CN210599103U - Satisfy high environmental requirement's tunnel separation escape canal of decontaminating - Google Patents

Satisfy high environmental requirement's tunnel separation escape canal of decontaminating Download PDF

Info

Publication number
CN210599103U
CN210599103U CN201921433384.0U CN201921433384U CN210599103U CN 210599103 U CN210599103 U CN 210599103U CN 201921433384 U CN201921433384 U CN 201921433384U CN 210599103 U CN210599103 U CN 210599103U
Authority
CN
China
Prior art keywords
tunnel
prefabricated
ditch
side wall
sewage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921433384.0U
Other languages
Chinese (zh)
Inventor
程勇
彭文波
李昕
高抗
蹇宜霖
郑聪
高翔
邹小新
宋梓栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Highway Survey and Design Institute Co Ltd
Original Assignee
CCCC Second Highway Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Highway Survey and Design Institute Co Ltd filed Critical CCCC Second Highway Survey and Design Institute Co Ltd
Priority to CN201921433384.0U priority Critical patent/CN210599103U/en
Application granted granted Critical
Publication of CN210599103U publication Critical patent/CN210599103U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a tunnel decontamination separation drainage ditch meeting high environmental requirements, which comprises a plurality of first prefabricated parts and second prefabricated parts, a plurality of first cover plates and second cover plates, wherein the first prefabricated parts are U-shaped, the first prefabricated parts are spliced longitudinally along a tunnel to form a sewage blind ditch, the second prefabricated parts are L-shaped, the second prefabricated parts are spliced longitudinally along the tunnel to form a cable ditch between the tunnel lining structure and the sewage blind ditch, a clear water blind ditch is formed between the left side wall of the first prefabricated part and the side wall of the second prefabricated part as well as between the tunnel lining structure, the first cover plates are sequentially arranged on the sewage blind ditch and the clear water blind ditch longitudinally along the tunnel, the second cover plates are sequentially arranged on the cable ditch longitudinally along the tunnel, compared with the prior art, the tunnel decontamination separation drainage ditch can meet the requirements of tunnel construction and decontamination separation in an operation stage, especially for the construction of extremely long and ultra-long tunnels with sewage, the sewage is purified after being discharged independently, and the purified water can be recycled, thereby meeting the high environmental requirement.

