CN210529699U - A spiral ground stake aligning installation auxiliary device for ground photovoltaic support - Google Patents

A spiral ground stake aligning installation auxiliary device for ground photovoltaic support Download PDF

Info

Publication number
CN210529699U
CN210529699U CN201921083847.5U CN201921083847U CN210529699U CN 210529699 U CN210529699 U CN 210529699U CN 201921083847 U CN201921083847 U CN 201921083847U CN 210529699 U CN210529699 U CN 210529699U
Authority
CN
China
Prior art keywords
spiral ground
ground stake
spiral
lagging
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921083847.5U
Other languages
Chinese (zh)
Inventor
王荣兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingjiang Xinda Photovoltaic Technology Co Ltd
Original Assignee
Jingjiang Xinda Photovoltaic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingjiang Xinda Photovoltaic Technology Co Ltd filed Critical Jingjiang Xinda Photovoltaic Technology Co Ltd
Priority to CN201921083847.5U priority Critical patent/CN210529699U/en
Application granted granted Critical
Publication of CN210529699U publication Critical patent/CN210529699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a spiral ground stake aligning installation auxiliary device for ground photovoltaic support, including spiral ground stake, the left and right sides of spiral ground stake bottom all is provided with the lagging, the locating plate is all installed to the left and right sides of lagging bottom, one side that spiral ground stake was kept away from to the lagging all is provided with the second knob, and the second knob is close to the middle part of lagging one side and all welds the bull stick, spiral ground stake left side movable plate is close to the upper and lower both ends of spiral ground stake one side and all welds the fixed head, the middle part welding that spiral ground stake right side movable plate is close to spiral ground stake one side has the fixed head, the movable plate is kept away from the upper and lower both ends of spiral ground stake one side and all welds the inserted bar. The utility model discloses in the fixed spiral ground stake of lagging, the ground can be bored in to the rotation downwards to the spiral ground stake, is applicable to the spiral ground stake of any thickness specification to help the staff with the more accurate ground of squeezing into of spiral ground stake, easy operation is convenient, the vertical accuracy is high.

Description

A spiral ground stake aligning installation auxiliary device for ground photovoltaic support
Technical Field
The utility model relates to a photovoltaic support technical field specifically is a spiral ground stake aligning installation auxiliary device for ground photovoltaic support.
Background
A solar photovoltaic support is a special support designed for placing, installing and fixing a solar panel in a solar photovoltaic power generation system, and is generally made of aluminum alloy, carbon steel and stainless steel.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation auxiliary device is straightened to spiral ground stake for ground photovoltaic support to the spiral ground stake that provides in solving above-mentioned background art need guarantee its problem with the perpendicular to ground state when installing to ground.
In order to achieve the above object, the utility model provides a following technical scheme: a spiral ground pile straightening and mounting auxiliary device for a ground photovoltaic support comprises a spiral ground pile, wherein sleeve plates are arranged on the left side and the right side of the bottom end of the spiral ground pile, the front side and the rear side of each sleeve plate are fixedly connected through bolts, positioning plates are arranged on the left side and the right side of the bottom end of each sleeve plate, first knobs are arranged at two corners of one side, far away from the sleeve plates, of the top of each positioning plate, second knobs are arranged on one sides, far away from the spiral ground pile, of the sleeve plates, rotating rods are welded in the middle portions, close to one sides of the sleeve plates, of the second knobs, one ends, far away from the second knobs, of the rotating rods penetrate through the sleeve plates and extend to the middle portions of the sleeve plates, one ends, far away from the second knobs, of the rotating rods are connected with the middle portions of the movable plates, close to the spiral ground pile, of the left side of the spiral ground pile, of the movable plates, the movable plate is kept away from all welding at the upper and lower both ends of spiral ground stake one side and has been had the inserted bar, two sets of slots have all been seted up on the inner wall that the lagging is close to spiral ground stake one side, the one end that the movable plate was kept away from to the inserted bar all inserts the inside of establishing the slot.
Preferably, the bottom of first knob all has welded self tapping screw, and self tapping screw's bottom passes the below that the locating plate extends to the locating plate, self tapping screw's top passes through the bearing with the locating plate and is connected.
Preferably, the surface of bull stick is provided with the external screw thread, the department of laminating mutually of lagging and bull stick is provided with the internal screw thread of mutually supporting with the bull stick.
Preferably, the fixed head includes mobile jib, arc piece and ball, the one end welding that the mobile plate was kept away from to the mobile jib has the arc piece, the arc piece is embedded to have two sets of balls near one side of spiral ground stake.
Preferably, the upper side and the lower side of one end, far away from the moving plate, of the inserted bar are welded with sliding blocks, and sliding grooves matched with the sliding blocks are formed in the inner walls of the inserting grooves.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a be provided with the movable plate, after the staff established the bottom of spiral ground pile with two sets of lagging covers, both ends fixed connection around with two sets of lagging through the bolt, then the second knob of rotation, the helicitic texture through the bull stick drives the movable plate and moves to the direction that is close to spiral ground pile, make the fixed head support the card to the surface of spiral ground pile, the fixed head of spiral ground pile left and right sides steps up spiral ground pile, make the lagging fix in the outside of spiral ground pile, and the arrangement mode of fixed head left and right sides one does not influence the rotation of spiral ground pile surface screw thread, and the ball has reduced the frictional force of fixed head and spiral ground pile surface, thereby when making the lagging fix spiral ground pile, spiral ground pile can rotate downwards and bore ground, moreover, the steam generator is simple in structure, and be applicable to the spiral ground pile of any thickness specification, therefore, the clothes hanger is strong in practicability;
the utility model discloses a be provided with the locating plate, the staff rotates first knob, drives self tapping screw and rotates, makes self tapping screw bore in the middle of the ground, lets locating plate and ground tightly laminate, because be the vertical state between locating plate and the lagging for the fixed spiral ground stake of lagging is the vertical state with ground, and help the staff squeezes into ground with the spiral ground stake more accurate, and easy operation is convenient, and the vertical accuracy is high.
Description of the drawings:
in order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
fig. 2 is an enlarged schematic view of the structure at a in fig. 1 of the present invention;
FIG. 3 is a schematic front view of the structure of the present invention;
fig. 4 is a schematic top sectional view of the structure of the fixing head of the present invention.
In the figure: 1. piling in a spiral manner; 2. sheathing; 3. positioning a plate; 4. a first knob; 5. a self-tapping screw; 6. a second knob; 7. a rotating rod; 8. moving the plate; 9. a fixed head; 91. a main rod; 92. an arc-shaped sheet; 93. a ball bearing; 10. inserting a rod; 11. and (4) a slot.
The specific implementation mode is as follows:
the technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a spiral ground pile straightening and mounting auxiliary device for a ground photovoltaic support comprises a spiral ground pile 1, sleeve plates 2 are arranged on the left side and the right side of the bottom end of the spiral ground pile 1, the front side and the rear side of each sleeve plate 2 are fixedly connected through bolts, positioning plates 3 are arranged on the left side and the right side of the bottom end of each sleeve plate 2, first knobs 4 are arranged at two surface corners of the top of each positioning plate 3 far away from one side of each sleeve plate 2, self-tapping screws 5 are welded at the bottom ends of the first knobs 4, the bottom ends of the self-tapping screws 5 penetrate through the positioning plates 3 and extend to the lower side of the positioning plates 3, the top ends of the self-tapping screws 5 are connected with the positioning plates 3 through bearings, the top ends of the self-tapping screws 5 are used for enabling workers to rotate the first knobs 4 to drive the self-tapping screws 5 to drill into the ground, the positioning plates 3 are tightly attached to the ground, the parallel state between the positioning plates, and the second knob 6 all has welded the bull stick 7 near the middle part of lagging 2 one side, the one end that the second knob 6 was kept away from to the bull stick 7 all passes the lagging 2 and extends to the middle part of lagging 2, the surface of bull stick 7 is provided with the external screw thread, the department of laminating mutually of lagging 2 and bull stick 7 is provided with the internal thread of mutually supporting with bull stick 7, its effect rotates second knob 6 for the staff and drives bull stick 7 and rotate, control through about the helicitic texture drive bull stick 7, the one end that the second knob 6 was kept away from to the bull stick 7 all is connected with the middle part of movable plate 8 through embedded bearing.
The upper end and the lower end of one side of a moving plate 8 at the left side of the spiral ground pile 1, which is close to the spiral ground pile 1, are welded with fixed heads 9, the middle part of one side of the moving plate 8 at the right side of the spiral ground pile 1 is welded with fixed heads 9, each fixed head 9 comprises a main rod 91, an arc-shaped sheet 92 and balls 93, one end of the main rod 91, which is far away from the moving plate 8, is welded with the arc-shaped sheet 92, one side of the arc-shaped sheet 92, which is close to the spiral ground pile 1, is embedded with two groups of balls 93, which are used for pushing the fixed heads 9 to clamp the surface of the spiral ground pile 1 by the moving plate 8, the fixed heads 9 at the left side and the right side of the spiral ground pile 1 tighten the spiral ground pile 1, so that the sleeve plate 2 is fixed at the outer side of the spiral ground pile 1, the arrangement mode of the left side and the right side of the fixed heads 9 does not influence the rotation of, spiral ground stake 1 can rotate downwards and bore into ground, the upper and lower both ends that spiral ground stake 1 one side was kept away from to movable plate 8 have all welded inserted bar 10, two sets of slots 11 have all been seted up on the inner wall that lagging 2 is close to spiral ground stake 1 one side, the one end that movable plate 8 was kept away from to inserted bar 10 all inserts the inside of establishing at slot 11, the upper and lower both sides that movable plate 8 one end was kept away from to inserted bar 10 have all welded the slider, the spout of mutually supporting with the slider has all been seted up on the inner wall of slot 11, when its effect was the removal of movable plate 8, inserted bar 10 slides in the middle of slot 11, movable plate 8 in the vertical state has been guaranteed, the stability that.
The working principle is as follows: after the working personnel sleeve the two groups of sleeve plates 2 at the bottom end of the spiral ground pile 1, the front end and the rear end of the two groups of sleeve plates 2 are fixedly connected through bolts, then the second knob 6 is rotated, the movable plate 8 is driven to move towards the direction close to the spiral ground pile 1 through the thread structure of the rotating rod 7, so that the fixed head 9 is used for abutting and clamping the surface of the spiral ground pile 1, the fixed heads 9 on the left side and the right side of the spiral ground pile 1 are used for fastening the spiral ground pile 1, the sleeve plate 2 is fixed on the outer side of the spiral ground pile 1, and the left-two-right-one arrangement of the fixed head 9 does not affect the rotation of the screw thread on the surface of the screw pile 1, and the balls 93 reduce the friction force between the fixed head 9 and the surface of the screw pile 1, therefore, when the sleeve plate 2 fixes the spiral ground pile 1, the spiral ground pile 1 can downwards rotate to drill into the ground, the structure is simple, the spiral ground pile 1 is suitable for spiral ground piles 1 of any thickness specification, and the practicability is high;
first knob 4 is rotated in work, drives self-tapping screw 5 and rotates, makes self-tapping screw 5 bore in the middle of the ground, lets locating plate 3 and ground tightly laminate, because be the vertical state between locating plate 3 and the lagging 2 for the fixed spiral ground stake 1 of lagging 2 is the vertical state with ground, and help the staff squeezes into ground with spiral ground stake 1 more accurate, and easy operation is convenient, and the vertical accuracy is high, does above the utility model discloses a whole theory of operation.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (5)

