
the vibration motor is fixedly arranged on the outer wall of the material conveying trolley; and
and the automatic discharging device and the vibrating motor are respectively connected with the automatic controller.
2. The material transporting trolley for producing the prefabricated wall body as claimed in claim 1, wherein two control cylinders are arranged below the feeding door, the two control cylinders are respectively fixed on the inner side wall of the material transporting trolley, the cylinder shafts of the two control cylinders are respectively fixed with the two split doors, and the two split doors are automatically opened and closed through the two control cylinders.
3. The material conveying trolley for producing the prefabricated wall body as claimed in claim 2, wherein the two control cylinders are synchronous cylinders, and switches of the two control cylinders are connected with an automatic controller.
4. The material conveying trolley for producing the prefabricated wall body as claimed in claim 1, wherein the automatic discharging device comprises a discharging pipeline and a discharging valve, the discharging pipeline is installed at a discharging port, the discharging valve is fixedly installed on the discharging pipeline, and the discharging valve is connected with an automatic controller.
5. The material conveying trolley for producing the prefabricated wall body as claimed in claim 1, wherein a window is further arranged on the side wall of the material conveying trolley, glass is mounted on the window, and scales are arranged on the glass.
6. The material conveying trolley for producing the prefabricated wall body as claimed in claim 1, wherein two sides of the material conveying trolley are respectively provided with an end lug, the end lugs are in right-angle shapes, and the inner sides of the end lugs are respectively provided with a friction-resisting gasket for improving wear resistance.
CN201920940920.XU 2019-06-21 2019-06-21 Prefabricated wall body production is with fortune material dolly Active CN210618126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920940920.XU CN210618126U (en) 2019-06-21 2019-06-21 Prefabricated wall body production is with fortune material dolly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920940920.XU CN210618126U (en) 2019-06-21 2019-06-21 Prefabricated wall body production is with fortune material dolly

Publications (1)

Publication Number Publication Date
CN210618126U true CN210618126U (en) 2020-05-26

Family

ID=70756228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920940920.XU Active CN210618126U (en) 2019-06-21 2019-06-21 Prefabricated wall body production is with fortune material dolly

Country Status (1)

Country Link
CN (1) CN210618126U (en)

Similar Documents

Publication Publication Date Title
CN207535058U (en) For producing the assembly line of plaster mould box
CN205289646U (en) Lost pattern casting middlings processing system disappears
CN110421118B (en) Automatic sand recycling system
CN210618126U (en) Prefabricated wall body production is with fortune material dolly
CN214082144U (en) Concrete discharging hopper
CN212859939U (en) Concrete discharge gate prevent remaining concrete dripping device
CN108115824A (en) A kind of slidingtype concrete product distribution device
CN210061544U (en) Quantitative distributing machine
CN108931289A (en) A kind of accurate batching weighing device of concrete
CN209063287U (en) A kind of castable refractory automatic recipe maker
CN206357507U (en) A kind of silica gel production powder feeding device
CN207711036U (en) A kind of slidingtype concrete product distribution device
CN208099244U (en) A kind of castings production quantifying feed mixing device
CN215331536U (en) Floating window plate and decorative moulding concrete pouring volume control device
CN112265107B (en) Building block casting molding system
CN201874242U (en) Quantitative foam concrete pouring machine
CN211466971U (en) A discharge apparatus for concrete storage hopper
CN209969488U (en) Water glass mulling feeding device
CN209469015U (en) A kind of architectural engineering is with pouring device
CN209920218U (en) Post-cast strip seals uses concrete filling equipment convenient to operation
CN103143688A (en) Automatic sand mixing device
CN208178363U (en) A kind of phenolic resin automatic adding device of precoated sand production
CN221314678U (en) Mixing station concrete secondary feed supplement system
CN211466951U (en) Concrete connects hopper splashproof material device
CN206011419U (en) A kind of new type block apparatus for pouring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A material transport cart for prefabricated wall production

Granted publication date: 20200526

Pledgee: Jiangsu Rudong Rural Commercial Bank Co.,Ltd. Shuangdian Sub branch

Pledgor: NANTONG JIQUAN BUILDING TECHNOLOGY Co.,Ltd.

Registration number: Y2024980013868

PE01 Entry into force of the registration of the contract for pledge of patent right