CN210597057U - Bridge maintenance construction structures - Google Patents
Bridge maintenance construction structures Download PDFInfo
- Publication number
- CN210597057U CN210597057U CN201920682894.5U CN201920682894U CN210597057U CN 210597057 U CN210597057 U CN 210597057U CN 201920682894 U CN201920682894 U CN 201920682894U CN 210597057 U CN210597057 U CN 210597057U
- Authority
- CN
- China
- Prior art keywords
- bridge
- structure according
- construction structure
- bearing
- movable platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 230000007246 mechanism Effects 0.000 claims abstract description 10
- 230000001681 protective effect Effects 0.000 claims description 2
- 241000282326 Felis catus Species 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a bridge maintenance construction structures, includes movable platform and the bearing mechanism of multiunit along bridge length direction setting, every group bearing mechanism includes that two divide relatively and establish the bearing unit in bridge width direction go up both sides, movable platform be located the bridge below and with bearing unit sliding connection. The technical advantages of the utility model reside in among the bridge maintenance construction structures movable platform's mobility is better, can be through the bearing mechanism who has set up, makes the long line removal in its limited range, and the operation scope is great, is convenient for overhaul the bridge, the maintenance base of people's bank of china also is convenient for to a certain extent to the maintenance of structure self, safe and reliable.
Description
Technical Field
The utility model relates to a bridge overhauls technical field, specifically is a bridge maintenance construction structures.
Background
In recent years, with the great increase of traffic volume, the traveling density and the vehicle load capacity are increased, which forms a new challenge for the safety of bridges, and proper bridge management and maintenance can avoid accidents caused by bridge collapse and other problems. Therefore, the daily maintenance of the bridge is enhanced, the service life of the bridge can be prolonged, and the cost of secondary construction is saved. As the bridge is erected on rivers, mountains and rivers, professional equipment is required to do the work. The currently commonly used devices mainly include: 1. a scaffold; 2. operating the hanging basket; 3. and (5) detecting the vehicle. Although the three types of equipment can complete operations such as bridge detection, bridge reinforcement and the like to a certain extent, the three types of equipment still have great limitations and disadvantages: or the cost is too high and the effect is common, or the maneuverability of the operation is poor, or the load requirement of the reinforcement operation cannot be met, or the range of the operation in the three-dimensional space under the bridge is too small.
Disclosure of Invention
A technical object of the utility model is to provide a bridge maintenance construction structures solves the problem that the tradition overhauls that structure mobility is poor, the working range is little.
The utility model discloses a concrete technical scheme as follows: the utility model provides a bridge maintenance construction structures, includes movable platform and the bearing mechanism of multiunit along bridge length direction setting, every group bearing mechanism includes that two divide relatively and establish the bearing unit in bridge width direction go up both sides, movable platform be located the bridge below and with bearing unit sliding connection.
Preferably, the load-bearing unit comprises a counterweight cabinet, a connecting cross beam and a connecting longitudinal arm, the counterweight cabinet is fixed on the surface of the bridge, the connecting cross beam is fixedly connected to the counterweight cabinet and horizontally extends to the outer side of the bridge, and the connecting longitudinal arm is fixedly connected to the connecting cross beam and vertically extends from the outer side of the bridge to the lower side of the bridge.
Preferably, the connecting trailing arm is provided with a bearing part, all the bearing parts on each side are fixedly connected with a sliding seat together, the sliding seat is provided with a sliding rail, the bottom of the movable platform is provided with a pulley, and the pulley is in sliding connection with the sliding rail.
Preferably, all the bearing parts on each side are fixedly connected with a personnel maintenance base together.
Preferably, the connecting trailing arm is fixedly connected with a force-assisted pull handle.
Preferably, a guard rail is fixedly connected between the adjacent connecting trailing arms on the same side.
Preferably, the connecting trailing arm is further provided with a ladder stand.
Preferably, the lower part of the connecting beam is also fixedly connected with a supporting column fixed on the bridge.
Preferably, the connecting trailing arm is in an "L" shape.
Preferably, the borrow pull handle is in a T shape.
The technical advantages of the utility model reside in among the bridge maintenance construction structures movable platform's mobility is better, can be through the bearing mechanism who has set up, makes the long line removal in its limited range, and the operation scope is great, is convenient for overhaul the bridge, the maintenance base of people's bank of china also is convenient for to a certain extent to the maintenance of structure self, safe and reliable.