Description

Satisfy high environmental requirement's tunnel separation escape canal of decontaminating
Technical Field
The utility model relates to a tunnel and underground works technical field especially relate to a satisfy the separation escape canal of decontaminating of tunnel that high environment requires.
Background
Tunnel drainage is closely related to normal propulsion and safety of tunnel construction and operation, and is specified in highway tunnel design specifications: "tunnel water drainage prevention measures to be taken, attention should be paid to the protection of natural environment"; a longitudinal drainage system is arranged in a tunnel according to the principle that underground water, operation cleaning sewage and fire-fighting sewage are separated and discharged. In areas with high environmental requirements, construction, operation and fire-fighting sewage are not allowed to be directly discharged and must be recycled after treatment or discharged in other places, so that a groove needs to be independently arranged in a tunnel to guide and discharge sewage, and particularly for extra-long and ultra-long tunnels, the sewage is large in volume and needs a strong sewage discharge treatment system.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art current situation, provide a satisfy the separation escape canal of decontaminating of tunnel that high environment requires.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a satisfy tunnel separation escape canal of decontaminating of high environmental requirement, including a plurality of first prefabs and second prefabs and a plurality of first apron and second apron, first prefabs is the U type, a plurality of first prefabs form the sewage underdrain along the vertical concatenation in tunnel, the slope and the tunnel longitudinal gradient of sewage underdrain are unanimous, the second prefab is the L type, a plurality of second prefabs form the cable pit along between the vertical concatenation back in tunnel and the tunnel lining structure, form clear water underdrain between first prefab left side wall and the second prefab lateral wall and the tunnel lining structure, clear water underdrain and vertical drain pipe are through a plurality of horizontal aqueducts intercommunication, first apron vertically sets gradually on sewage underdrain and clear water underdrain along the tunnel, the second apron vertically sets gradually the cable pit along the tunnel, first apron is located sewage underdrain top department and is equipped with arc and cuts the water recess, the bottom that arc cut the water recess vertically evenly is equipped with a plurality of outlet along the tunnel.
The tunnel lining structure is characterized by further comprising a plurality of middle cover plates, trapezoidal protrusions are arranged on the outer wall of the left side of the first prefabricated part, two ends of each middle cover plate are respectively placed on the tunnel lining structure and the corresponding trapezoidal protrusions, the middle cover plates are sequentially arranged along the longitudinal direction of the clean water blind ditch and divide the clean water blind ditch into an upper heat preservation area and a lower overflowing area, heat preservation materials are filled in the heat preservation areas, and the connecting position of the clean water blind ditch and the transverse water guide pipe is located in the overflowing area.
Furthermore, the height of the left side wall of the first prefabricated part is smaller than that of the right side wall of the first prefabricated part, so that the acting points of the first cover plate are distributed to two ends.
Further, the width of the right side wall of the first prefabricated member is larger than that of the left side wall of the first prefabricated member, and the width of the upper half part of the right side wall of the first prefabricated member is larger than that of the lower half part of the right side wall of the first prefabricated member.
Further, a waterproof cement mortar cushion layer is paved below the first prefabricated member to serve as a leveling layer.
Further, the distance between adjacent drainage holes is 10 cm.
The utility model has the advantages that:
1. compared with the prior art, the tunnel sewage disposal separation drainage ditch meeting the high environmental requirement can meet the requirements of tunnel construction and operation stage sewage disposal and separation, particularly for tunnel construction with extremely large sewage amount and ultra-long tunnel construction, the sewage is separately discharged and then purified, and the purified water can be recycled to meet the high environmental requirement;
2. the clear water blind ditch for leading and draining the underground water is subjected to heat preservation treatment, so that the anti-freezing requirement of the alpine region is met;
3. most structures of the drainage ditch all adopt a prefabricated form, so that the construction difficulty is reduced, the construction efficiency is improved, and the side type drainage ditch is convenient to overhaul without breaking the pavement during overhaul.
Drawings
FIG. 1 is a partial cross section of a drain pipe and tunnel drainage system of the present invention;
FIG. 2 is a structural diagram of a first prefabricated member of the present invention;
FIG. 3 is a front view of a first cover plate of the present invention;
fig. 4 is a top view of the first cover plate of the present invention.
Description of the labeling: 1. the water-saving and water-proof structure comprises a second cover plate, 2, a second prefabricated part, 3, a first cover plate, 4, a pavement, 5, a longitudinal water discharge pipe, 6, a transverse water guide pipe, 7, a heat insulation material, 8, a middle cover plate, 9, a leveling layer, 10, a first prefabricated part, 11 and a water discharge hole.
Detailed Description
Referring to fig. 1-4, a tunnel trash separation drain meeting high environmental requirements includes a plurality of first prefabricated members 10 and second prefabricated members 2, and a plurality of first cover plates 3 and second cover plates 1. The first prefabricated member 10 is the U type, and a plurality of first prefabricated members 10 vertically splice along the tunnel and form the sewage underdrain for the sewage in the drainage tunnel, the slope of sewage underdrain is unanimous with the tunnel longitudinal slope. The second prefab 2 is the L type, and a plurality of second prefabs 2 form the cable pit along behind the vertical concatenation in tunnel and between the tunnel lining structure for the cable conductor of arranging. Clear water underdrains are formed between the left side wall of the first prefabricated member 10 and the side wall of the second prefabricated member 2 and the tunnel lining structure, namely, one side wall of the clear water underdrains is shared by the sewage underdrains, the upper portion of the other side wall is shared by the cable trench, the lower portion and the bottom of the other side wall are shared by the tunnel lining structure, and the clear water underdrains are communicated with the longitudinal drain pipes 5 through the plurality of transverse water guide pipes 6 and used for guiding and draining the underground water collected through the longitudinal drain pipes 5.
First apron 3 vertically sets gradually on sewage underdrain and clear water underdrain along the tunnel, sewage underdrain and clear water underdrain share apron promptly, 3 both ends of first apron support respectively on second prefab 3 and first prefab 10, first apron 3 is located sewage underdrain top department and is equipped with arc and cuts the water recess, the bottom of arc cut the water recess vertically evenly is equipped with a plurality of outlet 11 along the tunnel, sewage in the tunnel collects to arc and cuts the water recess in to introduce the sewage underdrain through outlet 11. Preferably, the distance between adjacent drainage holes 11 is 10 cm. The second cover plate 1 is sequentially arranged on the cable trench along the longitudinal direction of the tunnel, and two ends of the second cover plate 1 are respectively supported on the tunnel lining structure and the second prefabricated member 2.
Among the above-mentioned technical scheme, its tunnel that satisfies high environmental requirement separates escape canal of decontaminating can satisfy the requirement of the separation of decontaminating of tunnel construction and operation stage, especially to the very big extra-long and overlength tunnel construction of sewage volume, carries out purification treatment after the sewage of discharging alone, and water after the purification can reuse, satisfies high environmental requirement. Most structures of the drainage ditch all adopt a prefabricated form, so that the construction difficulty is reduced, the construction efficiency is improved, and during maintenance, the side type drainage ditch does not need to break the pavement 4, so that the maintenance is convenient.
The novel clean water drainage structure is characterized by further comprising a plurality of middle cover plates 8, trapezoidal protrusions are arranged on the outer wall of the left side of the first prefabricated part 9, two ends of each middle cover plate 8 are respectively placed on the tunnel lining structure and the corresponding trapezoidal protrusions, the middle cover plates 8 are sequentially arranged along the longitudinal direction of the clean water blind ditches and divide the clean water blind ditches into an upper heat preservation area and a lower overflowing area, heat preservation materials 7 are filled in the heat preservation areas, and the joints of the clean water blind ditches and the transverse water guide pipes 6 are located in the overflowing areas. The clear water blind ditch for leading and draining the underground water is subjected to heat preservation treatment by the mode, so that the anti-freezing requirement of the alpine region is met. In the non-heat-preservation tunnel section, the heat-preservation area and the corresponding middle cover plate 8 can be eliminated, and at the moment, the whole clear water underdrain is used as a water passing section.
The height of the left side wall of the first prefabricated member 10 is smaller than that of the right side wall of the first prefabricated member, so that the acting points of the first cover plate 3 are distributed to two ends, and the stability of the support of the first cover plate 3 is ensured.
The width of the right side wall of the first preform 10 is greater than that of the left side wall thereof and the width of the upper half of the right side wall is greater than that of the lower half thereof. That is, the side wall of the sewage underdrain close to the road surface 4 is wide and the upper part is enlarged, the enlarged end is the first cover plate 3 and the bearing platform of the road surface 4, the size of the enlarged end can be adjusted properly, but the width of the lower non-enlarged end is not less than 10cm to ensure that the side wall of the sewage underdrain close to the road surface 4 is not damaged by the pressure of the road surface 4. Preferably, a waterproof cement mortar mat is laid as a finishing layer 9 under the first preform 10.
The tunnel left and right sides all sets up the escape canal, and the concrete size of left and right sides escape canal is confirmed according to construction and operation needs to consider the influence of 4 cross slopes on road surface, the size of left and right sides escape canal can have the difference, but the form keeps unanimous.
Specifically, during tunnel construction, the escape canal is opened, but clear water underdrain covers middle apron 8, does not fill insulation material 7, and during construction, face construction sewage and face basement rock crack water discharge in time to the sewage underdrain, and during tunnel operation, first apron 10 and middle apron 8 are all covered, and groundwater is discharged into the clear water underdrain through horizontal aqueduct 6, and sewage converges into the sewage underdrain from outlet 11 to realize the separation of decontaminating.
Of course, the above is only the preferred embodiment of the present invention, and the application range of the present invention is not limited thereto, so all the equivalent changes made in the principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a satisfy separation escape canal that decontaminates in tunnel that high environmental requirement, its characterized in that: comprises a plurality of first prefabricated parts (10), a plurality of second prefabricated parts (2), a plurality of first cover plates (3) and a plurality of second cover plates (1), wherein the first prefabricated parts (10) are U-shaped, the plurality of first prefabricated parts (10) are longitudinally spliced along a tunnel to form a sewage blind ditch, the gradient of the sewage blind ditch is consistent with the longitudinal gradient of the tunnel, the second prefabricated parts (2) are L-shaped, the plurality of second prefabricated parts (2) are longitudinally spliced along the tunnel to form a cable ditch with the tunnel lining structure, a clear water blind ditch is formed between the left side wall of the first prefabricated part (10), the side wall of the second prefabricated part (2) and the tunnel lining structure, the clear water blind ditch is communicated with a longitudinal drain pipe (5) through a plurality of transverse water guide pipes (6), the first cover plates (3) are sequentially arranged on the sewage blind ditch and the clear water blind ditch along the longitudinal direction of the tunnel, the second cover plates (1) are sequentially arranged on the cable ditch along the longitudinal direction of the tunnel, and arc-shaped water cutting grooves are, the bottom of the arc-shaped water interception groove is uniformly provided with a plurality of water drainage holes (11) along the longitudinal direction of the tunnel.
2. The tunnel trash separation drainage ditch meeting high environmental requirements of claim 1, wherein: still include a plurality of middle apron (8), be equipped with trapezoidal arch on the outer wall of first prefab (10) left side, middle apron (8) both ends are shelved respectively in tunnel lining structure and trapezoidal arch, and a plurality of middle apron (8) vertically set gradually along the clear water underdrain and divide into the clear water underdrain at last heat preservation district and the area of crossing under, pack insulation material (7) in the heat preservation district, and the clear water underdrain is located the area of crossing with horizontal aqueduct (6) junction.
3. The tunnel trash separation drain meeting high environmental requirements of claim 1 or 2, wherein: the height of the left side wall of the first prefabricated part (10) is smaller than that of the right side wall of the first prefabricated part, so that the acting points of the first cover plate are distributed to two ends.
4. The tunnel trash separation drain meeting high environmental requirements of claim 1 or 2, wherein: the width of the right side wall of the first prefabricated member (10) is larger than that of the left side wall of the first prefabricated member, and the width of the upper half part of the right side wall of the first prefabricated member is larger than that of the lower half part of the right side wall of the first prefabricated member.
5. The tunnel trash separation drain meeting high environmental requirements of claim 1 or 2, wherein: and a waterproof cement mortar cushion layer is paved below the first prefabricated member (10) to be used as a leveling layer (9).
6. The tunnel trash separation drainage ditch meeting high environmental requirements of claim 1, wherein: the distance between the adjacent drainage holes (11) is 10 cm.
CN201921433384.0U 2019-08-30 2019-08-30 Satisfy high environmental requirement's tunnel separation escape canal of decontaminating Active CN210599103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921433384.0U CN210599103U (en) 2019-08-30 2019-08-30 Satisfy high environmental requirement's tunnel separation escape canal of decontaminating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921433384.0U CN210599103U (en) 2019-08-30 2019-08-30 Satisfy high environmental requirement's tunnel separation escape canal of decontaminating

Publications (1)

Publication Number Publication Date
CN210599103U true CN210599103U (en) 2020-05-22

Family

ID=70698514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921433384.0U Active CN210599103U (en) 2019-08-30 2019-08-30 Satisfy high environmental requirement's tunnel separation escape canal of decontaminating

Country Status (1)

Country Link
CN (1) CN210599103U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110529180A (en) * 2019-08-30 2019-12-03 中交第二公路勘察设计研究院有限公司 A kind of tunnel meeting high environmental requirement, which is removed contamination, separates gutter
CN112523802A (en) * 2020-11-24 2021-03-19 上海市政工程设计研究总院(集团)有限公司 Prefabricated separation side formula ditch inspection shaft of decontaminating and apron

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110529180A (en) * 2019-08-30 2019-12-03 中交第二公路勘察设计研究院有限公司 A kind of tunnel meeting high environmental requirement, which is removed contamination, separates gutter
CN112523802A (en) * 2020-11-24 2021-03-19 上海市政工程设计研究总院(集团)有限公司 Prefabricated separation side formula ditch inspection shaft of decontaminating and apron

Similar Documents

Publication Publication Date Title
WO2021109537A1 (en) Ultra-long tunnel sewage disposing and separation drainage structure suitable for cold regions
KR100438794B1 (en) Construction method for three arch excavation tunnel
CN210599103U (en) Satisfy high environmental requirement's tunnel separation escape canal of decontaminating
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN104514216B (en) A kind of canal on embankment frost heaving resistant leakage preventing structure and construction method
CZ292829B6 (en) Basin construction for catchment of a traffic road
CN107740708B (en) Construction structure and construction method for preventing leakage of tunnel arch wall foot
CN105672443B (en) It is a kind of to integrate antiseepage film anchoring, cut flood and current structure
CN203716064U (en) Roadbed sewer convenient for dredging
CN110541443B (en) Sewage inspection well structure for dredging without stopping water and construction method thereof
AU2019202413B2 (en) Improved concrete road pavement with more sustainability benefits
CN210264760U (en) Tunnel waterproof construction
CN213061752U (en) High earthing abandons sediment field apron and contains structure
CN209538245U (en) A kind of late poured band structure of basement bottom board
CN114922226A (en) Method for staged construction of underpass
CN211474180U (en) Three-hole tunnel drainage system for centralized drainage by using service tunnel
CN213014373U (en) Basement outer wall post-cast strip structure
CN212223970U (en) Prefabricated apron post-cast strip stagnant water temporary enclosed construction
CN112854131A (en) Ecological revetment for water source protection area and construction method thereof
CN212027876U (en) Super long tunnel separation drainage structures of decontaminating suitable for cold areas
CN111501967A (en) Scheme for adding central trench to tunnel without interrupting traffic and rapid construction method
CN219080379U (en) Groundwater drainage system
CN216129911U (en) Terrace drainage system capable of being recycled
CN211897676U (en) Assembled road side ditch
CN212153647U (en) Drainage facility suitable for water source area protection district excavation highway section

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant