CN210512712U - Cooling tower convenient to clearance - Google Patents
Cooling tower convenient to clearance Download PDFInfo
- Publication number
- CN210512712U CN210512712U CN201921258072.0U CN201921258072U CN210512712U CN 210512712 U CN210512712 U CN 210512712U CN 201921258072 U CN201921258072 U CN 201921258072U CN 210512712 U CN210512712 U CN 210512712U
- Authority
- CN
- China
- Prior art keywords
- cleaning
- tower body
- water spraying
- plate
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000001816 cooling Methods 0.000 title claims abstract description 23
- 238000004140 cleaning Methods 0.000 claims abstract description 68
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 53
- 239000000945 filler Substances 0.000 claims abstract description 40
- 238000005507 spraying Methods 0.000 claims abstract description 37
- 230000000903 blocking effect Effects 0.000 claims abstract description 20
- 238000011084 recovery Methods 0.000 claims abstract description 17
- 238000009434 installation Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 4
- 238000009423 ventilation Methods 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 2
- 238000003780 insertion Methods 0.000 claims 1
- 230000037431 insertion Effects 0.000 claims 1
- 239000012535 impurity Substances 0.000 abstract description 28
- 239000007921 spray Substances 0.000 abstract description 15
- 239000010865 sewage Substances 0.000 abstract description 8
- 238000012856 packing Methods 0.000 abstract description 6
- 238000012545 processing Methods 0.000 abstract description 2
- 239000002351 wastewater Substances 0.000 description 21
- 230000004888 barrier function Effects 0.000 description 18
- 239000010813 municipal solid waste Substances 0.000 description 8
- 239000000498 cooling water Substances 0.000 description 7
- 230000000694 effects Effects 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 238000005034 decoration Methods 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000002826 coolant Substances 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000004043 dyeing Methods 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002918 waste heat Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000004065 wastewater treatment Methods 0.000 description 1
Images
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model relates to a processing device for cooling sewage, and discloses a cooling tower convenient to clean, which comprises a tower body, wherein a trickle filler is arranged in the tower body, a blow-off pipe is arranged at the top of the tower body, and a spray pipe is also arranged at the top of the tower body; a recovery port is arranged at the bottom of the tower body; the tower body is provided with a vent communicated with the outside, and the vent is positioned between the water spraying filler and the recovery port; the trickle packing is provided with a cleaning device, and the cleaning device comprises a cleaning plate arranged on one side of the trickle packing, which is far away from the vent opening, a cleaning opening arranged on the tower body in a sliding manner, and a driving piece for driving the cleaning plate to slide towards the cleaning opening and back to the cleaning opening; the cleaning opening is located between the water spraying filler and the water spraying pipe, and a blocking plate used for blocking the cleaning opening is arranged on the tower body. Through setting up cleaning device to can conveniently clear up the great impurity of volume on the trickle packs, finally prevent that the trickle packs and is blockked up.
Description
Technical Field
The utility model relates to a sewage refrigerated processing equipment especially relates to a cooling tower convenient to clearance.
Background
In the fields of printing and dyeing and other chemical industries, a lot of waste water is often produced, and most of the waste water has high heat. Before the wastewater treatment, the wastewater needs to be cooled. The existing equipment for cooling the wastewater is a cooling tower, and the common cooling mode in the cooling tower is to use a heat exchanger to take away heat in the wastewater; there are also devices that use cold water as a circulating coolant to absorb heat from the system and reject it to the atmosphere to reduce the temperature of the water. The waste heat generated in the waste water is dissipated by utilizing the principles of evaporation heat dissipation, convection heat transfer, radiation heat transfer and the like to reduce the water temperature.
Chinese patent with grant publication No. CN209131435U discloses a cooling tower with circulating spray function, which comprises a tower body, a base is installed at the bottom end of the tower body, a supporting foot pad is installed at the bottom end of the base, a vent is opened on the surface of the top end of the base, supporting columns are evenly installed inside the base, an air inlet window is installed outside the middle of the base, and a cover plate is installed at the top end of the tower body. The water catch bowl has been seted up to the inside bottom of tower body, and the filter tube is evenly installed on the water catch bowl top, and filter tube internally mounted has the filter screen. The interior of the tower body is provided with a water spraying filler. The bottom end of the water collecting tank is provided with a water delivery pipe, and the outer side of the water delivery pipe is provided with a valve. One end of the water delivery pipe is provided with a water inlet pipe, the top end of the water inlet pipe is provided with a bearing, both sides of the bearing are provided with water distribution pipes, and the bottom ends of the water distribution pipes are uniformly provided with spray heads.
In the actual operation process, need refrigerated waste water usually, from the input of tower body top, then drop to the trickle filler along with gravity on, drop logical in waste water simultaneously and lead to the while, the shower nozzle on the water distributor also sprays water towards the direction that the trickle was packed to make cooling water and waste water mix together, waste water with heat transfer to cooling water, and together drop to the trickle on the filler, thereby can give off the heat and fill on, thereby can give off the heat
However, there are often some impurities in the waste water, some bulky impurities can be attached to the trickle filler in the long-term in-process waste water of trickle filler, and the trickle filler is located inside the tower body, and the impurity of attaching to the trickle filler is inconvenient clearance again, finally can lead to the trickle filler to be blockked up.
SUMMERY OF THE UTILITY MODEL
Not enough to above-mentioned prior art exists, the utility model discloses an aim at then provides a cooling tower convenient to clearance, through setting up cleaning device to can conveniently clear up the great impurity of volume on the trickle packs, finally prevent that the trickle packs and is blockked up.
The above object of the present invention is achieved by the following technical solutions:
a cooling tower convenient to clean comprises a tower body, wherein water spraying filler is arranged in the tower body, a drain pipe is arranged at the top of the tower body, and a water spraying pipe is also arranged at the top of the tower body; a recovery port is arranged at the bottom of the tower body; the tower body is provided with a vent communicated with the outside, and the vent is positioned between the water spraying filler and the recovery port; the trickle packing is provided with a cleaning device, and the cleaning device comprises a cleaning plate arranged on one side of the trickle packing, which is far away from the vent opening, a cleaning opening arranged on the tower body in a sliding manner, and a driving piece for driving the cleaning plate to slide towards the cleaning opening and back to the cleaning opening; the cleaning opening is located between the water spraying filler and the water spraying pipe, and a blocking plate used for blocking the cleaning opening is arranged on the tower body.
Through adopting above-mentioned technical scheme, when drenching the packing and keeping away from on the lateral wall of retrieving mouthful attached to impurity and need the clearance, through the driving piece, drive the direction slip of clearance board towards clearance mouth, the clearance board is in the in-process that slides with the great impurity of drenching the packing go up the volume drive to clearance mouth department, then the staff will stop the board and open to can collect these impurity. Before the impurities block the water spraying filler, the impurities on the water spraying filler are cleaned, so that the water spraying filler can be prevented from being blocked by the impurities. Through setting up cleaning device to can conveniently clear up the great impurity of volume on the trickle packs, finally prevent that the trickle packs and is blockked up.
The utility model discloses further set up to: the driving piece including rotate set up in the tower is internal and with the drive lead screw that the clearance board screw thread links to each other and set up in the tower is internal and with the drive draw runner that the clearance board slided and links to each other, the drive draw runner with the drive lead screw is parallel to each other.
Through adopting above-mentioned technical scheme, when needs make the clearance board to drench impurity on the filler and clear up, the staff rotates the drive lead screw, drives the clearance board and slides along the axial of drive lead screw to can drive impurity and remove to clearance mouthful, thereby conveniently clear up these impurity. The driving screw rod drives the cleaning plate to move, the transmission is stable, and the self-locking effect is achieved.
The utility model discloses further set up to: the cleaning plates are two same, left threads and right threads which are opposite in direction are symmetrically arranged on the peripheral side wall of the driving screw rod from the center to two ends, and the two cleaning plates are respectively in threaded connection with the left threads and the right threads of the driving screw rod.
Through adopting above-mentioned technical scheme, set up left hand thread and right hand thread on the drive lead screw to be provided with two clearance boards, when needs clear up the impurity on the trickle packs, the staff rotates the drive lead screw, thereby makes two clearance boards orientation be close to or the direction motion of keeping away from each other mutually, thereby can accelerate the efficiency of clearance impurity.
The utility model discloses further set up to: the barrier plate with the tower body is articulated, be provided with on the tower body with the barrier plate is fixed to be blockked up the setting element of clearance mouth.
Through adopting above-mentioned technical scheme, when needs discharge impurity from clearance mouth, open the setting element, rotate the barrier plate for the barrier plate breaks away from clearance mouth department, then after the impurity clearance finishes, rotates the barrier plate, makes the barrier plate plug up the clearance mouth, then closes the setting element, thereby fixes the barrier plate on the tower body, convenient operation.
The utility model discloses further set up to: the setting element including fixed set up in fixed block on the tower body, slide set up in locating lever on the fixed block and fixed set up in on the barrier plate and supply the position sleeve that the locating lever was pegged graft.
Through adopting above-mentioned technical scheme, when the baffle is opened to needs, the locating lever slides for the locating lever breaks away from the position sleeve, then can make baffle and clearance mouth break away from. When needs make the barrier plate will clear up mouthful stifled dead, through rotating the barrier plate for the barrier plate is pegged graft in the clearance mouth, then the locating lever slides, makes the locating lever peg graft in the position sleeve, thereby prevents that barrier plate and clearance mouth from breaking away from, simple structure, convenient operation, and the location is stable.
The utility model discloses further set up to: an installation cavity is formed in the fixed block, a fixed rod penetrates through the fixed block, a connecting sheet is fixedly connected to the end part of the fixed rod, which is located in the installation cavity, and the connecting sheet is arranged in the installation cavity in a sliding manner; a poking sheet is arranged at one end of the fixed rod, which is far away from the connecting sheet, and a return spring is sleeved on the fixed rod; one end of the reset spring is tightly abutted with the connecting piece, and the other end of the reset spring is tightly abutted with the inner wall of the mounting cavity close to the poking piece; the fixed rod is fixedly connected with the positioning rod, and when the reset spring naturally extends, the positioning rod is inserted into the positioning sleeve.
Through adopting above-mentioned technical scheme, when the staff need make locating lever and position sleeve throw off, the staff overcomes reset spring's elasticity, and the direction pulling that faces away from the connection piece is dialled the movable plate, drives the dead lever and moves together, drives the connection piece and moves towards the direction of dialling the movable plate to compress reset spring, drive locating lever and position sleeve throw off, then rotate the barrier plate, thereby make barrier plate and clearance mouth break away from. When needs close the barrier plate lid in clearance mouth department, rotate the barrier plate earlier for the barrier plate is pegged graft in the clearance mouth, then the staff loosens and dials the piece, and the connection piece receives reset spring's elasticity, drives the dead lever and removes towards the direction of keeping away from dialling the piece, thereby drives the locating lever and pegs graft in the position sleeve, thereby can fix the barrier plate on the tower body. Through setting up reset spring to make the locating lever have the work that resets, the locating lever can be pegged graft in the position sleeve automatically.
The utility model discloses further set up to: a filter plate is fixedly arranged in the tower body and is positioned between the water spraying filler and the water spraying pipe, the cleaning plate is arranged on one side of the filter plate away from the water spraying filler in a sliding manner and is abutted against the filter plate; the filter plate is provided with a plurality of filter holes.
Through adopting above-mentioned technical scheme, waste water is after coming out from the blow off pipe, earlier through the filter plate to can strain the great impurity rubbish of volume on the filter plate, then accumulational rubbish can strike off under the effect of clearance board. The trickle filler is often scraped by the cleaning plate, easily damages. Now, the cleaning plate scrapes off the filter plate, so that when the filter plate can prevent impurity garbage from blocking the water spraying filler, the water spraying filler can be prevented from being damaged, and the service life of the water spraying filler is prolonged.
To sum up, the utility model discloses a beneficial technological effect does:
1. by arranging the cleaning device, impurities with larger volume on the water spraying filler can be conveniently cleaned, and the water spraying filler is finally prevented from being blocked;
2. the driving screw rod is provided with a left thread and a right thread and is provided with two cleaning plates, when impurities on the water spraying filler need to be cleaned, a worker rotates the driving screw rod, so that the two cleaning plates move towards the direction of approaching to or departing from each other, and the impurity cleaning efficiency can be improved;
3. the clearance board strikes off the filter plate to make can prevent that impurity rubbish from blockking up the trickle and filling the damage in, thereby make the life extension that the trickle was filled.
Drawings
FIG. 1 is a schematic structural view of a cooling tower of the present invention for easy cleaning;
FIG. 2 is a schematic cross-sectional view of a cooling tower for easy cleaning, illustrating the structure within the tower body;
FIG. 3 is an enlarged view taken at W in FIG. 2, showing the structure of the drive screw;
FIG. 4 is an enlarged view taken at Z in FIG. 1, illustrating the structure of the positioning member;
fig. 5 is a schematic sectional structure view of the fixing block, which is used for showing the structure of the mounting cavity.
Reference numerals: 1. a tower body; 2. a recovery port; 3. a recovery pipe; 4. a vent; 5. a ventilating fan; 6. water spraying and filling; 71. cleaning the plate; 72. cleaning the opening; 8. a drive member; 81. driving a lead screw; 82. driving the slide bar; 9. a positioning member; 91. a fixed block; 92. positioning a rod; 93. a positioning sleeve; 10. a water spray pipe; 11. a blow-off pipe; 12. an air inlet hole; 13. filtering the plate; 14. mounting grooves; 15. a handle; 16. a blocking plate; 17. a hinge; 18. a mounting cavity; 19. fixing the rod; 20. connecting sheets; 21. a toggle sheet; 22. a return spring; 23. a connecting rod; 24. a spray head; 25. a flare tube; 26. and (4) dividing the tube.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings. In which like parts are designated by like reference numerals. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "bottom" and "top," "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
Referring to fig. 1 and 2, the utility model discloses a cooling tower convenient to clearance, including tower body 1, the tower body 1 is inside to be hollow to the cross section of tower body 1 is the square. The bottom of tower body 1 is fixed and is provided with recovery opening 2, and recovery opening 2 is kept away from the one end fixedly connected with recovery tube 3 of tower body 1. The top end of the tower body 1 is provided with a ventilation opening 4 communicated with the outside, and the opening at the top of the tower body 1 is fixedly provided with a ventilation fan 5. The interior of the tower body 1 is sequentially provided with a water spraying filler 6, a filter plate 13, a water spraying pipe 10 and a sewage discharging pipe 11 along the vertical direction from the recovery port 2 to the ventilating fan 5. The trickle filler 6 is fixedly arranged in the tower body 1, and a plurality of air inlet holes 12 are formed in the inner wall of the tower body 1 between the trickle filler 6 and the recovery port 2. The filter plate 13 is positioned on one side of the water spraying filler 6 far away from the recovery port 2 and is fixedly installed on the side wall inside the tower body 1, and a plurality of filter holes are formed in the filter plate 13.
Referring to fig. 1 and 2, a cleaning device is arranged on the filter plate 13, the cleaning device comprises a cleaning plate 71, a cleaning port 72 and a driving member 8, and the driving member 8 comprises a driving screw 81 and a driving slide bar 82. The two opposite side walls inside the tower body 1 are respectively provided with a mounting groove 14 along the thickness direction thereof, and the driving screw 81 and the driving slide bar 82 are respectively positioned in the two mounting grooves 14. The both ends of drive lead screw 81 all rotate with the inside lateral wall of tower body 1 at both ends through the bearing and link to each other, and tower body 1 is worn out to one of them end of drive lead screw 81, fixedly connected with handle 15 to be provided with opposite direction's left-hand thread and right-hand thread to both ends symmetry from central authorities on the week lateral wall of drive lead screw 81. The driving sliding bar 82 and the driving screw 81 are parallel to each other, and both ends of the driving sliding bar 82 are fixedly connected to two opposite side walls inside the tower body 1, respectively. Two cleaning ports 72 are respectively formed on two opposite side walls of the tower body 1, and the two cleaning ports 72 are located between the driving screw 81 and the driving slide bar 82. The cleaning plate 71 is slidably disposed on the filter sheet 13, and one side of the cleaning plate 71 in the vertical direction abuts against the filter sheet 13. The cleaning plate 71 is connected to a drive slide 82 and a drive screw 81 on both sides in the horizontal direction. The two identical cleaning plates 71 are respectively in threaded connection with the left thread and the right thread of the driving screw 81, and the two cleaning plates 71 are both in sliding connection with the driving sliding rod 82.
Referring to fig. 4, two side walls of the tower body 1 provided with the cleaning opening 72 are both provided with the blocking plates 16, and the two blocking plates 16 are connected with the tower body 1 in the same manner and in the same structure. The blocking plate 16 is rectangular in shape, and the blocking plate 16 is in inserted fit with the cleaning opening 72. One side of the stop plate 16 in the width direction is hinged with the tower body 1 through a hinge 17, the other side is fixed on the tower body 1 through a positioning piece 9, and the positioning piece 9 and the hinge 17 are distributed along the vertical direction. The positioning member 9 includes a fixing block 91, a positioning rod 92, and a positioning sleeve 93. The fixing block 91 is welded on the outer side wall of the tower body 1 and is positioned at one side of the cleaning opening 72 far away from the hinge 17. The positioning sleeve 93 is welded to the blocking plate 16 and is located on the side of the blocking plate 16 remote from the hinge 17. The positioning rod 92 is inserted in the positioning sleeve 93.
Referring to fig. 4 and 5, the fixing block 91 is provided with a mounting cavity 18 therein, and the fixing rod 19 penetrates the fixing block 91. One end of the fixing rod 19 is located in the mounting cavity 18, the other end is located outside the fixing block 91, and the fixing rod 19 is cylindrical in shape. A connecting sheet 20 is welded at one end of the fixing rod 19 positioned in the mounting cavity 18, and the end face of the connecting sheet 20 is circular; the fixed rod 19 is welded with a poking sheet 21 at one side outside the fixed block 91. The fixing rod 19 is sleeved with a return spring 22, and the return spring 22 is positioned in the mounting cavity 18. One end of the return spring 22 is tightly abutted with the connecting piece 20, and the other end of the return spring is tightly abutted with the inner wall of the mounting cavity 18 close to the poking piece 21. The fixed rod 19 is parallel to the positioning rod 92, and the fixed rod 19 is connected with the positioning rod 92 through a connecting rod 23; one end of the connecting rod 23 is fixedly connected with one side of the fixing rod 19 outside the fixing block 91, and the other end is fixedly connected with the positioning rod 92. When the return spring 22 is in the natural extension, the positioning rod 92 is inserted into the positioning sleeve 93.
Referring to fig. 2, a spray pipe 10 is fixedly disposed inside the tower body 1, one end of the spray pipe 10 is located inside the tower body 1, and the other end of the spray pipe 10 is located outside the tower body 1. A shunt pipe 26 is fixedly communicated with one side of the spray pipe 10 positioned in the tower body 1, a plurality of spray heads 24 are fixedly communicated with one side of the shunt pipe 26 facing the filter plate, and the spray heads 24 face the filter plate 13. One end of the spray pipe 10, which is positioned outside the tower body 1, is connected with an external cooling water source. A sewage discharge pipe 11 is fixedly arranged in the tower body 1, one end of the sewage discharge pipe 11 is positioned in the tower body 1, and the other end of the sewage discharge pipe is positioned outside the tower body 1. The waste pipe 11 is located between the vent 4 and the spout 10. The one end fixedly connected with horn pipe 25 that is located tower body 1 of blow off pipe 11, the great one end of horn pipe 25 bore is towards filter plate 13, the less one end of bore and blow off pipe 11 fixed connection. One end of the sewage discharge pipe 11, which is positioned outside the tower body 1, is communicated with a waste water source.
The implementation principle is as follows:
during operation, the ventilating fan 5 is started firstly, waste water needing cooling is discharged from the horn pipe 25 at the sewage discharge pipe 11, meanwhile, an external cooling water source inputs cooling water towards the spray pipe 10, and the cooling water is discharged from the spray head 24 towards the filter plate 13. Waste water contacts with the cooling water, then cools down waste water. The waste water falls on the filter plate 13, then the waste water passes through the filter plate 13 and enters the water spraying filler 6, finally the waste water flows to the recovery port 2 from the water spraying filler 6, and then the waste water after being cooled flows to the recovery pipe 3 from the recovery port 2 and is discharged.
When the impurity garbage on the filter plates 13 needs to be cleaned, a worker rotates the handle 15 to drive the driving screw 81 to rotate, so that the cleaning plates 71 are driven to move from the middle to the two ends. The filter plates 13 are scraped during the movement of the cleaning plate 71, and the scraped garbage and impurities can be brought to the cleaning port 72. When the garbage needs to be discharged from the cleaning opening 72, the worker overcomes the elastic force of the return spring 22 to pull the toggle piece 21 in the direction back to the connecting piece 20, so as to drive the positioning rod 92 to be separated from the positioning sleeve 93, and then the toggle piece 21 is rotated, so that the fixing rod 19 rotates, and the positioning rod 92 moves to the upper side of the blocking plate 16 from the horizontal side of the blocking plate 16. Then the staff rotates the baffle 16 for baffle 16 breaks away from clearance mouth 72, thereby makes clearance mouth 72 be in open state, makes things convenient for clearance board 71 to discharge impurity and rubbish outside tower body 1 from clearance mouth 72.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (7)
1. A cooling tower convenient to clean comprises a tower body (1), wherein a water spraying filler (6) is arranged in the tower body (1), a drain pipe (11) is arranged at the top of the tower body (1), and a water spraying pipe (10) is also arranged at the top of the tower body (1); the bottom of the tower body (1) is provided with a recovery port (2); a vent (4) communicated with the outside is formed in the tower body (1), and the vent (4) is positioned between the water spraying filler (6) and the recovery port (2); the method is characterized in that: a cleaning device is arranged on the water spraying filler (6), and comprises a cleaning plate (71) which is arranged on one side of the water spraying filler (6) far away from the ventilation opening (4) in a sliding manner, a cleaning opening (72) which is arranged on the tower body (1), and a driving piece (8) which drives the cleaning plate (71) to face the cleaning opening (72) and back to the cleaning opening (72) in a sliding manner; the cleaning opening (72) is positioned between the water spraying filler (6) and the water spraying pipe (10), and a blocking plate (16) used for blocking the cleaning opening (72) is arranged on the tower body (1).
2. A cleaning-facilitating cooling tower, as set forth in claim 1, in which: the driving piece (8) including rotate set up in the tower body (1) and with drive lead screw (81) that cleaning plate (71) screw thread links to each other and set up in the tower body (1) and with cleaning plate (71) slide continuous drive draw runner (82), drive draw runner (82) with drive lead screw (81) are parallel to each other.
3. A cleaning-facilitating cooling tower, according to claim 2, wherein: the cleaning plates (71) are two in number, left threads and right threads which are opposite in direction are symmetrically arranged on the peripheral side wall of the driving screw rod (81) from the center to two ends, and the two cleaning plates (71) are respectively in threaded connection with the left threads and the right threads of the driving screw rod (81).
4. A cleaning-facilitating cooling tower, as set forth in claim 1, in which: the blocking plate (16) is hinged to the tower body (1), and a positioning piece (9) used for fixing and blocking the blocking plate (16) to the cleaning opening (72) is arranged on the tower body (1).
5. A cleaning-facilitating cooling tower, according to claim 4, wherein: the positioning piece (9) comprises a fixing block (91) fixedly arranged on the tower body (1), a positioning rod (92) slidably arranged on the fixing block (91), and a positioning sleeve (93) fixedly arranged on the blocking plate (16) and used for the insertion of the positioning rod (92).
6. A cleaning-facilitating cooling tower, according to claim 5, wherein: an installation cavity (18) is formed in the fixed block (91), a fixed rod (19) penetrates through the fixed block (91), the fixed rod (19) penetrates through the installation cavity (18), a connecting piece (20) is fixedly connected to the end part, located in the installation cavity (18), of the fixed rod (19), and the connecting piece (20) is arranged in the installation cavity (18) in a sliding mode; a poking sheet (21) is arranged at one end of the fixing rod (19) far away from the connecting sheet (20), and a return spring (22) is sleeved on the fixing rod (19); one end of the return spring (22) is tightly abutted with the connecting piece (20), and the other end of the return spring is tightly abutted with the inner wall of the mounting cavity (18) close to the poking piece (21); the fixing rod (19) is fixedly connected with the positioning rod (92), and when the return spring (22) naturally extends, the positioning rod (92) is inserted into the positioning sleeve (93).
7. A cleaning-facilitating cooling tower, as set forth in claim 1, in which: a filter plate (13) is fixedly arranged in the tower body (1), the filter plate (13) is positioned between the water spraying filler (6) and the water spraying pipe (10), the cleaning plate (71) is arranged on one side, away from the water spraying filler (6), of the filter plate (13) in a sliding manner, and the cleaning plate (71) is abutted against the filter plate (13); the filter plate (13) is provided with a plurality of filter holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921258072.0U CN210512712U (en) | 2019-08-06 | 2019-08-06 | Cooling tower convenient to clearance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921258072.0U CN210512712U (en) | 2019-08-06 | 2019-08-06 | Cooling tower convenient to clearance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210512712U true CN210512712U (en) | 2020-05-12 |
Family
ID=70587743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921258072.0U Expired - Fee Related CN210512712U (en) | 2019-08-06 | 2019-08-06 | Cooling tower convenient to clearance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210512712U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112393623A (en) * | 2020-11-13 | 2021-02-23 | 阜阳安固锅炉压力容器制造有限公司 | Automatic open cooling tower removes dust |
CN112393624A (en) * | 2020-11-13 | 2021-02-23 | 阜阳安固锅炉压力容器制造有限公司 | Closed cooling tower convenient to adjustment spray angle |
CN112665409A (en) * | 2020-12-22 | 2021-04-16 | 厦门烟草工业有限责任公司 | Cooling tower and refrigeration system |
CN112832320A (en) * | 2020-12-31 | 2021-05-25 | 河南中电投华新电力工程有限公司 | Thermal power plant fault judgment device and detection method using same |
CN113932628A (en) * | 2021-10-22 | 2022-01-14 | 杨伟 | Durable cooling tower |
-
2019
- 2019-08-06 CN CN201921258072.0U patent/CN210512712U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112393623A (en) * | 2020-11-13 | 2021-02-23 | 阜阳安固锅炉压力容器制造有限公司 | Automatic open cooling tower removes dust |
CN112393624A (en) * | 2020-11-13 | 2021-02-23 | 阜阳安固锅炉压力容器制造有限公司 | Closed cooling tower convenient to adjustment spray angle |
CN112393624B (en) * | 2020-11-13 | 2022-08-02 | 阜阳安固锅炉压力容器制造有限公司 | Closed cooling tower convenient to adjustment spray angle |
CN112665409A (en) * | 2020-12-22 | 2021-04-16 | 厦门烟草工业有限责任公司 | Cooling tower and refrigeration system |
CN112832320A (en) * | 2020-12-31 | 2021-05-25 | 河南中电投华新电力工程有限公司 | Thermal power plant fault judgment device and detection method using same |
CN112832320B (en) * | 2020-12-31 | 2022-06-17 | 华新控股(河南)有限公司 | Thermal power plant fault judgment device and detection method using same |
CN113932628A (en) * | 2021-10-22 | 2022-01-14 | 杨伟 | Durable cooling tower |
CN113932628B (en) * | 2021-10-22 | 2024-05-03 | 广东金菱制冷工程有限公司 | Durable cooling tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210512712U (en) | Cooling tower convenient to clearance | |
CN108811453B (en) | Communication box with dust removal heat dissipation function | |
CN114812259A (en) | Cooling tower return water treatment system | |
CN111867327A (en) | Intelligent monitoring system of industrial robot | |
JP2005214600A (en) | Device and method for cleaning air conditioner | |
CN219265016U (en) | Self-cleaning device of cooling tower | |
CN211552520U (en) | Dust protected closed constant current cooling tower | |
CN116475837A (en) | Water-cooling heat dissipation device for numerical control machine tool machining | |
CN112893250B (en) | Medical instrument disinfection cleaning equipment | |
CN209926966U (en) | Air cooler convenient to wash blowdown | |
CN211431946U (en) | Air-cooled cabinet with condensate water treatment device | |
CN207556349U (en) | A kind of heat exchanger with descaling function | |
CN216898510U (en) | Heat exchange device for industrial pipeline | |
CN221515467U (en) | Air inlet filtering structure of air shower | |
CN214582764U (en) | Three-cavity cleaning ball receiving and dispatching device | |
CN220095062U (en) | Low broken perforating device of high toughness tempered glass lid | |
CN219934734U (en) | Steam cooling device | |
CN218461666U (en) | Water circulation cooling and dust removing mechanism of horizontal drilling machine | |
CN214536623U (en) | Compression condensing unit of aluminum row-pipe hot-fluorine defrosting refrigeration system | |
CN218919749U (en) | High-voltage ring network cabinet | |
CN110975247A (en) | Maintenance type basketball cleaning device | |
CN214223273U (en) | Energy-saving central air conditioning ventilation blocks up early warning equipment | |
CN216278530U (en) | Coupling type heat conduction oil pump | |
CN219150714U (en) | Detachable dust removal equipment | |
CN211611672U (en) | Solvent recovery tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200512 |