Drawings
Fig. 1 is a schematic front view of an embodiment of the present invention;
fig. 2 is a schematic top view of an embodiment of the present invention;
the names of the parts corresponding to the numbers in the figure are respectively: the method comprises the following steps of 1-a movable platform, 2-a counterweight cabinet, 3-a connecting beam, 4-a connecting longitudinal arm, 41-a bearing part, 5-a sliding seat, 6-a pedestrian maintenance base, 7-a force-borrowing pull handle, 8-a protective fence, 9-a ladder stand, 10-a support column and an A-bridge.
Detailed Description
The invention will be further explained by means of specific embodiments with reference to the drawings, in which:
referring to fig. 1 and 2, an embodiment of a bridge maintenance construction structure, the schematic diagrams are only partially schematic and omit the construction structure of the whole section of bridge a, but it is sufficient to clearly understand the scheme, specifically includes a movable platform 1 and a plurality of sets of bearing mechanisms arranged along the length direction of the bridge a, each set of bearing mechanism includes two bearing units oppositely arranged on two sides of the bridge a in the width direction, and the movable platform 1 is located below the bridge a and is connected with the bearing units in a sliding manner. The bearing unit includes counter weight cabinet 2, connect crossbeam 3 and connect trailing arm 4, counter weight cabinet 2 is fixed on bridge A surface, connect crossbeam 3 fixed connection in counter weight cabinet 2 and level and extend to the bridge A outside, connect trailing arm 4 fixed connection in connect crossbeam 3 and follow the vertical bridge A below that extends to in the bridge A outside, counter weight cabinet 2 plays counter weight and guard action, it is also comparatively common in other bridge maintenance platforms, make and connect crossbeam 3, connect trailing arm 4, movable platform 1 can both be born by safety and stability. Connecting 3 lower parts of crossbeam still fixedly connected with fixes support column 10 on bridge A, and support column 10 generally selects to realize fixedly with bridge A both sides railing department, strengthens supporting connecting crossbeam 3, promotes the structural strength and the stability of bearing unit.
The connecting trailing arm 4 is in an L shape as shown in the figure, the horizontal block part at the lower end of the connecting trailing arm is the bearing part 41 of the connecting trailing arm, all the bearing parts 41 on each side are fixedly connected with a sliding seat 5 together, the sliding seat 5 is provided with a sliding rail, and the bottom of the movable platform 1 is provided with a pulley which is connected with the sliding rail in a sliding way. Still be equipped with cat ladder 9 on connecting trailing arm 4, the maintainer can make things convenient for on the underground to the under-bridge construction structure through cat ladder 9.
Connect fixedly connected with on the trailing arm 4 and draw handle 7 with borrow power, when needs let movable platform 1 move, can stand on movable platform 1, the man power hand power is drawn and is drawn handle 7 with borrow power, borrows reaction force to make movable platform 1 remove, and the both sides that best two people stand on movable platform 1 apply force simultaneously. The borrow pull handle 7 is in a T shape, and second connecting rods extend from the end parts of the first connecting rods fixedly connected to the connecting longitudinal arms 4 to the two sides of the length direction of the bridge A, so that the borrow pull handle is convenient for people to use.
Common fixedly connected with people's bank of china maintenance base 6 on all bearing parts 41 of every side, ordinary maintainer overhauls bridge A bottom on movable platform 1, goes wrong when pulley or slide rail or other near region, and maintainer can leave movable platform 1 and walk to and carry out corresponding maintenance on people's bank of china maintenance base 6. And the guard rail 8 is fixedly connected between the adjacent connecting longitudinal arms 4 on the same side, so that personnel are prevented from falling down, and the safety is improved.
It will be understood by those skilled in the art that the embodiments of the present invention as described above and shown in the drawings are given by way of example only and are not limiting of the present invention. The purpose of the utility model is completely and effectively realized. The functional and structural principles of the present invention have been shown and described in the embodiments, and the embodiments of the present invention can be modified or altered without departing from the principles.
Claims (10)
1. The utility model provides a bridge maintenance construction structures which characterized in that: including movable platform (1) and the bearing mechanism that the multiunit set up along bridge length direction, every group bearing mechanism includes that two divide relatively and establish the bearing unit in bridge width direction both sides, movable platform (1) be located the bridge below and with bearing unit sliding connection.
