CN217105095U - A ground connecting wall concrete pouring support - Google Patents

A ground connecting wall concrete pouring support Download PDF

Info

Publication number
CN217105095U
CN217105095U CN202220936789.1U CN202220936789U CN217105095U CN 217105095 U CN217105095 U CN 217105095U CN 202220936789 U CN202220936789 U CN 202220936789U CN 217105095 U CN217105095 U CN 217105095U
Authority
CN
China
Prior art keywords
ground
platform
support
concrete pouring
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220936789.1U
Other languages
Chinese (zh)
Inventor
黄跃楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Geological Engineering Co ltd
Original Assignee
Beijing Geological Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Geological Engineering Co ltd filed Critical Beijing Geological Engineering Co ltd
Priority to CN202220936789.1U priority Critical patent/CN217105095U/en
Application granted granted Critical
Publication of CN217105095U publication Critical patent/CN217105095U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a ground is wall concrete placement support even belongs to concrete placement's technical field, and it includes moving platform, moving platform erects on the wall of leading of ground even wall both sides, just moving platform follows ground is wall length direction removes even, moving platform includes the landing slab, be formed with the fixed orifices that is used for fixed concrete pipe on the landing slab, the through-hole has been seted up on the landing slab, it has two returning face plates, two to articulate in the through-hole the articulated one end of returning face plate deviates from the setting each other, two semicircular groove has been seted up respectively to one side that the returning face plate is close to. This application has improved the defect that current support of pouring is not convenient for even wall and has pour.

Description

一种地连墙混凝土浇筑支架Concrete pouring support for ground-connected wall

技术领域technical field

本申请涉及混凝土浇筑的技术领域,尤其是涉及一种地连墙混凝土浇筑支架。The present application relates to the technical field of concrete pouring, in particular to a ground-wall concrete pouring support.

背景技术Background technique

地连墙是基础工程,在地面上采用挖槽机械沿着深开挖工程的周边轴线,在泥浆护壁条件下,开挖出一条狭长的深槽,清槽后,在槽内吊放钢筋笼,然后用导管法灌筑水下混凝土筑成一个单元槽段,如此逐段进行,在地下筑成一道连续的钢筋混凝土墙壁,作为截水、防渗、承重、挡水结构。The ground connection wall is a basic project. A long and narrow deep groove is excavated on the ground along the peripheral axis of the deep excavation project under the condition of mud retaining wall. After the groove is cleaned, the steel cage is hung in the groove , and then use the conduit method to pour underwater concrete to form a unit tank section, and then proceed section by section to form a continuous reinforced concrete wall underground as a water interception, anti-seepage, load-bearing, and water-retaining structure.

在地连墙槽段开挖前,沿连续墙纵向轴线两侧构筑导墙,采用现浇混凝土或钢筋混凝土浇筑。导墙深度一般为1.2~1.5m,其顶面略高于地面10~15cm。Before the excavation of the groove section of the ground connection wall, guide walls shall be constructed along both sides of the longitudinal axis of the continuous wall, and shall be poured with cast-in-place concrete or reinforced concrete. The depth of the guide wall is generally 1.2-1.5m, and its top surface is slightly higher than the ground by 10-15cm.

目前,在使用混凝土导管进行地连墙浇筑时,需要使用浇筑支架固定混凝土导管,现有的浇筑支架需要吊装放置,使用麻烦,不便于地连墙的浇筑。At present, when using concrete pipes to pour the ground connection wall, it is necessary to use a pouring bracket to fix the concrete pipe. The existing pouring support needs to be hoisted and placed, which is troublesome to use and inconvenient for the pouring of the ground connection wall.

研发人员在研究改进中发现,存在有现有的浇筑支架不便于地连墙浇筑的缺陷。During the research and improvement, the research and development personnel found that there is a defect that the existing pouring support is inconvenient to pour into the wall.

实用新型内容Utility model content

为了改善现有的浇筑支架不便于地连墙浇筑的缺陷,本申请提供一种地连墙混凝土浇筑支架。In order to improve the defect that the existing pouring support is inconvenient for ground-to-wall pouring, the application provides a ground-to-wall concrete pouring support.

本申请提供的一种地连墙混凝土浇筑支架,采用如下技术方案:The concrete pouring support for a ground connection wall provided by the application adopts the following technical scheme:

一种地连墙混凝土浇筑支架,包括移动平台,所述移动平台架设在地连墙两侧的导墙上,且所述移动平台沿所述地连墙长度方向移动,所述移动平台包括平台板,所述平台板上形成有用于固定混凝土导管的固定孔。A ground wall concrete pouring bracket, comprising a mobile platform, the mobile platform is erected on the guide walls on both sides of the ground wall, and the mobile platform moves along the length direction of the ground wall, and the mobile platform includes a platform The platform plate is formed with fixing holes for fixing concrete conduits.

通过采用上述技术方案,通过设置移动平台,并且在移动平台上设置有固定混凝土导管的固定孔,固定孔将混凝土导管固定,移动平台能够随意移动,克服了现有浇筑支架不便于移动的问题,更加便于地连墙的浇筑施工,从而改善了现有的浇筑支架不便于地连墙浇筑的缺陷。By adopting the above technical scheme, by setting a mobile platform, and setting a fixing hole for fixing the concrete conduit on the mobile platform, the fixing hole fixes the concrete conduit, and the mobile platform can move freely, which overcomes the problem that the existing pouring support is not easy to move, The pouring construction of the ground connection wall is more convenient, thereby improving the defect that the existing pouring support is not convenient for the ground connection wall pouring.

可选的,所述平台板上开设有通孔,所述通孔内铰接有两块翻转板,两块所述翻转板铰接的一端相互背离设置,两块所述翻转板靠近的一侧分别开设有半圆形凹槽。Optionally, a through hole is opened on the platform plate, and two turning plates are hinged in the through hole, and the hinged ends of the two turning plates are set away from each other, and the sides close to the two turning plates are respectively A semicircular groove is opened.

通过采用上述技术方案,通过设置翻转板,并在翻转板上开设半圆形凹槽,使两块翻转板处于水平状态时,两个半圆形凹槽相对形成固定孔,固定孔将混凝土导管固定,将混凝土导管吊起,翻转板能够打开,从而能够对混凝土导管进行拆卸,使混凝土导管的固定方式简单,并且便于混凝土导管的拆卸。By adopting the above-mentioned technical scheme, by setting the turning plate and opening a semicircular groove on the turning plate, when the two turning plates are in a horizontal state, the two semicircular grooves face each other to form a fixing hole, and the fixing hole connects the concrete conduit Fixing, the concrete conduit is hoisted, and the overturning plate can be opened, so that the concrete conduit can be disassembled, so that the fixing method of the concrete conduit is simple, and the removal of the concrete conduit is facilitated.

可选的,所述平台板上安装有门型架,所述门型架包括两根竖杆,两根所述竖杆之间固定连接有横杆,所述横杆上安装有定滑轮。Optionally, a gantry frame is installed on the platform plate, and the gantry frame includes two vertical bars, and a horizontal bar is fixedly connected between the two vertical bars, and fixed pulleys are installed on the horizontal bar.

可选的,两根所述竖杆一端与所述平台板铰接,所述平台板上还铰接有两根支撑杆,且所述支撑杆与所述竖杆一一对应设置,相互对应的所述支撑杆与所述竖杆可拆卸连接。Optionally, one end of the two vertical rods is hinged to the platform board, and two support rods are also hinged on the platform board, and the support rods are set in one-to-one correspondence with the vertical rods, and the corresponding The support rod is detachably connected with the vertical rod.

通过采用上述技术方案,竖杆与平台板铰接,能够将门型架放倒,便于浇筑支架的收纳以及运输。By adopting the above technical solution, the vertical bar is hinged to the platform plate, and the portal frame can be laid down, which facilitates the storage and transportation of the pouring support.

可选的,所述平台板上安装有卷扬机,所述卷扬机上缠绕有钢丝绳,所述钢丝绳一端穿过所述定滑轮,所述钢丝绳穿过所述定滑轮的一端连接有吊绳。Optionally, a hoist is installed on the platform, a wire rope is wound on the hoist, one end of the wire rope passes through the fixed pulley, and one end of the wire rope passes through the fixed pulley is connected to a suspension rope.

通过采用上述技术方案,通过卷扬机吊起混凝土导管,便于安装以及拆卸混凝土导管。By adopting the above technical scheme, the concrete conduit is hoisted by the winch, which facilitates the installation and removal of the concrete conduit.

可选的,所述吊绳设置有四根,四根所述吊绳远离所述钢丝绳的一端固定连接有吊环。Optionally, there are four suspension ropes, and the ends of the four suspension ropes away from the steel wire rope are fixedly connected with suspension rings.

可选的,所述移动平台还包括支腿,所述支腿设置有四根,四根所述支腿分别固定连接在所述平台板一面的四角处,所述支腿远离所述平台板的一端分别安装有移动轮。Optionally, the mobile platform further includes four outriggers, the four outriggers are respectively fixedly connected to the four corners of one side of the platform board, and the outriggers are far away from the platform board One end of each is respectively equipped with moving wheels.

可选的,所述移动轮为具有刹车功能的万向轮。Optionally, the moving wheel is a universal wheel with a brake function.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

1.通过设置移动平台,并且在移动平台上设置有固定混凝土导管的固定孔,固定孔将混凝土导管固定,移动平台能够随意移动,克服了现有浇筑支架不便于移动的问题,更加便于地连墙的浇筑施工,从而改善了现有的浇筑支架不便于地连墙浇筑的缺陷;1. By setting up a mobile platform, and setting a fixing hole for fixing the concrete conduit on the mobile platform, the fixing hole fixes the concrete conduit, and the mobile platform can move freely, which overcomes the problem that the existing pouring support is not easy to move, and is more convenient to connect The pouring construction of the wall, thereby improving the defect that the existing pouring bracket is not convenient for pouring the wall;

2.通过设置翻转板,并在翻转板上开设半圆形凹槽,使两块翻转板处于水平状态时,两个半圆形凹槽相对形成固定孔,固定孔将混凝土导管固定,将混凝土导管吊起,翻转板能够打开,从而能够对混凝土导管进行拆卸,使混凝土导管的固定方式简单,并且便于混凝土导管的拆卸;2. By setting the overturning plate and opening a semicircular groove on the overturning plate, when the two overturning plates are in a horizontal state, the two semicircular grooves face each other to form a fixing hole. The fixing hole fixes the concrete conduit and the concrete The pipe is lifted, and the flip plate can be opened, so that the concrete pipe can be disassembled, so that the fixing method of the concrete pipe is simple, and the disassembly of the concrete pipe is convenient;

3.竖杆与平台板铰接,能够将门型架放倒,便于浇筑支架的收纳以及运输。3. The vertical bar is hinged with the platform plate, and the portal frame can be laid down, which is convenient for the storage and transportation of the pouring support.

附图说明Description of drawings

图1是本申请实施例的立体结构示意图。FIG. 1 is a schematic perspective view of the three-dimensional structure of the embodiment of the present application.

图2是本申请实施例移动平台立体结构示意图。FIG. 2 is a schematic diagram of a three-dimensional structure of a mobile platform according to an embodiment of the present application.

图中,1、移动平台;11、平台板;111、通孔;112、固定台;12、支腿;13、移动轮;131、调节螺杆;14、翻转板;141、半圆形凹槽;2、门型架;21、竖杆;22、横杆;221、定滑轮;23、支撑杆;3、卷扬机;4、钢丝绳;5、吊绳;6、混凝土料斗;7、混凝土导管。In the figure, 1. mobile platform; 11. platform plate; 111. through hole; 112. fixed platform; 12. outrigger; 13. moving wheel; 131. adjusting screw; 2, portal frame; 21, vertical bar; 22, cross bar; 221, fixed pulley; 23, support bar;

具体实施方式Detailed ways

以下结合附图1-2对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-2.

本申请实施例公开一种地连墙混凝土浇筑支架。参考图1,一种地连墙混凝土浇筑支架包括移动平台1、门型架2以及卷扬机3。The embodiment of the application discloses a concrete pouring support for a ground connection wall. Referring to FIG. 1 , a ground-to-wall concrete pouring support includes a mobile platform 1 , a portal frame 2 and a winch 3 .

移动平台1包括平台板11,平台板11为长方体平板,在平台板11一面的四角处分别固定连接有支腿12,且支腿12与平台板11相互垂直,在支腿12远离平台板11的一端固定安装有移动轮13,移动轮13采用具有刹车功能的万向轮,将移动平台1放置在待浇筑的地连墙上方,使支腿12位于地连墙两侧的导墙上。Mobile platform 1 comprises platform board 11, and platform board 11 is cuboid flat plate, and four corners of one side of platform board 11 are fixedly connected with supporting leg 12 respectively, and supporting leg 12 and platform board 11 are perpendicular to each other, and supporting leg 12 is away from platform board 11 One end of one end is fixedly installed with moving wheel 13, and moving wheel 13 adopts the universal wheel with brake function, mobile platform 1 is placed on the ground connecting wall to be poured above, and supporting leg 12 is positioned at the guide wall of ground connecting wall both sides.

进一步的,在移动轮13上固定安装有调节螺杆131,在支腿12背离平台板11一端开设有螺纹孔,将调节螺杆131拧入到螺纹孔中,使移动轮13与支腿12螺纹连接,转动移动轮13,能够调节移动轮13的高度,通过调节四个移动轮13的高度,能够将平台板11调平。Further, an adjusting screw 131 is fixedly installed on the moving wheel 13, and a threaded hole is provided at the end of the leg 12 away from the platform plate 11, and the adjusting screw 131 is screwed into the threaded hole, so that the moving wheel 13 is threadedly connected with the supporting leg 12 , rotate the moving wheel 13, the height of the moving wheel 13 can be adjusted, and the platform board 11 can be leveled by adjusting the height of the four moving wheels 13.

参照图1和图2,在平台板11上开设有通孔111,通孔111沿平台板11厚度方向贯穿平台板11,在通孔111内壁上还加工有固定台112;在通孔111内铰接有两块翻转板14,两块翻转板14的铰接端相互背离设置,在两块翻转板14相互靠近的端面上开设有半圆形凹槽141,两块翻转板14处于水平状态时,两个半圆形凹槽141相对形成固定孔,且两块翻转板14靠近铰接端的一端抵触在固定台112上,从而使两块翻转板14水平时能够处于固定状态。将混凝土导管7插入到固定孔中,两块翻转板14能够卡住混凝土导管7的接头,从而将混凝土导管7固定。1 and 2, a through hole 111 is provided on the platform plate 11, the through hole 111 runs through the platform plate 11 along the thickness direction of the platform plate 11, and a fixed platform 112 is also processed on the inner wall of the through hole 111; in the through hole 111 There are two flipping plates 14 hinged, the hinged ends of the two flipping plates 14 are set away from each other, and a semicircular groove 141 is provided on the end faces of the two flipping plates 14 that are close to each other. When the two flipping plates 14 are in a horizontal state, The two semicircular grooves 141 are opposite to each other to form a fixing hole, and the ends of the two turning plates 14 close to the hinged ends are in contact with the fixing table 112, so that the two turning plates 14 can be in a fixed state when they are horizontal. The concrete conduit 7 is inserted into the fixing hole, and the two overturning plates 14 can clamp the joint of the concrete conduit 7 , thereby fixing the concrete conduit 7 .

在平台板11上安装有门型架2,门型架2包括两根竖杆21,两根竖杆21位于通孔111相对的两侧,且竖杆21的一端与平台板11背离支腿12的一面铰接;在两根竖杆21之间固定连接有横杆22,且横杆22设置在竖杆21远离平台板11的一端,在横杆22上安装有定滑轮221,定滑轮221设置在横杆22靠近平台板11的一侧,且定滑轮221位于横杆22的中间位置。A portal frame 2 is installed on the platform board 11, and the portal frame 2 includes two vertical rods 21, and the two vertical rods 21 are located on opposite sides of the through hole 111, and one end of the vertical rod 21 is away from the platform board 11 from the legs One side of 12 is hinged; a cross bar 22 is fixedly connected between two vertical bars 21, and the cross bar 22 is arranged on the end of the vertical bar 21 away from the platform board 11, and a fixed pulley 221 is installed on the cross bar 22, and the fixed pulley 221 The fixed pulley 221 is located at the middle of the cross bar 22 .

在竖杆21与平台板11之间还连接有支撑杆23,且支撑杆23倾斜设置,在竖杆21的一侧分别设置有两块第一耳板,在平台板11的上设置有两块与第一耳板对应的第二耳板,将支撑杆23的一端设置在两块第一耳板之间,支撑杆23另一端设置在两块第二耳板之间,并使用螺栓将支撑杆23的两端固定,支撑杆23将竖杆21与平台板11连接,从而使竖杆21能够处于固定状态。A support bar 23 is also connected between the vertical bar 21 and the platform board 11, and the support bar 23 is arranged obliquely. Two first ear plates are respectively arranged on one side of the vertical bar 21, and two first ear plates are arranged on the platform board 11. A second ear plate corresponding to the first ear plate, one end of the support rod 23 is arranged between the two first ear plates, the other end of the support rod 23 is arranged between the two second ear plates, and bolts are used to Both ends of the support rod 23 are fixed, and the support rod 23 connects the vertical rod 21 with the platform board 11, so that the vertical rod 21 can be in a fixed state.

在平台板11上固定安装有卷扬机3,卷扬机3设置门型架2的一侧,在卷扬机3上缠绕有钢丝绳4,且钢丝绳4的一端从定滑轮221上穿过;在钢丝绳4穿过定滑轮221的一端固定连接有四根吊绳5,在四根吊绳5远离钢丝绳4的一端固定连接有吊环,吊环用于连接并吊起混凝土料斗6及混凝土导管7。On the platform board 11, hoisting machine 3 is fixedly installed, and hoisting machine 3 is provided with a side of gantry 2, is wound with wire rope 4 on hoisting machine 3, and an end of wire rope 4 passes from fixed pulley 221; One end of the pulley 221 is fixedly connected with four suspension ropes 5 , and one end of the four suspension ropes 5 away from the wire rope 4 is fixedly connected with a suspension ring, and the suspension ring is used to connect and lift the concrete hopper 6 and the concrete conduit 7 .

本申请实施例一种地连墙混凝土浇筑支架的实施原理为:将浇筑支架放在待浇筑的地连墙上方,并且是位于同一侧的两根支腿12处于地连墙一侧的导墙上,通过在支腿12上安装移动轮13,使浇筑支架能够沿着地连墙的长度方向移动;通过设置两块翻转板14,并且在两块翻转板14相互靠近的一侧开始半圆形凹槽141,两个半圆形凹槽141相对形成固定孔,固定孔能够夹持混凝土导管7,将混凝土导管7固定;并且通过设置门型架2以及卷扬机3,使用卷扬机3吊起一根混凝土导管7,并且使混凝土导管7卡在固定孔中,然后吊起第二根混凝土导管7,将第二根混凝土导管7与第一根混凝土导管7连接,然后将两根混凝土导管7下放,并且使固定孔卡住第二根混凝土导管7,按上述操作将混凝土导管7安装完成,然后吊起混凝土料斗6连接在混凝土导管7上,向混凝土料斗6中浇入混凝土对地连墙进行浇筑,使地连墙浇筑更加方便,提高了地连墙浇筑效率;此外将竖杆21与平台板11铰接,一起支撑杆23与平台板11铰接,通过拆卸支撑杆23,能够将门型架2放倒,使浇筑支架便于收纳以及运输。The implementation principle of a ground wall concrete pouring bracket in the embodiment of the present application is as follows: the pouring bracket is placed above the ground wall to be poured, and the two legs 12 on the same side are on the guide wall on the side of the ground wall Above, by installing moving wheels 13 on the legs 12, the pouring support can be moved along the length direction of the ground connection wall; by setting two turning plates 14, and starting a semicircle on the side where the two turning plates 14 are close to each other Groove 141, two semi-circular grooves 141 oppositely form a fixing hole, the fixing hole can clamp the concrete conduit 7, and the concrete conduit 7 is fixed; and by setting the portal frame 2 and the hoist 3, use the hoist 3 to lift a Concrete conduit 7, and make concrete conduit 7 be stuck in the fixing hole, then lift the second concrete conduit 7, connect the second concrete conduit 7 with the first concrete conduit 7, then lower the two concrete conduits 7, And make the fixing hole block the second concrete conduit 7, complete the installation of the concrete conduit 7 according to the above operation, then lift the concrete hopper 6 and connect it to the concrete conduit 7, pour concrete into the concrete hopper 6 and pour the ground connection wall , making the pouring of the ground connecting wall more convenient, and improving the pouring efficiency of the ground connecting wall; in addition, the vertical bar 21 is hinged with the platform plate 11, and the support bar 23 is hinged with the platform plate 11, and the portal frame 2 can be placed by removing the support bar 23 Inverted, so that the pouring bracket is convenient for storage and transportation.

