CN210529702U - Pile foundation pouring hopper temporary fixing frame - Google Patents

Pile foundation pouring hopper temporary fixing frame Download PDF

Info

Publication number
CN210529702U
CN210529702U CN201921448106.2U CN201921448106U CN210529702U CN 210529702 U CN210529702 U CN 210529702U CN 201921448106 U CN201921448106 U CN 201921448106U CN 210529702 U CN210529702 U CN 210529702U
Authority
CN
China
Prior art keywords
supporting plate
sliding
pile foundation
layer board
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921448106.2U
Other languages
Chinese (zh)
Inventor
张延宁
罗金玉
尚天雨
刘全营
肖庆峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Chengjian Huaxia Infrastructure Construction Co ltd
Original Assignee
Beijing Chengjian Huaxia Infrastructure Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Chengjian Huaxia Infrastructure Construction Co ltd filed Critical Beijing Chengjian Huaxia Infrastructure Construction Co ltd
Priority to CN201921448106.2U priority Critical patent/CN210529702U/en
Application granted granted Critical
Publication of CN210529702U publication Critical patent/CN210529702U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a pile foundation pouring hopper temporary fixing frame, which comprises two parallel horizontal rods, a horizontal rod respectively fixed at the two ends of the horizontal rod, a sealing plate arranged between the two horizontal rods in a sliding way and a supporting plate fixed on the top surface of the horizontal rod between the horizontal rod and the sealing plate, wherein the sealing plate comprises a first supporting plate and a second supporting plate, the butt joint part of the first supporting plate and the second supporting plate is respectively provided with a semicircular notch, and the two semicircular notches are butted to form a perforation for a guide pipe to pass through; the first supporting plate and the second supporting plate are respectively provided with tension springs which are used for driving the first supporting plate and the second supporting plate to deviate from each other between the horizontal rods which are close to the first supporting plate and the second supporting plate, the horizontal rods are provided with locking devices which temporarily fix the first supporting plate and the second supporting plate, the locking devices comprise sliding covers which are arranged on the horizontal rods in a sliding mode, and sliding grooves which are used for containing the side walls of the sliding covers are respectively formed in the first supporting plate and the second supporting plate. The utility model has the advantages of high, convenient operation and labour saving and time saving of security.

Description

Pile foundation pouring hopper temporary fixing frame
Technical Field
The utility model belongs to the technical field of the technique of pile foundation construction and specifically relates to a pile foundation pouring hopper temporary fixing frame is related to.
Background
At present, pile foundation concrete pouring generally adopts a plurality of sections of guide pipes inserted into pile foundation holes, the top end of each guide pipe is connected with a hopper through a flange, and concrete is conveyed into the pile foundation holes through the hopper and the guide pipes. However, when concrete is poured, in order to ensure that the concrete is smoothly placed in the pile hole, the depth of the conduit pipe embedded in the pile foundation concrete is regulated to be 2-6m in the construction specification, so that the conduit pipe needs to be gradually removed one by one when the concrete is poured. When the guide pipe or the hopper is dismantled, two beam reinforcing steel bars are generally erected at the top of the pile foundation casing, the guide pipe or the hopper is temporarily erected and fixed in cooperation with the U-shaped frame, and then the guide pipe or the hopper is installed and dismantled.
However, in this way, when the guide pipe is disassembled, two beam reinforcements need to be moved to two sides of the guide pipe; when concreting, two crossbeam reinforcing bars will be removed from the both sides of pipe again, avoid influencing the pipe and transfer, at whole pouring in-process, need the removal crossbeam reinforcing bar that relapse, the process is loaded down with trivial details, wastes time, difficultly.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a pile foundation pours interim mount of hopper has security height, convenient operation and labour saving and time saving's advantage.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a pile foundation pouring hopper temporary fixing frame comprises two parallel horizontal rods, cross rods fixedly arranged at two ends of the horizontal rods respectively, a sealing plate arranged between the two horizontal rods in a sliding mode and a supporting plate fixedly arranged on the top surface of the horizontal rods and between the cross rods and the sealing plate, wherein the sealing plate comprises a first supporting plate and a second supporting plate, semicircular notches are formed in the butt joint positions of the first supporting plate and the second supporting plate respectively, and two semicircular notches are in butt joint to form a through hole for a guide pipe to pass through; the first supporting plate and the second supporting plate are respectively provided with tension springs which are used for driving the first supporting plate and the second supporting plate to deviate from each other between the horizontal rods which are close to the first supporting plate and the second supporting plate, the horizontal rods are provided with locking devices which temporarily fix the first supporting plate and the second supporting plate, the locking devices comprise sliding covers which are arranged on the horizontal rods in a sliding mode, and sliding grooves which are used for containing the side walls of the sliding covers are respectively formed in the first supporting plate and the second supporting plate.
By adopting the technical scheme, the fixing frame can be stably erected on the top surface of the pile foundation casing through the two horizontal rods, when the guide pipe or the supporting frame is disassembled and installed, the guide pipe can be temporarily fixed through the first supporting plate and the second supporting plate which are horizontally arranged on the horizontal rods in a sliding manner, the fixing frame does not need to be moved back and forth, only the first supporting plate and the second supporting plate need to be slid, and the operation is more convenient and labor-saving;
meanwhile, when the first supporting plate and the second supporting plate are used for fixing the guide pipe, the guide pipe is only required to be slightly lifted, then the sliding cover is slid away from the first supporting plate and the second supporting plate, the first supporting plate and the second supporting plate automatically deviate from each other under the action of the tension spring, and the clamping and fixing of the guide pipe are removed; when the catheter needs to be supported and fixed, the first supporting plate and the second supporting plate are moved towards the direction of mutual approaching, and then the first supporting plate and the second supporting plate are fixed through the sliding cover, so that the operation is simple, and time and labor are saved; and pouring of whole pile foundation concrete, the installation of pipe and hopper and dismantlement staff all can stand and carry out work in the backup pad, convenient operation, and the security is high, the utility model has the advantages of the security is high, convenient operation and labour saving and time saving.
The utility model discloses further set up to: the sliding cover is provided with a handle.
By adopting the technical scheme, the sliding cover can slide conveniently.
The utility model discloses further set up to: and sliding covers are respectively arranged on the two horizontal rods.
Through adopting above-mentioned technical scheme, set up the sliding closure in first layer board and second layer board bilateral symmetry, can fix the better joint of both, avoid under the effect of extension spring, first layer board, second layer board take place to deviate from in the department that does not have the sliding closure, influence the support to the pipe.
The utility model discloses further set up to: a sliding channel is formed in the horizontal rod along the length direction of the horizontal rod, the sliding channel is communicated with the side wall of the horizontal rod, a plurality of pulleys are connected to the two sides of the first supporting plate and the two sides of the second supporting plate through connecting shafts respectively, and the pulleys are arranged in the sliding channel.
Through adopting above-mentioned technical scheme, drive first layer board or second layer board through the pulley and slide in the passageway that slides, convert rolling friction into by sliding friction, be convenient for more remove first layer board and second layer board.
The utility model discloses further set up to: and a partition plate is fixedly arranged in the sliding channel at the butt joint position of the first supporting plate and the second supporting plate.
Through adopting above-mentioned technical scheme, the baffle can restrict the sliding position of first layer board and second layer board, prevents that one side layer board displacement is big, and the distance that the opposite side removed is little, causes the perforation position to take place the skew, causes the position of pipe to take place the skew.
The utility model discloses further set up to: and the top surfaces of the first supporting plate and the second supporting plate are respectively and fixedly provided with a limiting block which can be abutted against the supporting plate.
By adopting the technical scheme, the limiting block can be abutted against the supporting plate when the tension spring pulls the first supporting plate or the second supporting plate to move, so that the opening of the sealing plate is prevented from being too large and difficult to close; simultaneously the stopper also can regard as the effect of handle, and it is more convenient, swift to remove first layer board or second layer board at convex stopper through the hand effect.
The utility model discloses further set up to: and lifting lugs are fixedly arranged on the top surfaces of the horizontal rods.
By adopting the technical scheme, the fixing frame can be conveniently lifted by a crane.
To sum up, the utility model discloses a beneficial technological effect does:
1. by arranging the push-pull type sealing plate, when the first supporting plate and the second supporting plate are used for fixing the guide pipe, the guide pipe is only required to be slightly lifted, then the sliding cover is slid away from the first supporting plate and the second supporting plate, the first supporting plate and the second supporting plate automatically deviate from each other under the action of the tension spring, and the clamping and fixing of the guide pipe are removed; when the catheter needs to be supported and fixed, the first supporting plate and the second supporting plate are moved towards the direction of mutual approaching, and then the first supporting plate and the second supporting plate are fixed through the sliding cover, so that the operation is simple, and time and labor are saved; in addition, the whole pile foundation concrete is poured, and workers for installing and disassembling the guide pipe and the hopper can stand on the supporting plate to work, so that the operation is convenient, the safety is high, and the utility model has the advantages of high safety, convenient operation, time saving and labor saving;
2. the first supporting plate or the second supporting plate is driven to slide in the sliding channel through the pulley, and sliding friction is converted into rolling friction, so that the first supporting plate and the second supporting plate can be moved more conveniently;
3. by arranging the limiting block, the limiting block can be abutted against the supporting plate when the tension spring pulls the first supporting plate or the second supporting plate to move, so that the opening of the sealing plate is prevented from being too large and difficult to close; simultaneously the stopper also can regard as the effect of handle, and it is more convenient, swift to remove first layer board or second layer board at convex stopper through the hand effect.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the extension spring of the present invention;
fig. 3 is a schematic view of the structure of the protruding sliding channel and the pulley of the present invention.
In the figure, 1, a horizontal rod; 11. a slipping channel; 2. a cross bar; 3. closing the plate; 31. a first pallet; 32. a second pallet; 33. a notch; 34. a pulley; 4. a tension spring; 5. a locking device; 51. a sliding cover; 511. a handle; 52. a chute; 6. a support plate; 7. a limiting block; 8. and (7) lifting lugs.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the utility model discloses a pile foundation pouring hopper temporary fixing frame, including two horizon bars 1 that are parallel to each other and the interval sets up, fix respectively in the position at both ends between two horizon bars 1 and be provided with horizontal pole 2, horizontal pole 2 forms the rectangle frame structure with horizon bar 1. Slide between two horizon bars 1 and be provided with shrouding 3, shrouding 3 includes first layer board 31 and second layer board 32, semicircular notch 33 has been seted up respectively to the butt joint department of first layer board 31 and second layer board 32, two semicircular notch 33 butt joints form the perforation that supplies the pipe to pass, be provided with between first layer board 31 and second layer board 32 respectively and the horizontal pole 2 that is close to and order about first layer board 31 and second layer board 32 the extension spring 4 that deviates from each other, 4 one ends of extension spring are colluded and are established on horizontal pole 2, other end fixed connection is at first layer board 31 or second layer board 32 tip. The horizontal bar 1 is provided with a locking device 5 for temporarily fixing the first pallet 31 and the second pallet 32.
Referring to fig. 1, the locking device 5 includes a sliding cover 51 slidably disposed on the horizontal rod 1 perpendicular to the direction of the horizontal rod 1, sliding grooves 52 for accommodating side walls of the sliding cover 51 are respectively disposed on the top surface of the horizontal rod 1, the first supporting plate 31 and the second supporting plate 32, and the sliding cover 51 is slidably disposed in the sliding grooves 52. A support plate 6 is welded and fixed between the cross rod 2 and the closing plate 3 on the top surface of the horizontal rod 1.
When the guide pipe is installed, the fixing frame is hung on the top surface of the pile foundation hole, the sliding cover 51 slides to the horizontal rod 1, the first supporting plate 31 and the second supporting plate 32 are unlocked, the first supporting plate 31 and the second supporting plate 32 are opened under the action of the tension spring 4, and the guide pipe is placed into the pile hole from the notch 33 between the first supporting plate 31 and the second supporting plate 32.
When connecting or dismantling the pipe, be close to the pulling each other with first layer board 31 and second layer board 32, make two breach 33 formation perforation centre gripping on the pipe, fix the flange butt of pipe tip on shrouding 3, then install or dismantle pipe or hopper to whole pile foundation concrete's pouring, the installation of pipe and hopper and dismantlement staff all can stand and carry out work in backup pad 6, convenient operation, and the security is high.
The fixing frame can be stably erected on the top surface of the pile foundation casing through the two horizontal rods 1, when a guide pipe or a supporting frame is disassembled and installed, the guide pipe can be temporarily fixed through the first supporting plate 31 and the second supporting plate 32 which are horizontally arranged on the horizontal rods 1 in a sliding mode, the fixing frame does not need to be moved back and forth, only the first supporting plate 31 and the second supporting plate 32 need to be slid, and the operation is more convenient and labor-saving;
meanwhile, when the fixing of the first supporting plate 31 and the second supporting plate 32 to the guide pipe is released, the guide pipe is only slightly lifted, then the sliding cover 51 slides away from the first supporting plate 31 and the second supporting plate 32, the first supporting plate 31 and the second supporting plate 32 automatically deviate from each other under the action of the tension spring 4, and the clamping and fixing of the guide pipe are released; when the catheter needs to be supported and fixed, the first supporting plate 31 and the second supporting plate 32 are moved towards the direction of mutual approaching, and then the first supporting plate 31 and the second supporting plate 32 are fixed through the sliding cover 51, so that the operation is simple, and time and labor are saved; and pouring of whole pile foundation concrete, the installation of pipe and hopper and dismantlement staff all can stand and carry out work in backup pad 6, convenient operation, and the security is high, the utility model has the advantages of the security is high, convenient operation and labour saving and time saving.
Referring to fig. 1, in order to facilitate the sliding of the slide cover 51, a handle 511 is fixedly provided on the top surface of the slide cover 51, the handle 511 is U-shaped, and both ends thereof are fixedly provided on the top surface of the slide cover 51. Further, in order to ensure the stability of the first supporting plate 31 and the second supporting plate 32 when locked, the sliding covers 51 are respectively disposed on the two horizontal rods 1, and the sliding grooves 52 are respectively disposed on the horizontal rods 1, the first supporting plate 31, and the second supporting plate 32. Sliding covers 51 are symmetrically arranged on two sides of the first supporting plate 31 and the second supporting plate 32, so that the first supporting plate 31 and the second supporting plate 32 can be better clamped and fixed, and the situation that the first supporting plate 31 and the second supporting plate 32 deviate without the sliding covers 51 under the action of the tension spring 4 to influence the support of the guide pipe is avoided.
Referring to fig. 2 and 3, a sliding channel 11 is formed inside the horizontal rod 1 along the length direction of the horizontal rod 1, the sliding channel 11 is communicated with the inner side wall of the horizontal rod 1, a plurality of pulleys 34 are respectively connected to two sides of the first supporting plate 31 and the second supporting plate 32 through connecting shafts, the pulleys 34 are uniformly arranged along the first supporting plate 31 and the second supporting plate 32 at intervals, and the pulleys 34 are arranged in the sliding channel 11. The first supporting plate 31 or the second supporting plate 32 is driven by the pulley 34 to slide in the sliding channel 11, and the sliding friction is converted into rolling friction, so that the first supporting plate 31 and the second supporting plate 32 can be moved more conveniently.
The baffle is fixedly arranged at the butt joint position of the first supporting plate 31 and the second supporting plate 32 in the sliding channel 11, the baffle can limit the sliding position of the first supporting plate 31 and the second supporting plate 32, the moving distance of the supporting plate at one side is large, the moving distance of the other side is small, the punching position is deviated, and the position of the guide pipe is deviated.
Referring to fig. 1, the top surfaces of the first supporting plate 31 and the second supporting plate 32 are respectively and fixedly provided with a limiting block 7, and the limiting blocks 7 can abut against the supporting plate 6 when the tension spring 4 pulls the first supporting plate 31 or the second supporting plate 32 to move, so that the opening of the sealing plate 3 is prevented from being too large and difficult to close; meanwhile, the limiting block 7 can also be used as a handle 511, and the first supporting plate 31 or the second supporting plate 32 can be moved more conveniently and quickly by the action of hands on the protruding limiting block 7.
Referring to fig. 1, because the mount weight is heavy, inconvenient the removal, for the convenience of the mount removes, welding lug 8 on the top surface of horizon bar 1, lug 8 sets up threely, sets up two on a horizon bar 1, sets up one on a horizon bar 1, and three lug 8 forms the isosceles triangle structure to when removing the mount, wire rope on the accessible crane colludes and establishes on lug 8, the handling mount.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. The utility model provides a pile foundation pours interim mount of hopper which characterized in that: the guide pipe sealing device comprises two parallel horizontal rods (1), cross rods (2) fixedly arranged at two ends of each horizontal rod (1), a sealing plate (3) arranged between the two horizontal rods (1) in a sliding mode and a supporting plate (6) fixedly arranged on the top surface of each horizontal rod (1) and between the cross rods (2) and the sealing plate (3), wherein the sealing plate (3) comprises a first supporting plate (31) and a second supporting plate (32), semicircular notches (33) are formed in the butt joint positions of the first supporting plate (31) and the second supporting plate (32), and two semicircular notches (33) are butted to form a through hole for a guide pipe to pass through; first layer board (31) and second layer board (32) respectively with be provided with between the horizontal pole (2) that is close to and order about first layer board (31) and second layer board (32) extension spring (4) that deviate from each other, be provided with on horizon bar (1) with first layer board (31) and second layer board (32) temporarily fixed locking device (5), locking device (5) are including sliding lid (51) of sliding setting on horizon bar (1), spout (52) that are used for holding sliding lid (51) lateral wall are seted up respectively on first layer board (31) and second layer board (32).
2. The pile foundation pouring hopper temporary fixing frame of claim 1, wherein: the sliding cover (51) is provided with a handle (511).
3. The pile foundation pouring hopper temporary fixing frame according to any one of claims 1-2, wherein: sliding covers (51) are respectively arranged on the two horizontal rods (1).
4. The pile foundation pouring hopper temporary fixing frame of claim 1, wherein: the horizontal rod (1) is internally provided with a sliding channel (11) along the length direction of the horizontal rod (1), the sliding channel (11) is communicated with the side wall of the horizontal rod (1), two sides of the first supporting plate (31) and the second supporting plate (32) are respectively connected with a plurality of pulleys (34) through connecting shafts, and the pulleys (34) are arranged in the sliding channel (11).
5. The pile foundation pouring hopper temporary fixing frame of claim 4, wherein: and a partition plate is fixedly arranged in the sliding channel (11) at the butt joint position of the first supporting plate (31) and the second supporting plate (32).
6. The pile foundation pouring hopper temporary fixing frame of claim 1, wherein: the top surfaces of the first supporting plate (31) and the second supporting plate (32) are respectively and fixedly provided with a limiting block (7) capable of being abutted against the supporting plate (6).
7. The pile foundation pouring hopper temporary fixing frame of claim 1, wherein: the top surface of the horizontal rod (1) is fixedly provided with a lifting lug (8).
CN201921448106.2U 2019-08-30 2019-08-30 Pile foundation pouring hopper temporary fixing frame Expired - Fee Related CN210529702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921448106.2U CN210529702U (en) 2019-08-30 2019-08-30 Pile foundation pouring hopper temporary fixing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921448106.2U CN210529702U (en) 2019-08-30 2019-08-30 Pile foundation pouring hopper temporary fixing frame

Publications (1)

Publication Number Publication Date
CN210529702U true CN210529702U (en) 2020-05-15

Family

ID=70603884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921448106.2U Expired - Fee Related CN210529702U (en) 2019-08-30 2019-08-30 Pile foundation pouring hopper temporary fixing frame

Country Status (1)

Country Link
CN (1) CN210529702U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778981A (en) * 2020-08-13 2020-10-16 成琳 Building concrete pile filling equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778981A (en) * 2020-08-13 2020-10-16 成琳 Building concrete pile filling equipment
CN111778981B (en) * 2020-08-13 2022-09-27 滨州市南泉工程有限公司 Building concrete pile filling equipment

Similar Documents

Publication Publication Date Title
CN106013233B (en) Sliding system and its construction method for underground pipe gallery cast-in-place construction
CN210529702U (en) Pile foundation pouring hopper temporary fixing frame
US4419030A (en) Apparatus for and method of constructing a sheet piling shoring structure
US4021979A (en) Aligning bracket for underground sectional precast concrete structures and method of assembly
CN202390843U (en) Fixing platform of guide pipe for pouring cast pile
CN112523223A (en) A pipe device for pouring into concrete
CN110274744B (en) Form removal method for internal mold support system of wind tunnel diffusion section
CN212294380U (en) Novel cast-in-place outrigger of light structure
CN108792924B (en) Reinforcing steel bar positioning frame
CN108285085B (en) Pipeline installation vertical and horizontal transport tool and transport method
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN111764289A (en) Novel cast-in-place suspension bracket with overhanging light structure and use method thereof
CN115506371A (en) Construction method for dismantling ultrahigh inner support of deep foundation pit
JP2012202106A (en) Demolition method of slab construction timbering in pile type pier construction
KR101201215B1 (en) Moving tool for mold of concrete building
CN114890291A (en) Comb-type water retaining partition wall of flocculation sedimentation tank and construction method thereof
CN211034868U (en) Steel reinforcement cage hoist device
CN111186763B (en) Concrete block masonry member assembling construction method and construction device
CN212176617U (en) Evaporate and press aerated concrete wallboard installation construction machines
CN109941900B (en) Simple installation equipment for sound barrier plugboard
CN110171766B (en) Steel bar transportation lifting appliance
JP2018150781A (en) Slab construction method
CN217105095U (en) Concrete pouring support for diaphragm wall
CN218520968U (en) Steel reinforcement cage pulls positioner for building installation
JP3097604U (en) Forming equipment for openings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200515