2. A bridge repair construction structure according to claim 1, characterized in that: the bearing unit includes counter weight cabinet (2), connects crossbeam (3) and connects trailing arm (4), counter weight cabinet (2) are fixed on the bridge surface, connect crossbeam (3) fixed connection in counter weight cabinet (2) and level extend to the bridge outside, connect trailing arm (4) fixed connection in connect crossbeam (3) and from the vertical extension in bridge outside to the bridge below.
3. A bridge repair construction structure according to claim 2, characterized in that: be equipped with bearing part (41) on connecting trailing arm (4), all of every side common fixedly connected with slide (5) on bearing part (41), be equipped with the slide rail on slide (5), the bottom of movable platform (1) is equipped with the pulley, the pulley with slide rail sliding connection.
4. A bridge repair construction structure according to claim 3, characterized in that: all the bearing parts (41) on each side are fixedly connected with a manual maintenance base (6) together.
5. A bridge repair construction structure according to claim 2, characterized in that: the connecting longitudinal arm (4) is fixedly connected with a force-borrowing pull handle (7).
6. A bridge repair construction structure according to claim 2, characterized in that: and a protective guard (8) is fixedly connected between the adjacent connecting longitudinal arms (4) on the same side.
7. A bridge repair construction structure according to claim 2, characterized in that: and a ladder (9) is also arranged on the connecting longitudinal arm (4).
8. A bridge repair construction structure according to claim 2, characterized in that: the lower part of the connecting beam (3) is also fixedly connected with a supporting column (10) fixed on the bridge.
9. A bridge repair construction structure according to claim 2, characterized in that: the connecting trailing arm (4) is L-shaped.
10. A bridge maintenance construction structure according to claim 5, characterized in that: the borrow pull handle (7) is T-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920682894.5U CN210597057U (en) | 2019-05-14 | 2019-05-14 | Bridge maintenance construction structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920682894.5U CN210597057U (en) | 2019-05-14 | 2019-05-14 | Bridge maintenance construction structures |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210597057U true CN210597057U (en) | 2020-05-22 |
Family
ID=70715582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920682894.5U Expired - Fee Related CN210597057U (en) | 2019-05-14 | 2019-05-14 | Bridge maintenance construction structures |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210597057U (en) |
-
2019
- 2019-05-14 CN CN201920682894.5U patent/CN210597057U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112160579A (en) | Super high-rise construction protection operation platform system and construction method | |
CN213896722U (en) | Modular assembling protection pocket bottom platform for front supporting point guyed cradle | |
CN210597057U (en) | Bridge maintenance construction structures | |
CN106522541B (en) | A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system | |
CN210395123U (en) | Front supporting leg telescopic structure convenient to operate for bridge girder erection machine | |
CN213653209U (en) | Integrated construction movable platform for bridge flange plate | |
CN205348005U (en) | Construction operation combination platform of basket is hung to cable -stay bridge guy rope | |
CN211498488U (en) | Highway and railway dual-purpose bridge movable railway hard protection platform | |
CN210216166U (en) | T roof beam pours safety protection platform | |
CN114086471A (en) | Simple and easy mobile device of bridge annex installation | |
CN208844441U (en) | Bridge beam body operation platform | |
CN219212046U (en) | Be used for steel case roof beam decorative board welded locomotive | |
CN214328569U (en) | Bridge operation platform | |
CN210917017U (en) | Movable type outside formwork construction trolley | |
CN220927529U (en) | Suspension type light-weight simulated continuous beam outer mold | |
CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
CN214527986U (en) | Construction elevator with movable bearing platform | |
CN217298622U (en) | Movable bridge side hanging flower basket construction operation car | |
CN211872627U (en) | Maintenance car for repairing concrete guardrail of viaduct | |
CN217379718U (en) | Prefabricated stairwell operation protection platform | |
CN217921349U (en) | High-safety protection lifter for construction site | |
CN211340474U (en) | Hang basket convenient to be under construction in roof beam side | |
CN213772931U (en) | Stretching-in type viaduct side construction crawling ladder | |
CN214531827U (en) | Mobilizable safe ladder formula scaffold frame for construction | |
CN219280501U (en) | Movable safety device for bridge deck construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200522 |
|
CF01 | Termination of patent right due to non-payment of annual fee |