CN210562176U - Constructional engineering pile device - Google Patents

Constructional engineering pile device Download PDF

Info

Publication number
CN210562176U
CN210562176U CN201921392678.3U CN201921392678U CN210562176U CN 210562176 U CN210562176 U CN 210562176U CN 201921392678 U CN201921392678 U CN 201921392678U CN 210562176 U CN210562176 U CN 210562176U
Authority
CN
China
Prior art keywords
frame
fixed
plate
vertical
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921392678.3U
Other languages
Chinese (zh)
Inventor
曹文峰
张李平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Forestry Vocational & Technical College
Fujian Vocational College of Agriculture
Original Assignee
Fujian Forestry Vocational & Technical College
Fujian Vocational College of Agriculture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Forestry Vocational & Technical College, Fujian Vocational College of Agriculture filed Critical Fujian Forestry Vocational & Technical College
Priority to CN201921392678.3U priority Critical patent/CN210562176U/en
Application granted granted Critical
Publication of CN210562176U publication Critical patent/CN210562176U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a building engineering pile device, including pneumatic cylinder, frame, support and holder, the top of support is fixed with the frame, the frame is the door type structure that a set of horizontal plate and two sets of vertical board are constituteed, the lateral wall in opposite directions of two sets of vertical boards of frame all is fixed with the holder, the lateral wall that two sets of vertical boards of frame carried on the back mutually all is fixed with the reinforcing plate, the top of the horizontal plate of frame is fixed with the pneumatic cylinder, the outer wall cover of pneumatic cylinder has the fastener, the piston rod of pneumatic cylinder runs through the inside through-hole of the horizontal plate of frame, the bottom mounting of the piston rod of pneumatic cylinder has the roof, the diapire of roof is fixed with the rubber pad, the both ends homogeneous body shaping of roof has the lug, the vertical spout with the lug adaptation is all seted up to the lateral wall of two sets of vertical boards of frame. This building engineering pile driver device has saved manpower and time, has higher stability.

