CN210564551U - A quick installing support for colliery tunnelling tunnel - Google Patents
A quick installing support for colliery tunnelling tunnel Download PDFInfo
- Publication number
- CN210564551U CN210564551U CN201920965335.5U CN201920965335U CN210564551U CN 210564551 U CN210564551 U CN 210564551U CN 201920965335 U CN201920965335 U CN 201920965335U CN 210564551 U CN210564551 U CN 210564551U
- Authority
- CN
- China
- Prior art keywords
- support
- quick
- fixed
- coal mine
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a quick mounting bracket for a coal mine tunneling tunnel, which belongs to the field of coal mine tunnel support; providing a protective bracket specially used for rapidly installing a roadway; the technical scheme is as follows: a quick mounting bracket for a coal mine excavation roadway, comprising: a lifting frame and a quick mounting frame; the lifting frame is used for assisting in mounting the quick mounting bracket; the lifting frame comprises a travelling mechanism and a lifting frame, the travelling mechanism is an electric flat trolley, and the lifting frame comprises a telescopic frame vertically fixed on the travelling mechanism and a lifting rod fixed at the top end of the telescopic frame; the utility model discloses but wide application in mine safety support field.
Description
Technical Field
The utility model relates to a quick installing support for colliery tunnelling tunnel belongs to the colliery tunnel and struts the field.
Background
Coal mines in China are mainly underground mining, a large number of roadways need to be excavated underground, and roadway support is adopted to keep the roadways smooth and surrounding rocks stable, so that the method has important significance for coal mine construction and production.
The basic purpose of supporting the roadway is to alleviate and reduce the movement of surrounding rocks, so that the section of the roadway is not excessively reduced, and meanwhile, the scattered and damaged surrounding rocks are prevented from falling. The roadway supporting effect is not only dependent on the supporting force of the support, but also influenced by a series of factors such as the properties of surrounding rocks, the mechanical properties (supporting force and flexibility) of the support, the installation density of the support, the time of installing the support, the installation quality of the support and the contact mode (point contact or surface contact) with the surrounding rocks.
Generally, in order to make the roadway support play a positive role in regulating and controlling the deformation process of the surrounding rock, the support is installed before the surrounding rock loosens and is damaged, so that the support and the surrounding rock play a bearing role under the condition that the surrounding rock still keeps self-bearing force, but the support is used for bearing the weight of the caving rock block under the condition that the surrounding rock loosens and is damaged and the self-bearing force is almost completely lost.
Therefore, when the heading machine is used for digging and forming a roadway, not only temporary payment is needed for forming protection above the heading machine, but also supports are needed to be quickly arranged in the roadway so as to ensure the life safety of workers in the roadway.
However, in general, in addition to a heavy hydraulic support, a common underground support has a support structure formed by combining a steel structure and a log, and the underground support structure is complex, inconvenient to move, slow in installation speed and difficult to meet the requirements of rapid installation and safety of a roadway.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a protection support that tunnel was installed fast is exclusively used in.
In order to achieve the technical purpose, the utility model provides a technical scheme does:
a quick mounting bracket for a coal mine excavation roadway, comprising: a lifting frame and a quick mounting frame; the lifting frame is used for assisting in mounting the quick mounting bracket;
the lifting frame comprises a travelling mechanism and a lifting frame, the travelling mechanism is an electric flat trolley, and the lifting frame comprises a telescopic frame vertically fixed on the travelling mechanism and a lifting rod fixed at the top end of the telescopic frame.
The fast ampere of support includes: the support column, the transverse bracket, the vertical bracket and the fixing anchor rod are arranged on the support column; the horizontal support both ends all are provided with porose A, two be provided with at least one hole B on the horizontal support between the hole A, two the horizontal support level sets up, and the hole A of two horizontal supports is all internal to articulate has a support post, four at least on the vertical setting of support post just is fixed in the tunnel wall through fixed stock, two be fixed with the perpendicular support of level setting between the hole B of horizontal support, just it is perpendicular with the horizontal support to erect the support, the axis in hole A and the hole B all is parallel with the horizontal support.
The hole A center shaft is parallel to the transverse support, when the supporting upright post is hinged with the transverse support, rotating shafts are arranged in the hole A, the rotating shafts can rotate relative to the hole A, two ends of each rotating shaft are fixed with the supporting upright post and the transverse support, and the supporting upright post can rotate relative to the transverse support by taking the central axis of the hole A as the center.
The top end of the supporting upright post is provided with a horizontal rod which is connected with the lifting rod in a clamping manner.
The lifting rod comprises a straight rod parallel to the transverse support and a groove arranged on the straight rod.
And a plurality of auxiliary supports are arranged on the vertical support between the two transverse supports, the auxiliary supports are consistent with the transverse support in structure, and the auxiliary supports are parallel to the transverse supports and hinged on the vertical support.
The quick-mounting support further comprises a protection steel wire mesh, the protection steel wire mesh is fixed on the upper end face of the quick-mounting support, and the protection steel wire mesh can prevent small-sized slag stones from falling down to injure pedestrians by crashing.
The telescopic frame is a hydraulic cylinder.
The lifting frame further comprises a hydraulic driving module, the hydraulic driving module is fixed on the traveling mechanism and comprises an oil tank, an oil pump and a control valve group, and the oil tank, the oil pump, the control valve group and the telescopic frame are sequentially communicated through hoses.
Compared with the prior art, the utility model beneficial effect who has is:
one, the utility model discloses a lifting frame and the mode of mutually supporting of fast ann's support can divide the worker to cooperate in the pit: some workers combine the quick-mounting support, and other workers adopt the lifting frame to lift the quick-mounting support and fix the quick-mounting support in surrounding rocks on two sides of the roadway through anchor rods.
Two, the utility model discloses the combination is convenient, and the installation is rapid, is applicable to the underground roadway support work to just digging, can guarantee safety protection in the pit as early as possible, ensures that the pedestrian of coming and going can not be fallen the sediment or the landslide injures by a crashing object by the tunnel top.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the lifting frame of the present invention;
FIG. 3 is a schematic view of the installation of the quick-mounting bracket of the present invention;
FIG. 4 is a sectional view of the roadway after the quick-mounting bracket of the present invention is mounted;
in the figure: 1 is the lifting frame, 2 is fast ampere of support, 11 is running gear, 12 is the hoisting frame, 13 is the expansion bracket 13, 14 is the lifting rod, 21 is the support post, 22 is the horizontal stand, 23 is vertical support, 24 is the fixed stock.
Detailed Description
For a further understanding of the present invention, reference will now be made in detail to the following examples and embodiments, taken in conjunction with the accompanying drawings:
as shown in fig. 1 to 4: a quick mounting bracket for a coal mine excavation roadway, comprising: a lifting frame 1 and a quick mounting bracket 2; the lifting frame 1 is used for assisting in mounting the quick mounting support 2;
the lifting frame 1 comprises a walking mechanism 11 and a lifting frame 12, the walking mechanism 11 is an electric flat car, and the lifting frame 12 comprises a telescopic frame 13 vertically fixed on the walking mechanism 11 and a lifting rod 14 fixed at the top end of the telescopic frame 13.
The quick-mounting bracket 2 comprises: a support upright post 21, a transverse bracket 22, a vertical bracket 23 and a fixed anchor rod 24; horizontal support 22 both ends all are provided with porose A, two be provided with at least one hole B on the horizontal support 22 between the hole A, two horizontal support 22 level sets up, and has support post 21, four at least in the hole A of two horizontal supports 22 is all articulated support post 21, two on the vertical setting of support post 21 just is fixed in the tunnel wall through fixed stock 24, two be fixed with the perpendicular support 23 of level setting between the hole B of horizontal support 22, just it is perpendicular with horizontal support 22 to erect support 23, the axis in hole A and the hole B all is parallel with horizontal support 22.
The top end of the supporting upright post 21 is provided with a horizontal rod which is clamped on the lifting rod 14.
The lifting bar 14 comprises a straight bar parallel to the cross brace 22 and a groove provided on the straight bar.
A plurality of auxiliary supports are arranged on the vertical support 23 between the two transverse supports 22, the auxiliary supports are consistent with the transverse supports 22 in structure, and the auxiliary supports are parallel to the transverse supports 22 and hinged on the vertical support 23.
The fast ampere of support 2 still includes the protection wire net, the protection wire net is fixed in on the 2 up end of fast ampere of support.
The telescopic frame 13 is a hydraulic cylinder.
The utility model discloses specific operation as follows:
the at least four supporting upright posts 21 are horizontally placed on the ground, the two transverse supports 22 are hinged to the front ends of the supporting upright posts 21, the plurality of vertical supports 23 are sequentially hinged to the transverse supports 22, and the protective steel wire meshes are integrally and flatly laid on the transverse supports 22 and the vertical supports 23; lifting frame 1 can move to the fast ann support 2 below of having made up (need workman's lifting fast ann support 2), with the horizon bar card on the support post 21 in the recess of lift bar 14, slowly control the vertical lifting of expansion bracket 13, stop until support post 21 complete vertical and after horizontal stand 22 and vertical 23 and the laminating of tunnel top, support post 21 passes through the stock to be fixed in the country rock of tunnel both sides, for improving support post 21 supporting effect, support post 21 lower part can set up the supporting pad, expansion bracket 1 descends, then lifting frame 1 moves forward and continues next round of work.
It should be noted in addition that the utility model discloses not only can use in the aspect of the roadway support in the pit, other supporting fields in the pit are equally suitable.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. It will be apparent to those skilled in the art that modifications and improvements can be made to the above-described embodiments without departing from the spirit and scope of the invention. Accordingly, it will be appreciated that those skilled in the art, upon attaining an understanding of the foregoing may readily produce alterations to, variations of, and equivalents to these embodiments without departing from the spirit and scope of the present invention as defined by the appended claims.
Claims (8)
1. The utility model provides a quick installing support for colliery tunnelling tunnel which characterized in that: the method comprises the following steps: a lifting frame (1) and a quick mounting bracket (2); the lifting frame (1) is used for assisting in mounting the quick mounting bracket (2);
lifting frame (1) includes running gear (11) and hoisting frame (12), running gear (11) are electronic dull and stereotyped dolly, hoisting frame (12) are including vertical expansion bracket (13) of being fixed in on running gear (11) and lifting rod (14) of being fixed in expansion bracket (13) top.
2. A quick-mount support for a coal mine excavation roadway as claimed in claim 1, wherein: the quick-mounting bracket (2) comprises: the support column (21), the transverse bracket (22), the vertical bracket (23) and the fixed anchor rod (24); horizontal support (22) both ends all are provided with porose A, two be provided with at least one hole B on horizontal support (22) between the hole A, two horizontal support (22) level sets up, and the hole A of two horizontal support (22) is all interior articulated have support post (21), four at least on the vertical setting of support post (21) just is fixed in the tunnel wall through fixed stock (24), two be fixed with perpendicular support (23) that the level set up between the hole B of horizontal support (22), just it is perpendicular with horizontal support (22) to erect support (23), the axis in hole A and the hole B all is parallel with horizontal support (22).
3. A quick-mount support for a coal mine excavation roadway as claimed in claim 2, wherein: the top end of the supporting upright post (21) is provided with a horizontal rod which is clamped on the lifting rod (14).
4. A quick-mount support for a coal mine excavation roadway as claimed in claim 3, wherein: the lifting rod (14) comprises a straight rod parallel to the transverse support (22) and a groove arranged on the straight rod.
5. A quick-mounting support for a coal mine excavation roadway according to any one of claims 2 to 4, characterised in that: a plurality of auxiliary supports are arranged on the vertical support (23) between the two transverse supports (22), the auxiliary supports are consistent with the transverse supports (22) in structure, and the auxiliary supports are parallel to the transverse supports (22) and hinged on the vertical support (23).
6. A quick-mounting bracket for a coal mine excavation roadway according to claim 5, characterized in that: the quick-mounting support (2) further comprises a protective steel wire mesh, and the protective steel wire mesh is fixed on the upper end face of the quick-mounting support (2).
7. A quick-mount support for a coal mine entry roadway as claimed in any one of claims 1, 2, 3, 4 or 6, wherein: the telescopic frame (13) is a hydraulic cylinder.
8. A quick-mount support for a coal mine excavation roadway as claimed in claim 7, wherein: lifting frame (1) still includes the hydraulic drive module, the hydraulic drive module is fixed in on running gear (11), the hydraulic drive module includes oil tank, oil pump and valves, oil tank, oil pump, valves and expansion bracket (13) communicate through the hose in proper order.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920965335.5U CN210564551U (en) | 2019-06-25 | 2019-06-25 | A quick installing support for colliery tunnelling tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920965335.5U CN210564551U (en) | 2019-06-25 | 2019-06-25 | A quick installing support for colliery tunnelling tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210564551U true CN210564551U (en) | 2020-05-19 |
Family
ID=70639777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920965335.5U Expired - Fee Related CN210564551U (en) | 2019-06-25 | 2019-06-25 | A quick installing support for colliery tunnelling tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210564551U (en) |
-
2019
- 2019-06-25 CN CN201920965335.5U patent/CN210564551U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101230785B (en) | Construction method for large section and multiple sections tunnel lining | |
CN101832102B (en) | Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage | |
CN102128040B (en) | Hydraulic striding-type advanced-support equipment | |
CN101858213B (en) | Drilling, loading, transporting and anchoring integrated machine with dual platforms and four arms for coal roadway | |
CN106593437A (en) | Digging, supporting, anchoring and drilling all-in-one fully-mechanized excavating machine | |
CN104879061A (en) | Multifunctional self-propelled portal wagon drill | |
CN102278110A (en) | Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage | |
CN102383815B (en) | Suspension type driftage temporary supporting device and use method thereof | |
CN206309412U (en) | A kind of umbrella shape point pillar gib for coal mine roadway | |
CN101812974A (en) | Lifting platform of construction vehicle | |
CN201826837U (en) | Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables | |
CN203223239U (en) | Roadway advance timbering support used for assisting machine to move | |
CN202055821U (en) | Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform | |
CN109209488A (en) | Gob side entry confined concrete pillar construction equipment and mechanized construction method | |
CN210564551U (en) | A quick installing support for colliery tunnelling tunnel | |
CN103216252B (en) | Roadway advanced supporting supports capable of assisting machinery to move | |
CN205743934U (en) | Self-propelled tunnel inverted arch reinforcing bar spelling installs chassis | |
CN101338672B (en) | Digging laneway temporary support device | |
CN102536277B (en) | Follower assorted supporting and anchoring system of cantilever type development machine | |
CN103130103A (en) | Lifting device suitable for underground ally and chamber | |
CN201696041U (en) | Double-platform four-arm drilling, loading, conveying and anchoring integrated machine for coal roadways | |
CN206448809U (en) | Pick, branch, anchor, drill integrated fully-mechanized digging machine | |
CN202645606U (en) | Cantilever type heading machine vehicle-mounted matched supporting and anchoring system | |
CN202187785U (en) | Suspended type temporary supporting device for laneway tunneling | |
CN207454002U (en) | Suspension device is tunneled in a kind of colliery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200519 Termination date: 20210625 |
|