本具体实施方式的实施例均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The embodiments of this specific implementation mode are all preferred embodiments of the application, and are not intended to limit the scope of protection of the application. Therefore: all equivalent changes made according to the structure, shape, and principle of the application should be covered by the application. Within the protection scope of this application.

Claims (8)

1.一种地连墙混凝土浇筑支架,其特征在于:包括移动平台(1),所述移动平台(1)架设在地连墙两侧的导墙上,且所述移动平台(1)沿所述地连墙长度方向移动,所述移动平台(1)包括平台板(11),所述平台板(11)上形成有用于固定混凝土导管(7)的固定孔。1. A ground connecting wall concrete pouring bracket is characterized in that: it comprises a mobile platform (1), and the mobile platform (1) is erected on the guide walls on both sides of the ground connecting wall, and the mobile platform (1) is The ground connecting wall moves along the length direction, and the mobile platform (1) includes a platform board (11), and fixing holes for fixing the concrete conduit (7) are formed on the platform board (11). 2.根据权利要求1所述的一种地连墙混凝土浇筑支架,其特征在于:所述平台板(11)上开设有通孔(111),所述通孔(111)内铰接有两块翻转板(14),两块所述翻转板(14)铰接的一端相互背离设置,两块所述翻转板(14)靠近的一侧分别开设有半圆形凹槽(141)。2. A concrete pouring support for ground-connected walls according to claim 1, characterized in that: said platform plate (11) is provided with a through hole (111), and said through hole (111) is hinged with two As for the turning plate (14), the hinged ends of the two turning plates (14) are set away from each other, and the sides close to the two turning plates (14) are respectively provided with semicircular grooves (141). 3.根据权利要求1所述的一种地连墙混凝土浇筑支架,其特征在于:所述平台板(11)上安装有门型架(2),所述门型架(2)包括两根竖杆(21),两根所述竖杆(21)之间固定连接有横杆(22),所述横杆(22)上安装有定滑轮(221)。3. A concrete pouring support for ground-connected walls according to claim 1, characterized in that: a gantry (2) is installed on the platform slab (11), and the gantry (2) includes two The vertical rods (21), the horizontal rods (22) are fixedly connected between the two vertical rods (21), and the fixed pulleys (221) are installed on the horizontal rods (22). 4.根据权利要求3所述的一种地连墙混凝土浇筑支架,其特征在于:两根所述竖杆(21)一端与所述平台板(11)铰接,所述平台板(11)上还铰接有两根支撑杆(23),且所述支撑杆(23)与所述竖杆(21)一一对应设置,相互对应的所述支撑杆(23)与所述竖杆(21)可拆卸连接。4. A concrete pouring support for a ground connecting wall according to claim 3, characterized in that: one end of the two vertical rods (21) is hinged to the platform board (11), and the platform board (11) is Two support rods (23) are also hinged, and the support rods (23) and the vertical rods (21) are provided in one-to-one correspondence, and the mutually corresponding support rods (23) and the vertical rods (21) Detachable connection. 5.根据权利要求3所述的一种地连墙混凝土浇筑支架,其特征在于:所述平台板(11)上安装有卷扬机(3),所述卷扬机(3)上缠绕有钢丝绳(4),所述钢丝绳(4)一端穿过所述定滑轮(221),所述钢丝绳(4)穿过所述定滑轮(221)的一端连接有吊绳(5)。5. A concrete pouring support for ground-connected walls according to claim 3, characterized in that: a hoist (3) is installed on the platform slab (11), and a steel wire rope (4) is wound on the hoist (3) One end of the steel wire rope (4) passes through the fixed pulley (221), and one end of the steel wire rope (4) passing through the fixed pulley (221) is connected with a suspension rope (5). 6.根据权利要求5所述的一种地连墙混凝土浇筑支架,其特征在于:所述吊绳(5)设置有四根,四根所述吊绳(5)远离所述钢丝绳(4)的一端固定连接有吊环。6. A concrete pouring support for a ground-connected wall according to claim 5, characterized in that four suspension ropes (5) are provided, and the four suspension ropes (5) are far away from the steel wire rope (4) One end is fixedly connected with a lifting ring. 7.根据权利要求1所述的一种地连墙混凝土浇筑支架,其特征在于:所述移动平台(1)还包括支腿(12),所述支腿(12)设置有四根,四根所述支腿(12)分别固定连接在所述平台板(11)一面的四角处,所述支腿(12)远离所述平台板(11)的一端分别安装有移动轮(13)。7. A concrete pouring support for a ground-connected wall according to claim 1, characterized in that: the mobile platform (1) also includes outriggers (12), and the outriggers (12) are provided with four, four The legs (12) are respectively fixedly connected to the four corners of one side of the platform board (11), and the ends of the legs (12) away from the platform board (11) are respectively equipped with moving wheels (13). 8.根据权利要求7所述的一种地连墙混凝土浇筑支架,其特征在于:所述移动轮(13)为具有刹车功能的万向轮。8. A concrete pouring support for ground-connected walls according to claim 7, characterized in that: the moving wheel (13) is a universal wheel with a braking function.
CN202220936789.1U 2022-04-21 2022-04-21 A ground connecting wall concrete pouring support Expired - Fee Related CN217105095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220936789.1U CN217105095U (en) 2022-04-21 2022-04-21 A ground connecting wall concrete pouring support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220936789.1U CN217105095U (en) 2022-04-21 2022-04-21 A ground connecting wall concrete pouring support

Publications (1)

Publication Number Publication Date
CN217105095U true CN217105095U (en) 2022-08-02

Family

ID=82584004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220936789.1U Expired - Fee Related CN217105095U (en) 2022-04-21 2022-04-21 A ground connecting wall concrete pouring support

Country Status (1)

Country Link
CN (1) CN217105095U (en)

Similar Documents

Publication Publication Date Title
CN102102365B (en) Slurry protection wall bored pile concrete casting device
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN217105095U (en) A ground connecting wall concrete pouring support
CN202746764U (en) Lifting bracket for pipeline butting adjustment
CN107630463A (en) A kind of construction technology of underground pipe gallery construction mobile jumbo device
CN218371396U (en) Lifting crane for transferring cement pipes
CN110656655A (en) Simple steel hanging box convenient for integral hoisting and hoisting method thereof
CN208473293U (en) Narrow deformation joint easy-dismount template system
CN207943803U (en) Diaphram wall steel reinforcement cage lifting device under overpass
CN215760498U (en) A concrete formwork demolition machine for housing construction
CN216866017U (en) A concrete pouring device in a concrete-filled steel tube column
CN207090836U (en) It is a kind of for the installation of power station pipeline from climbing hoisting equipment
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary
CN211714566U (en) Be used for highway tunnel shaft mid-board slipform construction equipment
CN204224987U (en) A kind of continuous girder bridge multiple pipeline installation structure
CN221760676U (en) Pile pulling device used under limited beam bottom space condition
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN221896242U (en) Water taking head steel sleeve box
CN219585700U (en) A water conservancy pipeline lifting transportation equipment
CN211773722U (en) Foundation pit concrete supporting structure
CN221321709U (en) High slope cable machine mobile construction platform based on concrete embedded pier
CN217539850U (en) Urban rainwater and sewage pipe network is reformed transform and is buried device underground with pipeline
CN222614873U (en) A device for assisting installation of ALC wall panels
CN215478452U (en) Portable concrete conveying and lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220802