Description

Constructional engineering pile device
Technical Field
The utility model belongs to the technical field of construction machinery, concretely relates to building engineering pile device.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building comprises a top cover, beam columns, walls, a foundation and a building body, wherein the roof cover, the beam columns, the walls and the foundation can form an internal space, so that the requirements of people on production, living, learning, public activities and the like are met, and the house building comprises a factory building, a theater, a hotel, a shop, a school, a hospital, a house and the like; the 'auxiliary facilities' refer to water towers, bicycle sheds, pools and the like which are matched with the house building. The 'installation of lines, pipelines and equipment' refers to the installation activities of the lines, pipelines and equipment such as electricity, water supply and drainage, communication, elevators and the like which are matched with the building construction and the auxiliary facilities thereof. In the building engineering work progress, need squeeze into the underground with prefabricated small-size concrete pile sometimes, artifical pile driving is not only wasted time and energy, can lead to the pile position skew because of the concrete pile is fixed not firm moreover, influences the quality of construction and pile foundation.
Therefore, in order to meet the current situation, the design and production of the piling device for construction engineering are urgently needed to meet the requirements of practical use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering pile device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering pile device, includes pneumatic cylinder, frame, support and holder, the top of support is fixed with the frame, the frame is the gate-type structure that a set of horizontal plate and two sets of vertical board are constituteed, the lateral wall in opposite directions of two sets of vertical boards of frame all is fixed with the holder, the lateral wall that two sets of vertical boards of frame carried on the back mutually all is fixed with the reinforcing plate, the top of the horizontal plate of frame is fixed with the pneumatic cylinder, the outer wall cover of pneumatic cylinder has the fastener, the piston rod of pneumatic cylinder runs through the inside through-hole of the horizontal plate of frame, the bottom mounting of the piston rod of pneumatic cylinder has the roof, the diapire of roof is fixed with the rubber pad, the both ends homogeneous body shaping of roof has the lug, the vertical spout with the lug adaptation is all seted up to the lateral wall of two.
Preferably, the support includes bottom plate, breach, lead screw and backing plate, the inside of bottom plate is dug and is equipped with the breach, the gyro wheel is all installed to the four corners department of the bottom of bottom plate, the equal threaded connection in four corners department of bottom plate has vertical lead screw, four groups the top homogeneous body shaping of lead screw has two sets of horizontally horizontal poles, four groups the bottom of lead screw all is fixed with the backing plate, four groups the equal integrated into one piece in bottom of backing plate has the multiunit rivet.
Preferably, the holder includes screw thread post, sleeve pipe, arc and damping pad, the one end of screw thread post is fixed with the ring flange, screw thread post and sleeve pipe threaded connection, the one end that the screw thread post was kept away from to the sleeve pipe rotates with the lateral wall of arc to be connected, the inner wall of arc is fixed with the damping pad.
Preferably, the clamping piece is of a hollow round platform structure, a flange is integrally formed on the bottom wall of the clamping piece, a plurality of groups of threaded holes are formed in the flange, a sleeve is integrally formed on the top end of the clamping piece, and a plurality of groups of threaded holes matched with the locking bolts are drilled in the side wall of the sleeve.
Preferably, the reinforcing plate is of an L-shaped plate structure, a clamping block is integrally formed at the joint of the horizontal section and the vertical section of the reinforcing plate, the clamping block is of a triangular prism structure, and a plurality of groups of through holes are drilled in the reinforcing plate.
The utility model discloses a technological effect and advantage: according to the piling device for the building engineering, a cross rod on the top wall of a screw rod is held by a hand to rotate the screw rod, the screw rod drives a base plate to descend, rivets at the bottom end of the base plate are enabled to be pricked into a soil layer, a base plate can be fixed on uneven or soft ground, the screw rod is rotated to enable the base plate and the rivets to be separated from the ground, a roller can be in contact with the ground, and the base plate and a frame can be conveniently moved; the sleeve is rotated to drive the arc-shaped plates to move, and the two groups of arc-shaped plates are combined with the damping pad, so that piles with different diameters can be supported, and the pile body is prevented from being inclined and swaying; the piston rod of pneumatic cylinder drives the roof and descends at the uniform velocity, exerts stable pressure for the stake, can squeeze into the underground smoothly with the stake, has alleviateed people's intensity of labour, has improved efficiency, and the lug at roof both ends combines with vertical spout and fastener, the reinforcing plate of frame lateral wall, has improved the stability of pile driving in-process, has guaranteed the pile quality, and this building engineering pile driver equipment has saved manpower and time, has higher stability.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a schematic structural view of the fastener of the present invention;
fig. 3 is a schematic structural view of the reinforcing plate of the present invention.
In the figure: the device comprises a hydraulic cylinder 1, a clamping piece 2, a sleeve 20, a locking bolt 21, a frame 3, a top plate 4, a support 5, a bottom plate 50, a notch 51, a screw rod 52, a cushion plate 53, a clamping piece 6, a threaded column 60, a sleeve 61, an arc plate 62, a reinforcing plate 7 and a clamping block 70.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless defined otherwise, all references to up, down, left, right, front, back, inner and outer directions herein are to be interpreted as referring to up, down, left, right, front, back, inner and outer directions in the drawings to which the invention is applied, and all references are hereby incorporated herein by reference.
The utility model provides a constructional engineering pile driving device as shown in figures 1-3, which comprises a hydraulic cylinder 1, a frame 3, a support 5 and a clamping piece 6, wherein the top end of the support 5 is welded with the frame 3, the frame 3 is a door-shaped structure consisting of a group of horizontal plates and two groups of vertical plates, the opposite side walls of the two groups of vertical plates of the frame 3 are respectively fixed with the clamping piece 6 through bolts, the opposite side walls of the two groups of vertical plates of the frame 3 are respectively fixed with a reinforcing plate 7 through bolts, the top end of the horizontal plate of the frame 3 is fixed with the hydraulic cylinder 1 through bolts, the hydraulic cylinder 1 adopts an electric single-piston-rod hydraulic cylinder, the outer wall of the hydraulic cylinder 1 is sleeved with a clamping piece 2, the piston rod of the hydraulic cylinder 1 penetrates through the through hole inside the horizontal plate of the frame 3, the bottom end of the piston rod of the hydraulic cylinder 1 is fixed with a top plate 4, the equal integrated into one piece in both ends of roof 4 has the lug, the vertical spout with the lug adaptation is all seted up to the lateral wall of two sets of vertical boards of frame 3.
Specifically, support 5 includes bottom plate 50, breach 51, lead screw 52 and backing plate 53, the inside of bottom plate 50 is dug and is equipped with breach 51, the gyro wheel is all installed to the four corners department of the bottom of bottom plate 50, the equal threaded connection in four corners department of bottom plate 50 has vertical lead screw 52, four groups the equal integrated into one piece in top of lead screw 52 has two sets of horizontally horizontal poles, four groups backing plate 53, four groups have all been welded to the bottom of lead screw 52 the equal integrated into one piece in bottom of backing plate 53 has the multiunit rivet, holds the horizontal pole rotating lead screw 52 of lead screw 52 roof, and lead screw 52 drives backing plate 53 and descends, makes the rivet of backing plate 53 bottom prick the soil layer, can fix bottom plate 50 at uneven or soft subaerial, rotating lead screw 52 makes backing plate 53 and rivet and ground break away from, and the gyro wheel can contact with ground, is convenient for remove bottom plate 50 and frame.
Specifically, holder 6 includes threaded post 60, sleeve pipe 61, arc 62 and damping pad, the flange dish has been welded to the one end of threaded post 60, threaded post 60 and sleeve pipe 61 threaded connection, the one end that threaded post 60 was kept away from to sleeve pipe 61 is rotated with the lateral wall of arc 62 and is connected, the inner wall of arc 62 bonds and has the damping pad, rotating sleeve pipe 61, and sleeve pipe 61 drives arc 62 and removes, and two sets of arcs 62 and damping pad combine, can support the stake of different diameters, prevent that the pile body from removing and crooked.
Specifically, fastener 2 is hollow round platform structure, the diapire integrated into one piece of fastener 2 has the flange, and the multiunit screw hole has been seted up to the inside of flange, the top integrated into one piece of fastener 2 has sleeve 20, the screw that is equipped with multiunit and locking bolt 21 adaptation is bored to the lateral wall of sleeve 20, and rotatory locking bolt 21 makes the one end of locking bolt 31 and the lateral wall laminating of pneumatic cylinder 1, can alleviate rocking of pneumatic cylinder 1.
Specifically, reinforcing plate 7 is L shaped plate structure, reinforcing plate 7's the junction integrated into one piece of horizontal segment and vertical section has fixture block 70, fixture block 70 is the triangular prism structure, reinforcing plate 7's inside is bored and is equipped with the multiunit through-hole, and reinforcing plate 7 has improved frame 3's stability.
Specifically, this building engineering pile driver equipment, promote support 5, hold the horizontal pole rotating lead screw 52 of lead screw 52 roof, lead screw 52 drives backing plate 53 and descends, make the rivet of backing plate 53 bottom prick the soil layer, can fix bottom plate 50 in the uneven or soft subaerial of pothole, arrange prefabricated pile in breach 51, rotating sleeve pipe 61, sleeve pipe 61 drives arc 62 and removes, two sets of arc 62 and damping pad combine, can support the stake of different diameters, prevent that the pile body from removing and crooked, control pneumatic cylinder 1 through pneumatic cylinder 1 from the control switch in area, pneumatic cylinder 1's piston rod drives roof 4 and descends at the uniform velocity, exert stable pressure for the stake, squeeze into the underground with the stake, manpower and time have been saved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (5)

1. A construction piling device, comprising a hydraulic cylinder (1), a frame (3), a support (5) and a clamping member (6), characterized in that: a frame (3) is fixed at the top end of the support (5), the frame (3) is a door-shaped structure consisting of a group of horizontal plates and two groups of vertical plates, clamping pieces (6) are fixed on the opposite side walls of the two groups of vertical plates of the frame (3), reinforcing plates (7) are fixed on the opposite side walls of the two groups of vertical plates of the frame (3), a hydraulic cylinder (1) is fixed at the top end of a horizontal plate of the frame (3), a clamping piece (2) is sleeved on the outer wall of the hydraulic cylinder (1), a piston rod of the hydraulic cylinder (1) penetrates through a through hole in a horizontal plate of the frame (3), a top plate (4) is fixed at the bottom end of a piston rod of the hydraulic cylinder (1), a rubber pad is fixed at the bottom wall of the top plate (4), the both ends of roof (4) all integrated into one piece have the lug, the lateral wall of two sets of vertical boards of frame (3) all seted up with the vertical spout of lug adaptation.
2. A construction piling device according to claim 1, wherein: support (5) include bottom plate (50), breach (51), lead screw (52) and backing plate (53), the inside of bottom plate (50) is dug and is equipped with breach (51), the gyro wheel is all installed in the four corners department of the bottom of bottom plate (50), the equal threaded connection in four corners department of bottom plate (50) has vertical lead screw (52), four groups the equal integrated into one piece in top of lead screw (52) has two sets of horizontally horizontal poles, four groups the bottom of lead screw (52) all is fixed with backing plate (53), four groups the equal integrated into one piece in bottom of backing plate (53) has the multiunit rivet.
3. A construction piling device according to claim 1, wherein: holder (6) are including screw thread post (60), sleeve pipe (61), arc (62) and damping pad, the one end of screw thread post (60) is fixed with the ring flange, screw thread post (60) and sleeve pipe (61) threaded connection, the one end that screw thread post (60) were kept away from in sleeve pipe (61) rotates with the lateral wall of arc (62) to be connected, the inner wall of arc (62) is fixed with the damping pad.
4. A construction piling device according to claim 1, wherein: fastener (2) are hollow round platform structure, the diapire integrated into one piece of fastener (2) has the flange, and the multiunit screw hole has been seted up to the inside of flange, the top integrated into one piece of fastener (2) has sleeve (20), the screw that is equipped with multiunit and locking bolt (21) adaptation is bored to the lateral wall of sleeve (20).
5. A construction piling device according to claim 1, wherein: reinforcing plate (7) are L shaped plate structure, the junction integrated into one piece of the horizontal segment of reinforcing plate (7) and vertical section has fixture block (70), fixture block (70) are the triangular prism structure, the inside of reinforcing plate (7) is bored and is equipped with the multiunit through-hole.
CN201921392678.3U 2019-08-26 2019-08-26 Constructional engineering pile device Expired - Fee Related CN210562176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921392678.3U CN210562176U (en) 2019-08-26 2019-08-26 Constructional engineering pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921392678.3U CN210562176U (en) 2019-08-26 2019-08-26 Constructional engineering pile device

Publications (1)

Publication Number Publication Date
CN210562176U true CN210562176U (en) 2020-05-19

Family

ID=70623209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921392678.3U Expired - Fee Related CN210562176U (en) 2019-08-26 2019-08-26 Constructional engineering pile device

Country Status (1)

Country Link
CN (1) CN210562176U (en)

Similar Documents

Publication Publication Date Title
CN201924360U (en) Multifunctional hydraulic static pile press
CN211849488U (en) A supporting construction for weak soil foundation ditch
CN211873950U (en) Combined supporting pile for civil engineering
JP3203114U (en) Pole basic structure
CN210562176U (en) Constructional engineering pile device
CN210263929U (en) A preformed hole template for building civil engineering
CN107859057A (en) A kind of retaining wall for hydraulic engineering
CN214034906U (en) Strutting arrangement is used in civil engineering construction
CN214302185U (en) House frame and interior wallboard assembly system of light gauge steel structure
CN210049301U (en) Excavating gear for building engineering
CN211201250U (en) Strutting arrangement for civil engineering
CN213267858U (en) Foundation engineering pile driving device
CN204385762U (en) A kind of Rock Bolt Foundation structure
CN106759493A (en) A kind of underground space existing ground iron winds booth underpinning structure and nested configuration
CN206545219U (en) Airport roof photovoltaic bracket basis and airport roof photovoltaic support structure
CN213836673U (en) Removable supporting is used in building engineering construction
CN216809885U (en) High-efficient type building foundation pile device
CN211713765U (en) City signboard
CN110714653A (en) Tower structure and method for distribution line water area emergency training
CN217680976U (en) Fender is enclosed with construction to civil engineering
CN214220812U (en) Support frame for preventing vertical rod from falling
CN210439723U (en) Civil engineering construction support
CN211115125U (en) Fencing device for building construction
CN215857741U (en) Reinforced supporting steel column for building
CN216665134U (en) Supporting frame for house construction project

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant