CN210529614U - Semicircular dam structure for installing lamp pile foundation - Google Patents

Semicircular dam structure for installing lamp pile foundation Download PDF

Info

Publication number
CN210529614U
CN210529614U CN201920632555.6U CN201920632555U CN210529614U CN 210529614 U CN210529614 U CN 210529614U CN 201920632555 U CN201920632555 U CN 201920632555U CN 210529614 U CN210529614 U CN 210529614U
Authority
CN
China
Prior art keywords
mounting groove
semi
lamp pile
lamp
circular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920632555.6U
Other languages
Chinese (zh)
Inventor
孙鹏
陈海英
丁洁
魏振兴
于隆基
苏建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waterway Engineering Design and Consulting Co Ltd
Original Assignee
Shanghai Waterway Engineering Design and Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waterway Engineering Design and Consulting Co Ltd filed Critical Shanghai Waterway Engineering Design and Consulting Co Ltd
Priority to CN201920632555.6U priority Critical patent/CN210529614U/en
Application granted granted Critical
Publication of CN210529614U publication Critical patent/CN210529614U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A semicircular dam structure for installing a lamp pile foundation includes: semicircular dykes and dams, lamp pile foundation mounting groove structure and lamp pile, lamp pile foundation mounting groove structure and semicircular dykes and dams middle part are connected, and the lamp pile is connected with lamp pile foundation mounting groove structure top. Wherein, lamp pile basis mounting groove structure includes: prefabricated lamp pile foundation, lamp pile foundation mounting groove, rubble base and piece stone filling structure. The utility model discloses compare with the conventional art, through add light stake basis mounting groove structure in original semi-circular dyke and dam, when realizing making semi-circular dyke and dam structure have the advantage that current semi-circular component protective effect is good, bear the wave can the reinforce, stability is high, can install the light stake again to the stability and the structure security of dykes and dams and light stake have been improved.

Description

Semicircular dam structure for installing lamp pile foundation
Technical Field
The utility model relates to a water conservancy, water conservancy dykes and dams technical field, concretely relates to semi-circular dykes and dams structure of installation light pile basis.
Background
The arc-shaped outer vertical surface of the traditional semicircular dam component has the advantages of strong wave bearing capacity, high stability, small foundation stress and the like, and is widely applied to coastal and river dam projects at present. In order to ensure the navigation safety of ships around the structure, lamp piles are required to be arranged on the dam. However, the strength of the semicircular component is limited, and the arc-shaped outer vertical surface is difficult to bear the self weight and the external load of a large lamp post. Also, the arcuate surfaces of the members are not suitable for direct mounting of the light stake.
In order to solve the above problems, we have made a series of improvements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a semi-circular dykes and dams structure of installation light pile basis to overcome the above-mentioned shortcoming and not enough that prior art exists.
A semicircular dam structure for installing a lamp pile foundation includes: the lamp pile foundation mounting groove structure is connected with the middle part of the semicircular dam, and the lamp pile is connected with the top of the lamp pile foundation mounting groove structure;
wherein, light stake basis mounting groove structure includes: prefabricated lamp pile basis, lamp pile basis mounting groove, rubble base and piece stone filling structure, semi-circular dykes and dams middle part is located to lamp pile basis mounting groove, the rubble base is located lamp pile basis mounting groove bottom, prefabricated lamp pile basis is connected with rubble base upper portion, piece stone filling structure is connected all around with lamp pile basis mounting groove, lamp pile basis mounting groove is box structure, the degree of depth of lamp pile basis mounting groove is the same with the inside degree of depth of semi-circular dykes and dams, the thickness of rubble base is not less than 1m, piece stone filling structure's thickness is not less than 0.5 meter.
Further, the semicircular dams include: the semi-circular component is of a hollow structure or a caisson structure, the radius of the semi-circular component is 3 m-8 m, the height of the semi-circular component is 4 m-12 m, the single length of the semi-circular component is not less than 5m, and the wall thickness of the semi-circular component is 0.3 m-0.8 m.
Further, the length and the width of the lamp pile foundation mounting groove are not less than the sum of the thicknesses of the prefabricated lamp pile foundation and the minimum block stone filling structure.
The utility model has the advantages that:
the utility model discloses compare with the conventional art, through add light stake basis mounting groove structure in original semi-circular dyke and dam, when realizing making semi-circular dyke and dam structure have the advantage that current semi-circular component protective effect is good, bear the wave can the reinforce, stability is high, can install the light stake again to the stability and the structure security of dykes and dams and light stake have been improved.
Description of the drawings:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the cross section of the semicircular dam of the present invention.
Fig. 3 is a schematic structural view of the cross section of the semi-circular dam with the hollow structure of the present invention.
Reference numerals:
a semicircular dam 100, a semicircular member 110, and an end plate 120.
A light pile foundation mounting groove structure 200, a prefabricated light pile foundation 210, a light pile foundation mounting groove 220, a gravel base 230, a block stone filling structure 240, and a light pile 300.
Detailed Description
The present invention will be further described with reference to the following examples. It should be understood that the following examples are illustrative only and are not intended to limit the scope of the present invention.
Example 1
Fig. 1 is a schematic structural diagram of the present invention. Fig. 2 is a schematic structural view of the cross section of the semicircular dam of the present invention. Fig. 3 is a schematic structural view of the cross section of the semi-circular dam with the hollow structure of the present invention.
As shown in fig. 1 and 2, a semicircular dam structure for installing a lamp post foundation includes: semicircular dykes 100, lamp pile basis mounting groove structure 200 and lamp pile 300, lamp pile basis mounting groove structure 200 is connected with semicircular dykes 100 middle part, and lamp pile 300 is connected with lamp pile basis mounting groove structure 200 top.
Wherein, beacon basis mounting groove structure 200 includes: prefabricated light pile basis 210, light pile basis mounting groove 220, rubble base 230 and stone filling structure 240, light pile basis mounting groove 220 is located semi-circular dykes and dams 100 middle part, rubble base 230 is located light pile basis mounting groove 220 bottom, prefabricated light pile basis 210 is connected with rubble base 230 upper portion, stone filling structure 240 is connected all around with light pile basis mounting groove 220, light pile basis mounting groove 220 is box structure, the degree of depth of light pile basis mounting groove 220 is the same with the inside degree of depth of semi-circular dykes and dams 100, rubble base 230's thickness is not less than 1m, stone filling structure 240's thickness is not less than 0.5 meter.
The semicircular dam 100 includes: the semi-circular member 110 and the end plate 120, the end plate 120 is connected with both sides of the semi-circular member 110, the semi-circular member 110 is a caisson structure, the radius of the semi-circular member 110 is 3 m-8 m, the height of the semi-circular member 110 is 4 m-12 m, the single length of the semi-circular member 110 is not less than 5m, and the wall thickness of the semi-circular member 110 is 0.3 m-0.8 m.
The length and width of the lamppost foundation installation groove 220 are not less than the sum of the thicknesses of the prefabricated lamppost foundation 210 and the minimum block stone filling structure 240.
The utility model discloses an operating principle is, at first carry out the ground as required and handle, and lay the riprap foundation bed of enough thickness and intensity in the bottom, guarantee that semi-circular dykes and dams 100 can not take place too big settlement because of the ground warp, skew etc., semi-circular member 110's radius is 3m ~ 8m, highly be 4m ~ 12m, single length is not less than 5m, the wall thickness is 0.3m ~ 0.8m, semi-circular member 110 is connected with end plate 120 along the both sides of dyke axis direction, the component is generally prefabricated by the concrete and forms, and select the arrangement of reinforcement according to the intensity machine, according to the construction condition of dykes and dams, semi-circular dykes and dams 100 are the confined caisson structure in this embodiment. Prefabricating the semicircular component 110 and transporting to a construction area, placing the semicircular component 110 according to the designed lamp pile position, keeping continuity with the existing components along the axial direction of the dam, arranging a lamp pile foundation installation groove 220 in the middle of the semicircular component 110, wherein the lamp pile foundation installation groove 220 is of a box-shaped structure, the length and the width of the lamp pile foundation installation groove are not less than the sum of the dimension of the prefabricated lamp pile foundation 210 and the minimum stone filling thickness, the groove depth is the same as the inner depth of the semicircular component 110, laying and leveling a broken stone base 230 at the bottom of the lamp pile foundation installation groove 220, placing the prefabricated lamp pile foundation 210 in the placement groove, and finally backfilling a block stone filling structure 240 around the prefabricated lamp pile foundation 210. The utility model discloses an add light pile basis mounting groove structure in original semi-circular dyke dam, when realizing making semi-circular dyke dam structure have that current semi-circular component protective effect is good, bear the advantage that wave ability is strong, stability is high, can install the light pile again to the stability and the structure security of dykes and dams and light pile have been improved.
Example 2
As shown in fig. 3, in the present embodiment, the semi-circular member 110 is formed in a hollow structure, which helps to save the cost and manufacturing time of the semi-circular embankment 100, and can be adjusted according to different strength requirements.
The above description has been made of the embodiments of the present invention, but the present invention is not limited thereto, and various changes may be made without departing from the spirit of the present invention.

Claims (3)

1. The utility model provides a semi-circular dykes and dams structure of installation light stake basis which characterized in that includes: the lamp pile foundation mounting groove structure comprises a semicircular dam (100), a lamp pile foundation mounting groove structure (200) and a lamp pile (300), wherein the lamp pile foundation mounting groove structure (200) is connected with the middle part of the semicircular dam (100), and the lamp pile (300) is connected with the top of the lamp pile foundation mounting groove structure (200);
wherein the light stake foundation mounting groove structure (200) comprises: prefabricated lamp pile basis (210), lamp pile basis mounting groove (220), rubble base (230) and piece stone filling structure (240), semi-circular dykes and dams (100) middle part is located in lamp pile basis mounting groove (220), lamp pile basis mounting groove (220) bottom is located in rubble base (230), prefabricated lamp pile basis (210) is connected with rubble base (230) upper portion, piece stone filling structure (240) are connected all around with lamp pile basis mounting groove (220), lamp pile basis mounting groove (220) are box structure, the degree of depth and semi-circular dykes and dams (100) inside degree of depth of lamp pile basis mounting groove (220) are the same, the thickness of rubble base (230) is not less than 1m, the thickness of piece stone filling structure (240) is not less than 0.5 m.
2. A semicircular dam structure for installing a lamppost foundation as claimed in claim 1, wherein: the semicircular dam (100) includes: the semi-circular member comprises a semi-circular member (110) and end plates (120), wherein the end plates (120) are connected with two sides of the semi-circular member (110), the semi-circular member (110) is of a through structure or a caisson structure, the radius of the semi-circular member (110) is 3 m-8 m, the height of the semi-circular member (110) is 4 m-12 m, the single length of the semi-circular member (110) is not less than 5m, and the wall thickness of the semi-circular member (110) is 0.3 m-0.8 m.
3. A semicircular dam structure for installing a lamppost foundation as claimed in claim 1, wherein: the length and the width of the lamp pile foundation mounting groove (220) are not less than the sum of the thicknesses of the prefabricated lamp pile foundation (210) and the minimum block stone filling structure (240).
CN201920632555.6U 2019-05-05 2019-05-05 Semicircular dam structure for installing lamp pile foundation Active CN210529614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920632555.6U CN210529614U (en) 2019-05-05 2019-05-05 Semicircular dam structure for installing lamp pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920632555.6U CN210529614U (en) 2019-05-05 2019-05-05 Semicircular dam structure for installing lamp pile foundation

Publications (1)

Publication Number Publication Date
CN210529614U true CN210529614U (en) 2020-05-15

Family

ID=70592906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920632555.6U Active CN210529614U (en) 2019-05-05 2019-05-05 Semicircular dam structure for installing lamp pile foundation

Country Status (1)

Country Link
CN (1) CN210529614U (en)

Similar Documents

Publication Publication Date Title
US10138616B2 (en) Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN105350526A (en) Method for setting up steel platform
KR100854338B1 (en) Construction structure of open caisson cofferdam using holding type sheet pile
CN213296396U (en) Steel sheet pile cofferdam for tidal zone of sea area
CN210529614U (en) Semicircular dam structure for installing lamp pile foundation
CN102797265A (en) Protective structure for bedding slope bridge piers and abutments
CN107940102B (en) Underground raw water pipeline protection construction method
CN104088288B (en) The preparation method of container caisson and application thereof
CN215715515U (en) Municipal pipe network construction supporting integrated structure under unfavorable geological conditions
CN216839463U (en) Combined support of welt local deep foundation pit in foundation pit
CN201738286U (en) Tetrapod pier type structure
JP2011214252A (en) Structure for reinforcing embankment
CN211621441U (en) Vertical dike structure
KR102152085B1 (en) Open Cell Caisson Structure and a Construction Method thereof
CN111980039B (en) Construction method and structure of steel sheet pile cofferdam in tidal zone of sea area
CN208251016U (en) A kind of turnover plate type flood-control wall
KR100402438B1 (en) An basement excavation apparatus of pier basis for a bridge
CN110939101A (en) Vertical dike structure and construction method thereof
CN205012351U (en) Arcading formula sheet pile supporting construction
Hawkswood et al. Foundations to precast marine structures
CN214784070U (en) Rapid construction structure for combined cofferdam of secant pile and steel sleeve box
CN212154795U (en) Integral structure system for passing through giant karst cave
CN219196024U (en) Soft soil area pile raft type tunnel anti-sedimentation structure
CN210946849U (en) Cofferdam device for construction engineering dredging engineering
CN216737132U (en) Assembled wharf structure capable of being hoisted on land in deepwater port

Legal Events

Date Code Title Description
GR01 Patent grant