1. The utility model provides a spiral ground stake aligning installation auxiliary device for ground photovoltaic support, includes spiral ground stake (1), its characterized in that: the left and right sides of spiral ground stake (1) bottom all is provided with lagging (2), and both sides all pass through bolt fixed connection around lagging (2), locating plate (3) are all installed to the left and right sides of lagging (2) bottom, two face angle departments that lagging (2) one side was kept away from at locating plate (3) top all are provided with first knob (4), one side that spiral ground stake (1) was kept away from in lagging (2) all is provided with second knob (6), and second knob (6) are close to the middle part of lagging (2) one side and all weld bull stick (7), the one end that second knob (6) were kept away from in bull stick (7) all passes lagging (2) and extends to the middle part of lagging (2), the one end that second knob (6) were kept away from in bull stick (7) all is connected through the middle part of embedded bearing with movable plate (8), the upper and lower both ends that spiral ground stake (1) one side was close to spiral ground movable plate (8) all weld has the fixed head, spiral ground stake (1) one side are all welded (9) The utility model discloses a spiral ground stake (1), spiral ground stake (1) right side movable plate (8) have fixed head (9) near the middle part welding of spiral ground stake (1) one side, movable plate (8) are kept away from the upper and lower both ends of spiral ground stake (1) one side and are all welded inserted bar (10), two sets of slots (11) have all been seted up on sleevelet (2) are close to the inner wall of spiral ground stake (1) one side, the one end that movable plate (8) were kept away from in inserted bar (10) all inserts the inside of establishing slot (11).
2. The spiral ground pile straightening installation auxiliary device for the ground photovoltaic support as claimed in claim 1, wherein: the bottom of first knob (4) all welds tapping screw rod (5), and the bottom of tapping screw rod (5) passes locating plate (3) and extends to the below of locating plate (3), the top of tapping screw rod (5) passes through the bearing with locating plate (3) and is connected.
3. The spiral ground pile straightening installation auxiliary device for the ground photovoltaic support as claimed in claim 1, wherein: the surface of bull stick (7) is provided with the external screw thread, the department of laminating mutually of lagging (2) and bull stick (7) is provided with the internal thread of mutually supporting with bull stick (7).
4. The spiral ground pile straightening installation auxiliary device for the ground photovoltaic support as claimed in claim 1, wherein: fixed head (9) include mobile jib (91), arc piece (92) and ball (93), the one end welding that the movable plate (8) was kept away from to mobile jib (91) has arc piece (92), arc piece (92) are close to one side embedded two sets of ball (93) of spiral ground stake (1).
5. The spiral ground pile straightening installation auxiliary device for the ground photovoltaic support as claimed in claim 1, wherein: the upper side and the lower side of one end, far away from the movable plate (8), of the inserted rod (10) are welded with sliding blocks, and sliding grooves matched with the sliding blocks are formed in the inner wall of the slot (11).
CN201921083847.5U 2019-07-11 2019-07-11 A spiral ground stake aligning installation auxiliary device for ground photovoltaic support Active CN210529699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921083847.5U CN210529699U (en) 2019-07-11 2019-07-11 A spiral ground stake aligning installation auxiliary device for ground photovoltaic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921083847.5U CN210529699U (en) 2019-07-11 2019-07-11 A spiral ground stake aligning installation auxiliary device for ground photovoltaic support

Publications (1)

Publication Number Publication Date
CN210529699U true CN210529699U (en) 2020-05-15

Family

ID=70597452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921083847.5U Active CN210529699U (en) 2019-07-11 2019-07-11 A spiral ground stake aligning installation auxiliary device for ground photovoltaic support

Country Status (1)

Country Link
CN (1) CN210529699U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111854685A (en) * 2020-07-22 2020-10-30 广东科捷检测技术服务有限公司 Building settlement and inclination integrated monitoring equipment and monitoring method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111854685A (en) * 2020-07-22 2020-10-30 广东科捷检测技术服务有限公司 Building settlement and inclination integrated monitoring equipment and monitoring method

Similar Documents

Publication Publication Date Title
CN210529699U (en) A spiral ground stake aligning installation auxiliary device for ground photovoltaic support
CN211447002U (en) Combined multifunctional foundation bolt positioning template
CN110653323B (en) Compound concatenation riveting frock of electrical cabinet
CN216067181U (en) Auxiliary tool for installation of aluminum alloy doors and windows
CN210830777U (en) Pipeline fixed mounting device for water conservancy construction
CN213145258U (en) Permanent magnet synchronous motor-based transmission rolling mounting rack for belt fixing machine
CN212689917U (en) Support arrangement for hydraulic jumbolter
CN207269215U (en) A kind of solar components track stent branch stake tool
CN111573528B (en) Tower crane wall attaching device and construction method thereof
CN210013182U (en) Hydraulic engineering construction breakwater device
CN210947138U (en) Constructional engineering frame roof beam reinforcing apparatus
CN219908960U (en) Foundation pit excavation supporting device
CN218734010U (en) Large ground pile support
CN210368936U (en) Civil engineering building composite pile
CN209921103U (en) Lightning protection charging pile
CN216386273U (en) Anchor rod axial force measuring tool
CN216049765U (en) Full-automatic tunnel secondary lining thickness detection instrument
CN207069977U (en) A kind of solar panel fixed mount easy to use
CN216190580U (en) Tower machine pull rod auxiliary installation device easy to assemble
CN210306479U (en) Welding tool for tower cylinder embedded part
CN215880531U (en) Two-sided welding position frock of wind-powered electricity generation jacket
CN218813758U (en) Foundation pit supporting frame
CN215562859U (en) C90 type concrete pipe pile resistance test equipment
CN220456010U (en) Number plate installation device
CN218946792U (en) Frock that wind power generation tower section of thick bamboo foundation ring concatenation flange prevents welding deformation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant